About this file

This solicitation requests proposals for indefinite delivery/indefinite quantity design-build/design-bid-build multiple award construction contracts for the Kanto Plains Operational Area in Japan. The total ceiling value for all awards is $250 million and task order values will range from $25 million to $500 million for construction and repair projects at various Navy and Marine Corps facilities. Projects may include office renovation, building demolition, equipment repair and replacement, electrical and mechanical work, roadwork, fencing, roofing, painting, asbestos abatement, and welding. The response deadline is December 24, 2021 and there is one seed project valued between $500 million to $1 billion to replace air conditioning systems at Commander Fleet Activities Yokosuka. The minimum guarantee for each awarded contract is 2 million Japanese yen.

View the file

Other files

File Type Posted
Amendment 0004_22R0077.pdf PDF
EXHIBIT E_Price-Proposal-Form_revision.doc DOC document
EXHIBIT F_FAR-Provision-52.229-11.doc DOC document
Amendment 0003_22R0077.pdf PDF
Amendment 0002_22R0077.pdf PDF
Amendment 0001_22R0077.pdf PDF
EXHIBIT A_Offeror Team.doc DOC document
EXHIBIT E_Price Proposal Form.doc DOC document
EXHIBIT B_ Construction Design Experience Project Data Sheet.doc DOC document
EXHIBIT D_Past Performance.docx DOCX document
EXHIBIT C_ Safety Narrative.doc DOC document
N4008422R0077 RFP SF 1442.pdf PDF
Attach_3_CUI_OPSEC Guide PIEE.pdf PDF
Attach_1_Pre-Bid_Inquiry_Form.xls XLS spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C – N4008422R0077

FACTOR 3 - SAFETY NARRATIVE

Use this form to provide the Safety Narrative. Individual blocks on this form may be expanded; however, total length should not exceed 2 single-sided (1 double sided) pages. Additional pages will not be considered.

OFFEROR NAME:

1. The Offeror’s plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors:

2. The safety management system that will be used to oversee safety compliance and performance of self-performed and subcontractor performed work:

3. Any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels (desired, but not required):

4. The Offeror’s methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities and near-miss mishaps:

Revised April 2011

PAGE

CUI//FEDCON [when filled in]

Source Selection Information – See FAR 2.101 & 3.104 [when filled]

File details come from the government source that posted it. Updated .