N4008518R1106-0004.pdf

PDF 59 KB Posted

Attached to
NOTICE OF MACC IDIQ AWARD
Solicitation number
N4008518R1106
Issued by

About this file

N4008518R1106-0004.pdf

View the file

Other files

File Type Posted
N4008518R1106-0007.pdf PDF
N4008518R1106-0006.pdf PDF
N400818R1106-0005.pdf PDF
09_90_00.pdf PDF
3889_1569859_M-501_REV_A.pdf PDF
N4008518R1106_0003.pdf PDF
HVAC_SITE_VISIT_LOG_NECO.pdf PDF
N4008518R1106_0002.pdf PDF
2017Q3_LC_Basemap.pdf PDF
N4008518R1106_0001.pdf PDF
One_Day_Visitor_Pass_Site_Visit.xls XLS spreadsheet
N4008518R1106.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE-DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) NEW CONSTRUCTION, RENOVATION, ALTERATION, AND REPAIR PROJECTS IN THE HAMPTON ROADS INTEGRATED PRODUCT TEAM (IPT) THE AREA OF RESPONSIBILITY (AOR)

The proposal due date remains 15 March 2018 at 2:00pm local time.

See the continuation sheet for all revisions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1106

X 9B. DATED (SEE ITEM 11)

31-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2018

CODE

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1106

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The purpose of this Amendment is to:

1. Revise INSTRUCTIONS TO OFFERORS, 1.1.1 and 1.2.1

2. Revise INSTRUCTIONS TO OFFERORS, 4. EVALUATION FACTORS FOR AWARD, 4.2 Basis of

Evaluation and Submittal Requirements for Each Factor, (a) Price, (1) Solicitation Submittal Requirements:

(iii) Bid Bond.

3. Provide response to all PPIs

4. Provide attachments “09 90 00,” and “3889_1569859_M-501 REV A”

1.1.1 THIS SOLICITATION IS BEING ISSUED AS A TOTAL SMALL BUSINESS SET-ASIDE. THE

NAICS CODE FOR THIS PROCUREMENT IS 238220 AND THE SIZE STANDARD IS $15M.

Offerors that wish to propose as a Joint Venture for this small business set-aside must be in compliance with 13 CFR 121.103(h)(3).

1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS

1.2.1 This solicitation is formatted as a Request for Proposal (RFP) in accordance with the requirements designated by sections of the FAR 15.203. This method permits evaluation of proposals based on price competition, technical merit and other factors; permits impartial and comprehensive evaluation of offerors' proposals; permits discussions if necessary; and ensures selection of the source whose performance provides the best value to the Government. This acquisition will be solicited as a competitively negotiated procurement as a total small business set-aside. Offerors that wish to propose as a Joint Venture for this small business set-aside must be in compliance with 13 CFR 121.103(h)(3).

4.2 . Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price

(1) Solicitation Submittal Requirements:

(iii) Bid bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the offeror identified on the SF1442. In addition, the offeror shall provide a letter from its bonding company confirming that it has a single award bonding capacity of at least $4,000,000 and the ability to bond multiple projects.

Provided are all response to all received PPIs, including those that have been responded to previously. The spreadsheet did not include numbers 15 through 19; no questions/answers have been excluded from this list.

Pre-Proposal Inquiry Submission Form

Reference Inquiry

# Page Section Paragraph

1 11 4.; Factor 1 11

The RFP states:

Experience shall be that of the Offeror, either performed as a prime or a subcontractor. Experience of proposed subcontractors will not be considered.

If we partner/team (not JV) with another contracting firm (not A/E), does the government consider the experience of both firms?

Bid per the RFP

2 8 4.2; a, iii 8

The RFP states:

...the offeror shall provide a letter from its bonding company confirming that it has a single award bonding capacity of at least $10,000,000 and the ability to bond multiple projects.

Is this dollar figure of $10 million correct? For the work to be completed (Size: HVAC work of $25,000 or more.

At least one (1) project must have a final cost for the HVAC work of $400,000 or more. page 10), $10 million bonding is unnecessary.

See Amendment 0004

3 N/A N/A N/A Who is the incumbent? This is a new contract.

4 Factor 1

Factor 1 experience states “ Offeror shall provide a minimum of 3 and maximum of 10 projects __” . However under the JV experience it states that “Offerors are still limited to total of five projects combined “ . It is possible that this could be a typographical error because the attachment A Past performance form has 10 projects .

See Amendment 0001

5 8 4.2(a) vi

The above-referenced solicitation states: "Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website if the Offeror is required to submit." How does each offeror determine whether or not it is required to submit? Also, the VETS-4212 reports for 2017 were required to be submitted by 9/30/17. The 2018 VETS-4212 report has not been issued yet.

Questions regarding whether or not a firm is required to file a VETS- 4212 should be directed to the Department of Labor.

This office does not determined whether or not a firm is required to file a

VETS-4212.

6 9 of 66 Factor 1 a.

Under Factor 1 for Construction and Design Experience, the RFP states:

"Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant construction projects."

However, under Basis of Evaluation of the same section, the RFP states: "The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five

(5) for Construction Experience and five (5) for Design Experience will not be considered."

Please clarify the number of projects that can be submitted and reviewed.

See Amendment 0001

7 9 of 66 Factor 1 a.

Under Factor 1 for Construction and Design Experience, the RFP states:

"Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant construction projects."

However, under Basis of Evaluation of the same section, the RFP states: "The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five

(5) for Construction Experience and five (5) for Design Experience will not be considered."

Please clarify the number of projects that can be submitted and reviewed.

See Amendment 0001

Please provide the Base Standard Specifications package for use on the Seed Project.

Bid per the RFP

If the Base Standard Specifications do not exist, please provide Specification Divisions 01, 09 (Exterior Painting), 22, 23, 26 specific for this Seed Project.

See Amendment 0004

10 M-501 Detail C3

Sheet M-501, Detail C3. Please provide the requirements for: CLEAN, PREPARE, PRIME AND PAINT

EXISITNG STRUCTURAL STEEL

SUPPORTS.

See Amendment 0004

Please provide a contact for the installer and manufacturer of the existing lightning protection system.

Bid per the RFP

Will the reinstalled lightning protection system require recertification?

Bid per the RFP

13 9 Factor 1 Experience a

Solicitation states: "Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant construction projects..." Also states: "Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant projects performed by the proposed design firm as the designer of record..." Then states: "The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five

(5) for Construction Experience and five (5) for Design Experience will not be considered."

Please clarify if offerors can submit up to 5 or up to 10.

See Amendment 0001

14 9 of 66 Factor 1 a.

Under Factor 1 for Construction and Design Experience, the RFP states:

"Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant construction projects."

However, under Basis of Evaluation of the same section, the RFP states: "The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five

(5) for Construction Experience and five (5) for Design Experience will not be considered."

Please clarify the number of projects that can be submitted and reviewed.

See Amendment 0001

1 of 66, 00800

Proposal Acceptance Period is shown in Block 13.D. as 120 calendar days and shown under GENERAL REQUIREMENTS as 105 days from receipt of offers. Which is correct?

See Amendment 0001

21 59 of 66 00800

Please confirm that Liquidated Damages as shown under GENERAL REQUIREMENTS will be $250.00/day for the Seed Project

Bid per the RFP

22 59 of 66 00800

Time for Completion under GENERAL REQUIREMENTS is shown as only 105 calendar days after award. This does not appear to accommodate for contract execution, submittal phase, material procurement or close out for this project. Is the 105 days correct?

See Amendment 0002

Will 23 05 93 Testing, Adjusting and Balancing be required for the Seed Project?

Bid per the RFP

Will 23 08 00 Commissioning of HVAC be required for the Seed

Project?

25 E-401 New Work Notes 1 &

Electrical - Under the description it states to “reuse existing“ - on the electrical drawings they are calling for a new feeder and providing a new breaker. Please clarify.

Reference Documents: Drawing E-401, New work notes 1 & 2. Also on demo note 1 states to remove wiring back to panel MDP. Drawing M-601 it shows MCA at 322A.

Bid per the RFP

Request to extend the deadline to submit PPIs to 1 week after the site visit to obtain answers for any questions that will arise.

See Amendment 0002

Request to extend the RFP closing date to 16 March to allow time for site visit PPIs to be answered and to obtain accurate, competitive pricing.

See Amendment 0002

Will the government provide cleared test reports showing no presence of Legionella bacteria or will this be a requirement of the contractor?

Bid per the RFP

29 M-501 C3 Drawing Sheet M-501, C3; Please specify the required NUTS, BOLTS, AND WASHERS

See Amendment 0004

Is a current HAZMAT Survey available for the work area? If not, would this be the responsibility of the contractor?

Bid per the RFP

Will a full time Superintendent, Quality Control Manager, and Site Safety and Health Officer be required on this project? Each with no other duties (i.e.

no “dual hat” roles)?

Bid per the RFP

32 19 of 66 10 5.3

Para 5.3 indicates all RFI inquiries must be submitted within 14 calendar days prior to the solicitation closing date. The current closing date is 3/6/18 thereby making the RFI cut off date as 2/20/18 in accordance with Para 5.3.

Amd 0001 was issued 2/15/18 establishing the Site Visit date as 2/27/18 which occurs after the indicated RFI cut off date of 2/20/18.

Since a site investigation will not have been performed and resulting questions developed until after 2/20/18 we hereby request that the RFI cut off date be extended at least 1 week beyond the site visit date to allow adequate time for review and submission of any RFI's.

See Amendment 0002

33 SF1442

The SF1442 establishes the bid due date as 3/6/18 at 2pm. Amd 0001 confirms that bid due date remains unchanged. Amd 0001 was not released until 2/15/18 which established a site visit for 2/27/18.

That only leaves 4 business days after the site investigation until the bid due date for the GC to complete their review of the contract documents for pricing , submit any questions presented by the site visit investigation, and for the govt to respond to those questions and any remaining unanswered questions that were not provided in Amd 0001. Seeing that this does not allow adequate time for all of the required actions to be taken after the site visit we hereby request that the bid due date be extended at least 2 weeks from the current date of 3/6/18 to allow adequate time to provide a fair and balanced response to this solicitation.

See Amendment 0002

34 N/A N/A N/A

The solicitation package that has been provided contains drawings for the seed project but no specifications. When will the specifications be provided?

See Amendment 0004

35 N/A N/A N/A

As there are no specifications for the seed project or a Statement of Work specific to the seed project it is not clear on whether commissioning of the new system in accordance with UFGS specifications is required performed by a 3rd party commissioning agent.

Please advise.

Bid per the RFP

36 5 5.3

Per paragraph 5.3 all inquiries are required to be submitted 14 calendar days prior to the solicitation closing date. This requirement would not permit any questions to be submitted after the site visit to be held on February 27. Can the inquiries date be extended to permit questions that are necessary as a result of the site visit?

See Amendment 0002

Cover Letter

13.A

The current proposal due date of March 6, 2018 only provides 6 calendar days after the site visit to prepare price proposal and complete our submission.

It is also precludes any bidder inquiries from being submitted. Would the government extend the proposal due date to at least March 14 and permit bidder inquiries to be submitted

See Amendment 0002 through end of day on Wednesday February 28?

38 M-601 Air Cooled Chiller Schedule

Please provide the ambient dry bulb temperature used for the scheduled chiller performance.

See Amendment 0004 and 12 of the

RFP;

and 5 of Amend ment

Per the RFP, the Contractor and Designer are to complete Construction & Design Experience Project Data Sheet (Attachment A) for the technical proposal, however per Amendment 0001 the Contractor and Designer are to complete Construction & Design Experience Project Data Sheet (Attachment C). Please advise which forms are to be used and/or submitted with the proposal. Please advise if the Contractor and Designer are to complete both Attachments to be submitted with the proposal.

See Amendment 0002

Does control work described on M-401 and M-601 need to be performed by a first-tier subcontractor?

Bid per the RFP

41 11

4.

FACTOR 1

EXPERIE

NCE

(A) Please confirm that Teaming Agreements are not allowed

Bid per the RFP

42 11

4.

FACTOR 1

EXPERIE

NCE

(A)

Please confirm that Joint Ventures must consist of two small businesses with a combined revenue of less than $15M or be in an SBA Approved Mentor- Protégé Joint Venture with a revenue of less than $15M in accordance with NAICS code 238220.

See Amendment 0004

43 11

4.

FACTOR 1

EXPERIE

NCE

(A)

Please confirm that a Joint Venture between a Small Business and a Large Business that are NOT in an SBA Approved Mentor-Protégé Joint Venture is not eligible to submit on this solicitation.

See Amendment 0004.

44 11

4.

FACTOR 1

EXPERIE

NCE

(A) Please define specifically what the minimum available line of credit amount is (i.e. is $500,000 sufficient?).

Bid per the RFP

45 11

4.

FACTOR 1

EXPERIE

NCE

(A)

Please confirm that if an offeror must provide a letter from their bank that states the available amount of borrowing capacity on the offeror’s line of credit.

46 5 of 7 Amendmen t 0002

General Requireme nts

The General Requirements for the project state the time for completion of this project is 145 calendar days from the date of award. We believe that 145 calendar days needs to provide NTP upon receipt of the chiller versus date of award. Upon award, the awarded team will need to provide a Chiller submittal to NAVFAC which we anticipate will take 5 calendar days. At that point the government will typically have 14 days for review. Once released, the expected procurement time frame for the new chiller is 12-14 weeks (84-98 calendar days). WIth that, the amount of time that will be expended prior to beginning significant work would be up to 117 days of the 145 day period of performance. We recommend the Period of Performance be based on an agreed upon NTP date versus from the time of award. Please advise.

See Amendment 0004

47 M401

From the time that the existing chiller is taken offline and removed to the time that the new chiller will be installed and brought back online up to a 10 day shutdown period will be necessary. As this is an occupied building will our proposal need to provide temporary cooling for the facility during this shutdown time frame?

Bid per the RFP

M501/C

M-501 detail C3 states to remove all existing nuts, bolts, and washers from the existing structural steel supports and provide new. Should the new nuts, bolts, and washers be stainless steel or hot dip galvanized?

See Amendment 0004

M501/C

M-501 detail C3 states to Clean, Prepare, Prime, and Paint existing structural steel supports. It was noticed that only certain areas contained rust, primarily at the bolts and from run-off of the chiller. The existing frame is hot dripped galvanized and therefore should not be primed and painted. We recommend in lieu of Prime and Paint to Cold Galvanize Spray. Please advise if this is acceptable and if not what should be done.

See Amendment 0004

Will the government please provide the building including the existing controls as-builts for the existing air cooled chiller and other controlled mechanical equipment?

51 M401

Throughout the project documents, for example M-401 Demolition Key Note #2 it references the existing piping as being 6" steel chilled water piping.

During the site walk it appeared that the chilled water piping was actually 4". Will the government confirm whether the existing chilled water piping is actually 6" or whether it is 4"?

If the existing chilled water piping is 4" is it acceptable to install 4" piping for the new work?

Bid per the RFP

52 M401

The existing insulation on the chilled water piping in the mechanical room is fiberglass insulation. M-401 new work keynote #4 gives direction for the new insulation on chilled water lines on the roof to receive cellular glass insulation.

There is not a detail indicating what is required in the mechanical room.

Please confirm that utilizing fiberglass insulation in the Mechanical Room is acceptable.

See Amendment 0004

What is the government’s allowable duration for a shutdown of the chiller during construction?

Bid per the RFP

Will the team need to bring a temporary chiller online or provide temporary heating/cooling during construction

Bid per the RFP

Is this the primary chiller serving B3889?

Attachments “09 90 00,” and “3889_1569859_M-501 REV A” are made available on NECO.

(End of Summary of Changes)