ATTACH_02_1503030 ELINS_ISWM BULK Rev1.xlsx
XLSX spreadsheet 173 KB Posted
- Solicitation number
- N4008426R2001
About this file
This is a pricing template and schedule of work for a federal contract solicitation (N40084-26-R-2001) for Integrated Solid Waste Management (ISWM) services at Marine Corps installations in Okinawa, Japan. The document establishes the exhibit line item numbers (ELINs) and pricing structure that contractors must complete and submit with their proposals. The contract covers a base period of 12 months (01 August 2026 – 31 July 2027) with seven one-year option periods, creating a potential eight-year contract duration through 31 July 2034.
The pricing template is organized into 16 line items (0001–0016) divided into recurring and non-recurring work categories for each contract period. Recurring work includes services for three customer accounts: MCB (Marine Corps Base) with standard service level operations covering bulk waste area operations, solid waste collection, disposal of non-recyclable and recyclable materials, vehicles and equipment maintenance, solid waste containers, and container delivery/pickup (limited to 50 containers per year); 78th Signal Battalion with container delivery/pickup services (maximum 8 containers annually); and DODEA (Department of Defense Education Activity) with container delivery/pickup services (maximum 20 containers annually). Non-recurring work items address one-time services including bulk sampling for asbestos-containing materials (20 each), disposal of identified ACM (50 tons), and medical waste cleanup and disposal (20 tons) for each contract period. All pricing must be submitted in Japanese Yen (YEN), and contractors must provide unit prices for recurring monthly services and estimated quantities for non-recurring work items across all eight contract periods as part of their offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008426R2001_Amend 0003.pdf | ||
| ATTACH_02_1503030 ELINS_ISWM BULK Rev2.xlsx | XLSX spreadsheet | |
| ATTACH_04_Experience Form_Revised.docx | DOCX document | |
| N4008426R2001_Amend 0002.pdf | ||
| N4008426R2001_Amend 0001.pdf | ||
| ATTACH_07_Site Visit Request Form.xlsx | XLSX spreadsheet | |
| ATTACH_03_PAP_ISWM BULK.pdf | ||
| ATTACH_11_For Contractors - NIST SP 800-171 and SPRS.pdf | ||
| N4008426R2001_RFP.pdf | ||
| ATTACH_04_Experience Form.docx | DOCX document | |
| ATTACH_05_Past Performance Questionnaire.docx | DOCX document | |
| ATTACH_12_For Contractors - CMMC.pdf | ||
| ATTACH_02_1503030 ELINS_ISWM BULK.xlsx | XLSX spreadsheet | |
| ATTACH_09_Before_Starting_Business_with_NAVFAC_2023.pdf | ||
| ATTACH_10_W-14.pdf | ||
| ATTACH_06_Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| ATTACH_08_PIEE Solicitation Module Guide.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| SCHEDULE OF WORK |
| (TO BE COMPLETED AND SUBMITTED WITH THE OFFER) |
ITEM NO. SUPPLIES/SERVICES AMOUNT
| 0001 | RECURRING WORK (Base Period) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0002 | NON-RECURRING (Base Period) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0003 | RECURRING WORK (Option Period One) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0004 | NON-RECURRING (Option Period One) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0005 | RECURRING WORK (Option Period Two) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0006 | NON-RECURRING (Option Period Two) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0007 | RECURRING WORK (Option Period Three) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0008 | NON-RECURRING (Option Period Three) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0009 | RECURRING WORK (Option Period Four) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0010 | NON-RECURRING (Option Period Four) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0011 | RECURRING WORK (Option Period Five) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0012 | NON-RECURRING (Option Period Five) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0013 | RECURRING WORK (Option Period Six) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0014 | NON-RECURRING (Option Period Six) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
| 0015 | RECURRING WORK (Option Period Seven) | ||
| Price to perform Recurring work, for the 12-month, in accordance with all the terms of this contract. | ¥ | - |
| 0016 | NON-RECURRING (Option Period Seven) | |||
| Price to perform non-recurring work, for the 12-month Period, in accordance with all the terms of this contract. | EST | ¥ | - |
TOTAL (CLINS 0001 THROUGH 0016) ¥ -
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
BASE_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Work - Base Period (01 August 2026 - 31 July 2027) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| A001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| A001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| A001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| A001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| A001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| A001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| A001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| A001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| A002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| A002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| A003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| A003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - BASE PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
BASE_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring Work - Base Period (01 August 2026 - 31 July 2027) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| A700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| A701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| A702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - BASE PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT1_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring Work - Option 1 Period (01 August 2027 - 31 July 2028) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 through B003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| B001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| B001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| B001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| B001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| B001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| B001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| B001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| B001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| B002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| B002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| B003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| B003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - OPTION 1 PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
OPT1_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring Work - Option 1 Period (01 August 2027 - 31 July 2028) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| B700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| B701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| B702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - OPTION 1 PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT2_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring Work - Option 2 Period (01 August 2028 - 31 July 2029) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs C001 through C003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| C001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| C001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| C001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| C001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| C001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| C001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| C001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| C001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| C002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| C002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| C003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| C003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - OPTION 2 PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
OPT2_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT C - CLIN 9002 |
| Line Item 0006 Non-Recurring Work - Option 1 Period (01 August 2028 - 31 July 2029) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C700 through C702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| C700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| C701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| C702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - OPTION 2 PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT3_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring Work - Option 3 Period (01 August 2029 - 31 July 2030) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs D001 through D003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| D001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| D001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| D001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| D001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| D001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| D001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| D001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| D001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| D002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| D002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| D003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| D003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - OPTION 3 PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
OPT3_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT D - CLIN 9003 |
| Line Item 0008 Non-Recurring Work - Option 3 Period (01 August 2029 - 31 July 2030) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D700 through D702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| D700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| D701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| D702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - OPTION 3 PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT4_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 Recurring Work - Option 4 Period (01 August 2030 - 31 July 2031) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs E001 through E003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| E001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| E001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| E001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| E001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| E001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| E001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| E001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| E001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| E002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| E002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| E003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| E003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - OPTION 4 PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
OPT4_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT E - CLIN 9004 |
| Line Item 0010 Non-Recurring Work - Option 4 Period (01 August 2030 - 31 July 2031) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E700 through E702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| E700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| E701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| E702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - OPTION 4 PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT5_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT F - CLIN 9005 |
| Line Item 0011 Recurring Work - Option 5 Period (01 August 2031 - 31 July 2032) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs F001 through F003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| F001 - MCB (Standard Service Level) - 1503030 Integrated Solid Waste Management | |||||||
| Services for MCB locations listed in the Maps and Locations provided in J-1503030-04 and Historical Containers Delivered and Picked-up provided in J-1503030-08 performed as specified per the Service Level Standards listed in J-1503030-03. Two 4-Ton containers are acceptable substitute for one 10-Ton container at the discretion of the Contractor. | |||||||
| F001 | AA | 1503030 | 3.1 | Bulk Waste Area Operations | 12 | MO | ¥ - 0 |
| F001 | AB | 1503030 | 3.2 | Solid Waste Collection | 12 | MO | ¥ - 0 |
| Solid Waste Disposal | |||||||
| F001 | AC | 1503030 | 3.3.1 | Non-Recyclable | 12 | MO | ¥ - 0 |
| F001 | AD | 1503030 | 3.3.2 | Recyclable | 12 | MO | ¥ - 0 |
| F001 | AE | 1503030 | 3.4 | Vehicles and Equipment | 12 | MO | ¥ - 0 |
| F001 | AF | 1503030 | 3.5 | Solid Waste Containers | 12 | MO | ¥ - 0 |
| F001 | AG | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 50 containers per year) | 12 | MO | ¥ - 0 |
| MCB Subtotal | ¥ - 0 | |||||||
| F002 - 78th Signal Battalion - 1503030 Integrated Solid Waste Management | ||||||||
| F002 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 8 containers per year) | 12 | MO | ¥ - 0 |
| 78th Signal Battalion Subtotal | ¥ - 0 | |||||||
| F003 - DODEA - 1503030 Integrated Solid Waste Management | ||||||||
| F003 | AA | 1503030 | 3.6 | Container Delivery and Pick-up (not to exceed 20 containers per year) | 12 | MO | ¥ - 0 |
DODEA Subtotal ¥ - 0
TOTAL RECURRING WORK - OPTION 5 PERIOD ¥ - 0
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
OPT5_NR
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT F - CLIN 9005 |
| Line Item 0012 Non-Recurring Work - Option 5 Period (01 August 2031 - 31 July 2032) | |||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs F700 through F702 | |||||||
| ELIN | Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC(s) |
| F700 | Bulk Sampling - Asbestos Containing Material (ACM) | The Contractor shall provide bulk sampling services to determine presence of ACM in suspected materials. Samples shall be collected and transported to a certified laboratory for analysis. Reports shall be provided to the Government. | 20 | EA | ¥ - | ||
| F701 | One-time Disposal of Asbestos Containing Material (ACM) | The Contractor shall dispose identified asbestos containing material. | 50 | TN | ¥ - | ||
| F702 | One-time Clean-up and Disposal of Medical Waste | Contractor shall dispose medical waste upon request from the COR. | 20 | TN | ¥ - | ||
| TOTAL NON-RECURRING WORK - OPTION 5 PERIOD | ¥ - |
_x000D_&1#&"Calibri"&10&K000000 DISTRIBUTION: DoD COMMUNITY ONLY
OPT6_R
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-26-R-2001 |
| EXHIBIT G - CLIN 9006 |
| Line Item 0013 Recurring Work - Option 6 Period (01 August 2032 - 31 July 2033) | ||||||
| PROVIDE PRICES TO PERFORM ISWM - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs G001 through G003 | ||||||
| ELIN / Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .