This is a Pre-Bid Inquiries document containing 8 questions and answers for IFB NO.N40084-25-B-0401, regarding Preventive Maintenance Program and Service Order for Vertical Transportation Equipment Systems at U.S. Commander Fleet Activities in Kanto Plain, Japan.

Key details from the Q&A include: contractors must cover damage costs with a 300,000 yen deduction applied to service orders; bid opening date was extended to January 27, 2025; service orders are not limited to devices listed in the inventory and include additional facilities/equipment added during the contract; emergency generator testing applies to whole buildings; elevator rescue training requires 4 total days (2 days each in Yokosuka and Ikego); and warranty work is typically performed by construction contractors as long as preventive maintenance is being done, though the government may issue service orders under this maintenance contract as needed.

View the file

Other files

File Type Posted
Amend 0003.pdf PDF
Attachment 2. Spec 1502000 rev.pdf PDF
Attachment 1. PreBid Inquiries.pdf PDF
Amend 0002.pdf PDF
25B0401 AMD0001.pdf PDF
Attachment 1. PreBid Inquiries.pdf PDF
Attach-3. Note - NIST SP 800-171 and SPRS.pdf PDF
Attach-4. Schedule of Price & ELINs.xlsx XLSX spreadsheet
Attach-1. PWS.pdf PDF
Attach-2. AcceptableID.pdf PDF
N4008425B0401A.pdf PDF
Attach-5. PreBid Inquiry Form.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB NO.N40084-25-B-0401

Pre-Bid Inquiries for

Question No.

Date QUESTION -Include Reference (Sect/Para/Page) GOVERNMENT RESPONSE

12/20/2024 Regarding the Service Order, 1502000 - 3.1of Facility Investment on P.54 of Specification, it does not specify the causeof the incident, such as natural disaster,damage caused by the resident or occupied person.

Should the contractor owe the cost for the damage?

Yes, the contractor will cover the cost. Therefore, please take into consideration the Service Order (Emergency, Urgent and Routine) of each ELIN fund as well as the deduction of 300,000 yen for each.

12/20/2024 Because of the year-end and new yearholidays, it is very difficult for us to obtainthe quotation from the manufacuturers andvendors and we need more time to preparefor the documentation to submit, thereforewe would like to ask the government toextend the due date to 31 Jan 2025.

Bid Open is extended to 27 Jan 2025.

12/26/2024 3.1 Service Orders / J-1502000-03 Inventory Is the scope of Service Orders limited to devices listed in the Inventory?

NO. Not limited to devices listed in the inventory. Refer to spec item 3.1 which reads: "Service orders are not limited to work performed on existing facilities, structures and equipment identified in the respective Section J attachments or spec items for each Annex. Additional facilities, structures and equipment added during the course of the contract will become part of the service order program at no additional cost to the Government".

12/26/2024 3.1 Service Orders For damage and/or malfunction of devices caused by occupants' intention or negligence, would it be applied as well that the Government will pay for repair work exceeding JPY 300,000 (JPY 300,000 will be decreased from full amount)? Or, the Government will pay full amount?

A deduction of 300,000 yen will be applied to the total amount of the service order. Please also see the answer to question 1.

12/26/2024 J-1502000-06.3, Page 2 Annual Fire Testing Log indicates "Phase 1 recall shall be tested by individually activating fire alarm initiating device input".

Shall the contractor arrange the activation of the devices? Or, shall the maintenance contractor of the devices perform it as requested by the Government?

The contractor will make the arrangements.

12/26/2024 J-1502000-06.2, Page 1 For Emergency Power Generator Operation Test, does the "Emergeny Power Generator" mean that for elevator, or for the whole building?

It's the whole building. Please see Note in 3.2.1.1.

12/26/2024 3.4.1 Eelvator Rescue Training for Navy Firefighter / J-1502000-08.1 For the annual rescue drill for firefighters, we interpret that it will take 2 days in Yokosuka and Ikego, 4 days in total. Would it be correct?

Yes, that is correct. A total of four days. two days in Yokosuka and two days in Ikego. This is because each fire station has an A team and a B team.

PREVENTIVE MAINTENANCE PROGRAM AND SERVICE ORDER FOR VERTICAL TRANSPORTATION

EQUIPMENT SYSTEMS AT U.S. COMMANDER FLEET ACTIVITIES, KANTO PLAIN IN JAPAN

IFB NO.N40084-25-B-0401

Question

No.

Date QUESTION -Include Reference (Sect/Para/Page) GOVERNMENT RESPONSE

1/13/2025 Response to Q3, Amendment 0001 We have one more question for "Additional facilities, structures and equipment" in Service Orders. In general, the construction prime contractor provides one-year warranty of newly installed facilities after completion of construction. During the warranty period, will service equivalent to the Service Orders be provided by the construction prime contractor?

The warranty details are relevant to each construction contract. Typically, a warranty work is perfomed by the construction contractor as long as preventive maintenance is being done. Government will pursue work under warranty but may have to issue service orders under this maintenance contract as necessary.