RM09-1862 DESIGN BID BUILD, HANGAR 200 FIRE PROTECTION & STRUCTURAL REPAIRNAS OCEANA, VIRGINIA BEACH, VIRGINIA
Solicitation number
N4008513R7758
Issued by

About this file

Amendment attachment RM09-1862 Hangar 200 Price Proposal Form 7-30-13

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RM09-1862, Design Bid Build, Hangar 200 Solicitation No.: N40085-13-R-7758 Fire Protection & Structural Repairs, NAS Oceana, Virginia Beach, Virginia

ATTACHMENT A

PRICE PROPOSAL FORM - REVISED 7-30-13

The proposed price shall be the lump sum price for the following items:

ITEM 0001 BASE PRICE

0001A. Price for the entire work, complete in accordance with the drawings and specifications, but excluding work described in Bid Item 0001B, 0001C, 0002, 0003, and 0004.

TOTAL PRICE FOR ITEM 0001A: $____________

0001B. Price for exterior precast concrete repairs, exterior cast in place concrete repairs, and exterior CMU repairs complete in accordance with drawings and specifications and in accordance with the following schedule:

ITEM UNIT UNIT PRICE NO. UNITS EXTENSION

Exterior Concrete SF $ 2325 $ Building Repairs

Exterior Concrete LF $ 2450 $ Crack Repair

Exterior CMU LF $ 725 $ Crack Repairs

TOTAL PRICE FOR ITEM 0001B: $____________

0001C. Price for Hangar Door Structural Steel Repair of 2000 LF in accordance with drawings and specifications and in accordance with the following schedule:

ITEM UNIT UNIT PRICE NO. UNITS EXTENSION

Hangar Door LF $ 2000 $ Steel Repair

Hangar Door SF $ 2750 $ Steel Sheeting Repair

TOTAL PRICE FOR ITEM 0001C: $____________

TOTAL BASE PRICE ITEMS 0001A – 0001C: $____________

ITEM 0002 – Option No. 1. Price for adding work in connection with interior painting complete in accordance with drawings and specifications. Panting of existing interior partitions in the 01 (first floor), 02 (second floor) and mezzanine levels of the support spaces and work associated with the painting on interior walls. This Additive Item excludes the painting of the Hangar Bay walls and ceilings as that work is part of the Base Price.

TOTAL PRICE FOR ITEM 0002: $____________

ITEM 0003 – Option No. 2: Price for adding work in connection with carpet replacement complete in accordance with drawings and specifications. Carpet replacement includes removal of existing carpet and wood flooring in 02 and mezzanine spaces and installation of new carpet tile over the existing VCT substrate and work associated with the installation.

TOTAL PRICE FOR ITEM 0003: $____________

ITEM 0004 – Option No.3: Price for adding work in connection with removal of VCT substrate under new carpet tiles and proper abatement of VCT that contains Asbestos in accordance with drawings and specifications. See the Asbestos and Lead Based Paint Survey in Appendix A of the specifications. This Additive Items includes the removal of all VCT substrate and associated substrate patching and repair work in areas of new carpet tile installation.

TOTAL PRICE FOR ITEM 0004: $____________

TOTAL PRICE FOR ITEMS 0001 - 0004: $____________

CONTRACT LINE ITEM NOTES

General

1. FAR 52.217-5, Evaluation of Options (Jul 1990) – Except when it is determined in accordance with

FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.

Evaluation of options will not obligate the Government to exercise the option(s).

2. In accordance with FAR 52.215-1, The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

3. In accordance with FAR 52.217-7, the Government reserves the unilateral right to award all options to the contractor at the proposed price within 60 calendar days after contract award.

4. In accordance with FAR 52.228-15, if an option is exercised after award and the contract price increases, an additional amount equal to 100 percent of the increase is required for the Performance and Payment Bonds.

5. Unit Prices: The unit prices provided will be the basis for the adjustment in accordance with FAR 52.211-18, Variation in Estimated Quantity.

6. For Items 0001B, 0001C, bidders shall enter unit prices and/or extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If a bidder provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

AMENDMENTS ACKNOWLEDGED

Amendment No. Date Amendment No. Date Amendment No. Date

Offeror:

Name:

Signed:

Date: