AMEND 0001.pdf
PDF 5 MB Posted
- Attached to
- OVERHAUL FREQUENCY CONVERTER No. 6 AT BUILDING 1805 IN THE U. S. COMMANDER FLEET ACTIVITIES, YOKOSUKA
- Solicitation number
- N4008423T0402
About this file
This document is an amendment to a solicitation for the overhaul of Frequency Converter No. 6 at Building 1805 in Yokosuka, Japan for the Department of the Navy Naval Facilities Engineering Command. The amendment provides revised specifications and technical drawings for replacing windings on a motor and generator, cables connecting to switchgear rooms, modifying bearings, and removing and installing new motor, generator, and control panel boards along with associated wiring and conduits to functionally operate an existing frequency converter and main terminal board. Bidders must acknowledge receipt of this amendment by the response date of 12 December 2022 at 10:30 AM, with no change to the required response time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND 0003.pdf | ||
| AMEND 0002.pdf | ||
| Attachment 1 23T0402B.pdf | ||
| 23T0402A.pdf | ||
| Attachment 3-AcceptableID.pdf | ||
| Attachment 2-PPI Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5831102
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
OVERHAUL FREQUENCY CONVERTER No. 6 AT BUILDING 1805 IN THE U.S. COMMANDER FLEET ACTIVITIES, YOKOSUKA
See continuation Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008423T0402
X 9B. DATED (SEE ITEM 11)
10-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Nov-2022
CODE
NAVFAC FAR EAST
FEAD YOKOSUKA
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008423T0402
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
The following have been added by full text:
1. The purpose of this amendment is to provide revised spec and technical drawings as per attached file.
2. The required response date/time remains unchanged, 12 December 2022, 10:30 AM.
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 4 REVISED SPEC &
DRAWINGS
28 28-NOV-2022
(End of Summary of Changes)
Section F Deliveries or Performance
0200000 - Management and Administration
Annex/ Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least four calendar days prior to requested day.
KO via
COR
1 As requested by Contractor.
2.3.1 N/A Request Pre-
Performance Conferences and Meetings
At least five working days prior to desired conference.
KO via
COR
1 Once after award.
2.3.1 N/A Sign-In Sheets and
Minutes
Within two working days. KO, COR and all attendees
1 As required.
2.3.1 N/A Final Revision of
Minutes
Within two working days. KO, COR and all attendees
1 As required.
2.3.4 N/A Permits and
Licenses
As a part of the QM plan before work commences.
KO via
COR
1 Once after award, when changed, and when requested by KO.
2.3.5 N/A Certificate of
Insurance
At least 30 calendar days prior to cancellation or material change in policy coverage.
KO 1 Once after award, and when insurance renewed.
2.3.8 N/A The Contractor’s
Invoicing
Any day on Monday through Friday except observed Federal holidays within Government regular working hour.
KO via
WAWF
1 Monthly.
2.6.1 N/A Plans of Action and
Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
1 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
1 As required
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
1 As Specified
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.6.4 N/A Work Schedules As a part of the QM plan
before work commences.
KO via
1 Once after award, when changed, and when requested by KO.
2.6.5 N/A Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Request to Service
Interruptions
At least seven 15 calendar days in advance prior to the interruptions for the approval.
KO,
Affected tenants, and customer
1 When any Service Interruptions are required.
2.6.9.1
N/A Quality Management (QM) plan
Within 30 calendar days after award.
KO via
COR
1 Once after award and when requested by KO.
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five calendar days
of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.2 N/A Quality Inspection and
Surveillance Report File
After termination of the contract.
KO via
COR
1 Once after termination of the contract.
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO via
COR
1 Monthly or as required.
2.6.10 N/A Property
Management Plan
Submitted with the QM plan.
KO via
COR
1 Once after award, when changed, and when requested by KO.
2.6.12.1 N/A Mobilization/Phase-
In Plan
Within 15 calendar days after requested.
KO via
COR
1 When requested by KO.
2.6.12.2 N/A Demobilization/
Phase-Out Plan
Within 15 calendar days after requested.
KO via
COR
1 When requested by KO.
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.7.1 N/A List of Key
Personnel Qualifications and Organizational Chart
As a part of the QM plan. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.7.1.4, 2.10
N/A ECATTS Training Certificate
Submitted with the EPP. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.7.2.6 N/A Proof of Legal
Residency
As a part of the QM plan. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31 October KO and
COR
1 Annually for labor executed during the period of performance during each Government fiscal year (FY)
2.8.1 N/A Employee List As a part of the QM plan. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.8.2 N/A Vehicle Insurance, Inspection Certificate
As a part of the QM plan. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.8.3 N/A Passes and Badges Within 10 calendar days
of any changes in accordance with the policy of the Government Pass Office.
KO 1 Once after award and when changed.
2.8.8 N/A Personnel Security
Investigation (PSI), Fingerprint Card (FD87), and OF-306 Declaration for Federal Employment
Prior to employee access to sensitive unclassified information.
KO, COR,
and
Security Manager
1 As required
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.8.9 N/A List of personnel
requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
1 As required
2.9.2 J-0200000-
04.12
Accident Prevention Plan (APP)
Within 30 calendar days after award, and within seven calendar days of any change.
KO via
COR
1 Once after award, when changed, and when requested by KO.
2.9.3 J-0200000-
04.13
Activity Hazard Analysis report (AHA) for recurring work
As a part of the APP. KO via
COR
1 Once after award, when changed, and when requested by KO.
2.9.3 J-0200000-
04.13
Activity Hazard Analysis report (AHA) for non-recurring work and one (1) time work
At least two working days prior to start of work.
KO via
COR
1 Once after award, when changed, and when requested by KO.
2.9.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-
04.2
Accident and Damage Reporting
(CIRS)
Within not later than four hours.
KO via
COR
1 When accident occurred.
2.9.6 J-0200000-
04.2
Weight Handling Equipment Accident Report
Within one calendar days of the accident.
KO via
COR
1 When accident occurred.
2.9.6 J-0200000-
04.2
Crane and Rigging Gear Near Miss Report
As soon as management becomes aware but not later than four hours
KO via
COR
1 When accident occurred.
2.9.6.2 J-0200000-
04.2
Initial Accident Reporting Notification Report
(CIRS)
Within not later than one hour after an accident or near miss occurred.
KO via
COR
1 When accident and near miss occurred.
2.9.6.2 J-0200000-
04.2
Follow-on Accident Reporting Notification Report
(CIRS)
Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.
KO via
COR
1 When accident occurred.
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.9.6.2 J-0200000-
04.2
Final Accident Reporting Notification Report
(CIRS)
Within 24 hours after completing the investigation of the accident.
KO via
COR
1 When accident occurred.
2.9.7 J-0200000-
04.4/ J-
0200000- 04.5
Hot work permit, Fire Usage Request
No later than five working days prior to the requested hot work date.
Fire Dept
/ COR
1 As required
2.9.8 J-0200000-
04.17
Monthly On-Site Labor Report
Within two calendar days following the end of month.
KO via
COR
1 Monthly.
2.9.9.1 N/A LSIO Citations and
Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO via
COR
1 As required.
2.9.10 N/A Copy of the
Contractor Safety Inspection and Monitoring Report
As a part of the Monthly Summary Report.
KO via
COR
1 Monthly, as required.
2.9.11 N/A Safety Certifications As a part of the APP. KO via
COR
1 Once after award, and When certifications renewal.
2.10 N/A EMS Goals and
Policy Measurement Information
Within seven calendar days when requested.
KO via
COR
1 When requested by KO.
2.10.1.1 N/A Water Conservation
Plan
Within seven calendar days when requested.
KO via
COR
1 When requested by KO.
2.10.2 J-0200000-
04.11
Environmental Protection Plan
(EPP)
Within 30 calendar days after award, and within seven calendar days of any change.
KO via
COR
1 Once after award, and when changed.
2.10.2 N/A Flowchart Of
Industrial Waste Processing
As a part of the EPP. KO via
COR
1 Once after award, and when changed.
2.10.2.1 N/A Written Sampling
Plan
Prior to each sampling event.
KO via
COR
1 As required.
2.10.2.1 N/A Sampling Results Within 24 hours after
receipt of laboratory analysis
KO via
COR
1 As required.
2.10.2.3 J-0200000-
04.15
Solid Waste Management Report
Within three months after start of contract performance and annually by October 10th thereafter
KO and
COR
1 As specified
2.10.2.3 N/A Recycling Weight
Ticket Receipts
As Specified KO and
1 As required.
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.10.2.4 N/A Waste Disposal
Manifest, (copy of slip-E)
Within 20 calendar days following the end of the month, after requested from previous month.
KO via
COR
1 When requested by KO, as required. Or When occurred.
2.10.2.4 J-0200000-
04.9
CFAY Solid Waste Tonnage Report
As a part of the EPP. KO via
COR
1 As required.
2.10.2.5 N/A Waste Stream
Determination
At least 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 N/A Spill Report Within 48 hours of spill
occurrence
KO and
COR
1 As required
2.10.2.8 J-0200000-
04.16
Contractor Hazardous Material Inventory Log
As a part of the EPP. KO via
COR
1 As required.
2.10.2.12 N/A Asbestos Containing
Material (ACM)
Written notification within 24 hours of discovery
KO and
COR
2 As specified
2.10.2.13 J-0200000-
04.18
Hazardous Air Pollutant (HAP) Monthly Data
First work day of each month.
KO and
COR
1 As required
2.10.3 N/A Sustainable
Procurement and Practices Plan
As a part of the EPP. KO via
COR
1 Once after award and when changed.
2.10.3 N/A Sustainable Delivery
of Services Report
Within 30 calendar days after awarded.
KO via
COR
1 Once after award and when changed.
2.10.3.2 N/A Recovered Material
Certification
When a product containing recovered materials is equal to or better than the original and could be used for this contract.
KO via
COR
1 As required.
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within seven calendar days when any changed.
KO via
COR,
1 When changed or as requested.
2.15.1.1 N/A Non-Recurring
Work Quantities Report Ordered Via Fed-Mall
Within seven calendar days following the end of month.
KO via
Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (includin g original)
2.15.2.1 N/A Non-Recurring
Work Proposals
Submit a Non-Recurring Proposal to the KO within five 20 calendar days following receipt for each potential task order, or when requested by KO.
KO via
1602000 – Electrical
2.2.1 N/A Certification, Training and Licensing
As a part of the QM plan.
Or, As a part of non-price proposal and as a part the QM plan.
KO via
COR
1 Once after contract award.
3.1 N/A Monthly Summary
of Completed Service Orders Report
Within 15 calendar days after completion of service order work, during the previous month.
KO via
COR
1 Monthly or as required.
3.2 N/A Preventive
Maintenance (PM) Program Plan
As a part of QM plan. KO via
COR
1 Once after award, when changed, and when requested by
KO.
3.2 N/A Notification of
repair work exceeding the incidental repairs limit
Within <<Note to Spec Writer: Insert time, e.g., two hours, and change the instruction too>> of identification.
KO via
COR
1 When notified, or as required.
3.2 N/A Monthly PM Work
Schedule.
Within five (5) calendar days following the end of month.
KO via
COR
1 Monthly or as required.
3.2 N/A Monthly Summary
of Completed PM Work Report
Within 15 calendar days after completion of PM work, following the end of month.
KO via
COR
1 <<Note to Spec Writer:
select frequency as following:
Quarterly, monthly, Semiannually, annually.
3.End# N/A Detailed Breakdown Within <<Note to Spec Writer: select 15 or 30 calendar days after contract award.
KO 1 Once after award and when changed.
4.1 N/A Outline Onsite
Work Schedule
As a part of the QM plan. KO 1 Once after contract award.
4.1 N/A Fixed Onsite Work
Schedule
Within 90 calendar days after the date of award.
KO 1 Once after contract award and when requested by
KO.
4.1.1 N/A Result of Overhaul
Work Report
Within 30 calendar days after completion of onsite work.
KO 1 Once after completion of onsite work and when requested by
KO.
1503030 – Integrated Solid Waste Management
2.3.1 N/A Certification, Training and Licensing
As a part of non-price proposal and as a part of QM plan.
KO via
COR
1 Once, when states change or renewed, and when requested by
KO.
2.3.2.1 N/A Expected Processing
Plan
Within 15 calendar days after award
KO via
COR
1 Once after award and when changed.
2.3.X N/A Additional Safety Plan
Within 15 calendar days after the date of award for approval.
KO via
COR
Once after award and when changed.
2.3.X N/A Manifest
”SANNGYOUHAI
KIBUTSU
KANNRIHYOU”
Within 35 calendar days after the pickup RMW and Amalgam
FMD
through
KO
1 As required.
2.3.4 N/A Contractor’s
Technical Proposal
RFP closing date and required due date by KO.
KO 2 Once and requested by
KO.
2.3.X N/A License As a part of non-price proposal and as a part of QM plan.
KO 1 Once and when changed.
2.3.X N/A Segregation Plan As a part of non-price proposal and as a part of QM plan.
KO and KO via
COR
1 Once and when changed.
2.3.X N/A Waste Treatment Plan
As a part of non-price proposal and as a part of QM plan.
KO and KO via
COR
1 Once and when changed.
2.3.X N/A Management Plan As a part of non-price proposal and as a part of QM plan.
KO and KO via
COR
1 Once and when changed.
2.4.2 N/A Completion of
Transport
Within 10 calendar days following the end of the month.
Disposal Ticket.
(slip-B2 of manifest)
KO via
COR
1 Monthly.
2.4.3 N/A Completion of
Disposal
Within 10 calendar days following the end of the month.
Disposal Ticket.
(slip-D and E of manifest)
KO via
COR
1 Monthly.
3.1.1.3.1 N/A Unscheduled Bulky
Waste Collection
As a part of monthly report.
KO via
COR
1 Monthly.
3.1.2.3 N/A Hazardous Waste
Identification Report
As a part of monthly report.
KO via
COR
1 When discovered monthly.
3.6 N/A Monthly Report Within 15 calendar days
after previous end of month.
KO via
COR
1 Monthly.
3.7 N/A Detailed Breakdown Within 15 calendar days
after contract award.
KO 1 Once after award and when changed.
1503030 – Integrated Solid Waste Management
4.1.2 N/A Home Appliance
Recycling Tickets Within 15 calendar days following the end of the month. (Slip-3 of Home Appliance. Recycle Coupon.)
KO via
COR
1 Monthly.
4.3 N/A Daily Inspection and
Report Services
Submitted with the monthly report.
KO via
COR
1 When Non- Recurring order occurred.
3.3 and 3.4.3
N/A Copy of manifest slip D
The slip D shall be provided to waste generator within 90 calendar days.
KO via
COR
1 As required.
3.X N/A Monthly Report Within 15 calendar days after previous end of month.
KO via
COR
1 Monthly.
3.End# N/A Detailed Breakdown Within <<Note to Spec Writer: select 15 or 30 calendar days after contract award.
KO 1 Once after award and when changed.
4.1.X N/A Home Appliance Recycling Tickets
Within 15 calendar days following the end of the month. (Slip-3 of Home Appliance. Recycle Coupon.)
KO via
COR
1 Monthly.
4.1.X N/A Daily Inspection and Report Services
Submitted with the monthly report.
KO via
COR
1 When occurred.
4.1.X N/A Damper of Dumpster Inspection and Report Services
Submitted with the monthly report.
KO via
COR
1 When occurred.
1604000 - Wastewater
2.2.1 N/A Certification, Training and Licensing
As a part of the QM plan. KO via
COR
1 Once after contract award.
3.1.3 N/A Monthly Summary
of Operating Records, Logs, and Reports
Within 15 days following the end of month.
KO via
COR
1 Monthly.
3.2 N/A Prescriptive
Maintenance (PM) Program Plan
As a part of the QM plan. KO via
COR
1 Once after contract award.
3.2 N/A Monthly PM work
schedule
Within 15 days following the end of month.
KO via
COR
1 Monthly.
3.End# N/A Detailed Breakdown Within <<Note to Spec Writer: select 15 or 30 calendar days after contract award.
KO 1 Once after award and when changed.
1) All Contractor’s deliverables shall be submitted via email and each data file size shall be less than 10M bytes
2) The Contractor is responsible to re-submit and provide corrections for all deliverables that do not meet contract requirements at no additional cost to the Government.
0200000 Deliverables Form Preparation Instructions
Deliverable Title: Quality Management (QM) Plan.
The following will be delivered as part of the QM Plan: Quality Management System Pre-Performance Review Checklist, Permits and Licenses, Property Management Plan, List of Key Personnel Qualifications, Organizational Chart, Proof of Legal Residency, Employee List, Vehicle Insurance and Inspection Certificate, and Preventive Maintenance (PM) Program Plan, and Monthly PM Work Schedule.
Form Attachment No.: J-0200000-04.1, but not limited to.
Government Approval Required: X Yes ___ No
Media:
Hard Copy X Electronic ___ Direct System Input
Instructions:
The report shall be prepared using Microsoft Office Word software and shall be converted to Adobe PDF for submission. Unless otherwise specified in the Annex, the QM Plan deliverables shall be delivered using the following method
1- QM Plan will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes.
2- QM Plan PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- The QM Plan will be provided to the Government once after the award and every time there is any changes in the QM Plan. The QM Plan will also be provided to the government when requested by the contracting officer or the Contracting Officer Representative.
5- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting; and mark deliverables/submittal in accordance with DoDI 5200.48 Controlled Unclassified Information (CUI)(March 6, 2020).
Deliverable Title: Accident Prevention Plan (APP).
The following will be delivered as part of the APP: Activity Hazard Analysis Report (AHA), and Safety certification.
Form Attachment No.: J-0200000-04.11
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the APP deliverables shall be delivered using the following method
1- APP will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes.
2- APP PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- The APP will be provided to the Government once after the award and every time there are any changes in the APP. The APP will also be provided to the government when requested by the contracting officer or the Contracting Officer Representative.
5- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Deliverable Title: Environmental Protection Plan (EPP).
The following will be delivered as part of the EPP: Flowcharts of industrial waste including manifest and ECATTS Training Certificates.
Form Attachment No.: J-0200000-04.10
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the EPP deliverables shall be delivered using the following method
1- EPP will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes.
2- EPP PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- EPP Shall be provided by the contractor within the specified time flame mentioned on the corresponding deliverable title/dates of submission in the table at the beginning of section F.
5- The EPP will be provided to the Government once after the award and every time there is any changes in the EPP. The EPP will also be provided to the government when requested by the contracting officer or the Contracting Officer Representative.
6- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Deliverable Title: Monthly Reports.
The following will be delivered as part of required Monthly Reports: Monthly PM Work Schedule (five (5) calendar days before scheduled month), Quality Inspection and Surveillance Report (As part of the completed Service Orders report), On-Site Labor Report (Within two (2) Calendar days following the end of the month) and Monthly Summary of Completed Service Orders Report (Within 15 Calendar days after completion of service work order during the previous month).
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the monthly reports deliverables shall be delivered using the following method
1- Monthly reports will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes.
2- Monthly PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- Monthly Reports Shall be provided by the contractor within the specified time flame mentioned on the corresponding deliverable title/dates of submission in the table at the beginning of section F.
5- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Deliverable Title: Quarterly Reports The following will be delivered as part of required Quarterly Reports: Contractors Invoicing (via WAWF) completion of Preventive Maintenance (PM) report.
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the quarterly reports deliverables shall be delivered using the following method
1- Quarterly reports will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes. The invoicing report will be pulled from WAWF by the Contracting officer and Contracting Officer Representative
2- Quarterly PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- Quarterly Reports Shall be provided by the contractor within the specified time flame mentioned on the corresponding deliverable title/dates of submission in the table at the beginning of section F. The contracting officer (KO) or the Contracting officer representative (COR) may request additional information or clarification on the Invoicing report pulled from WAWF.
5- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Deliverable Title: Accident and Damage Reporting (CIRS) The following will be delivered every time an accident or near miss occurs: Weight Handling Equipment Accident Report, Initial Accident Reporting Notification Report, Follow-on Accident Reporting Notification Report, and Final Accident Reporting Notification Report.
Form Attachment No.: J-0200000-04.2
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the CIRS reports deliverables shall be delivered using the following method
1- CIRS reports will be sent via email as PDF attachment to the contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes. The invoicing report will be pulled from WAWF by the Contracting officer and Contracting Officer Representative
2- CIRS PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- CIRS Reports Shall be provided by the contractor within the specified time flame mentioned on the corresponding deliverable title/dates of submission in the table at the beginning of section F.
5- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Deliverable Title: Important Notifications to The Contracting Officer (KO) The following notification will be made to the contracting officer: Notification to Exceed Recurring Work Limitations (Estimate), Non- Recurring work proposal and Service Interruptions, LSIO Citations and Violations Corrective Action Report and Request to work outside Government’s Regular Working hours.
Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
PDF for submission. Unless otherwise specified in the Annex, the Important notification deliverables shall be delivered using the following method
1- Important notifications will be sent via email as PDF attachment to the Contracting Officer (KO) and Contracting Officer Representative (COR) if it’s under 10 M bytes.
2- Important notifications PDF files over 10M bytes shall be saved on CD/DVD media and delivered to the Contracting Officer (KO) via the Contracting Officer Representative (COR).
3- The Contractor is subject to deliver any additional information as requested by the contracting officer in a form mentioned in 1 and 2 above.
4- The contracting officer will be notified in writing within <<Note to Spec Writer: Insert time, e.g., one
(1) ~ 15 calendar days >>when the required repair work is expected to exceed the recurring work limits.
5- The contractor will submit a non-recurring work proposal to the KO within five (5) calendar days following receipt for each potential task order, or when requested by KO.
6- If the contractor expects to interrupt any services, they must request in writing a request Service interruption for approval within the specified time flame mentioned on the corresponding deliverable title/dates of submission in the table at the beginning of section F.
7- LSIO Citations and Violations Corrective action Report shall be reported to the KO via COR within 48 hours after receiving the citation.
8- The Contractor shall submit a request to work outside the regular working hours at least four (4) calendar days earlier than the scheduled work day.
9- The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and
Controlled Unclassified Information (CUI)(March 6, 2020)
Deliverable Title: Passes and Badges Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
Hard Copy X Electronic ___ Direct System Input
Instructions:
All contractors are required to request passes and Badges in accordance with the Government pass office. After the award the contractor can get information of obtaining badges under the following link.
http://cnic.navy.mil/regions/cnrj/installations/cfa_yokosuka/om/security/industrial_security.html
The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting; and mark deliverables/submittal in accordance with DoDI 5200.48 Controlled Unclassified Information (CUI)(March 6, 2020).
http://cnic.navy.mil/regions/cnrj/installations/cfa_yokosuka/om/security/industrial_security.html
Deliverable Title: Certificate of Insurance Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
Hard Copy X Electronic ___ Direct System Input
Instructions:
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
The certificate of insurance shall include contract number, contract title.
The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting; and mark deliverables/submittal in accordance with DoDI 5200.48 Controlled Unclassified Information (CUI)(March 6, 2020).
Deliverable Title: Quality Inspection and Surveillance Report Form Attachment No.: N/A
Government Approval Required: X Yes ___ No
Media:
Hard Copy X Electronic ___ Direct System Input
Instructions:
1. The Contractor shall submit the following, but not limited to, actual accumulated records by each equipment and actual inventories.
a). Major repair (Over FFP limit) records.
b). Minor repair (Under FFP limit) records.
c). Actual inventories shall be filled out in the blank portion and/or unknown portion of a provided list.
2. Records shall be specified by the following, but not limited to, items stored in Word and/or Excel Software.
a). Year / Date b). Bldg. No.
c). Project title d). Performance of work.
e). Consumption material cost and abor hours.
3. The Contractor shall comply with FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems and DFARS 252-204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting; and mark deliverables/submittal in accordance with DoDI 5200.48 Controlled Unclassified Information (CUI)(March 6, 2020).
N o.
FC
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
CUI // FEDCON
CUI // FEDCON
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Text Box FC#6 High and Low Voltage Panels
Atsuo.Oosugi.JA Text Box
D-BUS
TIE TR No.1 2000KVA
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box Replace Cable
Tsutomu.Toriyama.JA Line
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Polygonal Line
Tsutomu.Toriyama.JA Oval
Tsutomu.Toriyama.JA Oval
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box To 2F
Atsuo.Oosugi.JA Text Box To 2F
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box To 2F
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Tsutomu.Toriyama.JA Oval
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box Replace Cable
Tsutomu.Toriyama.JA Line
CUI // FEDCON
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
CUI // FEDCON
CUI // FEDCON
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Polygonal Line
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Text Box Replace Cable
Atsuo.Oosugi.JA Line
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Rectangle
Atsuo.Oosugi.JA Text Box To 1F
Atsuo.Oosugi.JA Text Box To 1F
Atsuo.Oosugi.JA Text Box To 1F
Tsutomu.Toriyama.JA Oval
Tsutomu.Toriyama.JA Oval
Tsutomu.Toriyama.JA Oval
Overhaul (OH)
OH
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
CUI // FEDCON
CUI // FEDCON
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
Tsutomu.Toriyama.JA Line
米海軍横須賀基地 殿/TO FEAD, YOKOSUKA
No.6 FC工場持込整備仕様/Scope of work for factory repairing No.6 FC
各部位の推奨整備仕様は下記の通りです。
Recommended scope of work as below
同期電動機/Synchronous Motor (SM)
同期発電機/Synchronous Generator (SG)
補機/Associated equipment
対象/Subject 整備内容/Type of Repair Peplace Parts/
交換部品
June 22, 2020
固定子 Stator
一式更新 Overall replace
・固定子フレーム/Stator frame ・固定子コイル /Stator coil ・固定子鉄心 /Stator iron core
回転子 Rotor
コイル巻き替え Rewind the coil
・回転子コイル /Rotor coil
ACエキサイター
AC Exciter
固定子・回転子更新 Replace the stator and rotor
・固定子フレーム /Stator frame ・固定子コイル /Stator coil ・固定子鉄心 /Stator iron core ・回転子コイル /Rotor coil ・回転子鉄心 /Rotor iron core
整流器 Rectifier
一式更新 Overall replace
・整流器 /Rectifier
永久磁石同期電動機 Permanent Magnet Syncronous Motor
固定子コイル巻き替え Rewind coil for the stator
・固定子コイル /Stator coil
試験 Commissioning
工場内SM/SG組合わせ試験・工場内単体試験、現地試運転
SM/SG synchronizing and unit test at factory, on-site operation test
軸受メタル Bearing metal
一式更新(含温度計) Overall replace(incl. Thermometer)
・軸受メタル /Bearing metal
対象/Subject 整備内容/Type of Repair Peplace Parts/
交換部品
対象/Subject 整備内容/Type of Repair Peplace Parts/
交換部品
転動装置 Turning motor
電動機更新(カップリング部分は不含)・位置検出機(セルシン モーター)更新・減速機オーバーホール
Replace the motor (not incl. coupling point), Replace the Position detector(Selsyn motor), Overhaul of Decelerator.
・電動機 / Motor
固定子 Stator
インナー更新 Replace the inner
・インナーフレーム/Inner frame ・回転子コイル /Rotor coil ・回転子鉄心 /Rotor iron core ・スペースヒーター/Space Heater
回転子 Rotor
コイル巻き替え Rewind the coil
・回転子コイル /Rotor coil
試験 Commissioning
工場内単体試験、現地試運転 Unit test at factory, on-site operation test
ACエキサイター
AC Exciter
固定子・回転子更新 Replace the stator and rotor
・固定子フレーム /Stator frame ・固定子コイル /Stator coil ・固定子鉄心 /Stator iron core ・回転子コイル /Rotor coil ・回転子鉄心 /Rotor iron core
整流器 Rectifier
一式更新 Overall replace
・整流器 /Rectifier
同期発電機
SYN.GEN
同期電動機
SYN.MOT
5
軸受台 PMG
整
流
器 軸受台
整
流
器 軸受台 E
X
E X
7 8
AC Exciter
Rectifier
Rectifier
転動装置 Turning motor
Permanent Magnet Synchronous MotorAC Exciter
CUI // FEDCON
CUI // FEDCON
ATTACHMENT J-1602000-04
DETAIL SITE PLANS AND OVERHAUL REQUIREMENT FOR No.6 FC
CUI // FEDCON
CUI // FEDCON
Tsutomu.Toriyama.JA Rectangle
Tsutomu.Toriyama.JA Rectangle
Rectangle
| 23-T-0402-A0001-S.pdf |
| 008_F_Deli_List_v2.9_A0001 |
| 016-DetailSitePlansOhRequirement-A001 |
File details come from the government source that posted it. Updated .