Amendment_0001.pdf

PDF 37 KB Posted

Attached to
AWARD OF MACC CONTRACTS UNDER SUBJECT SOLICITATION
Solicitation number
N4008518R0605
Issued by

About this file

Amendment_0001.pdf

View the file

Other files

File Type Posted
UNIT_PRICE_SCHEDULE_ATTACHMENT_A1.pdf PDF
Amendment_0006.pdf PDF
0005.pdf PDF
PPI_Photos_B-6101.pdf PDF
09_90_00_spec_4-2-18.pdf PDF
Amendment_0003.pdf PDF
AMendment_2.pdf PDF
Attachment_A_Price_Proposal_Form.pdf PDF
Attachment_B_-_TRI-COMMAND_SPECIFICATION.pdf PDF
Attachment_C_-_Wage_Rate_GD_SC180015.docx DOCX document
Solicitation_0605.pdf PDF
Attachment_A_-_Construc_Exp_Proj_Data_Sheet.docx DOCX document
Attachment_C_-_ODP_Request.xls XLS spreadsheet
Attachment_B_-_Past_Perf_Questionnaire.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to incorporate the seed project requirements w ith all associated documents. Site visit information is included herein.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Feb-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R0605

X 9B. DATED (SEE ITEM 11)

23-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Feb-2018

CODE

NAVFAC MID ATLANTIC

MARINE CORPS IPT

9324 VIRGINIA AVE

NORFOLK VA 23511

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R0605

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-18-R-0807 NAVFAC MCRD Project No.: 1064871 NAVFAC MCRD Tri-Command Specifications: 1064871

Project Title: Prepare, Repair and Paint Thunderdome Buildings #925 and #6101

Location of the Work: Marine Corps Recruit Depot (MCRD), Parris Island, SC

Description of the Work: Contractor to furnish all labor, tools, equipment, materials, testing, transportation, permits, licenses, and qualified supervision to prepare, repair, prime and paint Building #925 and Building #6101 at MCRD, Parris Island, South Carolina. Additional details of the work to be completed are listed in Attachment B – Tri-Command Specification.

Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $100,000.00 and $250,000.00.

Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government desires completion of construction within one hundred fifty

(150) calendar days after award (includes fifteen (15) calendar days for submission and approval of bonds and insurance).

Wage Determination: Department of Labor (DoL) General Decision Number SC180015 01/12/2018 sc15 applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated at the time of award.

Liquidated Damages: In accordance with FAR Clause 52.211-12 - Liquidated Damages – Construction (SEP 2000), liquidated damages shall be assessed as stated below for the Seed Project construction schedule:

CLIN 0001: $200.00*

*- The amount of liquidated damages will be based upon the total estimated construction price, and will be addressed at the time for soliciting each additional task order issued from any contract awarded from this solicitation.

Utilities: In accordance with FAR 52.236-14 - Availability of Utilities (APR 1994), when available, the Government will provide reasonable amounts of electric, water and compressed air for the work to be performed under this contract and charged to the contractor. The Government will provide utilities to the contractor under this seed project.

Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for Construction Record Drawings, record shop drawings are required.

Reproducible copies of these record drawings are also required.

Evaluation Factors for Award: Refer to Section 00010 - Bidding Schedule/Instructions to Bidders of the SF1442, Instruction to Offerors, 5. Evaluation Factors for Award.

Bond Requirements: Submit Bid Guarantee in accordance with 52.228-1 BID GUARANTEE (Sept 1996) –and submit Performance and Payment Bonds within ten (10) calendar days after date of award in accordance with 5252.228-9305 NOTICE OF BONDING REQUIREMENTS, PERFORMANCE AND PAYMENT BONDS (DEC 2000).

Proposal Acceptance Period: Proposal acceptance period shall be one hundred twenty (120) calendar days from receipt of offers.

Pursuant to FAR 52.232-18, Availability of Funds, the Government's obligation under this solicitation, or any task order or contract that might result from the solicitation is entirely subject to, and contingent upon, the availability of appropriated funds. Should the Government be unable to award the seed project, the Government guarantees an award in the amount of $2,000.00 to each successful offeror upon award of the Multiple Award Construction Contracts. This minimum guarantee is over the full term of the contract, including option years. No legal liability on the part of the Government shall arise until funds are made available to the Contracting Officer and a task order or contract is awarded by the Contracting Officer. Any offeror proposing on this solicitation does so at its own cost and with the full knowledge that a task order for the seed project, might not result from this solicitation.

Site Visit:

Date & Time: Wednesday, March 7, 2018 2 10:00 am EST

Meeting Location: NAVFAC MID-LANT FEAD, 62 Atsugi Street, Bldg. 852, Conference Room 113, Marine Corps Recruit Depot (MCRD), Parris Island, SC 29905

SITE VISIT POINT OF CONTACT: Christopher J. Grubbe, Contracting Officer (843) 228-3981 email: Christopher.grubbe@navy.mil or Michael T. Ursetti, Contract Specialist (843) 228-3970 email: michael.t.ursetti@navy.mil

Special Instructions : Contractors are limited to a maximum of two (2) representatives for this site visit. The Conference Room will be made available starting at 09:45 hours and the Site Visit meeting will start at 10:00 am and then a walk-through of the two Buildings will commence. .

SITE VISIT REQUEST FORMAT: CONTACTORS SHALL SUBMIT THE FOLLOWING

INFORMATION ON COMPANY LETTERHEAD AS FOLLOWS:

COMPLETE NAME OF INDIVIDUALS ATTENDING SITE VISIT(MAXIMUM 2)

DATE OF BIRTH OF INDIVIDUALS

Example - Full Name: JOHN JAMES DOE JR. DOB: 1 January 2018

SUBMIT THE ABOVE INFORMATION BY EMAIL, NO LATER THAN MARCH 2, 2018

10:30 A.M. (Eastern Time) , TO AMANDA.BRICKER@NAVY.MIL TO ENSURE ACCESS

Pre-Proposal Inquiries (PPIs): Submit in accordance with Section 00010 - Bidding Schedule/Instructions to Bidders of the SF1442, Instruction to Offerors, 6.3 Pre-Proposal Inquiries (PPIs).

Proposal Due Date: Thursday, March 29, 2018 no later than 2:00 pm Eastern. LATE

PROPOSALS WILL NOT BE CONSIDERED.

Proposal Delivery Information: Proposals may arrive via U. S. mail, express mail carrier or hand delivery to the following address:

Naval Facilities Engineering Command, Mid-Atlantic Marine Corps IPT, Acquisition 9324 Virginia Avenue Building Z-140, Room 114 Norfolk, Virginia 23511-3624 Attn: Elizabeth Carmack, Code OPQA1

ATTACHMENTS:

(A) PRICE PROPOSAL FORM

(B) TRI-COMMAND SPECIFICATIONS

(C) WAGE DETERMINATION

All attachments will be provided under the “additional document” link on NECO.

(End of Summary of Changes)

File details come from the government source that posted it.