About this file

This document contains an exhibit and solicitation for multiple award construction contracts. The Navy seeks to award indefinite delivery/indefinite quantity design-build and design-bid-build contracts for construction and renovation projects in the Kanto Plains area of Japan. Task orders will range from 25 million to 5 billion Japanese yen and may be used for projects in Yokosuka, Yokohama, Tokyo, and other locations. The response deadline is December 24, 2021 and the total not-to-exceed amount for all awards combined is 250 million U.S. dollars. One seed project will be awarded initially for air conditioning replacement in Yokosuka valued between 500 million and 1 billion yen. Successful offerors will receive a minimum 2 million yen task order in addition to any work awarded. The exhibit provides a template for offerors to submit details on relevant past project experience for evaluation.

View the file

Other files

File Type Posted
Amendment 0004_22R0077.pdf PDF
EXHIBIT E_Price-Proposal-Form_revision.doc DOC document
EXHIBIT F_FAR-Provision-52.229-11.doc DOC document
Amendment 0003_22R0077.pdf PDF
Amendment 0002_22R0077.pdf PDF
EXHIBIT C_ Safety Narrative _Revision.doc DOC document
Amendment 0001_22R0077.pdf PDF
EXHIBIT A_Offeror Team.doc DOC document
EXHIBIT E_Price Proposal Form.doc DOC document
EXHIBIT D_Past Performance.docx DOCX document
EXHIBIT C_ Safety Narrative.doc DOC document
N4008422R0077 RFP SF 1442.pdf PDF
Attach_3_CUI_OPSEC Guide PIEE.pdf PDF
Attach_1_Pre-Bid_Inquiry_Form.xls XLS spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//FEDCON [when filled in]

Source Selection Information – See FAR 2.101 & 3.104 [when filled]

EXHIBIT B – N4008422R0077

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Submit separate Project Data Sheets for construction and design. Individual blocks on this form may be expanded; however, total length should not exceed 1 double-sided (2 single-sided) pages.

Project No. (check one) : FORMCHECKBOX

CON #1 FORMCHECKBOX

CON #2 FORMCHECKBOX

CON #3 FORMCHECKBOX

CON #4 FORMCHECKBOX

CON #5

FORMCHECKBOX

DESIGN #1 FORMCHECKBOX

DESIGN #2 FORMCHECKBOX

DESIGN #3 FORMCHECKBOX

DESIGN #4 FORMCHECKBOX

DESIGN #5

1. Experience for: FORMCHECKBOX Offeror FORMCHECKBOX Joint-Venture FORMCHECKBOX Other (Explain)

Firm Name:

Address:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: FORMCHECKBOX Prime Contractor FORMCHECKBOX Sub Contractor FORMCHECKBOX Joint Venture FORMCHECKBOX Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

FORMCHECKBOX

New Construction FORMCHECKBOX Renovation FORMCHECKBOX Repair FORMCHECKBOX Alteration FORMCHECKBOX Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Firm-Fixed Price FORMCHECKBOX Cost/Time and Material FORMCHECKBOX Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX Design-Bid-Build FORMCHECKBOX Delivery/Task Order (IDIQ) FORMCHECKBOX Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

FORMCHECKBOX

Design-Build FORMCHECKBOX RFP Development FORMCHECKBOX Designer of Record FORMCHECKBOX Engineering Services FORMCHECKBOX Full Plans & Specs

FORMCHECKBOX

Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). Include how this project meets the definition of a relevant project (size, scope, complexity). If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

Revised April 2011

PAGE

CUI//FEDCON [when filled in]

Source Selection Information – See FAR 2.101 & 3.104 [when filled]

File details come from the government source that posted it. Updated .