N4008518R1106_0002.pdf

PDF 53 KB Posted

Attached to
NOTICE OF MACC IDIQ AWARD
Solicitation number
N4008518R1106
Issued by

About this file

N4008518R1106_0002.pdf

View the file

Other files

File Type Posted
N4008518R1106-0007.pdf PDF
N4008518R1106-0006.pdf PDF
N400818R1106-0005.pdf PDF
09_90_00.pdf PDF
3889_1569859_M-501_REV_A.pdf PDF
N4008518R1106-0004.pdf PDF
N4008518R1106_0003.pdf PDF
HVAC_SITE_VISIT_LOG_NECO.pdf PDF
2017Q3_LC_Basemap.pdf PDF
N4008518R1106_0001.pdf PDF
One_Day_Visitor_Pass_Site_Visit.xls XLS spreadsheet
N4008518R1106.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE-DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) NEW CONSTRUCTION, RENOVATION, ALTERATION, AND REPAIR PROJECTS IN THE HAMPTON ROADS INTEGRATED PRODUCT TEAM (IPT) THE AREA OF RESPONSIBILITY (AOR)

The proposal due date has been changed to 13 March 2018.

See the continuation sheet for all revisions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1106

X 9B. DATED (SEE ITEM 11)

31-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Feb-2018

CODE

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1106

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of this Amendment is to

1. change to proposal due date to 13 March 2018,

2. revise Evaluation Non-Price Factor 1,

3. revise the “Time for Completion” under the General Requirements,

4. and provide a revised PPI due date.

Additionally, this amendment provides answers to PPIs 22, 26, 27, 32, 33, 36, 37, and 39.

INSTRUCTIONS TO OFFERORS

5.3 PRE-PROPOSAL INQUIRIES (PPIS)

All inquiries must be submitted in writing and received by the Contract Specialist ten calendar days prior to the solicitation closing date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to Sidnia.finke@navy.mil. Use of the PPI Log template is required. The PPI Log Template (Attachment D) can be found on the NECO website under the Additional Documents section.

Factor 1, Experience

(a) Solicitation Submittal Requirements:

Construction Experience:

Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant construction projects that best demonstrates your experience on relevant projects similar in size, scope, and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: HVAC work of $25,000 or more. At least one (1) project must have a final cost for the HVAC work of $400,000 or more.

Scope: HVAC/Mechanical/Refrigeration systems work to include

Repair Replacement New Installation

Complexity: HVAC/Mechanical/Refrigeration experience to include work in the following areas:

Energy Supply (oil, gas, steam, hot or chilled water supply) Heat Generating Systems (boilers, primary pumps, or auxiliary equipment, etc.)

Cooling Generating Systems (chillers, cooling towers, primary pumps, condensing units, or split system heat pump - outdoor units, etc.)

Distribution Systems (AHUs, FCUs, VAV systems, fans, exhaust fans, supply fans, heat exchangers, pumps, convectors, or duct heaters, etc.)

Terminal & Package Units (PTACs, PTHPs, WSHPs, Package/Rooftop Air Conditioners and Heat Pumps, or Furnaces, etc.)

Controls (DDC, stand-alone or controllers, etc.)

System Testing & Balancing (piping and air system testing and balancing) Commercial Equipment (walk-in refrigerators/freezers, condensers and condensing units for refrigeration systems, display cases, etc.)

Note: The Offeror’s proposal shall, cumulatively, demonstrate experience with all of the types of HVAC work listed under “Scope” and “Complexity.” All elements do not have to have been completed under one project. Offerors should attempt to identify which element(s) of work it believes are addressed in each submitted project.

Projects submitted for the Offeror shall have been completed within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. The Project Data Sheet includes a table with the Scope/Complexity Elements of this Factor in Block 9. The offeror is required to check off all of the Scope/Complexity elements included in the specific project within that table. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods) using the criteria identified above. In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.

Offerors are still limited to a total of ten (10) projects combined. For a JV, the offeror shall submit the signed JV agreement.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

Experience shall be that of the Offeror, either performed as a prime or a subcontractor. Experience of proposed subcontractors will not be considered.

Design Experience:

While the seed project is not design-build, design-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm to be proposed on future projects.

Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC. Provide the full name of the firm, address, DUNS number, and

CAGE code. The designated firm will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offer must provide a supporting signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment with the Architect-Engineer firm that is proposed to be utilized as the Designed of Record (DOR).

Offerors shall submit a minimum of three (3) up to a maximum of ten (10) relevant projects performed by the proposed design firm as the designer of record that best demonstrate your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC.

For purposes of this evaluation, a relevant project is further defined as follows:

Size: HVAC work of $25,000 or more. At least one (1) project must have a final cost for the HVAC work of $400,000 or more.

Scope: HVAC/Mechanical systems work to include

Repair Replacement New Installation

Complexity: HVAC/Mechanical/Refrigeration experience to include work in the following areas:

Energy Supply (oil, gas, steam, hot or chilled water supply) Heat Generating Systems (boilers, primary pumps, auxiliary equipment, etc.)

Cooling Generating Systems (chillers, cooling towers, primary pumps, condensing units, split system heat pump - outdoor units, etc.)

Distribution Systems (AHUs, FCUs, VAV systems, fans, exhaust fans, supply fans, heat exchangers, pumps, convectors, duct heaters, etc.)

Terminal & Package Units (PTACs, PTHPs, WSHPs, Package/Rooftop Air Conditioners and

Heat Pumps, Furnaces, etc.)

Controls (DDC, stand-alone controllers, etc.)

System Testing & Balancing (piping and air system testing and balancing) Commercial Equipment (walk-in refrigerators/freezers, condensers and condensing units for refrigeration systems, display cases, etc.)

In addition, at least one project submitted shall demonstrate the offerors ability to incorporate eOMSI into the project with a final list of equipment installed and equipment removed during the project that is provided to the government.

Note: The Offeror’s proposal shall, cumulatively, demonstrate experience with all of the types of HVAC work listed under “Scope” and “Complexity.” All elements do not have to have been completed under one project. Offerors should attempt to identify which element(s) of work it believes are addressed in each submitted project.

Projects submitted shall have been completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C).

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. The Project Data Sheet includes a table with the Scope/Complexity Elements of this Factor in Block 9. The offeror is required to check off all of the Scope/Complexity elements included in the specific project within that table. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form.

Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor.

(b) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction and five for design. Any projects submitted in excess of the ten (10) for Construction Experience and ten (10) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Offerors that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.

Relevant projects in which the Offerors demonstrates self-performance of the HVAC alteration, renovation, repair, or upgrade work may be considered more favorably than those that have not self-performed HVAC alteration, renovation, repair or upgrade work.

Relevant projects that were completed within the Hampton Roads Area of Virginia may be considered more favorably than those that were completed outside of the Hampton Roads Area of Virginia.

Offerors who demonstrate experience with special cooling systems and devices, dust and fume collectors, special humidity controls, or paint spray booth ventilation may be considered more favorably then offerors without such experience.

GENERAL REQUIREMENTS:

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within 145 calendar days after award (includes 15 calendar days for submission and approval of bonds and insurance).

PREPROPOSAL INQUIRIES 22, 26, 27, 32, 33, 36, 37, and 39

Reference

Inquiry Government’s

Response Number

Page Section Paragraph

59 of

00800

Time for Completion under GENERAL REQUIREMENTS is shown as only 105 calendar days after award. This does not appear to accommodate for contract execution, submittal phase, material procurement or close out for this project. Is the 105 days correct?

See Amendment

Request to extend the deadline to submit PPIs to 1 week after the site visit to obtain answers for any questions that will arise.

See Amendment

Request to extend the RFP closing date to 16 March to allow time for site visit PPIs to be answered and to obtain accurate, competitive pricing.

See Amendment

19 of

10 5.3

Para 5.3 indicates all RFI inquiries must be submitted within 14 calendar days prior to the solicitation closing date. The current closing date is 3/6/18 thereby making the RFI cut off date as 2/20/18 in accordance with Para 5.3. Amd 0001 was issued 2/15/18 establishing the Site Visit date as 2/27/18 which occurs after the indicated RFI cut off date of 2/20/18. Since a site investigation will not have been performed and resulting questions developed until after 2/20/18 we hereby request that the RFI cut off date be extended at least 1 week beyond the site visit date to allow adequate time for review and submission of any RFI's.

See Amendment

SF144

The SF1442 establishes the bid due date as 3/6/18 at 2pm. Amd 0001 confirms that bid due date remains unchanged. Amd 0001 was not released until 2/15/18 which established a site visit for

2/27/18. That only leaves 4 business days after the site investigation until the bid due date for the GC to complete their review of the contract documents for pricing , submit any questions presented by the site visit investigation, and for the govt to respond to those questions and any remaining unanswered questions that were not provided in Amd 0001.

Seeing that this does not allow adequate time for all of the required actions to be taken after the site visit we hereby request that the bid due date be extended at least 2 weeks from the current date of 3/6/18 to allow adequate time to provide a fair and balanced response to this solicitation.

See Amendment

5 5.3

Per paragraph 5.3 all inquiries are required to be submitted 14 calendar days prior to the solicitation closing date. This requirement would not permit any questions to be submitted after the site visit to be held on February 27. Can the inquiries date be extended to permit questions that are necessary as a result of the site visit?

See Amendment

Cover Letter

13.A

The current proposal due date of March 6, 2018 only provides 6 calendar days after the site visit to prepare price proposal and complete our submission. It is also precludes any bidder inquiries from being submitted. Would the government extend the proposal due date to at least March 14 and permit bidder inquiries to be submitted through end of day on Wednesday February 28?

See Amendment

Page 10 and 12 of the

RFP;

and 5 of Amen dment

Per the RFP, the Contractor and Designer are to complete Construction & Design Experience

Project Data Sheet (Attachment A) for the technical proposal, however per Amendment 0001 the Contractor and Designer are to complete Construction & Design Experience Project Data

Sheet (Attachment C). Please advise which forms are to be used and/or submitted with the proposal.

Please advise if the Contractor and Designer are to complete both Attachments to be submitted with the proposal.

See Amendment

(End of Summary of Changes)