This document provides details for an indefinite delivery indefinite quantity multiple award construction contract opportunity with the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for general building projects in Singapore, such as office, industrial and residential renovation, new construction, and demolition. The total contract value across all awards is $100 million. Task orders will range between $10,000 to $5 million. There is a minimum $10,000 guarantee for each contract. One seed project with a value between $1-5 million is also included for conversion of buildings into a hazmat facility. Proposals are due by December 21, 2021. The contract consists of an initial three-year base period and a five-year option period.

View the file

Other files

File Type Posted
N4008422R0066 Amd 0008.pdf PDF
N4008422R0066 Amd 0006.pdf PDF
Attach_1_Pre-Bid_Inquiry_Form_Revised.xlsx XLSX spreadsheet
N4008422R0066 Amd 0005.pdf PDF
N4008422R0066 Amd 0004.pdf PDF
N4008422R0066 Amd 0003.pdf PDF
N4008422R0066 Amd 0002.pdf PDF
N4008422R0066 Amd 0001.pdf PDF
N4008422R0066 SF1442.pdf PDF
Attach_7_PIEE Solicitation Module.pdf PDF
Attach_1_Pre-Bid_Inquiry_Form.xls XLS spreadsheet
Attach_6_CUI_OPSEC Guide.pdf PDF
Exhibits A-E.zip ZIP file
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5898352

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N4008422R0066, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) DESIGN BUILD (DB) / DESIGN-BID-BUILD (DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PUBLIC WORK DEPARTMENT (PWD) SINGAPORE

CONTINUED ON PAGE 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008422R0066

X 9B. DATED (SEE ITEM 11)

03-Nov-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jan-2022

CODE

NAVFAC FAR EAST

CORE EXECUTION TEAM

PSC 473 BOX 13

FPO AP 96349-0013

N40084 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008422R0066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

The purpose of this amendment is to provide answers to submitted pre-bid inquiries as follows:

Question No.

QUESTION GOVERNMENT RESPONSE

Within clause 52.228-1 Bid Guarantee(c) it is stated that the "amount of the bid guarantee shall be 20 percent of the bid price or

$4,147,800 SGD / $3,000,000 USD

(FY22 Budget Exchage Rate

$1.3826 SGD / $1 USD),

whichever is less.-". We would like to ask if possible same with performance bond if can review the mentioned requirement to 5 to 10% of bid project value as bid bond? , as for Singapore it is not a common practice to provide bid bond.

For purposes of this solicitation, the bid guarantee percentage will be reduced to align with the performance bond requirement. As such, FAR clause 52.228-1 BID GUARANTEE(c) will be updated to:

"(c) The amount of the bid guarantee shall be 10 percent of the bid price or $4,147,800 SGD / $3,000,000 USD (FY22 Budget Exchange Rate $1.3826 SGD / $1 USD), whichever is less."

All other terms and conditions remain unchanged.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

N4008422R0066

(c) The amount of the bid guarantee shall be 10 percent of the bid price or $4,147,800 SGD / $3,000,000 USD (FY22 Budget Exchange Rate $1.3826 SGD / $1 USD), whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

(End of Summary of Changes)