Attach 2_IDIQ PAINTING Solicitation Bid schedule_2.3.22.xlsx
XLSX spreadsheet 61 KB Posted
- Solicitation number
- N4008422B0099
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0005.pdf | ||
| Attach 2_IDIQ PAINTING Solicitation Bid schedule_2.18.22.xlsx | XLSX spreadsheet | |
| Amend 0004.pdf | ||
| Amend 0004 cover and spec.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.2.3.22.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ***Noice: This Summary Tab automatically calculates what you fill out all items price in each tabs. |
| ***Do not create your own or change formula.*** |
| PAINTING Indefinite Delivery Indefinite Quantity Work |
| PROVIDE UNIT PRICES FOR LINE ITEMS BELOW IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS |
AND DRAWINGS.
| Offerror/ Company Name: |
| Printed Name and Signature: Date: |
ITEM NO. SUPPLIES/ SERVICES Total Amount (in JPY)
| A001AA ~ A001AX | Ordering Period 1: All supplies and services for line item A001AA through A001AX | ¥21,000,000 |
| B001AA ~ B001AX | Ordering Period 2: All supplies and services for line item B001AA through B001AX | ¥21,000,000 |
| C001AA ~ C001AX | Ordering Period 3: All supplies and services for line item C001AA through C001AX | ¥21,000,000 |
| D001AA ~ D001AX | Ordering Period 4: All supplies and services for line item D001AA through D001AX | ¥21,000,000 |
| E001AA~ E001AX | Ordering Period 5: All supplies and services for line item E001AA through E001AX | ¥21,000,000 |
| TOTAL ( Base Period): CLIN 0001 | ¥105,000,000 | |
| F001AA ~ F001AX | Ordering Period 6: All supplies and services for line item F001AA through F001AX | ¥21,000,000 |
| G001AA ~ G001AX | Ordering Period 7: All supplies and services for line item G001AA through G001AX | ¥21,000,000 |
| H001AA ~ H001AX | Ordering Period 8: All supplies and services for line item H001AAthrough H001AX | ¥21,000,000 |
| TOTAL ( Option Period 1): CLIN 0002 | ¥63,000,000 |
TOTAL CONTRACT AMOUNT ¥168,000,000
| Abbreviations used: |
| LM: Linear Meter |
| TN: One metric ton (1,000 kg) |
| CM: Cubic Meter |
| SHT: One drawing sheet (A1 size) |
| Perf: Performance |
CUI //FEDCON [when filled in] Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in}
BASE - OP1
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Base Period - Ordering Period 1 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| A001 | BASE PERIOD - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from A001AA to A001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment/ Equipment Rental, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
A001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| A001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| A001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| A001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| A001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| A001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| A001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| A001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| A001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| A001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| A001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| A001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| A001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| A001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| A001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| A001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| A001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| A001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| A001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| A001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| A001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| A001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS A001AA THRU A001AX | ¥21,000,000 |
| BASE PERIOD - Ordering Period 1 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
BASE - OP2
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Base Period - Ordering Period 2 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| B001 | OPTION YEAR 1 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from B001AA to B001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
B001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| B001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| B001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| B001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| B001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| B001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| B001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| B001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| B001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| B001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| B001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| B001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| B001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| B001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| B001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| B001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| B001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| B001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| B001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| B001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| B001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| B001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS B001AA THRU B001AX | ¥21,000,000 |
| BASE PERIOD - Ordering Period 2 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
BASE - OP3
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Base Period - Ordering Period 3 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| C001 | OPTION YEAR 2 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from C001AA to C001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
C001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| C001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| C001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| C001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| C001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| C001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| C001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| C001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| C001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| C001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| C001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| C001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| C001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| C001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| C001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| C001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| C001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| C001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| C001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| C001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| C001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| C001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS C001AA THRU C001AX | ¥21,000,000 |
| BASE PERIOD - Ordering Period 3 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
BASE - OP4
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Base Period - Ordering Period 4 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| D001 | OPTION YEAR 3 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from D001AA to D001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
D001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| D001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| D001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| D001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| D001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| D001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| D001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| D001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| D001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| D001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| D001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| D001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| D001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| D001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| D001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| D001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| D001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| D001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| D001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| D001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| D001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| D001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS D001AA THRU D001AX | ¥21,000,000 |
| BASE PERIOD - Ordering Period 4 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
BASE - OP5
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Base Period - Ordering Period 5 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| E001 | OPTION YEAR 4 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from E001AA to E001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
E001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| E001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| E001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| E001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| E001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| E001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| E001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| E001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| E001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| E001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| E001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| E001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| E001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| E001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| E001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| E001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| E001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| E001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| E001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| E001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| E001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| E001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS E001AA THRU E001AX | ¥21,000,000 |
| BASE PERIOD - Ordering Period 5 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
OPTION PERIOD 1 - OP6
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Option Period 1 - Ordering Period 6 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| F001 | OPTION YEAR 5 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from F001AA to F001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
F001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| F001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| F001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| F001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| F001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| F001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| F001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| F01AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| F001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| F001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| F001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| F001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| F001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| F001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| F001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| F001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| F001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| F001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| F001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| F001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| F001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| F001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS F001AA THRU F001AX | ¥21,000,000 |
| OPTION PERIOD 1 - Ordering Period 6 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
OPTION PERIOD 1 - OP7
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Option Period 1 - Ordering Period 7 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| G001 | OPTION YEAR 6 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from G001AA to G001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
G001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| G001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| G001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| G001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| G001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| G001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| G001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| G001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| G001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| G001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| G001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| G001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| G001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| G001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| G001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| G001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| G001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| G001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| G001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| G001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| G001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| G001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS G001AA THRU G001AX | ¥21,000,000 |
| OPTION PERIOD 1 - Ordering Period 7 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
OPTION PERIOD 1 - OP8
| GOVERNMENT ESTIMATE | ||||||
| Prepared by : | FOR OFFICIAL USE ONLY | |||||
| Signature : | ||||||
| Date : | ||||||
| Option Period 1 - Ordering Period 8 | REFERNCE NO. OF DOCUMENT: | |||||
| NAME OF OFFFEROR OR CONTRACTOR | ||||||
| BID SCHEDULE | ||||||
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE (Including applicable performance bond) | TOTAL AMOUNT |
| H001 | OPTION YEAR 7 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from H001AA to H001AX. | |||||
| Units: SM = Square Meters LM = Linear Meter TO = Task Order HRS = Hours EA = Each OC = Occasion NTE=Not to exceed | ||||||
| Line Item Tasks - Material and Labor Hours Provision: |
The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. The following Line Item Tasks represent anticipated scope of work, that may be requested in Task Orders in any combination, and shall be based on Unit Costs that include Direct Labor,Material, Setup, Equipment, Cleanup and Waste Disposal costs, plus Contractor Markups, Overhead and Profit.
H001AA Water-blasting concrete/masonry surfaces. ( High pressure pump 10-15 Mpa)
| 60,000 | SM | ¥0 | |||||
| H001AB | Repair of concrete spall (Interior and Exterior). Assume Average Depth of 30mm. (Including chipping, scrape, Anti-rust Treatment of rebar and Polymer resin mortar backfill finish) | 5,000 | SM | ¥0 | |||
| H001AC | Exterior painting on textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 55,000 | SM | ¥0 | |||
| H001AD | Exterior painting on non textured concrete & masonry surfaces. (Including Taping/Masking of adjacent surfaces like doors, windows and louvers) | 100 | SM | ¥0 | |||
| H001AE | Scaffolding up to 12 meters. (Including Materials and Labor to assemble/disassemble) | 30,000 | SM | ¥0 | |||
| H001AF | Scaffolding up to 22 meters. (Including Materials and Labor to assemble/disassemble) | 16,000 | SM | ¥0 | |||
| H001AG | Exterior Painting of metal surfaces. (Including surface preparation/restoration and painting) | 5,000 | SM | ¥0 | |||
| H001AH | GWB Repair, Nail/Screw Pops | ||||||
| (Assume 1 per 1 S.M. of Int. GWB) | 1,500 | EA | ¥0 | ||||
| H001AJ | GWB Repair, Cut/Patch/Tape 50mm x 100mm Hole | ||||||
| (Assume 1 per 300 S.M. of Int. GWB) | 10 | EA | ¥0 | ||||
| H001AK | GWB Replace, Demo Existing/ Install New | ||||||
| (Assume 10% of Int. GWB) | 150 | SM | ¥0 | ||||
| H001AL | Interior painting of concrete, masonry, wallboard, plaster, interior and wood surfaces. (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 7,000 | SM | ¥0 | |||
| H001AM | Interior painting of ceilings (gypsum ceiling board and plaster board). (Including taping / masking of adjacent surfaces such as doors, windows, louvers, tiles, etc. Including base treatment such as putty). | 9,000 | SM | ¥0 | |||
| H001AN | Interior re-staining of wood floors. (Based on 2 Coats of Low VOC Polyurethane Varnish, including sanding and refinishing ) | 500 | SM | ¥0 | |||
| H001AP | Interior Painting of high wetness areas (all surfaces). ( including Taping/Masking of adjacent surfaces like doors, windows, louvers and tile) | 150 | SM | ¥0 | |||
| H001AQ | Interior moving type scaffolding, up to 5.4 meters, walls and ceilings. (Including Materials and Labor to assemble/disassemble) 4 rolling towers, 4 month usage period (H=5.4m). | 1 | EA | ¥0 | |||
| H001AR | Interior scaffolding, up to 1.8 meters, walls and ceilings. (Including Materials Transport and Labor to assemble/disassemble) | 2,000 | SM | ¥0 | |||
| H001AS | Sealants around existing doors and windows, | ||||||
| Demo Existing/Install New | 8,000 | LM | ¥0 | ||||
| H001AT | One lump sum additive per task order for each occurance of work at Ie Shima Island or JWTC | 3 | TO | ¥0 | |||
| H001AU | Non-specific work- Any work not identified on the ELINS but required to complete the project. | 1 | NTE | ¥21,000,000 | ¥21,000,000 | ||
| H001AV | ACM sampling and testting | 20 | EA | ¥0 | |||
| H001AW | LEAD sampling and testing | 20 | EA | ¥0 | |||
| H001AX | ACM and LEAD abatement and disposal including related accessories. | 20 | EA | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS H001AA THRU H001AX | ¥21,000,000 |
| OPTION PERIOD 1 - Ordering Period 8 |
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
Source Selection Information -- See FAR 2.101 and 3.104 [When filled in]
File details come from the government source that posted it. Updated .