02_82_16.00_22.pdf
PDF 80 KB Posted
- Solicitation number
- N4008513R7758
About this file
Amendment attachment 02 82 16.00 22
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hanger 200 Fire Protection and Structure Repair 60274055 Amendment 04
SECTION 02 82 16.00 22
ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
07/13
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION (AIHA)
AIHA Z88.6 (2006) Respiratory Protection - Respirator Use-Physical Qualifications for Personnel
AIHA Z9.2 (2006) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM C732 (2006) Aging Effects of Artificial Weathering on Latex Sealants
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D522 (1993a; R 2008) Mandrel Bend Test of Attached Organic Coatings
ASTM E119 (2011a) Standard Test Methods for Fire Tests of Building Construction and Materials
ASTM E1368 (2011) Visual Inspection of Asbestos Abatement Projects
ASTM E736 (2000; R 2011) Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
ASTM E84 (2011b) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2010) Standard Test Methods for Water Vapor Transmission of Materials
STATE OF VIRGINIA ADMINISTRATIVE CODE (VAC)
16 VAC 25-20-30 Title 16, Agency 25, Chapter 20, Section 30: Notification and Permit Fee
SECTION 02 82 16.00 22 Page 1
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos-Containing Materials in Buildings (Purple Book)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.103 Respiratory Protection
29 CFR 1926.1101 Asbestos
29 CFR 1926.200 Accident Prevention Signs and Tags
29 CFR 1926.51 Sanitation
29 CFR 1926.59 Hazard Communication
40 CFR 61-SUBPART M National Emission Standard for Asbestos
40 CFR 763 Asbestos
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009) Standard for High-Efficiency Particulate, Air Filter Units
1.2 DEFINITIONS
1.2.1 ACM
Asbestos Containing Materials.
1.2.2 Amended Water
Water containing a wetting agent or surfactant with a maximum surface tension of 0.00042 psi.
1.2.3 Area Sampling
Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.
1.2.4 Asbestos
The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least one tenth of one percent.
1.2.5 Asbestos Control Area
That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris. Two examples of an asbestos control area are: a full containment and a "glovebag."
SECTION 02 82 16.00 22 Page 2
1.2.6 Asbestos Fibers
Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.
1.2.7 Asbestos Permissible Exposure Limit
0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health. There is an Excursion Limit of 1.0 fibers per cubic centimeter of air as averaged over a sampling period of 30 minutes.
1.2.8 Background
The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.
1.2.9 Contractor
The Contractor is that individual, or entity under contract to the Navy to perform the herein listed work.
1.2.10 Competent Person
A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763) for project designer or supervisor, or its equivalent. The competent person shall have a current Commonwealth of Virginia asbestos contractors or supervisors license.
1.2.11 Encapsulation
The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.
1.2.12 Encapsulants
Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.
a. Removal Encapsulant (can be used as a wetting agent)
b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)
c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)
SECTION 02 82 16.00 22 Page 3
d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).
1.2.13 Friable Asbestos Material
One percent asbestos containing material that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
1.2.14 Full Containment
Those engineering control techniques described in 29 CFR 1926.1101 Appendix G.
1.2.15 Glovebag Technique
Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 Appendix G.
1.2.16 HEPA Filter Equipment
High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall retain 99.97 percent of particles
0.3 microns or larger as indicated in UL 586.
1.2.17 Nonfriable Asbestos Material
Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.
1.2.18 Personal Sampling
Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101.
1.2.19 Private Qualified Person (PQP)
That qualified person hired by the Contractor to perform the herein listed tasks.
1.2.20 Qualified Person (QP)
A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The QP must be qualified to perform visual inspections as indicated in ASTM E1368. The QP shall be appropriately licensed in the Commonwealth of Virginia. For this project, the QP shall be Mr. Thomas Post II of ECS Mid-Atlantic LLC in Virginia
SECTION 02 82 16.00 22 Page 4
Beach, Virginia. However, if the Building Owner decides to hire another firm as the Project Monitor, then the contracted firm shall become the QP and will be responsible for any additional sampling and implementation and procedural recommendations and scope interpretations for the project.
1.2.21 TEM
Refers to Transmission Electron Microscopy.
1.2.22 Time Weighted Average (TWA)
The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.
1.2.23 Wetting Agent
A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at most
0.00042 psi.
1.3 REQUIREMENTS
1.3.1 Description of Work
The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures shall be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes but not limited to the demolition and removal of located asbestos. Provide negative pressure enclosure techniques as outlined in this specification.
The Navy will evacuate the buildings/area during the asbestos abatement work. All asbestos removal work shall be supervised by a competent person as specified herein.
An Asbestos and Lead Paint Survey and an Additional Asbestos Sampling Report is located in Appendix A.
The Abatement Contractor shall remove the following materials as part of the base bid (additive Item 2A):
a) All asbestos-containing flooring materials and associated mastics located throughout the building; Approximately 68,000 square feet. The Contractor shall remove these materials within negative pressure enclosure (minimum neg. pressure 0.02" w.g.). The contractor shall also assume that all floors have at least 5 layers of floor tile and mastic and the contractor shall be responsible for removal of all layers of flooring and mastic under the base bid price. Where asbestos floor tile is present under carpets, laminates, and ceramic floor tiles the contractor shall be responsible for removal of these layers also to access and remove the underlying asbestos containing layers of floor tile and mastic. If these materials can be removed without disturbance of the asbestos floor tile, they may be disposed of as non-asbestos waste (specifically the carpets and laminates). The Contractor shall also be responsible for removal of flooring and mastic under all partition walls, fixtures, cabinets, carpets, SECTION 02 82 16.00 22 Page 5 etc. The contractor shall coordinate demolition to access these materials (as needed) with the Owner and the general contractor on-site. All quantities of floor tile and mastic shall be verified by the Owner's QP.
Actually quantities abated shall be credited to the contractor using established unit cost rates as outlined in this document. Quantities underneath the estimated base bid shall be credited back to the owner using the established unit rates.
b) Asbestos-containing TSI Aircell located throughout the structure;
Approximately 5 linear feet. The Contractor shall remove these materials within negative pressure enclosure (minimum neg. pressure 0.02" w.g.).
c) All window glazing found on all exterior Hanger 200 door windows. The Contractor shall place two layer 6 mil poly around the perimeter of the building where door windows are to be removed as drop cloths. Poly shall extend out from the building approximately 6 feet. The Abatement Contractor shall remove these materials intact without a negative pressure containment as described in Part 3 - Execution of this document.
Additional abatement notes:
***The Contractor shall be aware that there is pigeon/bird droppings and rodent fecal matter located in the cavity space above drop ceilings, between the roof deck, and spaces between interior/exterior walls. The Contractor shall comply with all applicable OSHA and EPA regulations for the disturbance and removal of this material as part of the base bid as needed.
The contractor shall provide units costs for the removal of the following materials:
1. All roofing/exterior materials (per square foot);
2. All pipe flanges and gaskets (per flange/gasket);
3. All fire doors (per door);
4. Light shields (per light shield);
5. Transite panels (per square foot);
6. All discovered pipe insulation (per linear foot - assuming < 6 " diameter);
7. Floor tile and mastic (per square foot - based upon the scope of work described in section 1.3.1 a );
8. Door window glazing (per door).
Note 1: For unit cost pricing the contractor shall assume that all mobilization, insurance, notification, profit etc. are to be included in the unit cost estimate. The contractor shall assume that the work will be performed during the scope of the contracted asbestos abatement work.
Note 2: The quantities indicated are for informational purposes only. The contractor is responsible for verifying all quantities to be removed to complete the scope of work.
Note 3: During the performance of the project, the contractor will be
SECTION 02 82 16.00 22 Page 6 subject to inspection by the owner's representative. If the contractor is found not in compliance with the project specifications, the contractor will stop all work immediately to resolve the violation. Standby time shall be at the contractor's expense.
Note 4: Following completion of work, the owner's representative shall visually verify that all ACMs scheduled for removal have been removed and that the containments are clean and ready for final aggressive air sampling. US EPA AHERA protocols will be followed for clearance criteria.
Contractor will re-clean the containment areas at their own expense until containment passes both visual and aggressive air sampling.
Note 5: The Abatement Contractor shall coordinate with the Mechanical, Electrical, Plumbing, and General Contractors to ensure that all appropriate systems that will be impacted by demolition have been properly decommissioned prior to the start of any work.
Note 6: The Abatement Contractor shall coordinate with the General Contractor selected for this project to verify that the structure will support the planned activities and comply with local building codes and OSHA requirements.
Note 7: During demolition/renovation, no visible emissions of dust are allowed. The Contractor must use dust control measures (i.e., water) during demolition/renovation.
1.3.1.1 Wallboard/Joint Compound
Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) have been tested and the results were found to be negative, reference ECS's report dated December 11, 2012 are attached.
1.3.2 Medical Requirements
Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101.
1.3.2.1 Medical Examinations
Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination shall be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word
"ASBESTOS."
1.3.2.2 Medical Records
Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of 50 years after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to:
The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), SECTION 02 82 16.00 22 Page 7 or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.
1.3.3 Employee Training
Submit certificates, prior to the start of work, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763;
understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Certificates shall be organized by individual worker, not grouped by type of certification. Post appropriate evidence of compliance with the training requirements of 40 CFR 763. Train all personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent. The Contractor shall document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101. Fully cover engineering and other hazard control techniques and procedures. All asbestos workers shall have a current Commonwealth of Virginia asbestos worker's license.
1.3.4 Permits , Licenses, and Notifications
Obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish timely notification of such actions required by Federal, State, regional, and local authorities prior to the start of work. Notify the Asbestos Control Clerk, Department of Labor and Industry, local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M and 16 VAC 25-20-30. Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer. Notify the local fire department 3 days prior to removing fire-proofing material from the building including notice that the material contains asbestos.
1.3.5 Environment, Safety and Health Compliance
In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials.
1.3.6 Respiratory Protection Program
Establish and implement a respirator program as required by AIHA Z88.6, 29 CFR 1926.1101, and 29 CFR 1926.103. Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.
SECTION 02 82 16.00 22 Page 8
1.3.6.1 Respirator Program Records
Submit records of the respirator program as required by AIHA Z88.6, 29 CFR 1926.103, and 29 CFR 1926.1101.
1.3.7 Asbestos Hazard Control Supervisor
The Contractor shall be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.
1.3.8 Hazard Communication
Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Material Safety Data Sheets (MSDS) for all materials brought to the site.
1.3.9 Asbestos Hazard Abatement Plan
Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the demolition and removal of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, shall be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which shall follow the sequence of requirements in the contract. Such plan shall include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection, the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan shall also include (both fire and medical emergency) response plans. The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor, and PQP shall meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan shall be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work. A copy of the approved plan shall be forwarded to Code 106.
1.3.10 Asbestos Check-Off List
Prior to performance of work, Contractor shall provide a completed Check-off List (form found at the end of this section).
1.3.11 Testing Laboratory
Submit the name, address, and telephone number of the testing laboratory selected for the sampling, analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license and/or permits an certification that the laboratory is American Industrial Hygiene
SECTION 02 82 16.00 22 Page 9
Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm shall be independent of the asbestos contractor and shall have no employee or employer relationship which could constitute a conflict of interest.
1.3.12 Landfill Approval
Submit written evidence that the landfill is for asbestos disposal by the U.S. Environmental Protection Agency, Region 3, Air Enforcement Section (38W12), and local regulatory agencies. Within 3 working days after delivery, submit detailed delivery tickets, prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within 1 day of the shipment leaving the project site.
1.3.13 Medical Certification
Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00.00 22
SUBMITTAL PROCEDURES:
SD-03 Product Data
Local exhaust equipment; G
Vacuums; G
Respirators; G
Pressure differential automatic recording instrument; G
Amended water; G
Glovebags; G
Material Safety Data Sheets (MSDS) for all materials proposed for transport to the project site; G
Encapsulants; G
SD-06 Test Reports
SECTION 02 82 16.00 22 Page 10
Air sampling results; G
Pressure differential recordings for local exhaust system; G
Asbestos disposal quantity report; G
Encapsulation test patches; G
Clearance sampling; G
SD-07 Certificates
Asbestos hazard abatement plan; G
Testing laboratory; G
Private qualified person documentation; G
Contractor's license; G
Competent person documentation; G
Worker's license; G
Landfill approval; G
Employee training; G
Medical certification requirements; G
Waste shipment records and if applicable exemption report; G
Respiratory Protection Program; G
Delivery tickets; G
Vacuums; G
Water filtration equipment; G
Ventilation systems; G
Other equipment used to contain airborne asbestos fibers; G
Chemical encapsulants sealers; G
Notifications
Show compliance with AIHA Z9.2 by providing manufacturers' certifications.
Asbestos Check-Off List; G
Test of HEPA filtered equipment; G
SD-11 Closeout Submittals
Notifications; G
SECTION 02 82 16.00 22 Page 11
Rental equipment; G
Respirator program records; G
Permits and licenses; G
1.5 QUALITY ASSURANCE
1.5.1 Private Qualified Person Documentation
Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP shall be appropriately licensed in the Commonwealth of Virginia as a Project Monitor. The PQP and the asbestos contractor shall not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP shall be a first tier subcontractor.
1.5.2 Competent Person Documentation
Submit training certification and a current Commonwealth of Virginia Asbestos Contractor's and Supervisor's License.
1.5.3 Worker's License
Submit documentation that requires all workers have a current Commonwealth of Virginia Asbestos Workers License.
1.5.4 Contractor's License
Contractor shall have current Virginia asbestos contractor's license.
Submit a copy of the asbestos contractor's license issued by the Commonwealth of Virginia.
1.5.5 Air Sampling Results
Complete fiber counting and provide results to the PQP for review within 16 hours of the "time off" of the sample pump. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees where required by law within 3 working days, signed by the testing laboratory employee performing air sampling, the employee that analyzed the sample, and the PQP. Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background whichever is higher. In no circumstance shall levels exceed 0.1 fibers per cubic centimeter.
SECTION 02 82 16.00 22 Page 12
1.5.6 Pressure Differential Recordings for Local Exhaust System
Provide a local exhaust system that creates a negative pressure of at least
0.02 inches of water relative to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP for review and to the Contracting Officer within 24 hours from the end of each work day.
1.5.7 Protective Clothing Decontamination Quality Control Records
Not Used.
1.5.8 Protective Clothing Decontamination Facility Notification
Not Used.
1.6 EQUIPMENT
1.6.1 Rental Equipment
Provide a copy of the written notification to the rental company concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.
1.6.2 HEPA Filtered Equipment
All equipment equipped with HEPA filters shall be tested every 90 days to verify that the unit will contain 99.95% of particles 0.7 microns or larger.
PART 2 PRODUCTS
2.1 ENCAPSULANTS
Shall conform to current USEPA requirements, shall contain no toxic or hazardous substances as defined in 29 CFR 1926.59, and shall conform to the following performance requirements.
2.1.1 Removal Encapsulants
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
SECTION 02 82 16.00 22 Page 13
Requirement Test Standard
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522 Mandrel Bend Test
2.1.2 Bridging Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522 Mandrel Bend Test
2.1.3 Penetrating Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Cohesion/Adhesion Test - 50 pounds of force/foot
ASTM E119
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
ASTM E119
SECTION 02 82 16.00 22 Page 14
Requirement Test Standard
Impact Resistance - Minimum 43 in/lb ASTM D2794 Gardner Impact Test
Flexibility - no rupture or cracking ASTM D522 Mandrel Bend Test
2.1.4 Lock-down Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E84
Life Expectancy - 20 years ASTM C732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E96/E96M
Fire Resistance - Negligible affect on fire resistance rating over 3 hour test (Tested with fireproofing over encapsulant applied directly to steel member)
ASTM E119
Bond Strength: 100 pounds of force/foot
ASTM E736
(Tests compatibility with cementitious and fibrous fireproofing)
PART 3 EXECUTION
3.1 EQUIPMENT
At all times, provide the Contracting Officer or the Contracting Officer's Representative, with at least two complete sets of personal protective equipment including decontaminating disposable coveralls as required for entry to and inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment. Provide manufacturer's certificate of compliance for all equipment used to contain airborne asbestos fibers.
3.1.1 Respirators
Select respirators from those approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services.
3.1.1.1 Respirators for Handling Asbestos
Provide personnel engaged in pre-cleaning, cleanup, handling, encapsulation
SECTION 02 82 16.00 22 Page 15 removal and/or demolition of asbestos materials with respiratory protection as indicated in 29 CFR 1926.1101 and 29 CFR 1926.103.
3.1.2 Exterior Whole Body Protection
3.1.2.1 Outer Protective Clothing
Provide personnel exposed to asbestos with disposable "non-breathable," whole body outer protective clothing, head coverings, gloves, and foot coverings. Provide disposable plastic or rubber gloves to protect hands.
Cloth gloves may be worn inside the plastic or rubber gloves for comfort, but shall not be used alone. Make sleeves secure at the wrists, make foot coverings secure at the ankles, and make clothing secure at the neck by the use of tape. Disposable whole body outer protective clothing shall be either disposed of as asbestos contaminated waste upon exiting from the asbestos regulated work area.
3.1.2.2 Work Clothing
Provide cloth work clothes for wear under the outer protective clothing and foot coverings and either dispose of or properly decontaminate them as recommended by the PQP after each use.
3.1.2.3 Personal Decontamination Unit
Provide a temporary, negative pressure unit with a separate decontamination locker room and clean locker room with a shower that complies with 29 CFR 1926.51(f)(4)(ii) through (V) in between for personnel required to wear whole body protective clothing. Provide two separate lockers for each asbestos worker, one in each locker room. Keep street clothing and street shoes in the clean locker. HEPA vacuum and remove asbestos contaminated disposable protective clothing while still wearing respirators at the boundary of the asbestos work area and seal in impermeable bags or containers for disposal. HEPA vacuum and remove asbestos contaminated reusable protective clothing while still wearing respirators at the boundary of the asbestos work area, seal in two impermeable bags, label outer bag as asbestos contaminated waste, and transport for decontamination.
Do not wear work clothing between home and work. Locate showers between the decontamination locker room and the clean locker room and require that all employees shower before changing into street clothes. Collect used shower water and filter with approved water filtration equipment to remove asbestos contamination. Dispose of filters and residue as asbestos waste.
Discharge clean water to the sanitary system. Dispose of asbestos contaminated work clothing as asbestos contaminated waste. Decontamination units shall be physically attached to the asbestos control area. Build both a personnel decontamination unit and an equipment decontamination unit onto and integral with each asbestos control area.
3.1.2.4 Decontamination of Reusable Outer Protective Clothing
Not Used.
3.1.2.5 Eye Protection
Provide goggles to personnel engaged in asbestos abatement operations when the use of a full face respirator is not required.
SECTION 02 82 16.00 22 Page 16
3.1.3 Warning Signs and Labels
Provide bilingual warning signs printed in English, Spanish or language spoken on site at all approaches to asbestos control areas. Locate signs at such a distance that personnel may read the sign and take the necessary protective steps required before entering the area. Provide labels and affix to all asbestos materials, scrap, waste, debris, and other products contaminated with asbestos.
3.1.3.1 Warning Sign
Provide vertical format conforming to 29 CFR 1926.200, and 29 CFR 1926.1101 minimum 20 by 14 inches displaying the following legend in the lower panel:
Legend Notation
Danger one inch Sans Serif Gothic or Block
Asbestos one inch Sans Serif Gothic or Block
Cancer and Lung Disease Hazard 1/4 inch Sans Serif Gothic or Block
Authorized Personnel Only 1/4 inch Sans Serif Gothic or Block
Respirators and Protective Clothing are Required in this Area
1/4 inch Sans Serif Gothic or Block
Spacing between lines shall be at least equal to the height of the upper of any two lines.
3.1.3.2 Warning Labels
Provide labels conforming to 29 CFR 1926.1101 of sufficient size to be clearly legible, displaying the following legend:
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
BREATHING ASBESTOS DUST MAY
CAUSE SERIOUS BODILY HARM
3.1.4 Local Exhaust System
Provide a local exhaust system in the asbestos control area in accordance with AIHA Z9.2 and 29 CFR 1926.1101 that will provide at least four air
SECTION 02 82 16.00 22 Page 17 changes per hour inside of the negative pressure enclosure. Local exhaust equipment shall be operated 24 hours per day, until the asbestos control area is removed and shall be leak proof to the filter and equipped with HEPA filters. Maintain a minimum pressure differential in the control area of minus 0.02 inch of water column relative to adjacent, unsealed areas.
Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. In no case shall the building ventilation system be used as the local exhaust system for the asbestos control area. Filters on exhaust equipment shall conform to AIHA Z9.2 and UL 586. The local exhaust system shall terminate out of doors and remote from any public access or ventilation system intakes.
3.1.5 Tools
Vacuums shall be leak proof to the filter and equipped with HEPA filters.
Filters on vacuums shall conform to AIHA Z9.2 and UL 586. Do not use power tools to remove asbestos containing materials unless the tool is equipped with effective, integral HEPA filtered exhaust ventilation systems. Remove all residual asbestos from reusable tools prior to storage or reuse.
3.1.6 Rental Equipment
If rental equipment is to be used, furnish written notification to the rental agency concerning the intended use of the equipment and the possibility of asbestos contamination of the equipment.
3.1.7 Glovebags
Submit written manufacturers proof that glovebags will not break down under expected temperatures and conditions.
3.2 WORK PROCEDURE
Perform asbestos related work in accordance with 29 CFR 1926.1101, 40 CFR 61-SUBPART M, and as specified herein. Use wet or if given prior EPA approval, dry removal procedures and/or appropriate encapsulation procedures as listed in the asbestos hazard abatement plan and full containment techniques. Personnel shall wear and utilize protective clothing and equipment as specified herein. Eating, smoking, drinking, chewing gum, tobacco, or applying cosmetics shall not be permitted in the asbestos work or control areas. Personnel of other trades not engaged in the encapsulation and/or removal and demolition of asbestos containing material shall not be exposed at any time to airborne concentrations of asbestos unless all the personnel protection and training provisions of this specification are complied with by the trade personnel. Shut down the building heating, ventilating, and air conditioning system, cap the openings to the system, and provide temporary heating, and ventilation, and air conditioning prior to the commencement of asbestos work. Disconnect electrical service when wet removal is performed and provide temporary electrical service with verifiable ground fault circuit interrupter (GFCI) protection prior to the use of any water and/or encapsulant. If an asbestos fiber release or spill occurs outside of the asbestos control area, stop work immediately, correct the condition to the satisfaction of the Contracting Officer including clearance sampling, prior to resumption of work.
3.2.1 Protection of Existing Work to Remain
Perform work without damage or contamination of adjacent work. Where such
SECTION 02 82 16.00 22 Page 18 work is damaged or contaminated as verified by the Contracting Officer using visual inspection or sample analysis, it shall be restored to its original condition or decontaminated by the Contractor at no expense to the Government as deemed appropriate by the Contracting Officer. This includes inadvertent spill of dirt, dust, or debris in which it is reasonable to conclude that asbestos may exist. When these spills occur, stop work immediately. Then clean up the spill. When satisfactory visual inspection and air sampling results are obtained from the PQP work may proceed at the discretion of the Contracting Officer.
3.2.2 Furnishings
Furniture , and equipment will be removed from the area of work by the Government before asbestos work begins.
At the conclusion of the asbestos removal work and cleanup operations, transfer all objects so removed and cleaned back to the area from which they came and re-install them. B
3.2.3 Precleaning
Wet wipe and HEPA vacuum all surfaces potentially contaminated with asbestos prior to establishment of an enclosure.
3.2.4 Asbestos Control Area Requirements
A watch stander shall be posted at the entrance of the asbestos control area at all times while the area is under asbestos controls. The watch stander may be waived for periods when work is not being performed and the area boundaries are made of structural materials and all entrances are locked.
3.2.4.1 Full Containment Enclosure
Block and seal openings in areas where the release of airborne asbestos fibers can be expected. Establish an asbestos full containment enclosure with the use of curtains, portable partitions, or other enclosures in order to prevent the escape of asbestos fibers from the contaminated asbestos work area. Full containment enclosure development shall include protective covering of uncontaminated walls, and ceilings with a continuous membrane of two layers of minimum 6-mil plastic sheet sealed with tape to prevent water or other damage. Provide two layers of 6-mil plastic sheet over floors and extend a minimum of 12 inches up walls. Seal all joints with tape. Provide local exhaust system in the asbestos control area. Openings will be allowed in enclosures of asbestos control areas for personnel and equipment entry and exit, the supply and exhaust of air for the local exhaust system and the removal of properly containerized asbestos containing materials. Replace local exhaust system filters as required to maintain the efficiency of the system.
3.2.4.2 Glovebag
If the construction of a negative pressure enclosure is infeasible for the removal of approximatley 30 linear feet of asbestos containing pipe insulation located in the elevator shaft of the building the contractor shall use alternate techniques as indicated in 29 CFR 1926.1101. Establish designated limits for the asbestos regulated area with the use of rope or other continuous barriers, and maintain all other requirements for asbestos control areas. The PQP shall conduct personal samples of each worker engaged in asbestos handling (removal, disposal, transport and other
SECTION 02 82 16.00 22 Page 19 associated work) throughout the duration of the project. If the quantity of airborne asbestos fibers monitored at the breathing zone of the workers at any time exceeds background or 0.01 fibers per cubic centimeter whichever is greater, stop work, evacuate personnel in adjacent areas or provide personnel with approved protective equipment at the discretion of the Contracting Officer. This sampling may be duplicated by the Government at the discretion of the Contracting Officer. If the air sampling results obtained by the Government differ from those obtained by the Contractor, the Government will determine which results predominate. If adjacent areas are contaminated as determined by the Contracting Officer, clean the contaminated areas, monitor, and visually inspect the area as specified herein.
3.2.5 Removal Procedures
Wet asbestos material with a fine spray of amended water during removal, cutting, or other handling so as to reduce the emission of airborne fibers. Remove material and immediately place in 6 mil plastic disposal bags. Remove asbestos containing material in a gradual manner, with continuous application of the amended water or wetting agent in such a manner that no asbestos material is disturbed prior to being adequately wetted. Where unusual circumstances prohibit the use of 6 mil plastic bags, submit an alternate proposal for containment of asbestos fibers to the Contracting Officer for approval. For example, in the case where both piping and insulation are to be removed, the Contractor may elect to wet the insulation, wrap the pipes and insulation in plastic and remove the pipe by sections. Asbestos containing material shall be containerized while wet. At no time shall asbestos material be allowed to accumulate or become dry. Lower and otherwise handle asbestos containing material as indicated in 40 CFR 61-SUBPART M.
3.2.5.1 Sealing Contaminated Items Designated for Disposal
Remove contaminated architectural, mechanical, and electrical appurtenances such as venetian blinds, full-height partitions, carpeting, duct work, pipes and fittings, radiators, light fixtures, conduit, panels, and other contaminated items designated for removal by completely coating the items with an asbestos lock-down encapsulant at the demolition site before removing the items from the asbestos control area. These items need not be vacuumed. The asbestos lock-down encapsulant shall be tinted a contrasting color. It shall be spray-applied by airless method. Thoroughness of sealing operation shall be visually gauged by the extent of colored coating on exposed surfaces. Lock-down encapsulants shall comply with the performance requirements specified herein.
3.2.5.2 Exposed Pipe Insulation Edges
Contain edges of asbestos insulation to remain that are exposed by a removal operation. Wet and cut the rough ends true and square with sharp tools and then encapsulate the edges with a 1/4 inch thick layer of non-asbestos containing insulating cement troweled to a smooth hard finish. When cement is dry, lag the end with a layer of non-asbestos lagging cloth, overlapping the existing ends by at least 4 inches. When insulating cement and cloth is an impractical method of sealing a raw edge of asbestos, take appropriate steps to seal the raw edges as approved by the Contracting Officer.
SECTION 02 82 16.00 22 Page 20
3.2.6 Encapsulation Procedures
3.2.6.1 Preparation of Test Patches
Install three test patches of encapsulant. Use airless spray at the lowest pressure and as recommended by the encapsulant manufacturer. Follow exactly the manufacturer's instructions for thinning recommendations, application procedures and rates. Curing time shall be not less than five days or that recommended by the manufacturer, whichever is more. A test patch shall be 9 square feet in size.
3.2.6.2 Field Testing
Not Used.
3.2.6.3 Large-Scale Application
Not Used.
3.2.7 Air Sampling
Sampling of airborne concentrations of asbestos fibers shall be performed in accordance with 29 CFR 1926.1101 and as specified herein. Sampling performed in accordance with 29 CFR 1926.1101 shall be performed by the PQP. Sampling performed for environmental and quality control reasons shall be performed by the PQP. Unless otherwise specified, use NIOSH Method 7400 for sampling and analysis. Monitoring may be duplicated by the Government at the discretion of the Contracting Officer. If the air sampling results obtained by the Government differ from those results obtained by the Contractor, the Government will determine which results predominate.
3.2.7.1 Sampling Prior to Asbestos Work
Provide area air sampling and establish the baseline one day prior to the masking and sealing operations for each demolition, removal and/or encapsulation site. Establish the background by performing area sampling in similar but uncontaminated sites in the building.
3.2.7.2 Sampling During Asbestos Work
The PQP shall provide area sampling as indicated in 29 CFR 1926.1101 and governing environmental regulations. In addition, provided the same type of work is being performed, provide area sampling at least once every work shift close to the work inside the enclosure, outside the clean room entrance to the enclosure, and at the exhaust opening of the local exhaust system. If sampling outside the enclosure shows airborne levels have exceeded background or 0.01 fibers per cubic centimeter, whichever is greater, stop all work, correct the condition(s) causing the increase, and notify the Contracting Officer immediately. Where glovebag methods are used, perform area air sampling at locations and frequencies that will accurately characterize the evolving airborne asbestos levels.
3.2.7.3 Sampling After Final Clean-Up (Clearance Sampling)
Provide area sampling of asbestos fibers using aggressive air sampling techniques as defined in the EPA 560/5-85-024 and establish an airborne
SECTION 02 82 16.00 22 Page 21 asbestos concentration of less than 0.01 fibers per cubic centimeter after final clean-up but before removal of the enclosure or the asbestos work control area. After final cleanup and the asbestos control area is dry but prior to clearance sampling, the PQP and NC shall perform a visual inspection in accordance with ASTM E 1368 to ensure that the asbestos control and work area is free of any accumulations of dirt, dust, or debris. Prepare a written report signed and dated by the PQP documenting that the asbestos control area is free of dust, dirt, and debris and all waste has been removed. Perform at least five (5) samples. Use Phas Contrast Microscopy (PCM) to analyze clearance samples and report the results in accordance with current NIOSH criteria. The asbestos fiber counts from these samples shall be less than 0.01 fibers per cubic centimeter or be not greater than the background, whichever is greater.
Should any of the final samples indicate a higher value, the Contractor shall take appropriate actions to re-clean the area and shall repeat the sampling and PCM analysis at the Contractor's expense.
3.2.8 Lock-Down
Prior to removal of plastic barriers and after pre-clearance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .