Amend 0004 cover and spec.pdf
PDF 1 MB Posted
- Solicitation number
- N4008422B0099
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0005.pdf | ||
| Attach 2_IDIQ PAINTING Solicitation Bid schedule_2.18.22.xlsx | XLSX spreadsheet | |
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Attach 2_IDIQ PAINTING Solicitation Bid schedule_2.3.22.xlsx | XLSX spreadsheet | |
| Amend 0002.2.3.22.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI / / FEDCON
NAVFAC FAR EAST
AMENDMENT NO. 0004
DATE: 18 FEB 2022
EXTERIOR/INTERIOR PAINTING AND MISCELLANEOUS REPAIRS OF SINGLE AND
MULTIPLE STORY FACILITIES AT VARIOUS U.S. GOVERNMENT INSTALLATIONS,
OKINAWA, JAPAN
NAVFAC Amendment Summary of Change is as below.
Solicitation Bid Schedule Attachment :
1. Revised the line items "AT" of Solicitation Bid Schedule as read.
"Only the transportation costs of workers and work vehicles required for one task on Ie Island"
2. Revised the line items "AX" of Solicitation Bid Schedule as read.
"ACM and LEAD abatement"
Specifications:
1. Revised paragraph h., 1.7.1. Asbestos Hazard Abatement Plan, section 01 35 26 of specifications as read.
h. Asbestos Hazard Abatement Plan. An Asbestos Hazard Abatement Plan is required. Asbestos abatement work is anticipated to be included in scope of work for any task orders issued under this contract.
Target areas for asbestos abatement:
1. Floating part of existing paint
2. Spalled and cracked parts of existing concrete
3. Areas that interfere with painting
AMENDMENT NO. 0004 (1/1)
CUI / / FEDCON
Project Title: Exterior/Interior Painting and Misc Repairs of Single and Multiple Story Facilities Project Location: Various U.S. Government Installations, Okinawa, Japan
e. Fall Protection and Prevention (FP&P) Program Documentation. The program documentation shall be site specific and address all fall hazards in the work place and during different phases of construction. Address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 1.8 m (6 feet). A qualified person for fall protection shall prepare and sign the program documentation. Include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Revise the Fall Protection and Prevention Program documentation every six months for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. Keep and maintain the accepted Fall Protection and Prevention Program documentation at the job site for the duration of the project. Include the Fall Protection and Prevention Program documentation in the Accident Prevention Plan (APP).
f. Occupant Protection Plan. The safety and health aspects of lead-based paint removal, prepared in accordance with Section 02 82 16.00 20 LEAD BASED PAINT
HAZARD ABATEMENT, TARGET HOUSING & CHILD OCCUPIED FACILITIES 02 82 33.13 20
REMOVAL AND DISPOSAL OF LEAD CONTAINING PAINT.
g. Lead Compliance Plan. The safety and health aspects of lead work, prepared in accordance with Section 02 83 00 LEAD REMEDIATION.
h. Asbestos Hazard Abatement Plan. An Asbestos Hazard Abatement Plan is required. Asbestos abatement work is anticipated to be included in scope of work for any task orders issued under this contract.
Target areas for asbestos abatement:
1. Floating part of existing paint
2. Spalled and cracked parts of existing concrete
3. Areas that interfere with painting
i. Site Safety and Health Plan. The safety and health aspects prepared in accordance with Section 01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES.
ACTIVITY HAZARD ANALYSIS (AHA)
The Activity Hazard Analysis (AHA) format (see attached) shall be in accordance with USACE EM 385-1-1, Section 1 and the attached “Activity Hazard Analysis Review”. Submit the AHA for review at least fifteen (15) calendar days prior to the start of each Definable Feature Of Work (DFOW). Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls.
The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.
Develop the activity hazard analyses using the project schedule as the basis for the DFOWs to be performed. Any DFOWs listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the Contracting Officer.
Integrate the concepts of Operational Risk Management (ORM) into the AHA.
Identify the hazards of the activity in the Principle Steps, Assess the Risks in
General Requirements
SECTION 01 35 26
Amendment 0004 18 February 2022
File details come from the government source that posted it. Updated .