Painting-A

PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "A"
EXHIBIT A Price for Ordering Period 1
ITEMDESCRIPTIONESTUTUNITEST AMT
NOQTYPRICETOTAL

A095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0

A096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0

A097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0

A098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0

A099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0

A100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0

A101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0

A101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0

A101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0

A102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0

A102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0

A102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0

A103(a) Repaint existing wood door and frame surfaces.

200 SM ¥ ¥ 0

A103(b) Repaint existing grazed wood window and frame surfaces.

100 SM ¥ ¥ 0

A104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0

A105Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
250LM¥¥0

A106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

A107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.

200 LM ¥ ¥ 0

A108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

A109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.

200 LM ¥ ¥ 0

A110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

A111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.

100 LM ¥ ¥ 0

A112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0

A113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.

350 LM ¥ ¥ 0

A114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >

2,000 SM ¥ ¥ 0

A115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <

250 SM ¥ ¥ 0

A116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >

2,000 SM ¥ ¥ 0

A117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <

250 SM ¥ ¥ 0

A118 Repaint existing multi-layer coating surfaces with top coating. 300SM >

2,000 SM ¥ ¥ 0

A119 Repaint existing multi-layer coating surfaces with top coating. 300SM <

250 SM ¥ ¥ 0

A120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0

A121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0

A122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0

A123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0

A124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0

A125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0

A126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.

50 SM ¥ ¥ 0

A127 Remove existing cement mortar, and provide waterproof cement mortar.

50 SM ¥ ¥ 0

A128 Repair spalling. 50 SM ¥ ¥ 0

A129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0

A130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0

A131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0

A132(a) Replace existing galvanized steel sheet with new.

400 SM ¥ ¥ 0

A132(b) Replace existing reinforced FRP with new.

100 SM ¥ ¥ 0

A133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0

A134 Provide new building number sign. 20 EA ¥ ¥ 0

A135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0

A136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0

A137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0

A138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0

A139 Remove existing building signs. 50 EA ¥ ¥ 0

A140 Replace existing sealants for windows/ doors with new.

1,500 LM ¥ ¥ 0

A141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0

A142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.

5 LM ¥ ¥ 0

A142(b) Replace existing wood window trim (up to w=70) with new.

5 LM ¥ ¥ 0

A143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.

1 LM ¥ ¥ 0

A143(b) Replace damaged wood beam (up to 400x200) with new.

1 LM ¥ ¥ 0

A144(a) Replace half-round PVC gutter with new. 100 LM ¥ ¥ 0

A144(b) Replace square PVC gutter with new. 100 LM ¥ ¥ 0

A144(c) Replace PVC downspout with new. 50 LM ¥ ¥ 0

A145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0

A146(a) Replace damaged clear glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

A146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

A146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

A146(d) Replace damaged wired glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

A147 Replace existing acrylic lighting fixture covers with new.

20 EA ¥ ¥ 0

A148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.

100 EA ¥ ¥ 0

A149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0

A150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.

20 EA ¥ ¥ 0

A151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0

A152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0

A153 Asbestos-containing surface preparation with solvent cleaning.

400 SM ¥ ¥ 0

A154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0

A155 Air, wipe and/or soil sampling and monitoring for lead control area.

25 EA ¥ ¥ 0

A156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

A157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

A158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0

A159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0

A160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0

A161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0

A162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0

A163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0

A164 Provide bucket truck lift. 10 DAY ¥ ¥ 0

A165 Provide scaffolding. 9,000 SM ¥ ¥ 0

A166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0

A167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.

50 EA ¥ ¥ 0

A168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.

50 EA ¥ ¥ 0

A169 Other related miscellaneous work (must be negotiated at time of order).

1LS¥¥10,000,000
(Not-to-exceed)
TOTAL (A095 through A169) Not-To-Exceed¥
Abbreviations:
EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work

&9&K000000Roofing and Exterior Painting IDIQ Contract for Various Projects (Painting)

&"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK&KFF0000IFB N4008421B5500

Amendment 0004

&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK

CUI//FEDCON&11&K000000

&10PAGE &P

Painting-B

PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "B"
EXHIBIT B Price for Ordering Period 2
ITEMDESCRIPTIONESTUTUNITEST AMT
NOQTYPRICETOTAL

B095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0

B096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0

B097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0

B098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0

B099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0

B100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0

B101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0

B101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0

B101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0

B102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0

B102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0

B102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0

B103(a) Repaint existing wood door and frame surfaces.

200 SM ¥ ¥ 0

B103(b) Repaint existing grazed wood window and frame surfaces.

100 SM ¥ ¥ 0

B104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0

B105Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
250LM¥¥0

B106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

B107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.

200 LM ¥ ¥ 0

B108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

B109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.

200 LM ¥ ¥ 0

B110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

B111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.

100 LM ¥ ¥ 0

B112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0

B113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.

350 LM ¥ ¥ 0

B114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >

2,000 SM ¥ ¥ 0

B115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <

250 SM ¥ ¥ 0

B116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >

2,000 SM ¥ ¥ 0

B117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <

250 SM ¥ ¥ 0

B118 Repaint existing multi-layer coating surfaces with top coating. 300SM >

2,000 SM ¥ ¥ 0

B119 Repaint existing multi-layer coating surfaces with top coating. 300SM <

250 SM ¥ ¥ 0

B120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0

B121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0

B122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0

B123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0

B124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0

B125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0

B126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.

50 SM ¥ ¥ 0

B127 Remove existing cement mortar, and provide waterproof cement mortar.

50 SM ¥ ¥ 0

B128 Repair spalling. 50 SM ¥ ¥ 0

B129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0

B130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0

B131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0

B132(a) Replace existing galvanized steel sheet with new.

400 SM ¥ ¥ 0

B132(b) Replace existing reinforced FRP with new.

100 SM ¥ ¥ 0

B133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0

B134 Provide new building number sign. 20 EA ¥ ¥ 0

B135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0

B136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0

B137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0

B138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0

B139 Remove existing building signs. 50 EA ¥ ¥ 0

B140 Replace existing sealants for windows/ doors with new.

1,500 LM ¥ ¥ 0

B141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0

B142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.

5 LM ¥ ¥ 0

B142(b) Replace existing wood window trim (up to w=70) with new.

5 LM ¥ ¥ 0

B143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.

1 LM ¥ ¥ 0

B143(b) Replace damaged wood beam (up to 400x200) with new.

1 LM ¥ ¥ 0

B144(a) Replace half-round PVC gutter with new. 100 LM ¥ ¥ 0

B144(b) Replace square PVC gutter with new. 100 LM ¥ ¥ 0

B144(c) Replace PVC downspout with new. 50 LM ¥ ¥ 0

B145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0

B146(a) Replace damaged clear glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

B146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

B146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

B146(d) Replace damaged wired glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

B147 Replace existing acrylic lighting fixture covers with new.

20 EA ¥ ¥ 0

B148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.

100 EA ¥ ¥ 0

B149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0

B150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.

20 EA ¥ ¥ 0

B151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0

B152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0

B153 Asbestos-containing surface preparation with solvent cleaning.

400 SM ¥ ¥ 0

B154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0

B155 Air, wipe and/or soil sampling and monitoring for lead control area.

25 EA ¥ ¥ 0

B156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

B157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

B158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0

B159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0

B160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0

B161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0

B162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0

B163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0

B164 Provide bucket truck lift. 10 DAY ¥ ¥ 0

B165 Provide scaffolding. 9,000 SM ¥ ¥ 0

B166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0

B167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.

50 EA ¥ ¥ 0

B168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.

50 EA ¥ ¥ 0

B169 Other related miscellaneous work (must be negotiated at time of order).

1LS¥¥10,000,000
(Not-to-exceed)

TOTAL (B095 through B169) Not-To-Exceed ¥

Abbreviations:
EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work
&"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK&KFF0000IFB N4008421B5500

Amendment 0004

&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK

&10PAGE &P

Painting-C

PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "C"
EXHIBIT C Price for Ordering Period 3
ITEMDESCRIPTIONESTUTUNITEST AMT
NOQTYPRICETOTAL

C095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0

C096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0

C097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0

C098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0

C099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0

C100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0

C101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0

C101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0

C101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0

C102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0

C102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0

C102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0

C103(a) Repaint existing wood door and frame surfaces.

200 SM ¥ ¥ 0

C103(b) Repaint existing grazed wood window and frame surfaces.

100 SM ¥ ¥ 0

C104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0

C105Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
250LM¥¥0

C106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

C107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.

200 LM ¥ ¥ 0

C108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

C109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.

200 LM ¥ ¥ 0

C110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0

C111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.

100 LM ¥ ¥ 0

C112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0

C113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.

350 LM ¥ ¥ 0

C114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >

2,000 SM ¥ ¥ 0

C115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <

250 SM ¥ ¥ 0

C116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >

2,000 SM ¥ ¥ 0

C117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <

250 SM ¥ ¥ 0

C118 Repaint existing multi-layer coating surfaces with top coating. 300SM >

2,000 SM ¥ ¥ 0

C119 Repaint existing multi-layer coating surfaces with top coating. 300SM <

250 SM ¥ ¥ 0

C120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0

C121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0

C122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0

C123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0

C124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0

C125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0

C126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.

50 SM ¥ ¥ 0

C127 Remove existing cement mortar, and provide waterproof cement mortar.

50 SM ¥ ¥ 0

C128 Repair spalling. 50 SM ¥ ¥ 0

C129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0

C130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0

C131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0

C132(a) Replace existing galvanized steel sheet with new.

400 SM ¥ ¥ 0

C132(b) Replace existing reinforced FRP with new.

100 SM ¥ ¥ 0

C133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0

C134 Provide new building number sign. 20 EA ¥ ¥ 0

C135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0

C136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0

C137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0

C138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0

C139 Remove existing building signs. 50 EA ¥ ¥ 0

C140 Replace existing sealants for windows/ doors with new.

1,500 LM ¥ ¥ 0

C141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0

C142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.

5 LM ¥ ¥ 0

C142(b) Replace existing wood window trim (up to w=70) with new.

5 LM ¥ ¥ 0

C143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.

1 LM ¥ ¥ 0

C143(b) Replace damaged wood beam (up to 400x200) with new.

1 LM ¥ ¥ 0

C144(a) Replace half-round PVC gutter with new. 100 LM ¥ 8,000 ¥ 800,000

C144(b) Replace square PVC gutter with new. 100 LM ¥ 10,000 ¥ 1,000,000

C144(c) Replace PVC downspout with new. 50 LM ¥ 8,000 ¥ 400,000

C145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0

C146(a) Replace damaged clear glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

C146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

C146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

C146(d) Replace damaged wired glass pane on aluminum framed door or window with new.

5 SM ¥ ¥ 0

C147 Replace existing acrylic lighting fixture covers with new.

20 EA ¥ ¥ 0

C148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.

100 EA ¥ ¥ 0

C149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0

C150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.

20 EA ¥ ¥ 0

C151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0

C152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0

C153 Asbestos-containing surface preparation with solvent cleaning.

400 SM ¥ ¥ 0

C154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0

C155 Air, wipe and/or soil sampling and monitoring for lead control area.

25 EA ¥ ¥ 0

C156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

C157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0

C158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0

C159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0

C160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0

C161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0

C162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0

C163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0

C164 Provide bucket truck lift. 10 DAY ¥ ¥ 0

C165 Provide scaffolding. 9,000 SM ¥ ¥ 0

C166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0

C167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.

50 EA ¥ ¥ 0

C168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.

50 EA ¥ ¥ 0

C169 Other related miscellaneous work (must be negotiated at time of order).

1LS¥¥10,000,000
(Not-to-exceed)

TOTAL (C095 through C169) Not-To-Exceed ¥

Abbreviations:
EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work
&"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK&KFF0000IFB N4008421B5500

Amendment 0004

&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK

&10PAGE &P

Painting-Summary

Summary - Painting Schedule of Indefinite Quantity Work

A-Ordering Period 1 (ELINs A095 through A169)¥
B-Ordering Period 2 (ELINs B095 through B169)¥
C-Ordering Period 3 (ELINs C095 through C169)¥
TOTAL (A through C) Not-To-Exceed¥
&"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK&KFF0000IFB N4008421B5500

Amendment 0004

&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK

&10PAGE &P

File details come from the government source that posted it. Updated .