N4008424B0409_Attachment (2) SOP and J-0200000-13 ELINs.xlsx
XLSX spreadsheet 70 KB Posted
- Solicitation number
- N4008424B0409
About this file
This document is a Schedule of Prices (SOP) for a federal solicitation. It outlines the required contract line items (CLINs) for preventive maintenance, repair, cleaning, and disposal services for exhaust hoods and ducts, grease traps, and oil water separators at various locations at U.S. Fleet Activities Yokosuka, Japan. The work includes labor, management, supervision, tools, materials, and equipment required to maintain these systems. The contract has a base period of 1 year and four 1-year option periods. Pricing is provided for both recurring services and non-recurring unit-priced labor and materials. The solicitation is being issued by the Department of the Navy's Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008424B0409-0006.pdf | ||
| N4008424B0409-0005.pdf | ||
| N4008424B0409-0004.pdf | ||
| N4008424B0409-0003.pdf | ||
| N4008424B0409-0002.pdf | ||
| N4008424B0409-0001.pdf | ||
| AcceptableID.pdf | ||
| N4008424B0409_Attachment (3) PreBid Inquiry Form.xlsx | XLSX spreadsheet | |
| N4008424B0409_Attachment (1) SOW.pdf | ||
| N4008424B0409.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOP
| N4008424B0409 | |||||
| SCHEDULE OF PRICE | |||||
| NAME OF OFFEROR OR CONTRACTOR: | Need to fill out. | Date : | Need to fill out. | ||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT | |
| NO. |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ |
| Provide PM Program Services for | ||||
| Exhaust Hoods and Ducts, Grease Traps and | ||||
| Oil Water Separator Systems and Oil Water Separators | ||||
| From 1 February 2025 through 31 January 2026. | ||||
| Includes Phase-In Cost |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| Upon receipt of a Task Order | ||||
| From 1 February 2025 through 31 January 2026. |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ |
| Provide PM Program Services for | ||||
| Exhaust Hoods and Ducts, Grease Traps and | ||||
| Oil Water Separator Systems and Oil Water Separators | ||||
| From 1 February 2026 through 31 January 2027. |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| Upon receipt of a Task Order | ||||
| From 1 February 2026 through 31 January 2027. |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ |
| Provide PM Program Services for | ||||
| Exhaust Hoods and Ducts, Grease Traps and | ||||
| Oil Water Separator Systems and Oil Water Separators | ||||
| From 1 February 2027 through 31 January 2028. |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| Upon receipt of a Task Order | ||||
| From 1 February 2027 through 31 January 2028. |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ |
| Provide PM Program Services for | ||||
| Exhaust Hoods and Ducts, Grease Traps and | ||||
| Oil Water Separator Systems and Oil Water Separators | ||||
| From 1 February 2028 through 31 January 2029. |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| Upon receipt of a Task Order | ||||
| From 1 February 2028 through 31 January 2029. |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide PM Program Services for | ||||
| Exhaust Hoods and Ducts, Grease Traps and | ||||
| Oil Water Separator Systems and Oil Water Separators | ||||
| From 1 February 2029 through 31 January 2030. | ||||
| Includes Phase-Out Costs |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Unit Priced Task Work | (NTE) | |||
| Upon receipt of a Task Order | ||||
| From 1 February 2029 through 31 January 2030. |
TOTAL: (LINE ITEM 0001 through 0010) ¥
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-13
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
General Services = Custodial, Pest Control, ISWM, and Grounds Maintenance Services.
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] &K00+000Page &P of &N&K000000
CUI // FEDCON [when filled in]
BR
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT A - CLIN 9000 |
| Line Item XXXX - | : 0001 | - Recurring Work - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELIN/Sub-ELINs | A001 through A006 | |||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |
| A001 | 1502000 | Facility Investment | ||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| A001 | AA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| A001 | AB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| A001 | AC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| A001 | AD | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| A001 | AE | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| DLA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| A002 | AA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| A002 | AB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| A002 | AC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| A002 | AD | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| MWR | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| A003 | AA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| A003 | AB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| A003 | AC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| A003 | AD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| A003 | AE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| GALLEY | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| A004 | AA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| A004 | AB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| A004 | AC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| A004 | AD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| A004 | AE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| DODEA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| A005 | AA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| A005 | AB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| A005 | AC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| A005 | AD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| A005 | AE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| INTEGRATED SOLID WASTE MANAGEMENT (ANNEX 1503030) | ||||||||
| GALLEY | ||||||||
| A006 | AA | 1503030 | 3.1 | Waste Cooking Oil Collection | 12 | MO | ¥ | ¥ |
| A006 | AB | 1503030 | 3.2. | Waste Cooking Oil Disposal | 12 | MO | ¥ | ¥ |
| A006 | AC | 1503030 | 3.3. | Waste Cooking Oil Containers | 12 | MO | ¥ | ¥ |
Total Recurring Work: ¥
&"Times New Roman,Regular"CUI // FEDCON SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
CUI // FEDCON [when filled in&"Arial,Regular"]
BNr
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT A - CLIN 9000 |
| Line Item | : 0002 Non-Recurring Price - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A701 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
300 HR ¥ ¥
A701 Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order.
| 1 | LS | ¥ | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ | |||||
| HR = | Hour | |||||
| LS = | Lump Sum | DA = | Day | |||
| EA = | Each | UN = | Unit |
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON [when filled in]
1R
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT B - CLIN 9001 |
| Line Item XXXX - | : 0003 | - Recurring Work - First Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELIN/Sub-ELINs | B001 through B006 | |||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |
| B001 | 1502000 | Facility Investment | ||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| B001 | BA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| B001 | BB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| B001 | BC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| B001 | BD | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| B001 | BE | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| DLA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| B002 | BA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| B002 | BB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| B002 | BC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| B002 | BD | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| MWR | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| B003 | BA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| B003 | BB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| B003 | BC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| B003 | BD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| B003 | BE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| GALLEY | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| B004 | BA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| B004 | BB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| B004 | BC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| B004 | BD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| B004 | BE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| DODEA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| B005 | BA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| B005 | BB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| B005 | BC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| B005 | BD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| B005 | BE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| INTEGRATED SOLID WASTE MANAGEMENT (ANNEX 1503030) | ||||||||
| GALLEY | ||||||||
| B006 | BA | 1503030 | 3.1 | Waste Cooking Oil Collection | 12 | MO | ¥ | ¥ |
| B006 | BB | 1503030 | 3.2. | Waste Cooking Oil Disposal | 12 | MO | ¥ | ¥ |
| B006 | BC | 1503030 | 3.3. | Waste Cooking Oil Containers | 12 | MO | ¥ | ¥ |
Total Recurring Work: ¥
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON [when filled in&"Arial,Regular"]
1Nr
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT B - CLIN 9001 |
| Line Item | : 0004 Non-Recurring Price - First Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B701 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
300 HR ¥ ¥
A701 Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order.
| 1 | LS | ¥ | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ | |||||
| HR = | Hour | |||||
| LS = | Lump Sum | DA = | Day | |||
| EA = | Each | UN = | Unit |
CUI // FEDCON [when filled in]
2R
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT C - CLIN 9002 |
| Line Item XXXX - | : 0005 | - Recurring Work - Second Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELIN/Sub-ELINs | C001 through C006 | |||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |
| C001 | 1502000 | Facility Investment | ||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| C001 | CA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| C001 | CB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| C001 | CC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| C001 | CD | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| C001 | CE | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| DLA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| C002 | CA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| C002 | CB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| C002 | CC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| C002 | CD | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| MWR | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| C003 | CA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| C003 | CB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| C003 | CC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| C003 | CD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| C003 | CE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| GALLEY | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| C004 | CA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| C004 | CB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| C004 | CC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| C004 | CD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| C004 | CE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| DODEA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| C005 | CA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| C005 | CB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| C005 | CC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| C005 | CD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| C005 | CE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| INTEGRATED SOLID WASTE MANAGEMENT (ANNEX 1503030) | ||||||||
| GALLEY | ||||||||
| A006 | CA | 1503030 | 3.1 | Waste Cooking Oil Collection | 12 | MO | ¥ | ¥ |
| A006 | CB | 1503030 | 3.2. | Waste Cooking Oil Disposal | 12 | MO | ¥ | ¥ |
| A006 | CC | 1503030 | 3.3. | Waste Cooking Oil Containers | 12 | MO | ¥ | ¥ |
Total Recurring Work: ¥
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON [when filled in&"Arial,Regular"]
2Nr
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT C - CLIN 9002 |
| Line Item | : 0006 Non-Recurring Price - Second Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C700 through C701 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
300 HR ¥ ¥
A701 Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order.
| 1 | LS | ¥ | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ | |||||
| HR = | Hour | |||||
| LS = | Lump Sum | DA = | Day | |||
| EA = | Each | UN = | Unit |
CUI // FEDCON [when filled in]
3R
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT D - CLIN 9003 |
| Line Item XXXX - | : 0007 | - Recurring Work - Third Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELIN/Sub-ELINs | D001 through D006 | |||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |
| D001 | 1502000 | Facility Investment | ||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| D001 | DA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| D001 | DB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| D001 | DC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| D001 | DD | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| D001 | DE | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| DLA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| D002 | DA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| D002 | DB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| D002 | DC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| D002 | DD | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| MWR | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| D003 | DA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| D003 | DB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| D003 | DC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| D003 | DD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| D003 | DE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| GALLEY | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| D004 | DA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| D004 | DB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| D004 | DC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| D004 | DD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| D004 | DE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| DODEA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| D005 | DA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| D005 | DB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| D005 | DC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| D005 | DD | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| D005 | DE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| INTEGRATED SOLID WASTE MANAGEMENT (ANNEX 1503030) | ||||||||
| GALLEY | ||||||||
| D006 | DA | 1503030 | 3.1 | Waste Cooking Oil Collection | 12 | MO | ¥ | ¥ |
| D006 | DB | 1503030 | 3.2. | Waste Cooking Oil Disposal | 12 | MO | ¥ | ¥ |
| D006 | DC | 1503030 | 3.3. | Waste Cooking Oil Containers | 12 | MO | ¥ | ¥ |
Total Recurring Work: ¥
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON [when filled in&"Arial,Regular"]
3Nr
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT D - CLIN 9003 |
| Line Item | : 0008 Non-Recurring Price - Third Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D700 through D701 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
300 HR ¥ ¥
A701 Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order.
| 1 | LS | ¥ | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ | |||||
| HR = | Hour | |||||
| LS = | Lump Sum | DA = | Day | |||
| EA = | Each | UN = | Unit |
CUI // FEDCON [when filled in]
4R
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT E - CLIN 9004 |
| Line Item XXXX - | : 0009 | - Recurring Work - Fourth Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||||
| ELIN/Sub-ELINs | E001 through E007 | |||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |
| E001 | 1502000 | Facility Investment | ||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| E001 | EA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| E001 | EB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| E001 | EC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| E001 | ED | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| E001 | EE | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| DLA | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| E002 | EA | 1502000 | 3.1.1 | Emergency - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| E002 | EB | 1502000 | 3.1.2 | Urgent - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| E002 | EC | 1502000 | 3.1.3 | Routine - Historically, approximately 12 times annually | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| E002 | ED | 1502000 | 3.2.3 | Oil Water Separators | 12 | MO | ¥ | ¥ |
| MWR | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| E003 | EA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| E003 | EB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| E003 | EC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| E003 | ED | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| E003 | EE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| GALLEY | ||||||||
| Emergency, Urgent, and Routine (E/U/R) Work | ||||||||
| E004 | EA | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| E004 | EB | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| E004 | EC | 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ |
| Other Recurring Services Program | ||||||||
| E004 | ED | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| E004 | EE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| DODEA | ||||||||
| E005 | EA | Emergency, Urgent, and Routine (E/U/R) Work | ||||||
| E005 | EB | 1502000 | 3.1.1 | Emergency | 12 | MO | ¥ | ¥ |
| E005 | EC | 1502000 | 3.1.2 | Urgent | 12 | MO | ¥ | ¥ |
| 1502000 | 3.1.3 | Routine | 12 | MO | ¥ | ¥ | ||
| Other Recurring Services Program | ||||||||
| E005 | ED | 1502000 | 3.2.1 | Exhaust Hoods and Ducts | 12 | MO | ¥ | ¥ |
| E005 | EE | 1502000 | 3.2.2 | Grease Traps | 12 | MO | ¥ | ¥ |
| INTEGRATED SOLID WASTE MANAGEMENT (ANNEX 1503030) | ||||||||
| GALLEY | ||||||||
| E006 | EA | 1503030 | 3.1 | Waste Cooking Oil Collection | 12 | MO | ¥ | ¥ |
| E006 | EB | 1503030 | 3.2. | Waste Cooking Oil Disposal | 12 | MO | ¥ | ¥ |
| E006 | EC | 1503030 | 3.3. | Waste Cooking Oil Containers | 12 | MO | ¥ | ¥ |
Total Recurring Work: ¥
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
CUI // FEDCON [when filled in&"Arial,Regular"]
4Nr
| Attachment J-0200000-13 |
| Exhibit Line Item Numbers (ELINS) |
| Solicitation/Contract No.: N4008424B0409/N4008425XXXXX |
| EXHIBIT E - CLIN 9004 |
| Line Item | : 0010 Non-Recurring Price - Fourth Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E700 through E701 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
300 HR ¥ ¥
A701 Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
Task order completion times will be specified on each task order.
| 1 | LS | ¥ | ¥ | |||
| TOTAL NON-RECUURRING PRICE | ¥ | |||||
| HR = | Hour | |||||
| LS = | Lump Sum | DA = | Day | |||
| EA = | Each | UN = | Unit |
CUI // FEDCON [when filled in]
NAVCAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .