This document contains an exhibit and solicitation for multiple award construction contracts. The Navy seeks to award indefinite delivery/indefinite quantity design-build and design-bid-build contracts for construction and renovation projects in the Kanto Plains area of Japan. Task orders will range from 25 million to 5 billion Japanese yen and may be used for projects in Yokosuka, Yokohama, Tokyo, and other locations. The response deadline is December 24, 2021 and the total not-to-exceed amount for all awards combined is 250 million U.S. dollars. One seed project will be awarded initially for air conditioning replacement in Yokosuka valued between 500 million and 1 billion yen. Successful offerors will receive a minimum 2 million yen task order in addition to any work awarded. The exhibit provides a template for offerors to submit details on relevant past project experience for evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004_22R0077.pdf | ||
| EXHIBIT E_Price-Proposal-Form_revision.doc | DOC document | |
| EXHIBIT F_FAR-Provision-52.229-11.doc | DOC document | |
| Amendment 0003_22R0077.pdf | ||
| Amendment 0002_22R0077.pdf | ||
| EXHIBIT C_ Safety Narrative _Revision.doc | DOC document | |
| Amendment 0001_22R0077.pdf | ||
| EXHIBIT A_Offeror Team.doc | DOC document | |
| EXHIBIT E_Price Proposal Form.doc | DOC document | |
| EXHIBIT D_Past Performance.docx | DOCX document | |
| EXHIBIT C_ Safety Narrative.doc | DOC document | |
| N4008422R0077 RFP SF 1442.pdf | ||
| Attach_3_CUI_OPSEC Guide PIEE.pdf | ||
| Attach_1_Pre-Bid_Inquiry_Form.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//FEDCON [when filled in]
Source Selection Information – See FAR 2.101 & 3.104 [when filled]
EXHIBIT B – N4008422R0077
CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET
Submit separate Project Data Sheets for construction and design. Individual blocks on this form may be expanded; however, total length should not exceed 1 double-sided (2 single-sided) pages.
Project No. (check one) : FORMCHECKBOX
CON #1 FORMCHECKBOX
CON #2 FORMCHECKBOX
CON #3 FORMCHECKBOX
CON #4 FORMCHECKBOX
CON #5
FORMCHECKBOX
DESIGN #1 FORMCHECKBOX
DESIGN #2 FORMCHECKBOX
DESIGN #3 FORMCHECKBOX
DESIGN #4 FORMCHECKBOX
DESIGN #5
1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain)
Firm Name:
Address:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
5. Type of work:
FORMCHECKBOX
New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Design Project:
A/E Design Fee: Total Construction Value:
Type of Contract/Task Order: (Check ALL that apply)
FORMCHECKBOX
Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs
FORMCHECKBOX
Other (explain):
9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). Include how this project meets the definition of a relevant project (size, scope, complexity). If design-build, include a description of the design-effort.
10. Provide a detailed description of what work your firm self-performed on this project:
11. Other Information:
Revised April 2011