AQQR5338737 170019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project 170019 Interior & Exterior Repairs, BEQ M440
The time and date for the receipt of bids are extended.
This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge this amendment may constitute grounds for rejection of the bid.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518B6151
X 9B. DATED (SEE ITEM 11)
04-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Apr-2018
CODE
NAVFAC MID ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518B6151
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
1. The drawings attached with this amendment are hereby incorporated into the solicitation project requirements.
2. Question: Is Air Barrier Testing required?
Answer: No
3. Question: S-101 & 4/A-502 & 3/A-103 – Please provide a detail of how the steps up to the catwalk, and the lower landing on which the steps rest are to be constructed.
Answer: Construct catwalk, platforms and steps with ¾” plywood and 2x lumber. See Sheet S-
4. Question: Drawing A-103 – Is the Standing Seam Metal Roof to be installed over a structural metal deck, or directly to the roof purlins?
Answer: See structural drawings
5. Question: Drawing S-001, note 14, directs that the roof sheathing is wood; 1/A-502 detail does not give sufficient detail of the roof sheathing or decking. Please provide a clarification of the requirement for the decking & roofing configuration, and specifications for what is required.
Answer: Disregard note 14
6. Question: Drawings M-601 & 2/A-502 – Please provide the lover sizes required for the
Side-Wall Louvers. Please provide details of any duct-to-louver attachments required.
Answer: Provide gable louver approximately 14’-0” W x 3’-0” H. Coordinate with truss manufacturer and field measure.
7. Question: Drawings A-102 & 7/A-402 – Please provide a BOD manufacturer and
Specifications for the Metal Panel Ceilings.
Answer: Provide factory prefinished 24 gauge flush metal panel with concealed fasteners similar to Fabral Décor-Flush panel.
8. Question: Please provide the construction requirements for the Attic Draft Stops. With what materials are these to be constructed? Is the sheathing to be on one side of the Draft Stop or on both sides? Are these Draft Stops to be rated?
Answer: See sheet S-102 and S-301. Draft stops are not rated.
9. Question: Please confirm that the doors and frames in these Draft Stop walls are to wood, as noted in the Door Schedule.
Answer: Provide per contract documents
10. Question: Please confirm that Doors 100B, 200B, 245A, 300B, are to have Type N Door
Frames.
11. Question: The specs indicate that the frames are to be level 1 (20 gauge) and the doors are to be level 2 (18 gauge) . While a 18 door would work a 20 gauge frame is relatively weak considering the amount of usage these doors will be taking. Typical projects aboard Camp Lejeune are at least 16 gauge frames and 16 gauge doors. Please advise if we can price 16 gauge for frames and doors in lieu of 20 gauge frames and doors.
Answer: Revise Door Classification to Level 3 Extra Heavy-Duty Doors for all doors and revise Frame Classification to Level 3 for all frames.
12. Question: What are the dimensions of the shower stalls to be abated?
Answer: This requirement is shown on the contract drawings.
13. Question: What is the total number of shower stalls?
14. Question: How thick is the shower membrane ?
Answer: Existing shower membrane to be abated is unknown.
15. Question: What is the subfloor? Concrete? Wood?
Answer: This condition is shown on the contract drawings.
16. Question: Where are the water supply lines and drain pipes for the showers located?
17. Question: Drawing 2/S-302 shows new Masonry infill around exterior door and window openings. When the existing masonry is demolished, can this be done by saw-cutting in a vertical line (as shown on this detail), or is the infill required to be “toothed in” for both the CMU and brick veneer?
18. Question: Drawing A-503, showing the new Walkway Railings, has a railing profile of a welded extruded aluminum railing; the specification 05 52 00 indicate the handrails are to be hot-dipped galvanized steel handrails. Please clarify the requirement for the new handrails.
19. Question: Drawing S-502 shows structural steel reinforcing around openings in the
Coreslab roof and floor slabs; however, the drawings do not show clearly the number and size of the openings that will require the reinforcing. Would you please provide clarification on the number and sizes of these openings?
Answer: Coordinate with Mechanical drawings.
20. Question: Drawing 3/A-401 shows a detail section of the Washing Machine Chase walls.
Do the walls require sound batt insulation? Insulation is drawn but not noted.
Answer: Insulation is not required in the Washing Machine Chase.
21. Question: Drawing 3/A-401 shows a detail section of the Washing Machine Chase walls.
Do the walls require a covering on the interior of the chase walls? There is no interior covering noted.
Answer: No
22. Question: Drawing 6 & 7/A-401 shows “Insulated Magnetic Gasket” around all 3 sides of the Dryer Wall Opening. Since the dryers are not in this contract (Note A11, A-401), will these “Insulated Magnetic Gaskets” be provided with the dryers, or are they required by the contractor?
Answer: The Contractor shall provide gaskets.
23. Question: Drawing 2/A-401 and 6 & 7/A-401 shows different construction materials & methods for the Dryer Chase Walls. Please clarify which detail is required. (Since ceramic or porcelain tile is not shown on the finish schedule for the laundry room, is the Fiber Cement Board required?)
Answer: Provide cased openings constructed with fiber cement trim boards (similar to Hardie, not fiber cement tile backerboard)
24. Question: Drawing 2/A-405 – The Drawing shows a ceiling access panel that is about 32” X
44” per the scale; however, the specifications specify both 12” X 12” and 14” X 14” access panels. Please clarify the size of access panes required.
Answer: Provide 42” x 48” access panel at all sleeping room soffits.
25. Question: Specification 06 41 16,2,1,1,2 calls for a face frame on the vanity cabinets;
however the cabinets are shown to be Plastic Laminated and can only be frameless construction. Please clarify the cabinet requirement.
Answer: Provide frameless construction
26. Reference Specification 23 73 33 HEATING, VENTILATING, AND COOLING
SYSTEMS, paragraph 1.3 SUBMITTALS. Submit Equipment Layout Drawings for all mechanical spaces.
27. Reference Specification 23 07 00 INSULATION OF MECHANICAL SYSTEMS, paragraph 2.2.1 Duct Insulation in Concealed Spaces, Mechanical Rooms, and Attics:
Minimum blanket insulation thickness is 1” for ductwork in concealed spaces.
28. Reference Specification 23 07 00 INSULATION OF MECHANICAL SYSTEMS, Table 1
Piping Insulation Wall Thickness: Minimum insulation thickness for HHW piping concealed within sleep room soffits is 1”.
29. Reference Specification 08 71 00 DOOR HARDWARE. Door closers shall be Series
CO2000 door closers with arms for interior mount.
30. Omit two (2) courses of CMU at closet wall above doors, down to 7’-4” high. See Detail
12/A-404
31. Access panel in sleeping room soffits shall be 42”x48”. Provide 11-gauge suspension wires at the four (4) corners.
32. Layout sleeping room soffit framing members perpendicular to the chase to provide space between framing members for perpendicular pipe and conduit to run between framing.
33. E-501 On lighting fixture schedule, change type ‘G’ fixture to LED type, Pearlescent lens, Dark Bronze finish, 16 watt 3500K LED, multi-volt, with LED emergency battery backup.
Basis of design is ‘Kenall S711D-P-DB-16L35K-DV-LEL-SA’.
34. Contractor to provide and install a dedicated 20A, 120VAC circuit, including 20A circuit breaker, 3/4" EMT conduit, #12 conductors and duplex receptacle, for the refrigerator/microwave combo unit. Provide the dedicated circuit breaker in the power panels associated with the respective sleeping room. Circuit breaker to match type and KAIC rating of other 20A circuit breakers. Location of the duplex receptacle shall be at end of the closets on the main wall. Exact location to be field determined.
35. AD103: Omit lamps from Furniture General Note 1. The KTR shall dispose of the lamps along with the mattresses, wardrobes, mirrors, area rugs, draperies, and comforters as stated in Furniture General Note 3.
36. AD103: Omit Stored Furniture Requirements note 7- “Furniture-Deduct Line Item: The
Contractor shall move all the sleeping room metal secretaries, metal racks, metal desks, and night tables to the treatment and processing (T&P) lot on Piney Green Rd.”
37. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 04-May-2018 02:30 PM to 10-May-2018 02:30 PM.
(End of Summary of Changes)