This document provides schedules of indefinite quantity work for roofing and painting services at various project sites. It includes 258 line items detailing the removal and installation of roofing materials, waterproofing systems, insulation, flashing, gutters, downspouts, mechanical equipment supports, and other exterior elements. It also lists 159 painting and coating tasks involving surface preparation and application of various coatings to steel, wood, concrete, and other building materials. Pricing is to be provided for four separate ordering periods. The schedules include extensive abbreviations and notes to clarify technical requirements and measurement units for the line items.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXIBIT-A
| ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK | |
| SCHEDULE OF INDEFINITE QUANTITY WORK - "A" | |
| EXHIBIT A Price for Ordering Period 1 |
| ITEM | DESCRIPTION | EST | UT | UNIT | EST AMT |
| NO | QTY | PRICE | TOTAL |
| ROOFING | ||||||
| A001 | Remove all existing mineral surfaced built-up roofing. | 1,000 | SM | ¥ | ¥ | 0 |
| A002 | Remove all existing sheet waterproofing. | 100 | SM | ¥ | ¥ | 0 |
| A003 | Remove all existing urethane waterproof coating. | 100 | SM | ¥ | ¥ | 0 |
| A004 | Remove existing mineral surfaced built-up roofing. (100% vertical area , 5% horizontal area) | 1,500 | SM | ¥ | ¥ | 0 |
| A005 | Remove existing sheet waterproofing. (100% vertical area , 5% horizontal area) | 100 | SM | ¥ | ¥ | 0 |
| A006 | Remove existing urethane waterproof coating. (100% vertical area , 5% horizontal area) | 100 | SM | ¥ | ¥ | 0 |
| A007 | Remove existing insulation board. | 400 | SM | ¥ | ¥ | 0 |
| A008 | Remove existing asbestos contained mineral surfaced built-up roofing. | 500 | SM | ¥ | ¥ | 0 |
| A009 | Remove existing asbestos contained sheet waterproof. | 300 | SM | ¥ | ¥ | 0 |
| A010 | Remove existing asbestos contained waterproof coating. | 100 | SM | ¥ | ¥ | 0 |
| A011 | Clean up existing built-up roofing surface by water blasting. | 2,000 | SM | ¥ | ¥ | 0 |
| A012 | Clean up existing gutter surface by water blasting. | 200 | LM | ¥ | ¥ | 0 |
| A013 | Cut and remove existing local deteriorated asphalt roofing system and repair them. | 200 | SM | ¥ | ¥ | 0 |
| A014 | Repair existing blister of asphalt roofing system. |
| 100 | SM | ¥ | ¥ | 0 | ||||
| A015 | Repair existing concrete covering of the slab. | 100 | LM | ¥ | ¥ | 0 | ||
| A016 | Repair existing concrete crack with U-cut. | 200 | LM | ¥ | ¥ | 0 | ||
| A017 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (up to 300SM). | 100 | SM | ¥ | ¥ | 0 | ||
| A018 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (over 300SM). | 800 | SM | ¥ | ¥ | 0 | ||
| A019 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (up to 300SM). | 100 | SM | ¥ | ¥ | 0 | ||
| A020 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (over 300SM). | 500 | SM | ¥ | ¥ | 0 | ||
| A021 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (up to 300SM). | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| A022 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (over 300SM). | 500 | SM | ¥ | ¥ | 0 | ||
| A023 | Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (up to 300SM). | 200 | SM | ¥ | ¥ | 0 | ||
| A024 | Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (over 300SM). |
| 500 | SM | ¥ | ¥ | 0 | |
| A025 | Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (up to 300SM). | ||||
| 100 | SM | ¥ | ¥ | 0 | |
| A026 | Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (over 300SM). | ||||
| 400 | SM | ¥ | ¥ | 0 | |
| A027 | Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (up to 300SM). |
| 100 | SM | ¥ | ¥ | 0 | |
| A028 | Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (over 300SM). |
| 400 | SM | ¥ | ¥ | 0 | |
| A029 | Provide polymer modified bitumen roofing system on existing riser surface. |
| 200 | SM | ¥ | ¥ | 0 | ||||
| A030 | Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (up to 300SM). | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| A031 | Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (over 300SM). | |||||||
| 400 | SM | ¥ | ¥ | 0 | ||||
| A032 | Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM). | |||||||
| 200 | SM | ¥ | ¥ | 0 | ||||
| A033 | Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM). | 400 | SM | ¥ | ¥ | 0 | ||
| A034 | Provide urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to 300SM). | 200 | SM | ¥ | ¥ | 0 | ||
| A035 | Provide urethane membrane waterproof coating system on existing concrete surface (over 300SM). |
| 400 | SM | ¥ | ¥ | 0 | ||||
| A036 | Provide urethane membrane waterproof coating system on existing riser surface. | |||||||
| 50 | SM | ¥ | ¥ | 0 | ||||
| A037 | Provide urethane membrane waterproof coating system on existing & concrete structure and foundation surface. | 50 | SM | ¥ | ¥ | 0 | ||
| A038 | Provide mineral surfaced built-up roofing for maintenance access. |
| 50 | SM | ¥ | ¥ | 0 | ||||
| A039 | Remove existing asphalt shingle roofing system and provide asphalt shingle roofing system. | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| A040 | Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide asphalt shingle roofing & asphalt roofing felt. | 100 | SM | ¥ | ¥ | 0 | ||
| A041 | Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (up to 300SM). |
| 250 | SM | ¥ | ¥ | 0 | |
| A042 | Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (over 300SM). |
| 1,000 | SM | ¥ | ¥ | 0 | |
| A043 | Provide polymer modified bitumen roofing system on steel surface of vent pipe. |
| 10 | EA | ¥ | ¥ | 0 | ||||
| A044 | Remove existing roof tile & asphalt roofing felt and provide structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board. | 100 | SM | ¥ | ¥ | 0 | ||
| A045 | Remove existing fascia & gable wood board and provide wood fascia & gable board. |
| 50 | LM | ¥ | ¥ | 0 | |
| A046 | Provide 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board. |
| 50 | LM | ¥ | ¥ | 0 | |
| A047 | Remove existing metal roof and provide high profile folded sheet metal roof. |
| 20 | SM | ¥ | ¥ | 0 | |
| A048 | Remove existing metal roof and provide low profile folded sheet metal roof. |
| 30 | SM | ¥ | ¥ | 0 | |
| A049 | Provide precoated galvanized metal roof on existing metal roof. |
| 30 | SM | ¥ | ¥ | 0 | ||||
| A050 | Remove existing metal roof fascia & gable and provide precoated galvanized metal fascia & gable. | 30 | LM | ¥ | ¥ | 0 | ||
| A051 | Remove existing slate roofing system and provide slate roofing system. | 50 | SM | ¥ | ¥ | 0 | ||
| A052 | Remove existing sheet roofing and provide synthetic polymer roofing system. | 50 | SM | ¥ | ¥ | 0 | ||
| A053 | Remove existing sheet roofing and provide synthetic polymer roofing system with heat resistant rigid insulation board. |
| 70 | SM | ¥ | ¥ | 0 | ||||
| A054 | Remove existing expansion joint filler & sealant and provide expansion joint filler & sealant . | 100 | LM | ¥ | ¥ | 0 | ||
| A055 | Provide SST air ventilator pipe. | 40 | EA | ¥ | ¥ | 0 | ||
| A056 | Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide polymer modified bitumen roofing system around existing vent pipe with SST band. |
| 50 | EA | ¥ | ¥ | 0 | |
| A057 | Remove existing aluminum coping and provide aluminum coping. |
| 300 | LM | ¥ | ¥ | 0 | |
| A058 | Remove existing PC coping and provide aluminum coping. |
| 100 | LM | ¥ | ¥ | 0 | |
| A059 | Remove existing aluminum coping temporarily and reinstall existing aluminum coping. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| A060 | Provide aluminum coping to existing concrete parapet/wall. | 200 | LM | ¥ | ¥ | 0 | ||
| A061 | Remove existing aluminum expansion cover (up to W=450) and provide aluminum expansion cover. |
| 70 | LM | ¥ | ¥ | 0 | |
| A062 | Remove existing aluminum expansion cover (W=450 ~ 600) and provide aluminum expansion cover. |
| 100 | LM | ¥ | ¥ | 0 | |
| A063 | Remove existing metal strap with sealant and provide aluminum strap with sealant. |
| 300 | LM | ¥ | ¥ | 0 | |
| A064 | Provide aluminum strap with sealant. |
| 200 | LM | ¥ | ¥ | 0 | |
| A065 | Remove existing aluminum strap or flashing with sealant and provide aluminum flashing with sealant. |
| 200 | LM | ¥ | ¥ | 0 | |
| A066 | Provide aluminum flashing with sealant. |
| 100 | LM | ¥ | ¥ | 0 | |
| A067 | Remove existing metal flashing and provide precoated galvanized flashing of roof edge. |
| 100 | LM | ¥ | ¥ | 0 | |
| A068 | Remove existing metal flashing and provide aluminum or stainless steel flashing of roof edge. |
| 100 | LM | ¥ | ¥ | 0 | ||||
| A069 | Remove existing horizontal roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer. | |||||||
| 40 | EA | ¥ | ¥ | 0 | ||||
| A070 | Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them. | 40 | EA | ¥ | ¥ | 0 | ||
| A071 | Remove existing vertical roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer. | 50 | EA | ¥ | ¥ | 0 | ||
| A072 | Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them. | 50 | EA | ¥ | ¥ | 0 | ||
| A073 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (up to W=200). | 20 | LM | ¥ | ¥ | 0 | ||
| A074 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (W=200~400). | 50 | LM | ¥ | ¥ | 0 | ||
| A075 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (over W=400). | 50 | LM | ¥ | ¥ | 0 | ||
| A076 | Remove existing stainless mesh strainer in the gutter and provide SST mesh strainer. | 30 | EA | ¥ | ¥ | 0 | ||
| A077 | Remove existing rain gutter & gutter hanger and provide PVC gutter & stainless gutter hanger. | 50 | LM | ¥ | ¥ | 0 | ||
| A078 | Remove existing downspout with leader straps and provide PVC downspout with SST leader straps with concrete splash block. | 50 | LM | ¥ | ¥ | 0 | ||
| A079 | Remove existing concrete foundation. | 20 | CM | ¥ | ¥ | 0 | ||
| A080 | Remove existing cement mortar and provide waterproof cement mortar for existing concrete foundation. | 20 | SM | ¥ | ¥ | 0 | ||
| A081 | Provide raised concrete foundation (300x300~400x400x200H). | 10 | EA | ¥ | ¥ | 0 | ||
| A082 | Provide raised concrete foundation (400x400~600x600x300H). | 10 | EA | ¥ | ¥ | 0 | ||
| A083 | Provide raised concrete foundation (over 600x600x300H). | 10 | EA | ¥ | ¥ | 0 | ||
| A084 | Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti-vibration rubber with. | 10 | EA | ¥ | ¥ | 0 | ||
| A085 | Remove existing conductors and support materials for lightning protection and provide ones to match existing. | 10 | EA | ¥ | ¥ | 0 | ||
| A086 | Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 10 | EA | ¥ | ¥ | 0 | ||
| A087 | Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| A088 | Cut and weld existing steel leg (over 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| A089 | Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| A090 | Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| A091 | Cut and weld existing steel leg (over 75x75 angle or over 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 20 | EA | ¥ | ¥ | 0 | ||
| A092 | Remove existing steel leg with concrete base and provide steel leg support with isolation rubber sheet. | 20 | EA | ¥ | ¥ | 0 | ||
| A093 | Paint/Repaint exposed surface of existing steel & wood surfaces. | 20 | LM | ¥ | ¥ | 0 | ||
| A094 | Repaint exposed surface of existing lead based paint contained steel surfaces. | 20 | LM | ¥ | ¥ | 0 | ||
| A095 | Erect and dismantle scaffolding. | 2,000 | SM | ¥ | ¥ | 0 | ||
| A096 | Erect and dismantle safety handrail to the parapet for roof work. | 500 | LM | ¥ | ¥ | 0 | ||
| A097 | ACM sampling of existing roofing material. | 10 | EA | ¥ | ¥ | 0 | ||
| A098 | ACM sampling of existing roofing material and request sampling analysis. | 50 | EA | ¥ | ¥ | 0 | ||
| A099 | LBP sampling of existing painted steel surface at roof. | 5 | EA | ¥ | ¥ | 0 | ||
| A100 | LBP sampling of existing painted steel surface at roof and request sampling analysis. | 20 | EA | ¥ | ¥ | 0 | ||
| A101 | Temporary enclosure for ACM / LBP control area. | 400 | SM | ¥ | ¥ | 0 | ||
| A102 | Air, wipe and / or soil sampling and monitoring for ACM / LBP control area. | |||||||
| 40 | EA | ¥ | ¥ | 0 | ||||
| A103 | PCM air sampling and monitoring for ACM / LBP control. | 40 | EA | ¥ | ¥ | 0 | ||
| A104 | TEM air sampling and monitoring for ACM / LBP control. | 40 | EA | ¥ | ¥ | 0 | ||
| A105 | Change room for ACM / LBP control area. | 10 | EA | ¥ | ¥ | 0 | ||
| A106 | Disposal of ACM / LBP. | 30 | CM | ¥ | ¥ | 0 | ||
| A107 | Remove existing acrylic skylight and provide acrylic skylight (±600x600). |
| 20 | EA | ¥ | ¥ | 0 | |
| A108 | Remove existing acrylic skylight and provide acrylic skylight (±900x900). |
| 20 | EA | ¥ | ¥ | 0 | |
| A109 | Remove existing acrylic skylight and provide acrylic skylight (±1300x1300). |
| 15 | EA | ¥ | ¥ | 0 | ||||
| A110 | Provide 50dia stainless steel overflow drain pipe with mesh. | 40 | EA | ¥ | ¥ | 0 | ||
| A111 | Provide cast-iron vent cap over exist vent pipe. | 20 | EA | ¥ | ¥ | 0 | ||
| A112 | Temporary remove, clean and reinstall existing aluminum roof skylight canopy (up to 30 SM). | 5 | EA | ¥ | ¥ | 0 | ||
| A113 | Temporary remove, clean and reinstall existing skylight/ventilator. | 20 | EA | ¥ | ¥ | 0 | ||
| PAINTING | ||||||||
| A114 | Prepare Lead-free surfaces with water cleaning. | 31,000 | SM | ¥ | ¥ | 0 | ||
| A115 | Remove debris and clean existing gutter. | 600 | LM | ¥ | ¥ | 0 | ||
| A116 | Remove debris and clean existing downspout. | 200 | EA | ¥ | ¥ | 0 | ||
| A117 | Prepare Lead-free surfaces with SSPCW Type 3 (RC-Type). | 5,000 | SM | ¥ | ¥ | 0 | ||
| A118 | Prepare Lead-free surfaces with SSPCW Type 2 (RB-Type). | 2,000 | SM | ¥ | ¥ | 0 | ||
| A119 | Prepare Lead-free surfaces with SSPCW Type 1 (RA-Type). | 1,000 | SM | ¥ | ¥ | 0 | ||
| A120 | Remove existing paint for no-paint concrete surfaces and trowel finish repair. | 300 | SM | ¥ | ¥ | 0 | ||
| A121 | Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM > | 2,500 | SM | ¥ | ¥ | 0 | ||
| A122 | Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM < | 200 | SM | ¥ | ¥ | 0 | ||
| A123 | Repaint existing wooden siding and board surfaces. | 500 | SM | ¥ | ¥ | 0 | ||
| A124 | Repaint existing calcium silicate board surfaces after surface preparation. | 1,000 | SM | ¥ | ¥ | 0 | ||
| A125 | Repaint existing wooden beams and columns after surface preparation. | 500 | SM | ¥ | ¥ | 0 | ||
| A126 | Repaint existing steel doors / Roll up doors and door frames. | 100 | SM | ¥ | ¥ | 0 | ||
| A127 | Repaint existing steel doors / Roll up doors and door frames w/ water-based paint and water-based primer. | 100 | SM | ¥ | ¥ | 0 | ||
| A128 | Repaint existing steel window and window frames. | 50 | SM | ¥ | ¥ | 0 | ||
| A129 | Repaint existing steel square pipe surfaces, up to 400mm outside perimeter with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| A130 | Repaint existing steel square pipe surfaces, up to 800mm outside perimeter with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| A131 | Repaint existing steel square pipe surfaces, up to 1200mm outside perimeter with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A132 | Repaint existing steel H-section surfaces, up to 150mm height with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A133 | Repaint existing steel H-section surfaces, up to 250mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| A134 | Repaint existing steel H-section surfaces, up to 350mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| A135 | Repaint existing steel H-section surfaces, up to 450mm height with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A136 | Repaint existing steel channel surfaces, up to 50mm height with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| A137 | Repaint existing steel channel surfaces, up to 100mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| A138 | Repaint existing steel channel surfaces, up to 150mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| A139 | Repaint existing steel and galvanized steel box surfaces. | 50 | SM | ¥ | ¥ | 0 | ||
| A140 | Repaint existing steel doors and door frames with polyurethane type coating. | 150 | SM | ¥ | ¥ | 0 | ||
| A141 | Repaint existing steel windows and window frames with polyurethane type coating. | 30 | SM | ¥ | ¥ | 0 | ||
| A142 | Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. | 20 | SM | ¥ | ¥ | 0 | ||
| A143 | Repaint existing wood doors and door frames. |
| 200 | SM | ¥ | ¥ | 0 | |
| A144 | Repaint existing glazed wood windows and frames. |
| 100 | SM | ¥ | ¥ | 0 | ||||
| A145 | Repaint existing aluminum panel surfaces. | 500 | SM | ¥ | ¥ | 0 | ||
| A146 | Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter. | |||||||
| 250 | LM | ¥ | ¥ | 0 | ||||
| A147 | Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| A148 | Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| A149 | Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| A150 | Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| A151 | Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| A152 | Repaint existing steel and galvanized steel pipe surfaces, up to 600mm outside diameter. |
| 100 | LM | ¥ | ¥ | 0 | ||||
| A153 | Repaint existing steel and galvanized steel pipe surfaces, over 600mm outside diameter with polyurethane type coating. | 50 | LM | ¥ | ¥ | 0 | ||
| A154 | Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter. | |||||||
| 250 | LM | ¥ | ¥ | 0 | ||||
| A155 | Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| A156 | Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| A157 | Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| A158 | Repaint existing PVC gutter surfaces after surface preparation. |
| 1,000 | LM | ¥ | ¥ | 0 | |
| A159 | Repaint existing PVC downspout surfaces after surface preparation up to 100mm outside diameter. |
| 1,000 | LM | ¥ | ¥ | 0 | |
| A160 | Repaint existing PVC downspout surfaces after surface preparation up to 200mm outside diameter. |
| 100 | LM | ¥ | ¥ | 0 | |
| A161 | Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM > |
| 2,000 | SM | ¥ | ¥ | 0 | |
| A162 | Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | |
| A163 | Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM > |
| 2,000 | SM | ¥ | ¥ | 0 | |
| A164 | Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | |
| A165 | Repaint existing multi-layer coating surfaces with top coating. 300SM > |
| 6,000 | SM | ¥ | ¥ | 0 | |
| A166 | Repaint existing multi-layer coating surfaces with top coating. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | ||||
| A167 | Repaint existing building numbers and unit number text. | 25 | EA | ¥ | ¥ | 0 | ||
| A168 | Repaint letters, unit: continuous letters (one word)/ EA. | 100 | EA | ¥ | ¥ | 0 | ||
| A169 | Repaint existing ACB/Cement board surfaces. | 50 | SM | ¥ | ¥ | 0 | ||
| A170 | Repaint fire alarm bell. | 20 | EA | ¥ | ¥ | 0 | ||
| A171 | Repaint plaster (Shikkui) surfaces. | 800 | SM | ¥ | ¥ | 0 | ||
| A172 | Repaint existing non-slip floor coating. | 400 | SM | ¥ | ¥ | 0 | ||
| A173 | Provide urethane roof coating over existing roof coating. | 2,000 | SM | ¥ | ¥ | 0 | ||
| A174 | Provide roof coating over existing roof (for single). | 500 | SM | ¥ | ¥ | 0 | ||
| A175 | Provide rubber type multi-layer coating system. | 300 | SM | ¥ | ¥ | 0 | ||
| A176 | Provide acrylic type multi-layer coating system. | 500 | SM | ¥ | ¥ | 0 | ||
| A177 | Provide slight-elastic type multi-layer coating system. | 500 | SM | ¥ | ¥ | 0 | ||
| A178 | Provide waterproof urethane type floor coating on concrete and cement mortar surfaces. |
| 50 | SM | ¥ | ¥ | 0 | |
| A179 | Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM> |
| 300 | SM | ¥ | ¥ | 0 | |
| A180 | Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM< |
| 100 | SM | ¥ | ¥ | 0 | ||||
| A181 | Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM> | 250 | SM | ¥ | ¥ | 0 | ||
| A182 | Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM< | 100 | SM | ¥ | ¥ | 0 | ||
| A183 | Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM> | 250 | SM | ¥ | ¥ | 0 | ||
| A184 | Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM< | 100 | SM | ¥ | ¥ | 0 | ||
| A185 | Provide waterproof silicon hydride type coating on concrete and cement mortar foundation surfaces. | 100 | SM | ¥ | ¥ | 0 | ||
| A186 | Provide silicon type for foundation use paint on concrete and cement mortar foundation surfaces. | 100 | SM | ¥ | ¥ | 0 | ||
| A187 | Remove existing cement mortar, and provide waterproof cement mortar. |
| 50 | SM | ¥ | ¥ | 0 | |
| A188 | Remove existing floor coating on concrete and prepare surfaces with resin mortar. |
| 50 | SM | ¥ | ¥ | 0 | ||||
| A189 | Repair concrete spalling. | 50 | SM | ¥ | ¥ | 0 | ||
| A190 | Repair concrete crack with Seal method. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A191 | Repair concrete crack with U-cut seal material filling method. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A192 | Repair concrete crack with epoxy resin injection method. | 200 | LM | ¥ | ¥ | 0 | ||
| A193 | Remove existing cement board and provide cement board. | 250 | SM | ¥ | ¥ | 0 | ||
| A194 | Remove existing metal flashing and provide metal flashing. | 500 | LM | ¥ | ¥ | 0 | ||
| A195 | Remove existing ALUM expansion joint and provide ALUM expansion joint (Exterior wall + Exterior wall 100mm type). | 20 | LM | ¥ | ¥ | 0 | ||
| A196 | Remove existing ALUM expansion joint and provide ALUM expansion joint (Exterior wall + Exterior wall corner 100mm type). | 20 | LM | ¥ | ¥ | 0 | ||
| A197 | Remove existing SST expansion joint and provide stainless steel expansion joint (Floor + Floor 100mm type). | 20 | LM | ¥ | ¥ | 0 | ||
| A198 | Remove existing SST expansion joint and provide stainless steel expansion joint (Floor + Floor corner 100mm type). | 20 | LM | ¥ | ¥ | 0 | ||
| A199 | Remove existing aluminum expansion joint and provide aluminum expansion joint (Exterior wall + Exterior wall corner 200mm type). | 20 | LM | ¥ | ¥ | 0 | ||
| A200 | Remove existing galvanized steel sheet and provide galvanized steel sheet. |
| 400 | SM | ¥ | ¥ | 0 | |
| A201 | Remove existing reinforced FRP and provide reinforced FRP. |
| 100 | SM | ¥ | ¥ | 0 | ||||
| A202 | Remove existing vent cover and provide aluminum air vent cover (up to 200mm diameter). | 200 | EA | ¥ | ¥ | 0 | ||
| A203 | Remove existing vent cover and provide SST deep type air vent cover (up to 200mm diameter). | 50 | EA | ¥ | ¥ | 0 | ||
| A204 | Remove existing vent cover and provide SST deep type air vent cover (200mm and over diameter). | 20 | EA | ¥ | ¥ | 0 | ||
| A205 | Provide building number sign. | 20 | EA | ¥ | ¥ | 0 | ||
| A206 | Provide ALUM building identification signs (H=610mm). | 50 | EA | ¥ | ¥ | 0 | ||
| A207 | Provide ALUM building identification signs (H=457mm). | 50 | EA | ¥ | ¥ | 0 | ||
| A208 | Provide ALUM building identification signs (H=305mm). | 50 | EA | ¥ | ¥ | 0 | ||
| A209 | Provide SST building identification signs (H=610mm). | 10 | EA | ¥ | ¥ | 0 | ||
| A210 | Provide SST building identification signs (H=457mm). | 10 | EA | ¥ | ¥ | 0 | ||
| A211 | Provide SST building identification signs (H=305mm). | 10 | EA | ¥ | ¥ | 0 | ||
| A212 | Provide SST illuminated signs with Electrical work. | 30 | EA | ¥ | ¥ | 0 | ||
| A213 | Remove existing building signs. | 50 | EA | ¥ | ¥ | 0 | ||
| A214 | Remove existing sealants for windows/ doors and provide sealants for windows/ doors. |
| 1,500 | LM | ¥ | ¥ | 0 | ||||
| A215 | Remove existing joint sealants and provide joint sealants. | 1,000 | LM | ¥ | ¥ | 0 | ||
| A216 | Remove existing wood window w/ glazing and provide wood window w/ tinted glazing including ALUM bottom and upper guide rails. Paint wood window and frames. |
| 10 | SM | ¥ | ¥ | 0 | |
| A217 | Remove damaged decorative wood post and filler and provide decorative wood post and filler (up to 150mm x 150mm). |
| 1 | LM | ¥ | ¥ | 0 | |
| A218 | Remove damaged wood beam and provide wood beam (up to 400mm x 200mm). |
| 1 | LM | ¥ | ¥ | 0 | ||||
| A219 | Remove half-round PVC gutter and provide half-round PVC gutter (up to W=200mm). | 100 | LM | ¥ | ¥ | 0 | ||
| A220 | Remove square PVC gutter and provide square PVC gutter (up to radius 200mm). | 100 | LM | ¥ | ¥ | 0 | ||
| A221 | Remove PVC downspout and provide PVC downspout (up to 125mm outside diameter). | 50 | LM | ¥ | ¥ | 0 | ||
| A222 | Remove PVC downspout and provide PVC downspout (up to 200mm outside diameter). | 200 | LM | ¥ | ¥ | 0 | ||
| A223 | Remove existing downspout bracket and band and provide SST bracket and band. | 200 | EA | ¥ | ¥ | 0 | ||
| A224 | Remove damaged polycarbonate roofing and provide polycarbonate (THK=5mm). | 10 | SM | ¥ | ¥ | 0 | ||
| A225 | Remove damaged clear glass panes on aluminum framed door or window and provide clear glass panes. |
| 5 | SM | ¥ | ¥ | 0 | |
| A226 | Remove damaged frosted glass panes on aluminum framed door or window and provide frosted glass panes. |
| 5 | SM | ¥ | ¥ | 0 | |
| A227 | Remove damaged tempered glass panes on aluminum framed door or window and provide tempered glass panes. |
| 5 | SM | ¥ | ¥ | 0 | |
| A228 | Remove damaged wired glass panes on aluminum framed door or window and provide wired glass panes. |
| 5 | SM | ¥ | ¥ | 0 | |
| A229 | Remove existing acrylic lighting fixture covers and provide acrylic lighting fixture covers. |
| 20 | EA | ¥ | ¥ | 0 | |
| A230 | Patch repair hole on steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05SM hole/EA. |
| 100 | EA | ¥ | ¥ | 0 | ||||
| A231 | Remove existing ACB and provide cement board. | 50 | SM | ¥ | ¥ | 0 | ||
| A232 | Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50SM hole/EA. |
| 20 | EA | ¥ | ¥ | 0 | ||||
| A233 | LBP surface preparation with SSPCW Type 3. | 200 | SM | ¥ | ¥ | 0 | ||
| A234 | LBP surface preparation with solvent cleaning. | 200 | SM | ¥ | ¥ | 0 | ||
| A235 | ACM surface preparation with solvent cleaning. |
| 200 | SM | ¥ | ¥ | 0 | ||||
| A236 | Provide temporary enclosure for LBP / ACM control area. | 800 | SM | ¥ | ¥ | 0 | ||
| A237 | Air, wipe and/or soil sampling and monitoring for LBP control area. |
| 25 | EA | ¥ | ¥ | 0 | ||||
| A238 | PCM air sampling and monitoring for ACM control. | 25 | EA | ¥ | ¥ | 0 | ||
| A239 | TEM air sampling and monitoring for ACM control. | 25 | EA | ¥ | ¥ | 0 | ||
| A240 | Provide temporary Change Room for LBP / ACM control area. | 10 | EA | ¥ | ¥ | 0 | ||
| A241 | Disposal of LBP / ACM. | 5 | CM | ¥ | ¥ | 0 | ||
| A242 | ACM sampling of existing material. | 10 | EA | ¥ | ¥ | 0 | ||
| A243 | Laboratory reports of ACM sampling of existing material. | 10 | EA | ¥ | ¥ | 0 | ||
| A244 | LBP sampling of existing steel surfaces of material. | 10 | EA | ¥ | ¥ | 0 | ||
| A245 | Laboratory reports of LBP sampling of existing steel surfaces of material. | 10 | EA | ¥ | ¥ | 0 | ||
| A246 | Provide bucket truck lift. | 10 | DAY | ¥ | ¥ | 0 | ||
| A247 | Provide scaffolding. | 6,000 | SM | ¥ | ¥ | 0 | ||
| A248 | Provide safety barricade and safety sign. | 2,000 | LM | ¥ | ¥ | 0 | ||
| A249 | Remove and provide pigeon net, Unit: Up to 16SM of opening size/EA. |
| 50 | EA | ¥ | ¥ | 0 | |
| A250 | Remove and provide bird spike, Unit: Up to 10LM of length size/EA. |
| 50 | EA | ¥ | ¥ | 0 | |
| A251 | Temporarily remove and reinstall existing steel window security grills, Unit: Up to 2SM of guard size/EA. |
| 50 | EA | ¥ | ¥ | 0 | |
| A252 | Temporarily remove and reinstall existing steel window security grills, Unit: Up to 3SM of guard size/EA. |
| 20 | EA | ¥ | ¥ | 0 | |
| A253 | Temporarily remove and reinstall existing steel window security grills, Unit: Up to 4SM of guard size/EA. |
| 20 | EA | ¥ | ¥ | 0 | ||||
| A254 | Clean existing SST handrails. | 150 | SM | ¥ | ¥ | 0 | ||
| A255 | Clean existing SST guardrails. | 200 | LM | ¥ | ¥ | 0 | ||
| A256 | Clean existing SST surfaces. | 200 | SM | ¥ | ¥ | 0 | ||
| A257 | Clean existing ALUM / glass windows and frames. | 200 | LM | ¥ | ¥ | 0 | ||
| A258 | Other related miscellaneous work (must be negotiated at time of order). (Estimated) |
1 LS ¥ ¥ 60,000,000
TOTAL (A001 through A258) Not-To-Exceed ¥ 0
| Abbreviations: |
| ALUM=Aluminum, EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Height, W = Width, SSPCW = Standard Specifications for Public Construction Work, SST = Stainless Steel |
&8&K000000Roofing and Painting IDIQ Contract for Various Projects &9 &"-,Bold"&10CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]
&"-,Bold"&8&K000000CUI//FEDCON [when filled in] Source Selection Information-See FAR 2 101 and 3.104 [when filled in]&"-,Regular"&10 &"-,Bold"ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK - "A"&"-,Regular"
PAGE &P
EXIBIT-B
| ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK | |
| SCHEDULE OF INDEFINITE QUANTITY WORK - "B" | |
| EXHIBIT B Price for Ordering Period 2 |
| ITEM | DESCRIPTION | EST | UT | UNIT | EST AMT |
| NO | QTY | PRICE | TOTAL |
| ROOFING | ||||||
| B001 | Remove all existing mineral surfaced built-up roofing. | 1,000 | SM | ¥ | ¥ | 0 |
| B002 | Remove all existing sheet waterproofing. | 100 | SM | ¥ | ¥ | 0 |
| B003 | Remove all existing urethane waterproof coating. | 100 | SM | ¥ | ¥ | 0 |
| B004 | Remove existing mineral surfaced built-up roofing. (100% vertical area , 5% horizontal area) | 1,500 | SM | ¥ | ¥ | 0 |
| B005 | Remove existing sheet waterproofing. (100% vertical area , 5% horizontal area) | 100 | SM | ¥ | ¥ | 0 |
| B006 | Remove existing urethane waterproof coating. (100% vertical area , 5% horizontal area) | 100 | SM | ¥ | ¥ | 0 |
| B007 | Remove existing insulation board. | 400 | SM | ¥ | ¥ | 0 |
| B008 | Remove existing asbestos contained mineral surfaced built-up roofing. | 500 | SM | ¥ | ¥ | 0 |
| B009 | Remove existing asbestos contained sheet waterproof. | 300 | SM | ¥ | ¥ | 0 |
| B010 | Remove existing asbestos contained waterproof coating. | 100 | SM | ¥ | ¥ | 0 |
| B011 | Clean up existing built-up roofing surface by water blasting. | 2,000 | SM | ¥ | ¥ | 0 |
| B012 | Clean up existing gutter surface by water blasting. | 200 | LM | ¥ | ¥ | 0 |
| B013 | Cut and remove existing local deteriorated asphalt roofing system and repair them. | 200 | SM | ¥ | ¥ | 0 |
| B014 | Repair existing blister of asphalt roofing system. |
| 100 | SM | ¥ | ¥ | 0 | ||||
| B015 | Repair existing concrete covering of the slab. | 100 | LM | ¥ | ¥ | 0 | ||
| B016 | Repair existing concrete crack with U-cut. | 200 | LM | ¥ | ¥ | 0 | ||
| B017 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (up to 300SM). | 100 | SM | ¥ | ¥ | 0 | ||
| B018 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing mineral surfaced built-up roofing (over 300SM). | 800 | SM | ¥ | ¥ | 0 | ||
| B019 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (up to 300SM). | 100 | SM | ¥ | ¥ | 0 | ||
| B020 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating (over 300SM). | 500 | SM | ¥ | ¥ | 0 | ||
| B021 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (up to 300SM). | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| B022 | Provide polymer modified bitumen roofing system with heat resistant rigid urethane insulation board on existing concrete slab or concrete covering (over 300SM). | 500 | SM | ¥ | ¥ | 0 | ||
| B023 | Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (up to 300SM). | 200 | SM | ¥ | ¥ | 0 | ||
| B024 | Provide polymer modified bitumen roofing system on existing mineral surfaced built-up roofing (over 300SM). |
| 500 | SM | ¥ | ¥ | 0 | |
| B025 | Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (up to 300SM). | ||||
| 100 | SM | ¥ | ¥ | 0 | |
| B026 | Provide polymer modified bitumen roofing system on existing urethane membrane waterproof coating (over 300SM). | ||||
| 400 | SM | ¥ | ¥ | 0 | |
| B027 | Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (up to 300SM). |
| 100 | SM | ¥ | ¥ | 0 | |
| B028 | Provide polymer modified bitumen roofing system on existing concrete slab or concrete cover (over 300SM). |
| 400 | SM | ¥ | ¥ | 0 | |
| B029 | Provide polymer modified bitumen roofing system on existing riser surface. |
| 200 | SM | ¥ | ¥ | 0 | ||||
| B030 | Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (up to 300SM). | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| B031 | Provide urethane membrane waterproof coating system on existing mineral surfaced built-up roofing (over 300SM). | |||||||
| 400 | SM | ¥ | ¥ | 0 | ||||
| B032 | Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM). | |||||||
| 200 | SM | ¥ | ¥ | 0 | ||||
| B033 | Provide urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM). | 400 | SM | ¥ | ¥ | 0 | ||
| B034 | Provide urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to 300SM). | 200 | SM | ¥ | ¥ | 0 | ||
| B035 | Provide urethane membrane waterproof coating system on existing concrete surface (over 300SM). |
| 400 | SM | ¥ | ¥ | 0 | ||||
| B036 | Provide urethane membrane waterproof coating system on existing riser surface. | |||||||
| 50 | SM | ¥ | ¥ | 0 | ||||
| B037 | Provide urethane membrane waterproof coating system on existing & concrete structure and foundation surface. | 50 | SM | ¥ | ¥ | 0 | ||
| B038 | Provide mineral surfaced built-up roofing for maintenance access. |
| 50 | SM | ¥ | ¥ | 0 | ||||
| B039 | Remove existing asphalt shingle roofing system and provide asphalt shingle roofing system. | |||||||
| 100 | SM | ¥ | ¥ | 0 | ||||
| B040 | Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide asphalt shingle roofing & asphalt roofing felt. | 100 | SM | ¥ | ¥ | 0 | ||
| B041 | Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (up to 300SM). |
| 250 | SM | ¥ | ¥ | 0 | |
| B042 | Apply heat resistant coating on existing mineral surfaced built-up roofing or urethane membrane waterproof coating surface (over 300SM). |
| 1,000 | SM | ¥ | ¥ | 0 | |
| B043 | Provide polymer modified bitumen roofing system on steel surface of vent pipe. |
| 10 | EA | ¥ | ¥ | 0 | ||||
| B044 | Remove existing roof tile & asphalt roofing felt and provide structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board. | 100 | SM | ¥ | ¥ | 0 | ||
| B045 | Remove existing fascia & gable wood board and provide wood fascia & gable board. |
| 50 | LM | ¥ | ¥ | 0 | |
| B046 | Provide 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board. |
| 50 | LM | ¥ | ¥ | 0 | |
| B047 | Remove existing metal roof and provide high profile folded sheet metal roof. |
| 20 | SM | ¥ | ¥ | 0 | |
| B048 | Remove existing metal roof and provide low profile folded sheet metal roof. |
| 30 | SM | ¥ | ¥ | 0 | |
| B049 | Provide precoated galvanized metal roof on existing metal roof. |
| 30 | SM | ¥ | ¥ | 0 | ||||
| B050 | Remove existing metal roof fascia & gable and provide precoated galvanized metal fascia & gable. | 30 | LM | ¥ | ¥ | 0 | ||
| B051 | Remove existing slate roofing system and provide slate roofing system. | 50 | SM | ¥ | ¥ | 0 | ||
| B052 | Remove existing sheet roofing and provide synthetic polymer roofing system. | 50 | SM | ¥ | ¥ | 0 | ||
| B053 | Remove existing sheet roofing and provide synthetic polymer roofing system with heat resistant rigid insulation board. |
| 70 | SM | ¥ | ¥ | 0 | ||||
| B054 | Remove existing expansion joint filler & sealant and provide expansion joint filler & sealant . | 100 | LM | ¥ | ¥ | 0 | ||
| B055 | Provide SST air ventilator pipe. | 40 | EA | ¥ | ¥ | 0 | ||
| B056 | Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide polymer modified bitumen roofing system around existing vent pipe with SST band. |
| 50 | EA | ¥ | ¥ | 0 | |
| B057 | Remove existing aluminum coping and provide aluminum coping. |
| 300 | LM | ¥ | ¥ | 0 | |
| B058 | Remove existing PC coping and provide aluminum coping. |
| 100 | LM | ¥ | ¥ | 0 | |
| B059 | Remove existing aluminum coping temporarily and reinstall existing aluminum coping. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| B060 | Provide aluminum coping to existing concrete parapet/wall. | 200 | LM | ¥ | ¥ | 0 | ||
| B061 | Remove existing aluminum expansion cover (up to W=450) and provide aluminum expansion cover. |
| 70 | LM | ¥ | ¥ | 0 | |
| B062 | Remove existing aluminum expansion cover (W=450 ~ 600) and provide aluminum expansion cover. |
| 100 | LM | ¥ | ¥ | 0 | |
| B063 | Remove existing metal strap with sealant and provide aluminum strap with sealant. |
| 300 | LM | ¥ | ¥ | 0 | |
| B064 | Provide aluminum strap with sealant. |
| 200 | LM | ¥ | ¥ | 0 | |
| B065 | Remove existing aluminum strap or flashing with sealant and provide aluminum flashing with sealant. |
| 200 | LM | ¥ | ¥ | 0 | |
| B066 | Provide aluminum flashing with sealant. |
| 100 | LM | ¥ | ¥ | 0 | |
| B067 | Remove existing metal flashing and provide precoated galvanized flashing of roof edge. |
| 100 | LM | ¥ | ¥ | 0 | |
| B068 | Remove existing metal flashing and provide aluminum or stainless steel flashing of roof edge. |
| 100 | LM | ¥ | ¥ | 0 | ||||
| B069 | Remove existing horizontal roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer. | |||||||
| 40 | EA | ¥ | ¥ | 0 | ||||
| B070 | Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them. | 40 | EA | ¥ | ¥ | 0 | ||
| B071 | Remove existing vertical roof drain strainer with clamping base and provide copper roof drain and aluminum die-cast strainer. | 50 | EA | ¥ | ¥ | 0 | ||
| B072 | Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them. | 50 | EA | ¥ | ¥ | 0 | ||
| B073 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (up to W=200). | 20 | LM | ¥ | ¥ | 0 | ||
| B074 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (W=200~400). | 50 | LM | ¥ | ¥ | 0 | ||
| B075 | Provide urethane membrane waterproof coating system on existing cement mortar surface of roof gutter (over W=400). | 50 | LM | ¥ | ¥ | 0 | ||
| B076 | Remove existing stainless mesh strainer in the gutter and provide SST mesh strainer. | 30 | EA | ¥ | ¥ | 0 | ||
| B077 | Remove existing rain gutter & gutter hanger and provide PVC gutter & stainless gutter hanger. | 50 | LM | ¥ | ¥ | 0 | ||
| B078 | Remove existing downspout with leader straps and provide PVC downspout with SST leader straps with concrete splash block. | 50 | LM | ¥ | ¥ | 0 | ||
| B079 | Remove existing concrete foundation. | 20 | CM | ¥ | ¥ | 0 | ||
| B080 | Remove existing cement mortar and provide waterproof cement mortar for existing concrete foundation. | 20 | SM | ¥ | ¥ | 0 | ||
| B081 | Provide raised concrete foundation (300x300~400x400x200H). | 10 | EA | ¥ | ¥ | 0 | ||
| B082 | Provide raised concrete foundation (400x400~600x600x300H). | 10 | EA | ¥ | ¥ | 0 | ||
| B083 | Provide raised concrete foundation (over 600x600x300H). | 10 | EA | ¥ | ¥ | 0 | ||
| B084 | Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti-vibration rubber with. | 10 | EA | ¥ | ¥ | 0 | ||
| B085 | Remove existing conductors and support materials for lightning protection and provide ones to match existing. | 10 | EA | ¥ | ¥ | 0 | ||
| B086 | Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 10 | EA | ¥ | ¥ | 0 | ||
| B087 | Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| B088 | Cut and weld existing steel leg (over 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing isolation rubber sheet and provide isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| B089 | Cut and weld existing steel leg (up to 40x40 angle or up to 40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| B090 | Cut and weld existing steel leg (up to 75x75 angle or up to 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 30 | EA | ¥ | ¥ | 0 | ||
| B091 | Cut and weld existing steel leg (over 75x75 angle or over 65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Remove existing concrete base and isolation rubber sheet and provide concrete base and isolation rubber sheet. | 20 | EA | ¥ | ¥ | 0 | ||
| B092 | Remove existing steel leg with concrete base and provide steel leg support with isolation rubber sheet. | 20 | EA | ¥ | ¥ | 0 | ||
| B093 | Paint/Repaint exposed surface of existing steel & wood surfaces. | 20 | LM | ¥ | ¥ | 0 | ||
| B094 | Repaint exposed surface of existing lead based paint contained steel surfaces. | 20 | LM | ¥ | ¥ | 0 | ||
| B095 | Erect and dismantle scaffolding. | 2,000 | SM | ¥ | ¥ | 0 | ||
| B096 | Erect and dismantle safety handrail to the parapet for roof work. | 500 | LM | ¥ | ¥ | 0 | ||
| B097 | ACM sampling of existing roofing material. | 10 | EA | ¥ | ¥ | 0 | ||
| B098 | ACM sampling of existing roofing material and request sampling analysis. | 50 | EA | ¥ | ¥ | 0 | ||
| B099 | LBP sampling of existing painted steel surface at roof. | 5 | EA | ¥ | ¥ | 0 | ||
| B100 | LBP sampling of existing painted steel surface at roof and request sampling analysis. | 20 | EA | ¥ | ¥ | 0 | ||
| B101 | Temporary enclosure for ACM / LBP control area. | 400 | SM | ¥ | ¥ | 0 | ||
| B102 | Air, wipe and / or soil sampling and monitoring for ACM / LBP control area. | |||||||
| 40 | EA | ¥ | ¥ | 0 | ||||
| B103 | PCM air sampling and monitoring for ACM / LBP control. | 40 | EA | ¥ | ¥ | 0 | ||
| B104 | TEM air sampling and monitoring for ACM / LBP control. | 40 | EA | ¥ | ¥ | 0 | ||
| B105 | Change room for ACM / LBP control area. | 10 | EA | ¥ | ¥ | 0 | ||
| B106 | Disposal of ACM / LBP. | 30 | CM | ¥ | ¥ | 0 | ||
| B107 | Remove existing acrylic skylight and provide acrylic skylight (±600x600). |
| 20 | EA | ¥ | ¥ | 0 | |
| B108 | Remove existing acrylic skylight and provide acrylic skylight (±900x900). |
| 20 | EA | ¥ | ¥ | 0 | |
| B109 | Remove existing acrylic skylight and provide acrylic skylight (±1300x1300). |
| 15 | EA | ¥ | ¥ | 0 | ||||
| B110 | Provide 50dia stainless steel overflow drain pipe with mesh. | 40 | EA | ¥ | ¥ | 0 | ||
| B111 | Provide cast-iron vent cap over exist vent pipe. | 20 | EA | ¥ | ¥ | 0 | ||
| B112 | Temporary remove, clean and reinstall existing aluminum roof skylight canopy (up to 30 SM). | 5 | EA | ¥ | ¥ | 0 | ||
| B113 | Temporary remove, clean and reinstall existing skylight/ventilator. | 20 | EA | ¥ | ¥ | 0 | ||
| PAINTING | ||||||||
| B114 | Prepare Lead-free surfaces with water cleaning. | 31,000 | SM | ¥ | ¥ | 0 | ||
| B115 | Remove debris and clean existing gutter. | 600 | LM | ¥ | ¥ | 0 | ||
| B116 | Remove debris and clean existing downspout. | 200 | EA | ¥ | ¥ | 0 | ||
| B117 | Prepare Lead-free surfaces with SSPCW Type 3 (RC-Type). | 5,000 | SM | ¥ | ¥ | 0 | ||
| B118 | Prepare Lead-free surfaces with SSPCW Type 2 (RB-Type). | 2,000 | SM | ¥ | ¥ | 0 | ||
| B119 | Prepare Lead-free surfaces with SSPCW Type 1 (RA-Type). | 1,000 | SM | ¥ | ¥ | 0 | ||
| B120 | Remove existing paint for no-paint concrete surfaces and trowel finish repair. | 300 | SM | ¥ | ¥ | 0 | ||
| B121 | Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM > | 2,500 | SM | ¥ | ¥ | 0 | ||
| B122 | Repaint existing steel and galvanized steel siding/ roof/ wall surfaces with polyurethane type paint. 300SM < | 200 | SM | ¥ | ¥ | 0 | ||
| B123 | Repaint existing wooden siding and board surfaces. | 500 | SM | ¥ | ¥ | 0 | ||
| B124 | Repaint existing calcium silicate board surfaces after surface preparation. | 1,000 | SM | ¥ | ¥ | 0 | ||
| B125 | Repaint existing wooden beams and columns after surface preparation. | 500 | SM | ¥ | ¥ | 0 | ||
| B126 | Repaint existing steel doors / Roll up doors and door frames. | 100 | SM | ¥ | ¥ | 0 | ||
| B127 | Repaint existing steel doors / Roll up doors and door frames w/ water-based paint and water-based primer. | 100 | SM | ¥ | ¥ | 0 | ||
| B128 | Repaint existing steel window and window frames. | 50 | SM | ¥ | ¥ | 0 | ||
| B129 | Repaint existing steel square pipe surfaces, up to 400mm outside perimeter with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| B130 | Repaint existing steel square pipe surfaces, up to 800mm outside perimeter with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| B131 | Repaint existing steel square pipe surfaces, up to 1200mm outside perimeter with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| B132 | Repaint existing steel H-section surfaces, up to 150mm height with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| B133 | Repaint existing steel H-section surfaces, up to 250mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| B134 | Repaint existing steel H-section surfaces, up to 350mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| B135 | Repaint existing steel H-section surfaces, up to 450mm height with polyurethane type coating. | 1,000 | LM | ¥ | ¥ | 0 | ||
| B136 | Repaint existing steel channel surfaces, up to 50mm height with polyurethane type coating. | 3,000 | LM | ¥ | ¥ | 0 | ||
| B137 | Repaint existing steel channel surfaces, up to 100mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| B138 | Repaint existing steel channel surfaces, up to 150mm height with polyurethane type coating. | 2,000 | LM | ¥ | ¥ | 0 | ||
| B139 | Repaint existing steel and galvanized steel box surfaces. | 50 | SM | ¥ | ¥ | 0 | ||
| B140 | Repaint existing steel doors and door frames with polyurethane type coating. | 150 | SM | ¥ | ¥ | 0 | ||
| B141 | Repaint existing steel windows and window frames with polyurethane type coating. | 30 | SM | ¥ | ¥ | 0 | ||
| B142 | Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. | 20 | SM | ¥ | ¥ | 0 | ||
| B143 | Repaint existing wood doors and door frames. |
| 200 | SM | ¥ | ¥ | 0 | |
| B144 | Repaint existing glazed wood windows and frames. |
| 100 | SM | ¥ | ¥ | 0 | ||||
| B145 | Repaint existing aluminum panel surfaces. | 500 | SM | ¥ | ¥ | 0 | ||
| B146 | Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter. | |||||||
| 250 | LM | ¥ | ¥ | 0 | ||||
| B147 | Repaint existing steel and galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| B148 | Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| B149 | Repaint existing steel and galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| B150 | Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| B151 | Repaint existing steel and galvanized steel pipe surfaces, up to 300mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| B152 | Repaint existing steel and galvanized steel pipe surfaces, up to 600mm outside diameter. |
| 100 | LM | ¥ | ¥ | 0 | ||||
| B153 | Repaint existing steel and galvanized steel pipe surfaces, over 600mm outside diameter with polyurethane type coating. | 50 | LM | ¥ | ¥ | 0 | ||
| B154 | Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter. | |||||||
| 250 | LM | ¥ | ¥ | 0 | ||||
| B155 | Paint existing galvanized steel pipe surfaces, up to 50mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| B156 | Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter. |
| 200 | LM | ¥ | ¥ | 0 | ||||
| B157 | Paint existing galvanized steel pipe surfaces, up to 150mm outside diameter with polyurethane type coating. | 150 | LM | ¥ | ¥ | 0 | ||
| B158 | Repaint existing PVC gutter surfaces after surface preparation. |
| 1,000 | LM | ¥ | ¥ | 0 | |
| B159 | Repaint existing PVC downspout surfaces after surface preparation up to 100mm outside diameter. |
| 1,000 | LM | ¥ | ¥ | 0 | |
| B160 | Repaint existing PVC downspout surfaces after surface preparation up to 200mm outside diameter. |
| 100 | LM | ¥ | ¥ | 0 | |
| B161 | Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM > |
| 2,000 | SM | ¥ | ¥ | 0 | |
| B162 | Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | |
| B163 | Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM > |
| 2,000 | SM | ¥ | ¥ | 0 | |
| B164 | Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | |
| B165 | Repaint existing multi-layer coating surfaces with top coating. 300SM > |
| 6,000 | SM | ¥ | ¥ | 0 | |
| B166 | Repaint existing multi-layer coating surfaces with top coating. 300SM < |
| 250 | SM | ¥ | ¥ | 0 | ||||
| B167 | Repaint existing building numbers and unit number text. | 25 | EA | ¥ | ¥ | 0 | ||
| B168 | Repaint letters, unit: continuous letters (one word)/ EA. | 100 | EA | ¥ | ¥ | 0 | ||
| B169 | Repaint existing ACB/Cement board surfaces. | 50 | SM | ¥ | ¥ | 0 | ||
| B170 | Repaint fire alarm bell. | 20 | EA | ¥ | ¥ | 0 | ||
| B171 | Repaint plaster (Shikkui) surfaces. | 800 | SM | ¥ | ¥ | 0 | ||
| B172 | Repaint existing non-slip floor coating. | 400 | SM | ¥ | ¥ | 0 | ||
| B173 | Provide urethane roof coating over existing roof coating. | 2,000 | SM | ¥ | ¥ | 0 | ||
| B174 | Provide roof coating over existing roof (for single). | 500 | SM | ¥ | ¥ | 0 | ||
| B175 | Provide rubber type multi-layer coating system. | 300 | SM | ¥ | ¥ | 0 | ||
| B176 | Provide acrylic type multi-layer coating system. | 500 | SM | ¥ | ¥ | 0 | ||
| B177 | Provide slight-elastic type multi-layer coating system. | 500 | SM | ¥ | ¥ | 0 | ||
| B178 | Provide waterproof urethane type floor coating on concrete and cement mortar surfaces. |
| 50 | SM | ¥ | ¥ | 0 | |
| B179 | Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM> |
| 300 | SM | ¥ | ¥ | 0 | |
| B180 | Provide waterproof epoxy resin non-skid type floor coating on concrete and cement mortar surfaces. 300SM< |
| 100 | SM | ¥ | ¥ | 0 | ||||
| B181 | Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM> | 250 | SM | ¥ | ¥ | 0 | ||
| B182 | Provide corrosion-proof non-skid waterproof epoxy resin type floor coating on concrete and cement mortar surfaces (Dog Kennel Floor) . 100SM< | 100 | SM | ¥ | ¥ | 0 | ||
| B183 | Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM> | 250 | SM | ¥ | ¥ | 0 | ||
| B184 | Provide corrosion-proof waterproof epoxy resin type wall coating on concrete and cement mortar surfaces (Dog Kennel wall) . 100SM< | 100 | SM | ¥ | ¥ | 0 | ||
| B185 | Provide waterproof silicon hydride type coating on concrete and cement mortar foundation surfaces. | 100 | SM | ¥ | ¥ | 0 | ||
| B186 | Provide silicon type for foundation use paint on concrete and cement mortar foundation surfaces. | 100 | SM | ¥ | ¥ | 0 | ||
| B187 | Remove existing cement mortar, and provide waterproof cement mortar. |
| 50 | SM | ¥ | ¥ | 0 | |
| B188 | Remove existing floor coating on concrete and prepare surfaces with resin mortar. |
| 50 | SM | ¥ | ¥ | 0 | ||||
| B189 | Repair concrete spalling. | 50 | SM | ¥ | ¥ | 0 | ||
| B190 | Repair concrete crack with Seal method. | 1,000 | LM | ¥ | ¥ | 0 | ||
| B191 | Repair concrete crack with U-cut seal material filling method. | 1,000 | LM | ¥ | ¥ | 0 | ||
| B192 | Repair concrete crack with epoxy resin injection method. | 200 | LM | ¥ | ¥ | 0 | ||
| B193 | Remove existing cement board and provide cement board. | 250 | SM | ¥ | ¥ | 0 | ||
| B194 | Remove existing metal flashing and provide metal flashing. | 500 | LM | ¥ | ¥ | 0 | ||
| B195 | Remove existing ALUM expansion joint and provide ALUM expansion joint (Exterior wall + Exterior wall 100mm type). | 20 | LM | ¥ | ¥ | 0 |