N4008422R0066 Amd 0006.pdf
PDF 150 KB Posted
- Solicitation number
- N4008422R0066
About this file
This document includes an amendment to a solicitation and the related solicitation opportunity. The amendment extends the response date for the solicitation to January 20, 2022 from January 10, 2022 to allow additional time for new NCAGE code applications and bond processing due to pandemic delays. The solicitation is for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract by the Naval Facilities Engineering Command Far East for the Public Works Department in Singapore. The scope includes general building projects through both design-build and design-bid-build delivery methods. The contract has a maximum value of $100 million over eight years. Individual task order values range from $10,000 to $5 million USD. A minimum $10,000 SGD task order will be issued to all awardees. The seed project has a value between $1-5 million USD to convert three buildings into a hazmat facility. Responses are due by January 20, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008422R0066 Amd 0008.pdf | ||
| N4008422R0066 Amd 0007.pdf | ||
| Attach_1_Pre-Bid_Inquiry_Form_Revised.xlsx | XLSX spreadsheet | |
| N4008422R0066 Amd 0005.pdf | ||
| N4008422R0066 Amd 0004.pdf | ||
| N4008422R0066 Amd 0003.pdf | ||
| N4008422R0066 Amd 0002.pdf | ||
| N4008422R0066 Amd 0001.pdf | ||
| N4008422R0066 SF1442.pdf | ||
| Attach_7_PIEE Solicitation Module.pdf | ||
| Attach_1_Pre-Bid_Inquiry_Form.xls | XLS spreadsheet | |
| Attach_6_CUI_OPSEC Guide.pdf | ||
| Exhibits A-E.zip | ZIP file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5898352
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N4008422R0066, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) DESIGN BUILD (DB) / DESIGN-BID-BUILD (DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PUBLIC WORK DEPARTMENT (PWD) SINGAPORE
CONTINUED ON PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008422R0066
X 9B. DATED (SEE ITEM 11)
03-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jan-2022
CODE
NAVFAC FAR EAST
CORE EXECUTION TEAM
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008422R0066
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to provide answers to submitted pre-bid inquiries as follows:
Question No.
QUESTION GOVERNMENT RESPONSE
New applications for NCAGE codes is currently delayed until Jan 10, 2022. Given the requirement to submit the NCAGE code, we respectfully request a further 1-week extension to the due date
Yes, the proposal due date is extended to 20 January 2022.
Please also remember that in addition to the CAGE code, in accordance with Section 00 21 00 - Instructions part L SYSTEM FOR AWARD MANAGEMENT REGISTRATION: "All offerors are required to be registered in SAM at the time their offer is submitted. Offerors with no active SAM registration upon receipt of their offer/quotation/bid shall be considered ineligible for award."
Is FAR 52.219-4 Notice of Price Evaluation Preference for HUBZone applicable to this contract?
No, this is not a HUBZONE set aside
The RFP states that, "Submittals (with all required supporting documentation) shall be submitted by via electronic means (e-mail, DoD SAFE, or solicitation module).". Can you please confirm that we can submit our proposal by any one of these methods?
Yes, any of these submittal methods are acceptable. Please see Section 00 21 00 - Instructions O. PROPOSAL SUBMISSION - INSTRUCTIONS for additional information regarding each submittal method.
The RFP states that we are to provide, "A detailed statement outlining the following in terms of percentages where appropriate:
1) The relationship of the team/partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.
2) The management approach in terms of who will conduct, direct supervise, and control. 3) The structure and decision-making responsibilities of the partners/parties in terms of who will control
Yes, this can be included in Tab 1 - Factor 1.
the manner and method of performance of work.
4) Identify (by name and title) the personnel having the authority to legally bind the partners/parties (including authority to executed the contract documents and bonds). Can you please confirm that this information should be provided in Tab 1 - Factor 1?
The RFP states that we are to provide, "A detailed statement outlining the following in terms of percentages where appropriate:1) The relationship of the team/partners/parties in terms of business ownership, capital contribution,profit distribution or loss sharing.2) The management approach in terms of who will conduct, direct supervise, and control. 3) The structure and decision-making responsibilities of the partners/parties in terms of who will controlthe manner and method of performance of work.4) Identify (by name and title) the personnel having the authority to legally bind thepartners/parties (including authority to executed the contract documents and bonds). Can you please confirm that this information does NOT count towards the 2-page limit for Exhibit A?
Yes, this statement does NOT count toward the 2-page limit for Exhibit A.
The RFP states that we are to provide, "A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point of contact, e-mail address, phone number and facsimile number." Can you please confirm that this information should be provided in Tab 1 - Factor 1?
Yes, this can be included in Tab 1 - Factor 1.
The RFP states that we are to provide, "A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point of contact, e-mail address, phone number and facsimile number." Can you please confirm that this information does NOT count towards the 2-page limit for Exhibit A?
Yes, this information does NOT count toward the 2-page limit for Exhibit A.
RFP page 16 states "More weight may be given to the Offeror’s projects than to those submitted for subcontractors." Can you please confirm that a design team member/subcontractor's project experience submitted under 2) Design Experience will be considered at the same weight as the offeror's projects due to the nature of engaging independent design firms to satisfy the design-build requirements of this contract?
To clarify, the statement: "More weight may be given to the Offeror’s projects than to those submitted for subcontractors."
refers to the 1) Construction Experience section of Factor 2 only.
Can you please confirm that proposing a single design firm will be evaulated the same way as proposing multiple design firms?
Yes, there is no requirement to propose multiple design firms.
Proposing a single design firm will be evaulated the same way as proposing multiple design firms. Please note that in accordance with Factor 2, "Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating."
In Amendment 004 response #14, the penal amount of the performance bond requirement is revised to 10% of the contract price. We would like to ask if this 10% already include the bid bond.
To clarify, the bid bond is not the same thing as the performance bond. The bid bond is required as a submittal requirement to Factor 5, Price. If selected as the awardee of the Seed project, the awardee must furnish the performance bond within 15 calendar days of the contract award. So the bid bond and performance bond are two separate bonds. The bid bond must be furnished and provided with the proposal during the solicitation. The performance bond should be furnished if awarded the seed project.
In this pandemic, paper works for the bonds and processing duration take a bit longer, we would like to request if able to extend the submission for another 10 days, with proposal submission due date to January 20,2022. Thanks for your consideration.
Yes, the proposal due date is extended to 20 January 2022.
The proposal due date is hereby extended to 20 January 2022 by 1430 Japan Standard Time (JST).
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 10-Jan-2022 02:30 PM to 20-Jan-2022 02:30 PM.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $4,147,800 SGD / $3,000,000 USD (FY22 Budget Exchage Rate $1.3826 SGD / $1 USD), whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
(End of Summary of Changes)