This document provides details for an indefinite delivery indefinite quantity multiple award construction contract solicitation for the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for design-build and design-bid-build projects for the Public Works Department in Singapore, with a total contract value not to exceed $100 million over eight years. Projects may include office, industrial and residential renovation, new construction, demolition, equipment repair and replacement, piping work, electrical work, HVAC work, fire protection, roofing, and other civil engineering and architectural finishing work. A seed project to convert buildings 74-4, 75-4 and RSB-2 into a hazmat facility in Singapore with an estimated value between $1 million and $5 million is also included. The response deadline is 21 December 2021. Individual task order values will range from $10,000 to $5 million USD. Minimum guarantees of $10,000 SGD will be provided for each awarded contract. Details on the seed project scope and specifications are provided in the attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008422R0066 Amd 0008.pdf | ||
| N4008422R0066 Amd 0007.pdf | ||
| N4008422R0066 Amd 0006.pdf | ||
| Attach_1_Pre-Bid_Inquiry_Form_Revised.xlsx | XLSX spreadsheet | |
| N4008422R0066 Amd 0005.pdf | ||
| N4008422R0066 Amd 0004.pdf | ||
| N4008422R0066 Amd 0002.pdf | ||
| N4008422R0066 Amd 0001.pdf | ||
| N4008422R0066 SF1442.pdf | ||
| Attach_7_PIEE Solicitation Module.pdf | ||
| Attach_1_Pre-Bid_Inquiry_Form.xls | XLS spreadsheet | |
| Attach_6_CUI_OPSEC Guide.pdf | ||
| Exhibits A-E.zip | ZIP file |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5898352
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N4008422R0066, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) DESIGN BUILD (DB) / DESIGN-BID-BUILD (DBB) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PUBLIC WORK DEPARTMENT (PWD) SINGAPORE
CONTINUED ON PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008422R0066
X 9B. DATED (SEE ITEM 11)
03-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Dec-2021
CODE
NAVFAC FAR EAST
CORE EXECUTION TEAM
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008422R0066
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
The purpose of this amendment is to provide answers to submitted pre-bid inquiries as follows:
Question No.
QUESTION GOVERNMENT RESPONSE
Regarding Tab 5H Construction License requirement, we recommend that US businesses be allowed to get Singapore business license after the award of the IDIQ contract. Based on experience in the Pacific including Thailand, US businesses holding a US Government contract are eligible to apply for Singapore businesses license. Due to past experience, we know the process and can get Singapore business license within 30 days.
The construction license description has been revised as follows:
"A copy of the Offeror’s construction license and/or a narrative demonstrating the offeror’s eligibility, ability, and plan to obtain all required business licensure to ensure the offeror is duly authorized to operate and conduct construction business in Singapore."
Ultimately, offerors must clearly demonstrate their entity's authorization to legally operate and conduct business in Singapore. Offerors must have the capability to perform all the requirements of the seed project in accordance with the schedule and performance period as indicated in the specifications.
Page 19, Factor 5 states, "Completed Price Proposal Form, Exhibit E. Price proposal shall be in U.S. Dollars only." However, page 10 states, "Offers shall be priced only in Singapore Dollar (SGD)." Can you please clarify?
To clarify, offers shall be priced in Singapore Dollars (SGD).
Factor 5, Price has been revised accordingly.
We would like to kindly request an extension to the proposal due date to January 10, 2022. Given shifts in the global market, as well as the upcoming holidays, a proposal extension would allow for more time to prepare a complete proposal response and more accurate pricing.
Thank you for considering.
A proposal due date extension to 10 January 2022 is acceptable.
The proposal due date is hereby extended to 10 January 2022 by 1430 Japan Standard Time (JST).
Section 00 21 00 – INSTRUCTIONS has been revised in accordance with the pre-bid inquiry responses. All changes are denoted in yellow highlighted red text.
All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 21-Dec-2021 02:30 PM to 10-Jan-2022 02:30 PM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
INSTRUCTIONS
A. AMENDMENTS
Amendments will be posted to the Government-wide point of entry (GPE), currently SAM
(https://sam.gov). Hard copies of the amendment will not be mailed. It is the Offeror’s responsibility to check the website periodically for any postings or amendments to the solicitation.
B. BID GUARANTEE AND BONDING REQUIREMENTS
A bid guarantee and performance bond are required by this solicitation. See, FAR 52.228-1, 52.228-15, and
52.228-2 for details. Individual sureties will only be permitted where the Offeror proposing an individual to act as surety complies with FAR 52.228-11 herein and the Government, in its discretion, determines the individual surety to be acceptable for purposes of this procurement. Singapore sureties (whether corporations, banks or individuals) are requested to register with NAVFAC Far East prior to issuing any bond. Refer to FAR 52.228-1 for Government acceptable forms of firm commitments.
The company name and address of Bid Bond (SF24), Performance Bond (SF25), and Additional Bond
(SF1415) should match with the company name and address of bid form. Bonding company or Bank should register with the contracting office before they issue the bond. If they don’t register with the contracting office, their bond will be rejected. If the contractor wants to use the check for bond, the issue office should be Bank or financial (banking) institution. We cannot accept the check issued by the Offerors.
Electronic copy of SF24 can be downloaded at below URL:
http://www.gsa.gov/portal/forms/download/115982
Electronic copy of SF25 can be downloaded at below URL:
http://www.gsa.gov/portal/forms/download/115986
Electronic copy of SF1415 can be downloaded at below URL: https://www.gsa.gov/forms-library/consent-surety-and-increase-penalty
C. CONTRACTOR LICENSING REQUIREMENTS
Any contract resulting from this solicitation will be awarded and performed in its entirety in the country of
Singapore. Contractors must be duly authorized to operate and conduct business in Singapore and must fully comply with all laws, decrees, labor standards, and regulations of Singapore during the performance of the contract.
D. ENFORCEABILITY OF PROPOSAL
The proposal must set forth full, accurate, and complete information as required by this solicitation. The Government will rely on such information in the award of the contract. By submissions of the offer, the Offeror agrees that all items proposed (e.g., key personnel, subcontractors, materials, design concept, etc.)
will be utilized for the duration of the contract and any substitutions shall require Contracting Officer’s approval.
E. FAR PROVISION 52.229-11 AND FAR CLAUSE 52.229-12
FAR provision 52.229-11 and FAR clause 52.229-12 are included in this solicitation. This provision and clause concern the imposition of a 2 percent Federal excise tax withholding on any resultant contract award or payment request. This rule applies to Federal Government contracts for goods or services that are awarded to foreign persons. It implements the Department of the Treasury final regulations published in the Federal Register at 81 FR 55133 on August 18, 2016, under section 5000C of the Internal Revenue Code relating to the 2 percent tax on payments made by the U.S. Government to foreign entities pursuant to certain contracts.
Exemptions from this excise tax must be claimed by an Offeror when it submits, with its offer, a U.S.
Department of Treasury Internal Revenue Service (IRS) Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, available via the internet at www.irs.gov/w14. If not submitted with the offer, exemptions will not be applied to any resulting contract and the Government will withhold a full 2 percent on each payment. Failure to submit IRS Form W-14 with a payment request will also result in an automatic withholding of 2 percent from the payment request.
When filling out the IRS Form W-14 the following information may be used to complete Part I, Line 6 and 7:
Line 6 Contract / reference number: N4008422R0066 Line 7 Name and address of the acquiring agency:
Naval Facilities Engineering Systems Command (NAVFAC) Far East City of town, state or province. Include postal code where appropriate Country (do not abbreviate) Bldg. 1828, 1F, Tomari-cho Yokosuka, Kanagawa, 238-0001 Japan
Any exemption claimed and self-certified is subject to audit by the IRS. Any disputes concerning this tax are adjudicated by the IRS because the Section 5000C tax is a tax matter not a contract issue.
Offerors are encouraged to seek guidance from their own tax, legal, or accounting professionals for advice concerning the provision, clause, and the execution/submission of IRS Form W-14. Additional information is also available at:
https://www.navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/contractors_information.html
However, Offerors are advised to consult Title 26 U.S.C. 5000C and its implementing regulations at 26 CFR
1.5000C-1 through 1.5000C-7 (see FAR 29.402-3, 31.205-41(b)(8)) for specific details and/or updates.
F. INCORPORATION OF PROPOSAL
The Contractor’s proposal, including revisions and amendments, made prior to contract award and a copy of which is in the possession of both parties, shall be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. In the event of any inconsistency between the provisions of this contract and the proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal) and then (ii) the proposal.
G. INCURRED EXPENSES
The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
H. JOINT VENTURE (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED PARTNERSHIPS
(LTD), ETC.
Joint Ventures and Limited Liability Companies and Limited Partnerships shall submit the following additional documentation regarding their business entities with the offer:
a. A copy of the JV, LLC or LTD agreement.
b. A detailed statement outlining the following in terms of percentages where appropriate:
1) The relationship of the team/partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.
2) The management approach in terms of who will conduct, direct supervise, and control.
3) The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.
4) Identify (by name and title) the personnel having the authority to legally bind the partners/parties (including authority to executed the contract documents and bonds).
c. A list of partners/parties, to include company name, DUNS and CAGE numbers, address, point of contact, e-mail address, phone number and facsimile number.
NOTE: An offer may be rejected if the company name identified on the submittals and any bonds or guarantees is different from the JV, LLC or LTD name identified on the agreement.
I. PRE-PROPOSAL INQUIRIES
Inquiries regarding this Request for Proposal (RFP) shall be submitted electronically using the Pre-
Proposal Inquiry (PPI) form provided as Attachment 1. The Point of Contact (POC) for inquiries is Mr. Kyle Monma, Contract Specialist, at kyle.monma@fe.navy.mil. The Government does not intend to respond to inquiries submitted less than 10 calendar days before the proposal closing date and time. Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands the requirement of the solicitation.
J. PRE-PROPOSAL CONFERENCE AND SITE VISIT
See Section 00 21 00 Instructions, FAR 52.236-27 Site Visit (Construction) (FEB 1995) – Alternate I
(FEB 1995) for more information.
K. RESPONSIBILITY DETERMINATION/PRE-AWARD SURVEY
FAR 9.103 requires the Contracting Officer to make an affirmative determination of responsibility prior to making an award. The general standards for responsibility are outlined in FAR 9.104 and include having adequate financial resources to perform the contract or the ability to obtain them, being able to comply with the required performance schedule, having a satisfactory performance record, having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them, having the necessary production, construction, and technical equipment and facilities, or the ability to obtain them, and being otherwise eligible to receive an award under applicable laws and regulations. The pre-award survey is not a part of the technical evaluation.
The Government may conduct a pre-award survey of Offerors to determine whether such Offeror is qualified and capable of performing the contract. The pre-award survey may involve examination of the Offeror's financial and technical status and understanding of the contract requirements.
Requested information shall be forwarded within three (3) business days upon request or as indicated on the letter from the Contracting Officer. Failure to provide requested information may result in rejection of the proposal.
The following are examples of the information that, upon request, the Offeror shall be required to provide in writing to the pre-award survey team.
1. Identification of the Contractor's personnel and management to be used on this contract.
2. The Contractor's technical and management plans for performing required services.
3. Description of Contractor's facilities and equipment.
4. Summary of the Contractor's experience in performing work of the type required by this specification.
5. Current financial statements and data.
6. Other work presently under contract.
7. Prior contracts for similar work, and the names and addresses of individuals with the organization issuing the contract who may be contacted for information concerning the Contractor's performance.
8. Contractor Quality Control plan for this contract.
L. SYSTEM FOR AWARD MANAGEMENT REGISTRATION
All offerors (i.e., whether individually or as a joint venture, etc.) responding to this solicitation must be registered in the System for Award Management (SAM) database to be eligible for award. For more information please go to https://www.sam.gov, or by calling 866-606-8220 or 334-206-7828 for international call and complete the provisions associated with the annual representations and certifications identified in the Federal Acquisition Regulation (FAR) Subpart 4.1202 and Defense FAR Supplement (DFARS) Subpart 204.1202.
An Offeror is required to be registered in SAM when submitting its offer/quotation/bid, and shall continue to be registered at all relevant times, i.e., time of award, during contract performance, and through final payment of the contract resulting from this solicitation.
CAUTION: All offerors are required to be registered in SAM at the time their offer is submitted. Offerors with no active SAM registration upon receipt of their offer/quotation/bid shall be considered ineligible for award."
M. SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
N. SUBMISSION OF OFFERS IN SINGAPORE DOLLARS
Offers shall be priced only in Singapore Dollar (SGD). Offers not priced in SGD shall be deemed non-responsive and will not be eligible for award.
O. PROPOSAL SUBMISSION - INSTRUCTIONS
1. PROPOSAL SUBMISSION
Submittals (with all required supporting documentation) shall be submitted by via electronic means (e-mail, DoD SAFE, or solicitation module). HARD COPY PROPOSALS AND FACSIMILE PROPOSALS WILL
NOT BE ACCEPTED.
EMAIL:
Proposal Packages shall be emailed to the following address:
Contract Specialist, Mr. Kyle Monma kyle.monma@fe.navy.mil
Subject line of email should be labeled: RFP N4008422R0066 SINGAPORE MACC
No email sent shall be larger than 4 MB in size. If the proposing company must send multiple emails, then each email must be labeled with the subject as “Email x of n”, where x is the unique number and n is the total number of emails. The time stamp of when the email is received by the Contract Specialist shall be official, so please provide enough time when sending to allow for possible server delays.
DoD SAFE:
Proposals shall be submitted in English in Adobe PDF form (*.pdf) via DoD SAFE.
In order to submit through DoD SAFE (https://safe.apps.mil/), you must request from the Contract Specialist a unique “Request for Drop-Off” code. The request should include the Offeror’s Point of Contact (POC) name, email address, and telephone number and shall be submitted to the assigned Contract Specialist via email to Kyle Monma at kyle.monma@fe.navy.mil at least 5 calendar days prior to the deadline for receipt of proposals.
Within 3 calendar days prior to the proposal due date, the Government will send a DoD SAFE invitation email to the Offeror’s POC email address with a “Request for Drop-Off” code for use in submitting the proposal. Only the identified POC will be able to drop-off proposals or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.
To upload the proposal in DoD SAFE:
1. Request a Drop-Off code from the Contract Specialist identified in the solicitation at least 5 calendar days prior to the deadline for receipt of proposals.
2. Log into DoD SAFE at https://safe.apps.mil/
3. Click “Drop-off” and enter the Request Code that was provided by the Contract Specialist.
4. Enter the solicitation number, Offeror name, DUNS number and CAGE code in the field labeled “Short note to the Recipients.”
5. Upload files by clicking button labeled “Click to Add Files or Drag Them Here”.
6. Click “Drop-Off Files” to send the files to the recipient.
7. DoD SAFE will provide a time stamped notification to the Government when the file is uploaded. The
DoD SAFE system notification must show the submittal “Drop-Off” or submission was no later than the submittal due date. The date and time of “Drop-Off” or submission recorded in DoD SAFE shall govern the timeliness of any submission.
For DoD SAFE User Guide information visit:
https://safe.apps.mil
SOLICITATION MODULE:
Proposals shall be submitted in English in Adobe PDF form (*.pdf) via Solicitation Module in PIEE.
In order to submit through the Solicitation Module in PIEE, you must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.
To upload the proposal in Solicitation module in PIEE:
1. Ensure you have an active role as with the Proposal Manager in PIEE.
2. Log into PIEE at https://piee.eb.mil/ to access the Solicitation Module or go directly to the Solicitation
Module at the following link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml.
3. Select Solicitation icon.
4. At the Home screen of the Solicitation Module, select the Search link to find the solicitation you intend to post an offer against.
5. In the Solicitation Search Criteria filter by entering the complete solicitation number and for Status, select Open, then click Search.
6. When search results display, select the solicitation number link to open the solicitation.
7. The solicitation displays, with information as view only.
8. To post the offer, click the Offer tab.
9. Click the Add button to add an offer to the solicitation.
10. Select the applicable CAGE Code for which you are submitting the offer. The list is pre-filtered based on the CAGEs in the Proposal Manager’s profile.
11. Click on the Choose Files link to upload attachments that comprise your offer.
12. Enter Signature Date and click Signature button after entering all necessary information.
13. Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and OTP. Click the Sign and Submit button to continue.
14. After successfully adding the Offer a success message of the submission will be displayed providing confirmation of on-time/late proposal receipt.
Refer to Attachment 7 for additional guidance on the use of the PIEE Solicitation Module.
For addition information on PIEE Vendor Access Instructions or PIEE Solicitation Module Frequently Asked Questions visit:
https://dodprocurementtoolbox.com/site-pages/solicitation-module
For additional instructions on how to post an offer, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf
2. PROPOSAL FORMAT
Offeror’s proposal must be submitted in accordance with the following instructions. Nonconformance may result in an unfavorable proposal evaluation.
Non-Cost/Price Proposal and Price Proposal shall be separate attached files and shall be labeled accordingly. All files shall be Adobe PDF formatted.
(1) Non-Cost/Price Proposal
The Non-Cost/Price Proposal shall be labeled “Non-Cost/Price Proposal”. All pages shall be numbered. Page limits, if stipulated, must be adhered to. Submissions related to the Factors shall be labeled and organized as follows:
Tab 1 – Factor 1, Technical Approach (Exhibit A, Offeror Team, including Organizational Chart;
JV Agreement, etc.)
Tab 2 – Factor 2, Experience (Exhibit B, Construction & Design Experience Project Data Sheet;
Letter of Commitment and Explanation of Meaningful Involvement of Subcontractor, if applicable.)
Tab 3 – Factor 3, Safety (Exhibit C, Safety Narrative) Tab 4 – Factor 4, Past Performance (CPARS evaluations or Exhibit D, Past Performance
Questionnaire; Explanations, if applicable)
(2) Price Proposal
The Price Proposal shall be labeled “Price Proposal.” It shall be organized as follows:
Tab 5A – SF 1442, with Blocks 14-20c completed, with all amendments acknowledged Tab 5B – Exhibit E, Price Proposal Form Tab 5C – Bid Guarantee Tab 5D – Offeror Letter
Tab 5E – Representations and Certifications Tab 5F – Latest Financial Statement Tab 5G – Letter from Bonding Agent or Surety indicating single and aggregate bonding capacity Tab 5H – Construction License Tab 5I – Executed FAR Provision 52.229-11 Tab 5J – Completed IRS Form W-14, if applicable
The Non-Cost/Price Proposal and Price Proposal shall be submitted in accordance with the solicitation.
The above list is provided for the Offeror’s convenience and is not exhaustive. Offerors shall refer to Section 00 21 00 Instructions, Paragraph R of the solicitation (“Evaluation Factors for Award”) for details regarding each submittal requirement.)
3. TIMELY RECEIPT OF PROPOSALS
Offerors shall ensure that proposals (with all required supporting documentation) are received electronically no later than the date and time stated in Block 13A of the Standard Form (SF) 1442 “Solicitation, Offer, and Award (Construction, Alteration, or Repair)”, unless revised by a formal amendment. Proposals not received by the date and time specified shall be treated in accordance with FAR 52.215-1 “Instruction to Offerors – Competitive Acquisitions” and may be rejected. Ultimately, it is the Offeror’s responsibility to ensure timely proposal submission. An Offeror risks the late receipt and rejection of a proposal where it delays submitting its proposal until the last few minutes before the time set for receipt of proposals. Hard copy submissions will not be accepted.
P. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the most advantageous to the Government, cost/price and other factors considered.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. Technical factors and their respective weighting in comparison to performance confidence assessment (past performance) and price are detailed within Section R. EVALUATION FACTORS FOR AWARD.
5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions.
Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
6. The Government anticipates approximately five (5) MACCs will be awarded. However, the government reserves the right to award more than five (5) MACCs if determined to be in the best interest of the government.
The minimum guarantee is $10,000 SGD per contract, except one (1) Offeror will be awarded the seed project, which will also serve as a minimum guarantee. The Offeror submitting the proposal, conforming to the RFP, determined to represent the best value – the proposal most advantageous to the Government, cost/price and other factors considered, will receive award of the seed project.
Q. DEFINITIONS
The following definitions apply to the evaluation of the Non-Cost/Price Factors:
Strength: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Renovation and Repair Project Types: Refers to projects where the primary work modifies existing facilities.
New Construction: Refers to projects creating entirely new facilities (or new expansions/additions to existing facilities where a new structure and foundation is provided as part of the expansion/addition).
100% Complete:
For construction projects: The facility is completely constructed and ready for the intended use.
For design projects: 100% design, plans, and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support
(PCAS).
Self-Perform: Refers to performing relevant and major construction trade work in-house without subcontractors.
This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup). Relevant and major construction trade work is the same or similar to the work that may be ordered under this contract.
R. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-cost/price
Factor 1 – Technical Approach Factor 2 – Experience Factor 3 – Safety Factor 4 – Past Performance
The distinction between experience and past performance is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance for evaluation factors is as follows: Factor 1 – Technical Approach will only be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be eligible for award unless corrected during discussions. In making the best value award decision, the Government will consider Factor 2 – Experience, Factor 3 – Safety, Factor 4 - Past Performance, and price. The relative order of importance of the non-cost/price evaluation factors is that technical factor 2 – Experience and 3 – Safety are equal to each other and when combined are equal importance to the performance assessment (Factor 4 – Past Performance). The combined non-cost/price factors are approximately equal to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
a. Non-cost/price Factors:
(1) Factor 1, Technical Approach:
(i) Solicitation Submittal Requirements: The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.
The Offeror shall submit the following information:
1) Using Exhibit A (Offeror Team),
a) Provide a narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract;
b) Provide the rationale for proposing this arrangement; and
c) Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6).
The attached Exhibit A (Offeror Team) shall be used to submit the technical approach narrative. Individual blocks on this form may be expanded; however, the technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages). The information requested in items #2 and #3 below are not included in this page limitation.
2) The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.
3) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).
(ii) Basis of Evaluation: The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.
(2) Factor 2, Experience:
(i) Solicitation Submittal Requirements: The Offeror should submit the following information using Exhibit B (Construction & Design Experience Project Data Sheet):
1) Construction Experience:
Submit a maximum of five (5) relevant construction projects that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP.
For purposes of this evaluation, a relevant project is further defined as follows:
A construction project with a total construction cost (size) of at least $250,000 USD. The size of the project is based on construction cost in U.S. Dollars or equivalent foreign currency.
A construction project involving the following (scope): new construction of infrastructure or renovation, alteration, or repair of existing infrastructure; and
A construction project with at least one of the following characteristics (complexity):
(a) Interior renovation for residential, multifamily, industrial, and commercial facilities.
(b) Heating, Ventilation and Air Conditioning (HVAC) systems not limited to Variable
Refrigerant Flow (VRFs), Packaged Terminal Air Conditioner (PTACs), and central systems.
(c) Fire suppression and/or telecom systems for commercial and industrial facilities.
(d) Critical power system not limited to emergency generators and building electrical distribution systems;
(e) Civil and structural work on roads, utilities, and/or water-front facilities.
(f) Roof replacement, recoating, and/or repair
Infrastructure is defined as: residential buildings; non-residential buildings including business and office, commercial, health care, educational, recreational, industrial and warehouse facilities; mixed use developments and planned unit developments; public work utilities systems; dredging and waterfront work on piers, wharves, caissons, dry docks, and other shoreline structures; airfields, roadways, and supporting facilities.
Note: A single project may satisfy more than one of the above minimum requirements.
Projects submitted for the Offeror shall be completed within the past seven (7) years of the date of issuance of this RFP, or at least 80% complete at the time of proposal submission.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Exhibit B) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet should not exceed one (1) double-sided page (or two
(2) single-sided pages). Offerors failing to use and submit Exhibit B will be considered to have not met the requirements of Factor 2 and shall be rated Unacceptable.
For all submitted projects, the description of the project should clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined.
If the Offeror is/was a JV and would like to submit a project completed by the JV as a single entity to show the single entity’s experience/capability, said JV project must clearly demonstrate the percentage of work performed by each firm in the JV and the single entity Offeror must provide a detailed description of the work the single entity self-performed under the JV project in Exhibit B. Note: Offerors failing to submit the information requested will be considered to have not met the requirements of Factor 2 and shall be rated as a Deficiency.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal should clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract and identified in Factor 1 submission.
The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
More weight may be given to the Offeror’s projects than to those submitted for subcontractors.
2) Design Experience
Submit a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as follows:
A design project with a total construction cost (size) of at least $250,000 USD. The size of the project is based on construction cost in U.S. Dollars or equivalent foreign currency.
A design project involving the following (scope): design for new construction of infrastructure or renovation, alteration, or repair of existing infrastructure; and
A design project with at least one of the following characteristics (complexity):
(a) Interior renovation for residential, multifamily, industrial, and commercial facilities.
(b) Heating, Ventilation and Air Conditioning (HVAC) systems not limited to Variable
Refrigerant Flow (VRFs), Packaged Terminal Air Conditioner (PTACs), and central systems.
(c) Fire suppression and/or telecom systems for commercial and industrial facilities.
(d) Critical power system not limited to emergency generators and building electrical distribution systems;
(e) Civil and structural work on roads, utilities, and/or water-front facilities.
(f) Roof replacement, recoating, and/or repair
Infrastructure is defined as: residential buildings; non-residential buildings including business and office, commercial, health care, educational, recreational, industrial and warehouse facilities; mixed use developments and planned unit developments; public work utilities systems; dredging and waterfront work on piers, wharves, caissons, dry docks, and other shoreline structures; airfields, roadways, and supporting facilities.
Note: A single project may satisfy more than one of the above minimum requirements.
Projects submitted shall be completed within the past seven (7) years of the date of issuance of this RFP, or at least 80% complete at the time of proposal submission. For design-build projects, the design portion of the contract shall have been completed within the past seven (7) years of the date of issuance of this RFP, or at least 80% complete at the time of proposal submission. The design completion date should reflect the date that plans and specifications were complete, signed off by an Architect-Engineer, and approved for construction with final cost estimate, and does not include architect/engineering services during construction or Post Construction Award support (PCAS).
A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as whole should not be submitted as a project; rather Offerors should submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Exhibit B) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrated construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet should not exceed one (1) double-sided page (or two
(2) single-sided pages). Offerors failing to use and submit Exhibit B will be considered to have not met the requirements of Factor 2 and shall be rated Unacceptable.
For all submitted projects, the description of the project should clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal should clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract and identified in Factor 1 submission.
The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor.
Offerors proposing multiple design firms should submit relevant project experience for all design firms.
Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.
(ii) Basis of Evaluation: The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction and five (5) for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.
Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.
Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.
Relevant projects that demonstrate Offeror experience in the following may be considered more favorably than those that do not demonstrate experience in these categories:
Interior renovation for large scale residential, multifamily, industrial, and commercial facilities.
Heating, Ventilation and Air Conditioning (HVAC) systems not limited to Variable Refrigerant Flow (VRFs), Packaged Terminal Air Conditioner (PTACs), and central systems.
Fire suppression and/or telecom systems for commercial and industrial facilities.
Critical power system not limited to emergency generators and building electrical distribution systems;
Offerors who submit relevant projects that demonstrate experience self-performing relevant features of work may receive a higher rating than those who do not demonstrate self-performance.
(3) Factor 3, Safety:
(i) Solicitation Submittal Requirements: The Offeror shall submit a narrative that fully describes the safety management system that will be used to oversee the safety compliance and performance of self-performed and sub-contractor performed work. The narrative shall include the Offeror’s method for qualifying, evaluating, and selecting all tiers of sub-contractors. The narrative shall demonstrate the offeror’s commitment to safely accomplishing the requirements identified in the Solicitation and how it will properly manage and implement safety procedures and accident prevention methods. The narrative should address each of the following topics:
1) The offeror’s method for selecting a subcontractor with a safe performance record;
2) The offeror’s plan to monitor and oversee the safety compliance and performance of self-performed and subcontractor performed work;
3) The offeror’s methodology to execute an effective program that facilitates accident prevention techniques and processes, and employee reporting of unsafe conditions and unsafe activities.
A copy of the blank Safety Narrative to be used for submission is included as Exhibit C.
The technical approach to safety narrative shall be limited to one (1) double-sided page or (two (2) single-sided pages). Pages in excess of the page limit specified above will not be considered/evaluated.
(ii) Basis of Evaluation: The Government is seeking to determine the degree to which the Offeror has demonstrated a commitment to safety and its plan to properly manage and implement safety procedures and accident prevention methods for itself and its subcontractors.
(4) Factor 4, Past Performance:
(i) Solicitation Submittal Requirements: If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it should be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it should be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (Exhibit D) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors should not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for the project(s) to obtain the PPQ information. However, Offerors should follow-up with the clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Mr. Kyle Monma, kyle.monma@fe.navy.mil.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues.
Explanations should not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance awards or additional information submitted will not be considered.
(ii) Basis of Evaluation: This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.
Past performance ratings of “Substantial Confidence” or “Satisfactory…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .