Appendix_B_-_Fire_Protection_Phasing_Plan.pdf

PDF 505 KB Posted

Attached to
RM09-1862 DESIGN BID BUILD, HANGAR 200 FIRE PROTECTION & STRUCTURAL REPAIRNAS OCEANA, VIRGINIA BEACH, VIRGINIA
Solicitation number
N4008513R7758
Issued by

About this file

Amendment attachment Appendix B - Fire Protection Phasing Plan

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX B – Fire Protection Phasing Plan

Temporary feed from existing underground to new overhead main during upper half/phase of work (Lower half is still occupied).

This section's two foam systems are out of service for work in upper half of bay.

3 Trench systems to remain in service.

Temporary feed from existing underground to new overhead main during lower half/phase of work (Upper half is still occupied).

This section's two foam systems are out of service for work in lower half of bay.

3 Trench systems to remain in service.