Amendment_0006_Lead_Report_170019.pdf

PDF 1 MB Posted

Attached to
Project 170019, Interior and Exterior Repairs, BEQ M440, MCB Camp Lejeune (Camp Johnson), North Carolina
Solicitation number
N4008518B6151
Issued by

About this file

Amendment_0006_Lead_Report_170019.pdf

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Client:

Mr. Randy Alvar Project Manager CEMS Engineering 320-C Midland Parkway Summerville, SC 29485

Submitted Electronically: ralvar@CEMS-ae.com

Project:

Lead Base Paint Inspection

M440 - BEQ

Camp Lejeune, North Carolina

Dear Mr. Alvar:

Crystal Coast Environmental, Inc. (CCEI) was retained to conduct a lead base paint

(LBP) inspection at the project identified above. The inspection consisted of visible and accessible interior and exterior surfaces coated with paint.

Background information on the Site and a summary of the inspection are provided below. CCEI’s services are subject to the Terms and Conditions to the Limitations and Service Constraints in Attachment A. The results of the inspection are presented in the attachments to this report.

LEAD SURVEY

CCEI conducted a LBP inspection to identify building components that may be impacted during scheduled renovations and may have lead-containing surface coatings.

The LBP inspection was performed on June 16, 2017, by Mr. Robert Elbertson of

CCEI. The inspection was conducted by visually assessing areas of concern that may have surface coatings that are suspected to contain lead. Suspected materials coated with LBP were analyzed for total lead content (reported in total percent by weight) by Flame Atomic Adsorption Spectrometry (AAS) in accordance with U.S.

EPA Method 7420, SW 846-3050B/7000B. Strict Quality Control/Quality Assurance provisions were adhered to for analysis of all lead samples. from a wall, door frame, window sill, and baseboard. The results of the LBP inspection are presented in the attachments to this report as follows.

Crystal Coast Environmental, Inc.

10302 Bristow Center Dr.

Suite 115

Bristow, VA 20136

Tel: 910.938.7998

Fax: 910.938.3441 www.cceinc.biz

ENVIRONMENTAL

Date:

June 29, 2017

Contact:

Robert Elbertson

Phone:

910.330.7410

Email:

relbertson@cceinc.biz

Our ref:

17-5033

June 29, 2017

Attachment A – CCEI Limitations and Service Constraints

Attachment B – Laboratory Results

Attachment C – Sampling Locations

Attachment D – Photographic Log

FINDINGS

Based on the results of the investigation, the following painted components were identified as LBP:

Red in color interior doors.

Yellow in color interior door frames

If analysis was conducted by a laboratory: 0.5% by weight or 5,000 parts per million

(ppm).

The Occupational Safety and Health Administration (OSHA) Lead in Construction standard does not define lead paint based on content. Any detectable lead in paint makes it lead paint for purposes of complying with OSHA regulations to determine worker exposure.

CONCLUSIONS

Based upon the results of the inspection, the samples are reported as not containing detectable quantities of lead. The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required

The remaining samples are reported as not containing detectable quantities of lead.

The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required.

CLOSING

Should you have any questions regarding this report, or if CCEI can be of further assistance, please feel free to contact CCEI at (910) 938-7998.

June 29, 2017

Sincerely, Crystal Coast Environmental, Inc.

Robert Elbertson Operations Manager

Attachments

A. CCEI Limitations and Service Constraints

B. Laboratory Results

C. Sampling Locations

D. Photographic Log

Limitations and Service Constraints

The opinions, conclusions and recommendations presented in this report are limited to the information obtained during the performance of the specific scope of service identified in the report. To the extent that

Crystal Coast Environmental, Inc. (CCEI) relied upon any information prepared by other parties not under direct contract to CCEI, no representation as to the accuracy or completeness of such information is made. This report is an instrument of professional service and the services described in the report were performed in accordance with generally accepted standards and level of skill and care ordinarily exercised by members of the profession working under similar conditions including comparable budgetary and schedule constraints. No warranty, guarantee or certification express or implied, is intended or given with respect to CCIE’s services, opinions, conclusions or recommendations. This statement is in lieu of any other statement either expressed or implied.

CCEI’s observations, the results of testing and CCEI’s opinions, conclusions and recommendations apply solely to conditions existing at the specific times when and specific locations where CCEI’s investigative work was performed. Observation and testing activities such as those conducted by CCEI are inherently limited and do not represent a conclusive or complete characterization. Conditions in other parts of the project site, building or area may vary from conditions at the specific locations where observations were made and where testing was performed by CCEI. Additionally, other building material hazards which were not identified by CCEI, may also be present in the indoor air, un-accessed areas and in walls, ceilings, cavities and floors. Therefore, the extent of CCEI’s opinions, conclusions and recommendations are limited and 100% confidence in these opinions, conclusions and recommendations cannot reasonably be achieved. Nothing contained in this report shall relieve any other party of its responsibility to abide by contract documents and applicable laws, codes, regulations, or standards nor shall it be considered medical advice or consultation.

This report may document whether work conducted by CCEI or under CCEI’s observation was done so in accordance with applicable regulatory standards. In the absence of standards such as is often the case for microbial assessment and abatement, this report may not be construed as providing clearance, approval, or authorization for use or re-occupancy of a given structure. Actual site conditions and quantities should be field verified and unless expressly stated.

This report is expressly for the sole and exclusive use of the party for whom this report was originally prepared for and for the particular purpose outlined in the report. Only the party for whom this report was originally prepared and/or other specifically named parties have the right to make use of and rely upon this report. Reuse of this report or any portion thereof for other than its intended purpose, or if modified, or if used by third parties, shall be at the user’s sole risk.

Weight

Attn:

Address: 10302 Bristow Center Dr Order #: 218422

#115

Project: M440

Bristow, VA 20136

Crystal Coast Environmental (3425)Customer:

17-5033Number: PO Number:

Received 06/20/17

Matrix Paint

% / Wt. RL*Total µg

Cust. Sample ID

Parameter

Sample ID Location

Schneider Laboratories Global, Inc 2512 W. Cary Street • Richmond, Virginia • 23220-5117 804-353-6778 • 800-785-LABS (5227) • Fax 804-359-1475

06/20/17

Location: Camp Lajene, NC

Analyzed

06/20/17Reported

Sample Date

Conc.Method

Analysis Report

Door/Frame- Barracks 06/16/17440-PB-01218422-001 318 mg

3.61 % 1570 mg/kg11500 µgEPA 7000B / 3050B 36100 mg/kgLead

Walls- Barracks 06/16/17440-PB-02218422-002 320 mg

2.31 % 781 mg/kg7400 µgEPA 7000B / 3050B 23100 mg/kgLead

Door- Hallways 06/16/17440-PB-03218422-003 340 mg

0.0204 % 29.4 mg/kg69.4 µgEPA 7000B / 3050B 204 mg/kgLead

Door Frame- Hallways 06/16/17440-PB-04218422-004 316 mg

0.00887 % 31.6 mg/kg28.0 µgEPA 7000B / 3050B 88.7 mg/kgLead

Analyst: ESB

218422-06/20/17 04:30 PM

Analyst

Reviewed By: Omar Elshowaya

Federal Lead Paint Statute

Location UnitClearance

Lead in paint by weight < 0.50 %

Lead in paint as PPM < 5000 mg/kg

Minimum reporting limit: 10.0 µg. Concentration and *Reporting Limit (RL) based on weights provided by client. All internal QC parameters were met. Unusual sample conditions, if any, are described. Values are reported to three significant figures. PPM = mg/kg | PPB = µg/kg. The test results reported relate only to the samples submitted. AIHA-LAP, LLC accredited for Lead.

SHEET NO.

JOB NO.

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0019

INTERIOR & EXTERIOR

REPAIRS AT BEQ M440

AS101

06/01/17

HAZARDOUS

MATERIALS

ABATEMENT FIRST

FLOOR PLAN

NO

. DATE DESCRIPTION

SCALE: 1 : 280

FIRST FLOOR PLAN

PLAN NORTH

440-Pb-01 (-)

440-Pb-02 (-)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0019

INTERIOR & EXTERIOR

REPAIRS AT BEQ M440

AS102

06/01/17

HAZARDOUS

MATERIALS

ABATEMENT SECOND

FLOOR PLAN

NO

. DATE DESCRIPTION

SCALE: 1 : 280

SECOND FLOOR PLAN

PLAN NORTH

440-Pb-03 (+)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0019

INTERIOR & EXTERIOR

REPAIRS AT BEQ M440

AS103

06/01/17

HAZARDOUS

MATERIALS

ABATEMENT THIRD

FLOOR PLAN

NO

. DATE DESCRIPTION

PLAN NORTH

SCALE: 1 : 280

THIRD FLOOR PLAN

440-Pb-04 (+)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0019

INTERIOR & EXTERIOR

REPAIRS AT BEQ M440

AS104

06/01/17

HAZARDOUS

MATERIALS

ABATEMENT ROOF

PLAN

NO

. DATE DESCRIPTION

SCALE: 1 : 280

ROOF PLAN

PLAN NORTH

Building M440 (BEQ), Camp Lejeune, NC

17-5033 Page 1 of 1

View of the Front of the Building Pb-1: Door / Door Frame

Pb-2: Wall Pb-3: Door (Hallways)

Pb-4: Door Frames (Hallways)

File details come from the government source that posted it.