Atch(2)_Roofing and Painting IDIQ_PC001.pdf

PDF 2 MB Posted

Attached to
ROOFING AND EXTERIOR PAINTING IDIQ CONTRACT FOR VARIOUS PROJECTS AT THE U. S. MARINE CORPS AIR STATION, IWAKUNI, JAPAN
Solicitation number
N4008424B5500
Issued by

About this file

This document is a Proposed Change No. PC001 to the Roofing and Exterior Painting IDIQ Contract for Various Projects at the U.S. Marine Corps Air Station Iwakuni, Japan. The key changes include revisions to the Schedule of Indefinite Quantity Work, Supplementary Explanation of Work, and Construction Quality Control requirements. The revisions cover updates to lightning protection work, qualifications for the Construction Quality Control Manager, and licensing requirements for key personnel. The document also includes a revised drawing for a roofing project. This contract opportunity is being solicited by the Department of the Navy Naval Facilities Engineering Command. Bidders must be authorized to operate in Japan and possess a construction license. There will be no site visit or pre-bid conference, and bids must be submitted through SAM.gov.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed Change No.PC001 Page 1

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

FEAD IWAKUNI

DATE: 09/APR/2024

Proposed Change No.PC001

Roofing and Exterior Painting IDIQ Contract for Various Projects at the

U. S. Marine Corps Air Station, Iwakuni, Japan

Attachment:

(1) Revised Roofing and Painting Schedule of Indefinite Quantity Work

(No.PC001)

(2) Revised Roofing and Painting Supplementary Explanation of Work

(No.PC001)

(3) Revised Section 01 45 00.00 20 Conctruction Quality Control (No.PC001)

(4) Revised R-37 Drawing of Roofing Project (No.PC001)

GENERAL INTENT:

The following changes and revisions must be made to the NAVFAC specifications and drawings listed herein.

Revised NAVFAC specifications and drawings will be issued with this change.

1. Changes must be made to pages of the specifications as follows:

ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK

ITEM NO; A085 through G085

Change “Remove existing conductors and support materials for lightning protection and provide ones to match existing.”, to read as “Temporarily lifting of existing conductors for lightning protection, remove existing support materials and provide new.”

ROOFING AND PAINTING SUPPLEMENTARY EXPLANATION OF WORK

ITEM NO; 085

Change “Remove existing conductors and support materials for lightning protection and provide ones and connect to the existing line. The conductor must include wiring, bar or rod type and related expansion terminals. The conductor connection investigation must be included in this work item (according to NFPA 780). As shown in the attached sketch R-37.”, to read as “Temporarily lifting of existing conductors for lightning protection affected by roofing repair work. Remove existing support materials and provide new. As shown in the attached sketch R-37.”

Proposed Change No.PC001 Page 2

SECTION 01 45 00.00 20 “CONSTRUCTION QUALITY CONTROL”

PARA. 1.5.1.2 Qualifications – a

Delete the subparagraph; “A minimum of 5 years’ combined experience in the following positions: On-Site Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction contracts that included the major trades that are part of a Task Order.”

PARA. 1.5.1.2 Qualifications – b

LINE 1. Change “A minimum of 2 years’ experience as QC Manager.”, to read as “A minimum of 3 years’ experience of Construction Quality Control.”

PARA. 1.5.1.2 Qualifications – e

LINE 1. Change “Have the Japanese license of Construction Quality Management Technician (“Kanri Gijyutsu-sha Shikaku-sha Shou”) and one of the following, as specified in a Task Order;

(1) 1st Class Civil Engineering Works Execution Managing Engineer

“1 Kyu, Doboku Sekou Kanri Gishi”

(2) 1st Class Building Works Execution Manager “1 Kyu, Kenchiku Sekou Kanri Gishi”

(3) 1st Class Electric Works Execution Manager

“1 Kyu, Dennki Kouji Sekou Kanri Gishi”

(4) 1st Class Piping Works Execution Managing Engineer “1 Kyu, Kankouji Sekou Kanri Gishi” ”, to read as “

(1) For Roofing Projects;

Have the Japanese license of Construction Quality Management Technician (“Kanri Gijyutsu-sha Shikaku-sha Shou”) and 1st Class Building Works Execution Manager (“1 Kyu, Kenchiku Sekou Kanri Gishi”).

(2) For Painting Projects;

Have the Japanese license of 1st or 2nd Class Building Works Execution Manager (“1 Kyu or 2 Kyu, Kenchiku Sekou Kanri Gishi”)”

PARA. 1.5.1.2 Qualifications

Add the following new subparagraph: “f. The key personnel may be able to serve multiple Task Orders simultaneously if the Contractor submits a

Proposed Change No.PC001 Page 3 request in writing to the Contracting Officer for considerations using same key personnel and the request is approved.”

2. Changes must be made to the prints of the drawings as follows: The following revised drawing supersedes previously issued drawings bearing the same sheet number and title:

SHEET NO. REV LTR TITLE

R-37 1 LIGHTNING PROTECTION

-- End of Proposed Change No.PC001 --

Roofing and Painting IDIQ Contract for Various Projects

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

ITEM EST UT UNIT EST AMT

NO QTY PRICE TOTAL

1,000 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

1,500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

500 SM ¥ ¥ 0

300 SM ¥ ¥ 0

100 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

200 LM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 LM ¥ ¥ 0

200 LM ¥ ¥ 0

100 SM ¥ ¥ 0

800 SM ¥ ¥ 0

100 SM ¥ ¥ 0

A006

Remove existing asbestos contained mineral surfaced built-up roofing.

A009 Remove existing asbestos contained sheet waterproof.

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (up to 300SM).

A018

ROOFING AND PAINTING SCHEDULE OF INDEFINITE

QUANTITY WORK

SCHEDULE OF INDEFINITE QUANTITY WORK - "A"

EXHIBIT A Price for Ordering Period 1

DESCRIPTION

A001 Remove all existing mineral surfaced built-up roofing.

ROOFING

A016

A010

Clean up existing built-up roofing surface by water blasting.

Repair existing blister of asphalt roofing system.

A004 Remove existing mineral surfaced built-up roofing. (100% vertical area , 5% horizontal area)

A002 Remove all existing sheet waterproofing.

A005

A003

A008

A007

A011

A012

A015

Remove existing insulation board.

Clean up existing gutter surface by water blasting.

Cut and remove existing local deteriorated asphalt roofing system and repair them.

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (over 300SM).

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (up to 300SM).

A013

A014

A017

A019

Remove existing sheet waterproofing. (100% vertical area , 5% horizontal area)

Remove all existing urethane waterproof coating.

Remove existing urethane waterproof coating. (100% vertical area , 5% horizontal area)

Remove existing asbestos contained waterproof coating.

Repair existing concrete covering of the slab.

Repair existing concrete crack with U-cut.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK - "A"

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

500 SM ¥ ¥ 0

200 SM ¥ ¥ 0

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

400 SM ¥ ¥ 0

50 SM ¥ ¥ 0

A025

Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (over 300SM).

Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (up to

300SM).

A022

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (over 300SM).

A024

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (up to 300SM).

Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (over 300SM).

A020

A031

Provide polymer modified bitumen roofing system on existing riser surface.

A033

Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (up to

300SM).

Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to

300SM).

Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over

300SM).

A026 Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (over

300SM).

A027 Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (up to 300SM).

A029

Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (over 300SM).

A028

A030

A032

A021

Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (over 300SM).

Provide urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to 300SM).

Provide urethane membrane waterproof coating system on existing concrete surface (over 300SM).

Provide urethane membrane waterproof coating system on existing riser surface.

Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (up to 300SM).

A034

A035

A036

A023

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

250 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

10 EA ¥ ¥ 0

100 SM ¥ ¥ 0

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

20 SM ¥ ¥ 0

30 SM ¥ ¥ 0

30 SM ¥ ¥ 0

30 LM ¥ ¥ 0

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

70 SM ¥ ¥ 0

100 LM ¥ ¥ 0

40 EA ¥ ¥ 0

Remove existing sheet roofing and provide synthetic polymer roofing system with heat resistant rigid insulation board.

Provide polymer modified bitumen roofing system on steel surface of vent pipe.

Remove existing roof tile & asphalt roofing felt and provide structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.

Remove existing fascia & gable wood board and provide wood fascia & gable board.

Provide 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.

Remove existing metal roof and provide high profile folded sheet metal roof.

Remove existing metal roof and provide low profile folded sheet metal roof.

Remove existing expansion joint filler & sealant and provide expansion joint filler & sealant .

Provide SST air ventilator pipe.

A048

A046

A050

A051

A052

A053

A054

A055

A049

A043

A044

Provide precoated galvanized metal roof on existing metal roof.

Remove existing metal roof fascia & gable and provide precoated galvanized metal fascia & gable.

Remove existing slate roofing system and provide slate roofing system.

Remove existing sheet roofing and provide synthetic polymer roofing system.

Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide asphalt shingle roofing & asphalt roofing felt.

Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (up to 300SM).

Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (over 300SM).

Provide urethane membrane waterproof coating system on existing & concrete structure and foundation surface.

Provide mineral surfaced built-up roofing for maintenance access.

Remove existing asphalt shingle roofing system and provide asphalt shingle roofing system.

A037

A038

A039

A040

A041

A042

A045

A047

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 EA ¥ ¥ 0

300 LM ¥ ¥ 0

100 LM ¥ ¥ 0

200 LM ¥ ¥ 0

200 LM ¥ ¥ 0

70 LM ¥ ¥ 0

100 LM ¥ ¥ 0

300 LM ¥ ¥ 0

200 LM ¥ ¥ 0

200 LM ¥ ¥ 0

100 LM ¥ ¥ 0

100 LM ¥ ¥ 0

100 LM ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

20 LM ¥ ¥ 0

A057 Remove existing aluminum coping and provide aluminum coping.

Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide polymer modified bitumen roofing system around existing vent pipe with SST band.

A056

Remove existing aluminum expansion cover (up to W=450) and provide aluminum expansion cover.

A062 Remove existing aluminum expansion cover (W=450 ~

600) and provide aluminum expansion cover.

A058 Remove existing PC coping and provide aluminum coping.

A059 Remove existing aluminum coping temporarily and reinstall existing aluminum coping.

A060 Provide aluminum coping to existing concrete parapet/wall.

A061

Remove existing horizontal roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer.

A063

A064

A065

A066

Remove existing metal flashing and provide precoated galvanized flashing of roof edge.

A067

A068

A069

A070

A071

A072

A073

Remove existing metal strap with sealant and provide aluminum strap with sealant.

Provide aluminum strap with sealant.

Remove existing aluminum strap or flashing with sealant and provide aluminum flashing with sealant.

Provide aluminum flashing with sealant.

Remove existing metal flashing and provide aluminum or stainless steel flashing of roof edge.

Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.

Remove existing vertical roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer.

Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.

Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (up to W=200).

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

30 EA ¥ ¥ 0

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

20 CM ¥ ¥ 0

20 SM ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

30 EA ¥ ¥ 0

30 EA ¥ ¥ 0

A077

A074

A075

A076

Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (over W=400).

Remove existing stainless mesh strainer in the gutter and provide SST mesh strainer.

Remove existing rain gutter & gutter hanger and provide PVC gutter & stainless gutter hanger.

A078

A087

Provide raised concrete foundation (over 600x600x300H).

Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti-vibration rubber with.

Temporarily lifting of existing conductors for lightning protection, remove existing support materials and provide new.

A085

Remove existing downspout with leader straps and provide PVC downspout with SST leader straps with concrete splash block.

Remove existing concrete foundation.A079

A080

A081

A082

A083

A084

A086

A088

Provide raised concrete foundation (300x300~400x400x200H).

Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (W=200~400).

Cut and weld existing steel leg (over 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

Remove existing cement mortar and provide waterproof cement mortar for existing concrete foundation.

Provide raised concrete foundation (400x400~600x600x300H).

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

30 EA ¥ ¥ 0

30 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 LM ¥ ¥ 0

20 LM ¥ ¥ 0

2,000 SM ¥ ¥ 0

500 LM ¥ ¥ 0

10 EA ¥ ¥ 0

50 EA ¥ ¥ 0

5 EA ¥ ¥ 0

20 EA ¥ ¥ 0

400 SM ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

10 EA ¥ ¥ 0

30 CM ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

A092

A089

A090

A091

LBP sampling of existing painted steel surface at roof.

A096

A098

ACM sampling of existing roofing material.

Disposal of ACM / LBP.

LBP sampling of existing painted steel surface at roof and request sampling analysis.

Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

Remove existing steel leg with concrete base and provide steel leg support with isolation rubber sheet.

Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

Cut and weld existing steel leg (over 75x75 angle or over 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

Paint/Repaint exposed surface of existing steel & wood surfaces.

Repaint exposed surface of existing lead based paint contained steel surfaces.

Erect and dismantle scaffolding.

Erect and dismantle safety handrail to the parapet for roof work.

Temporary enclosure for ACM / LBP control area.

Air, wipe and / or soil sampling and monitoring for ACM / LBP control area.

PCM air sampling and monitoring for ACM / LBP control.

TEM air sampling and monitoring for ACM / LBP control.

ACM sampling of existing roofing material and request sampling analysis.

Remove existing acrylic skylight and provide acrylic skylight (±600x600).

Remove existing acrylic skylight and provide acrylic skylight (±900x900).

A104

A105

A099

Change room for ACM / LBP control area.

A106

A107

A108

A101

A094

A093

A095

A097

A100

A102

A103

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

15 EA ¥ ¥ 0

40 EA ¥ ¥ 0

20 EA ¥ ¥ 0

5 EA ¥ ¥ 0

20 EA ¥ ¥ 0

31,000 SM ¥ ¥ 0

600 LM ¥ ¥ 0

200 EA ¥ ¥ 0

5,000 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

300 SM ¥ ¥ 0

2,500 SM ¥ ¥ 0

200 SM ¥ ¥ 0

500 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

50 SM ¥ ¥ 0

3,000 LM ¥ ¥ 0

3,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0Repaint existing steel H-section surfaces, up to 150mm height with polyurethane type coating.

A132

Repaint existing steel square pipe surfaces, up to 1200mm outside perimeter with polyurethane type coating.

Prepare Lead-free surfaces with SSPCW Type 1 (RA-Type).

Remove existing paint for no-paint concrete surfaces and trowel finish repair.

Repaint existing steel window and window frames.

Repaint existing wooden beams and columns after surface preparation.

Repaint existing steel square pipe surfaces, up to 800mm outside perimeter with polyurethane type coating.

Provide cast-iron vent cap over exist vent pipe.

Repaint existing steel doors / Roll up doors and door frames w/ water-based paint and water-based primer.

Temporary remove, clean and reinstall existing skylight/ventilator.

Prepare Lead-free surfaces with SSPCW Type 2 (RB-Type).

Remove existing acrylic skylight and provide acrylic skylight (±1300x1300).

Provide 50dia stainless steel overflow drain pipe with mesh.

Temporary remove, clean and reinstall existing aluminum roof skylight canopy (up to 30 SM).

Prepare Lead-free surfaces with water cleaning.

Remove debris and clean existing downspout.

Prepare Lead-free surfaces with SSPCW Type 3 (RC-Type).

A128

A129 Repaint existing steel square pipe surfaces, up to 400mm outside perimeter with polyurethane type coating.

A131

A111

A113

A114

A115

A116

A117

A118

A119

A120

Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM >

A122 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM <

A123 Repaint existing wooden siding and board surfaces.

A124 Repaint existing calcium silicate board surfaces after surface preparation.

Remove debris and clean existing gutter.

A127

A126

A121

A125

PAINTING

A109

A110

A112

Repaint existing steel doors / Roll up doors and door frames.

A130

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

2,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

3,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

50 SM ¥ ¥ 0

150 SM ¥ ¥ 0

30 SM ¥ ¥ 0

20 SM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

500 SM ¥ ¥ 0

250 LM ¥ ¥ 0

150 LM ¥ ¥ 0

200 LM ¥ ¥ 0

150 LM ¥ ¥ 0

200 LM ¥ ¥ 0

150 LM ¥ ¥ 0

100 LM ¥ ¥ 0

A145

A146

A147

Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter.

A148

Repaint existing steel H-section surfaces, up to 250mm height with polyurethane type coating.

A134 Repaint existing steel H-section surfaces, up to 350mm height with polyurethane type coating.

A135 Repaint existing steel H-section surfaces, up to 450mm height with polyurethane type coating.

A136 Repaint existing steel channel surfaces, up to 50mm height with polyurethane type coating.

Repaint existing steel channel surfaces, up to 100mm height with polyurethane type coating.

A137

A138 Repaint existing steel channel surfaces, up to 150mm height with polyurethane type coating.

A139 Repaint existing steel and galvanized steel box surfaces.

A140 Repaint existing steel doors and door frames with polyurethane type coating.

Repaint existing steel windows and window frames with polyurethane type coating.

A142 Repaint existing steel and galvanized steel box surfaces with polyurethane type coating.

A141

A143 Repaint existing wood doors and door frames.

A144 Repaint existing glazed wood windows and frames.

Repaint existing aluminum panel surfaces.

Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter.

Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating.

A149

A151

Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating.

Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter.

Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter with polyurethane type coating.

Repaint existing steel and galvanized steel pipe surfaces, up to 600mm outside diameter.

A150

A152

A133

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 LM ¥ ¥ 0

250 LM ¥ ¥ 0

150 LM ¥ ¥ 0

200 LM ¥ ¥ 0

150 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

100 LM ¥ ¥ 0

2,000 SM ¥ ¥ 0

250 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

250 SM ¥ ¥ 0

6,000 SM ¥ ¥ 0

250 SM ¥ ¥ 0

25 EA ¥ ¥ 0

100 EA ¥ ¥ 0

50 SM ¥ ¥ 0

20 EA ¥ ¥ 0

800 SM ¥ ¥ 0

400 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

500 SM ¥ ¥ 0

300 SM ¥ ¥ 0

500 SM ¥ ¥ 0

500 SM ¥ ¥ 0

Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter.

A157 Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating.

Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter.

A155 Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating.

Provide urethane roof coating over existing roof coating.A173

A163 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >

Repaint existing steel and galvanized steel pipe surfaces, over 600mm outside diameter with polyurethane type coating.

A158 Repaint existing PVC gutter surfaces after surface preparation.

A159 Repaint existing PVC downspout surfaces after surface preparation up to 100mm outside diameter.

A160 Repaint existing PVC downspout surfaces after surface preparation up to 200mm outside diameter.

Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM > Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <

A153

A161

A162

Provide slight-elastic type multi-layer coating system.

Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <

Repaint existing multi-layer coating surfaces with top coating. 300SM >

Repaint existing multi-layer coating surfaces with top coating. 300SM <

Repaint existing building numbers and unit number text.

A164

A165

A166

A167

A175

Repaint letters, unit: continuous letters (one word)/ EA.

Repaint plaster (Shikkui) surfaces.

Repaint existing non-slip floor coating.

A169 Repaint existing ACB/Cement board surfaces.

A170 Repaint fire alarm bell.

A174 Provide roof coating over existing roof (for single).

A168

A171

A177

A172

A154

A156

Provide rubber type multi-layer coating system.

A176 Provide acrylic type multi-layer coating system.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 SM ¥ ¥ 0

300 SM ¥ ¥ 0

100 SM ¥ ¥ 0

250 SM ¥ ¥ 0

100 SM ¥ ¥ 0

250 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

1,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

200 LM ¥ ¥ 0

250 SM ¥ ¥ 0

500 LM ¥ ¥ 0

20 LM ¥ ¥ 0

20 LM ¥ ¥ 0

20 LM ¥ ¥ 0

A193

A183

A184

A189

Remove existing cement mortar, and provide waterproof cement mortar.

Remove existing floor coating on concrete and prepare surfaces with resin mortar.

Repair concrete spalling.

Repair concrete crack with Seal method.

Repair concrete crack with U-cut seal material filling method.

Repair concrete crack with epoxy resin injection method.

Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM>

Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM<

Provide silicon type for foundation use paint on concrete and cement mortar foundation surfaces.

Remove existing cement board and provide cement board.

A194 Remove existing metal flashing and provide metal flashing.

A195

A178 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.

Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM>

A181

A182

A187

A188

A190

A191

A192

A197

A185

A186

Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM<

Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM>

A179

A180

Remove existing SST expansion joint and provide stainless steel expansion joint (Floor + Floor 100mm type).

Provide waterproof silicon hydride type coating on concrete and cement mortar foundation surfaces.

Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM<

Remove existing ALUM expansion joint and provide ALUM expansion joint (Exterior wall + Exterior wall 100mm type).

A196 Remove existing ALUM expansion joint and provide ALUM expansion joint (Exterior wall + Exterior wall corner 100mm type).

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

20 LM ¥ ¥ 0

20 LM ¥ ¥ 0

400 SM ¥ ¥ 0

100 SM ¥ ¥ 0

200 EA ¥ ¥ 0

50 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

30 EA ¥ ¥ 0

50 EA ¥ ¥ 0

1,500 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

10 SM ¥ ¥ 0

1 LM ¥ ¥ 0

1 LM ¥ ¥ 0

100 LM ¥ ¥ 0

100 LM ¥ ¥ 0

Remove existing wood window w/ glazing and provide wood window w/ tinted glazing including ALUM bottom and upper guide rails. Paint wood window and frames.

A217 Remove damaged decorative wood post and filler and provide decorative wood post and filler (up to 150mm x 150mm).

A218 Remove damaged wood beam and provide wood beam (up to 400mm x 200mm).

A219 Remove half-round PVC gutter and provide half-round PVC gutter (up to W=200mm).

A220 Remove square PVC gutter and provide square PVC gutter (up to radius 200mm).

Remove existing joint sealants and provide joint sealants.

Provide ALUM building identification signs (H=610mm).

A207 Provide ALUM building identification signs (H=457mm).

A208 Provide ALUM building identification signs (H=305mm).

A212 Provide SST illuminated signs with Electrical work.

A213 Remove existing building signs.

A211 Provide SST building identification signs (H=305mm).

A206

A214 Remove existing sealants for windows/ doors and provide sealants for windows/ doors.

A209 Provide SST building identification signs (H=610mm).

A210 Provide SST building identification signs (H=457mm).

Remove existing vent cover and provide SST deep type air vent cover (up to 200mm diameter).

A204 Remove existing vent cover and provide SST deep type air vent cover (200mm and over diameter).

A201

A202 Remove existing vent cover and provide aluminum air vent cover (up to 200mm diameter).

A200

Provide building number sign.

Remove existing reinforced FRP and provide reinforced

FRP.

A203

A205

A215

A216

Remove existing galvanized steel sheet and provide galvanized steel sheet.

A198 Remove existing SST expansion joint and provide stainless steel expansion joint (Floor + Floor corner 100mm type).

Remove existing aluminum expansion joint and provide aluminum expansion joint (Exterior wall + Exterior wall corner 200mm type).

A199

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 LM ¥ ¥ 0

200 LM ¥ ¥ 0

200 EA ¥ ¥ 0

10 SM ¥ ¥ 0

5 SM ¥ ¥ 0

5 SM ¥ ¥ 0

5 SM ¥ ¥ 0

5 SM ¥ ¥ 0

20 EA ¥ ¥ 0

100 EA ¥ ¥ 0

50 SM ¥ ¥ 0

20 EA ¥ ¥ 0

200 SM ¥ ¥ 0

200 SM ¥ ¥ 0

200 SM ¥ ¥ 0

800 SM ¥ ¥ 0

25 EA ¥ ¥ 0

25 EA ¥ ¥ 0

25 EA ¥ ¥ 0

10 EA ¥ ¥ 0

5 CM ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0Laboratory reports of LBP sampling of existing steel surfaces of material.

Remove existing ACB and provide cement board.

A237 Air, wipe and/or soil sampling and monitoring for LBP control area.

A238 PCM air sampling and monitoring for ACM control.

A239

A240

A241

A242

A244

A243

A231

Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50SM hole/EA.

A234

A232

LBP surface preparation with solvent cleaning.

A235 ACM surface preparation with solvent cleaning.

A236 Provide temporary enclosure for LBP / ACM control area.

A233 LBP surface preparation with SSPCW Type 3.

TEM air sampling and monitoring for ACM control.

Provide temporary Change Room for LBP / ACM control area.

Disposal of LBP / ACM.

A245

ACM sampling of existing material.

Laboratory reports of ACM sampling of existing material.

LBP sampling of existing steel surfaces of material.

Remove damaged frosted glass panes on aluminum framed door or window and provide frosted glass panes.

A227 Remove damaged tempered glass panes on aluminum framed door or window and provide tempered glass panes.

A228 Remove damaged wired glass panes on aluminum framed door or window and provide wired glass panes.

A229 Remove existing acrylic lighting fixture covers and provide acrylic lighting fixture covers.

A230 Patch repair hole on steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05SM hole/EA.

Remove PVC downspout and provide PVC downspout (up to 125mm outside diameter).

A223 Remove existing downspout bracket and band and provide SST bracket and band.

A224 Remove damaged polycarbonate roofing and provide polycarbonate (THK=5mm).

A225 Remove damaged clear glass panes on aluminum framed door or window and provide clear glass panes.

A222 Remove PVC downspout and provide PVC downspout (up to 200mm outside diameter).

A221

A226

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

10 DAY ¥ ¥ 0

6,000 SM ¥ ¥ 0

2,000 LM ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

150 SM ¥ ¥ 0

200 LM ¥ ¥ 0

200 SM ¥ ¥ 0

200 LM ¥ ¥ 0

1 LS ¥ ¥ 60,000,000

¥ 0

Abbreviations:

A258

A246

A247

A248

Provide bucket truck lift.

Provide scaffolding.

Provide safety barricade and safety sign.

Remove and provide pigeon net, Unit: Up to 16SM of opening size/EA.

Remove and provide bird spike, Unit: Up to 10LM of length size/EA.

Temporarily remove and reinstall existing steel window security grills, Unit: Up to 2SM of guard size/EA.

Temporarily remove and reinstall existing steel window security grills, Unit: Up to 3SM of guard size/EA.

Temporarily remove and reinstall existing steel window security grills, Unit: Up to 4SM of guard size/EA.

Other related miscellaneous work (must be negotiated at time of order). (Estimated)

A254

A255

Clean existing SST handrails.

Clean existing SST guardrails.

TOTAL (A001 through A258) Not-To-Exceed

ALUM=Aluminum, EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Height, W = Width, SSPCW = Standard Specifications for Public Construction Work, SST = Stainless Steel

Clean existing SST surfaces.

Clean existing ALUM / glass windows and frames.

A256

A257

A249

A250

A251

A252

A253

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

ITEM EST UT UNIT EST AMT

NO QTY PRICE TOTAL

1,000 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

1,500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

500 SM ¥ ¥ 0

300 SM ¥ ¥ 0

100 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

200 LM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 LM ¥ ¥ 0

200 LM ¥ ¥ 0

100 SM ¥ ¥ 0

800 SM ¥ ¥ 0

100 SM ¥ ¥ 0

B017 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (up to 300SM).

B018 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (over 300SM).

B019 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (up to 300SM).

B014 Repair existing blister of asphalt roofing system.

B015 Repair existing concrete covering of the slab.

B016 Repair existing concrete crack with U-cut.

B011 Clean up existing built-up roofing surface by water blasting.

B012 Clean up existing gutter surface by water blasting.

B013 Cut and remove existing local deteriorated asphalt roofing system and repair them.

B008 Remove existing asbestos contained mineral surfaced built-up roofing.

B009 Remove existing asbestos contained sheet waterproof.

B010 Remove existing asbestos contained waterproof coating.

B006 Remove existing urethane waterproof coating. (100% vertical area , 5% horizontal area)

B007 Remove existing insulation board.

B002 Remove all existing sheet waterproofing.

B003 Remove all existing urethane waterproof coating.

B004 Remove existing mineral surfaced built-up roofing. (100% vertical area , 5% horizontal area)

ROOFING AND PAINTING SCHEDULE OF INDEFINITE

QUANTITY WORK

SCHEDULE OF INDEFINITE QUANTITY WORK - "B"

EXHIBIT B Price for Ordering Period 2

DESCRIPTION

ROOFING

B001 Remove all existing mineral surfaced built-up roofing.

B005 Remove existing sheet waterproofing. (100% vertical area , 5% horizontal area)

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK - "B"

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

500 SM ¥ ¥ 0

200 SM ¥ ¥ 0

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

400 SM ¥ ¥ 0

200 SM ¥ ¥ 0

400 SM ¥ ¥ 0

50 SM ¥ ¥ 0

B035 Provide urethane membrane waterproof coating system on existing concrete surface (over 300SM).

B036 Provide urethane membrane waterproof coating system on existing riser surface.

B032 Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to

300SM).

B033 Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over

300SM).

B034 Provide urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to 300SM).

B029 Provide polymer modified bitumen roofing system on existing riser surface.

B030 Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (up to

300SM).

B031 Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (over 300SM).

B026 Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (over

300SM).

B027 Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (up to 300SM).

B028 Provide polymer modified bitumen roofing system on

B023 Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (up to 300SM).

B024 Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (over 300SM).

B025 Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (up to

300SM).

B020 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (over 300SM).

B021 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (up to 300SM).

B022 Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (over 300SM).

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

250 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

10 EA ¥ ¥ 0

100 SM ¥ ¥ 0

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

20 SM ¥ ¥ 0

30 SM ¥ ¥ 0

30 SM ¥ ¥ 0

30 LM ¥ ¥ 0

50 SM ¥ ¥ 0

50 SM ¥ ¥ 0

70 SM ¥ ¥ 0

100 LM ¥ ¥ 0

40 EA ¥ ¥ 0

B053 Remove existing sheet roofing and provide synthetic polymer roofing system with heat resistant rigid insulation board.

B054 Remove existing expansion joint filler & sealant and provide expansion joint filler & sealant .

B055 Provide SST air ventilator pipe.

B050 Remove existing metal roof fascia & gable and provide precoated galvanized metal fascia & gable.

B051 Remove existing slate roofing system and provide slate roofing system.

B052 Remove existing sheet roofing and provide synthetic polymer roofing system.

B047 Remove existing metal roof and provide high profile folded sheet metal roof.

B048 Remove existing metal roof and provide low profile folded sheet metal roof.

B049 Provide precoated galvanized metal roof on existing metal roof.

B044 Remove existing roof tile & asphalt roofing felt and provide structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.

B045 Remove existing fascia & gable wood board and provide wood fascia & gable board.

B046 Provide 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.

B041 Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (up to 300SM).

B042 Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (over 300SM).

B043 Provide polymer modified bitumen roofing system on steel surface of vent pipe.

B038 Provide mineral surfaced built-up roofing for maintenance access.

B039 Remove existing asphalt shingle roofing system and provide asphalt shingle roofing system.

B040 Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide asphalt shingle roofing & asphalt roofing felt.

B037 Provide urethane membrane waterproof coating system on existing & concrete structure and foundation surface.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 EA ¥ ¥ 0

300 LM ¥ ¥ 0

100 LM ¥ ¥ 0

200 LM ¥ ¥ 0

200 LM ¥ ¥ 0

70 LM ¥ ¥ 0

100 LM ¥ ¥ 0

300 LM ¥ ¥ 0

200 LM ¥ ¥ 0

200 LM ¥ ¥ 0

100 LM ¥ ¥ 0

100 LM ¥ ¥ 0

100 LM ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

50 EA ¥ ¥ 0

50 EA ¥ ¥ 0

20 LM ¥ ¥ 0

B071 Remove existing vertical roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer.

B072 Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.

B073 Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (up to W=200).

B068 Remove existing metal flashing and provide aluminum or stainless steel flashing of roof edge.

B069 Remove existing horizontal roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer.

B070 Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.

B065 Remove existing aluminum strap or flashing with sealant and provide aluminum flashing with sealant.

B066 Provide aluminum flashing with sealant.

B067 Remove existing metal flashing and provide precoated galvanized flashing of roof edge.

B062 Remove existing aluminum expansion cover (W=450 ~

600) and provide aluminum expansion cover.

B063 Remove existing metal strap with sealant and provide aluminum strap with sealant.

B064 Provide aluminum strap with sealant.

B059 Remove existing aluminum coping temporarily and reinstall existing aluminum coping.

B060 Provide aluminum coping to existing concrete parapet/wall.

B061 Remove existing aluminum expansion cover (up to W=450) and provide aluminum expansion cover.

B056 Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide polymer modified bitumen roofing system around existing vent pipe with SST band.

B057 Remove existing aluminum coping and provide aluminum coping.

B058 Remove existing PC coping and provide aluminum coping.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

30 EA ¥ ¥ 0

50 LM ¥ ¥ 0

50 LM ¥ ¥ 0

20 CM ¥ ¥ 0

20 SM ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

10 EA ¥ ¥ 0

30 EA ¥ ¥ 0

30 EA ¥ ¥ 0

B086 Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

B087 Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

B088 Cut and weld existing steel leg (over 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet.

B083 Provide raised concrete foundation (over 600x600x300H).

B084 Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti-vibration rubber with.

B085 Temporarily lifting of existing conductors for lightning protection, remove existing support materials and provide new.

B080 Remove existing cement mortar and provide waterproof cement mortar for existing concrete foundation.

B081 Provide raised concrete foundation (300x300~400x400x200H).

B082 Provide raised concrete foundation (400x400~600x600x300H).

B077 Remove existing rain gutter & gutter hanger and provide PVC gutter & stainless gutter hanger.

B078 Remove existing downspout with leader straps and provide PVC downspout with SST leader straps with concrete splash block.

B079 Remove existing concrete foundation.

B074 Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (W=200~400).

B075 Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (over W=400).

B076 Remove existing stainless mesh strainer in the gutter and provide SST mesh strainer.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

30 EA ¥ ¥ 0

30 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

20 LM ¥ ¥ 0

20 LM ¥ ¥ 0

2,000 SM ¥ ¥ 0

500 LM ¥ ¥ 0

10 EA ¥ ¥ 0

50 EA ¥ ¥ 0

5 EA ¥ ¥ 0

20 EA ¥ ¥ 0

400 SM ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

40 EA ¥ ¥ 0

10 EA ¥ ¥ 0

30 CM ¥ ¥ 0

20 EA ¥ ¥ 0

20 EA ¥ ¥ 0

B107 Remove existing acrylic skylight and provide acrylic skylight (±600x600).

B108 Remove existing acrylic skylight and provide acrylic skylight (±900x900).

B104 TEM air sampling and monitoring for ACM / LBP control.

B105 Change room for ACM / LBP control area.

B106 Disposal of ACM / LBP.

B101 Temporary enclosure for ACM / LBP control area.

B102 Air, wipe and / or soil sampling and monitoring for ACM / LBP control area.

B103 PCM air sampling and monitoring for ACM / LBP control.

B098 ACM sampling of existing roofing material and request sampling analysis.

B099 LBP sampling of existing painted steel surface at roof.

B100 LBP sampling of existing painted steel surface at roof and request sampling analysis.

B095 Erect and dismantle scaffolding.

B096 Erect and dismantle safety handrail to the parapet for roof work.

B097 ACM sampling of existing roofing material.

B092 Remove existing steel leg with concrete base and provide steel leg support with isolation rubber sheet.

B093 Paint/Repaint exposed surface of existing steel & wood surfaces.

B094 Repaint exposed surface of existing lead based paint contained steel surfaces.

B089 Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

B090 Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

B091 Cut and weld existing steel leg (over 75x75 angle or over 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet.

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

15 EA ¥ ¥ 0

40 EA ¥ ¥ 0

20 EA ¥ ¥ 0

5 EA ¥ ¥ 0

20 EA ¥ ¥ 0

31,000 SM ¥ ¥ 0

600 LM ¥ ¥ 0

200 EA ¥ ¥ 0

5,000 SM ¥ ¥ 0

2,000 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

300 SM ¥ ¥ 0

2,500 SM ¥ ¥ 0

200 SM ¥ ¥ 0

500 SM ¥ ¥ 0

1,000 SM ¥ ¥ 0

500 SM ¥ ¥ 0

100 SM ¥ ¥ 0

100 SM ¥ ¥ 0

50 SM ¥ ¥ 0

3,000 LM ¥ ¥ 0

3,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0B132 Repaint existing steel H-section surfaces, up to 150mm height with polyurethane type coating.

B129 Repaint existing steel square pipe surfaces, up to 400mm outside perimeter with polyurethane type coating.

B130 Repaint existing steel square pipe surfaces, up to 800mm outside perimeter with polyurethane type coating.

B131 Repaint existing steel square pipe surfaces, up to 1200mm outside perimeter with polyurethane type coating.

B125 Repaint existing wooden beams and columns after surface preparation.

B128 Repaint existing steel window and window frames.

B122 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM <

B123 Repaint existing wooden siding and board surfaces.

B124 Repaint existing calcium silicate board surfaces after surface preparation.

B126 Repaint existing steel doors / Roll up doors and door frames.

B127 Repaint existing steel doors / Roll up doors and door frames w/ water-based paint and water-based primer.

B119 Prepare Lead-free surfaces with SSPCW Type 1 (RA-Type).

B120 Remove existing paint for no-paint concrete surfaces and trowel finish repair.

B121 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM >

B116 Remove debris and clean existing downspout.

B117 Prepare Lead-free surfaces with SSPCW Type 3 (RC-Type).

B118 Prepare Lead-free surfaces with SSPCW Type 2 (RB-Type).

B113 Temporary remove, clean and reinstall existing skylight/ventilator.

PAINTING

B114 Prepare Lead-free surfaces with water cleaning.

B115 Remove debris and clean existing gutter.

B110 Provide 50dia stainless steel overflow drain pipe with mesh.

B111 Provide cast-iron vent cap over exist vent pipe.

B112 Temporary remove, clean and reinstall existing aluminum roof skylight canopy (up to 30 SM).

B109 Remove existing acrylic skylight and provide acrylic skylight (±1300x1300).

CUI//FEDCON [when filled in]

Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]

2,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

1,000 LM ¥ ¥ 0

3,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

2,000 LM ¥ ¥ 0

50 SM ¥ ¥ 0

150 SM ¥ ¥ 0

30 SM ¥ ¥ 0

20 SM ¥ ¥ 0

200 SM ¥ ¥ 0

100 SM ¥ ¥ 0

500 SM ¥ ¥ 0

250 LM ¥ ¥ 0

150 LM ¥ ¥ 0

200 LM ¥ ¥ 0

150 LM ¥ ¥ 0

200 LM ¥ ¥ 0

150 LM ¥ ¥ 0

100 LM ¥ ¥ 0

B150 Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter.

B151 Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter with polyurethane type coating.

B152 Repaint existing steel and galvanized steel pipe surfaces, up to 600mm outside diameter.

B147 Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating.

B148 Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter.

B149 Repaint existing steel and galvanized steel pipe…