Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx
XLSX spreadsheet 106 KB Posted
- Attached to
- Roofing and Exterior Painting IDIQ Contract at U. S. Marine Corps Air Station Iwakuni, Japan
- Solicitation number
- N4008421B5500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21B5500_A0004_Atch(2)_PC002_30Jun2021.pdf | ||
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx | XLSX spreadsheet | |
| 21B5500_A0004_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0004.pdf | ||
| 21B5500_A0003.pdf | ||
| 21B5500_A0002_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0002.pdf | ||
| 21B5500_A0001_Atch(2)_PC001.pdf | ||
| 21B5500_A0001_Atch(1)_Government_Response.pdf | ||
| 21B5500_A0001.pdf | ||
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet | |
| Atch(1)_Roofing_and_Painting_IDIQ_Contract_Spec_05May2021.pdf | ||
| Atch(6)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| 21B5500_SF1442.pdf | ||
| Atch(5)_1-Day_Official_Entry-Exit_Request.pdf | ||
| Atch(2)_Summary_Schedule_of_Price.xlsx | XLSX spreadsheet | |
| Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Painting-A
| PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "A" | |
| EXHIBIT A Price for Ordering Period 1 |
| ITEM | DESCRIPTION | EST | UT | UNIT | EST AMT |
| NO | QTY | PRICE | TOTAL |
A095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0
A096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
A097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0
A098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0
A099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
A100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0
A101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0
A101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0
A101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0
A102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0
A102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0
A102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0
A103(a) Repaint existing wood door and frame surfaces.
200 SM ¥ ¥ 0
A103(b) Repaint existing grazed wood window and frame surfaces.
100 SM ¥ ¥ 0
A104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
| A105 | Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter. | ||||
| 250 | LM | ¥ | ¥ | 0 |
A106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
A107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
200 LM ¥ ¥ 0
A108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
A109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
200 LM ¥ ¥ 0
A110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
A111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
100 LM ¥ ¥ 0
A112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0
A113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.
350 LM ¥ ¥ 0
A114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
2,000 SM ¥ ¥ 0
A115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
250 SM ¥ ¥ 0
A116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >
2,000 SM ¥ ¥ 0
A117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <
250 SM ¥ ¥ 0
A118 Repaint existing multi-layer coating surfaces with top coating. 300SM >
2,000 SM ¥ ¥ 0
A119 Repaint existing multi-layer coating surfaces with top coating. 300SM <
250 SM ¥ ¥ 0
A120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
A121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
A122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
A123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0
A124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0
A125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0
A126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
50 SM ¥ ¥ 0
A127 Remove existing cement mortar, and provide waterproof cement mortar.
50 SM ¥ ¥ 0
A128 Repair spalling. 50 SM ¥ ¥ 0
A129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0
A130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0
A131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
A132(a) Replace existing galvanized steel sheet with new.
400 SM ¥ ¥ 0
A132(b) Replace existing reinforced FRP with new.
100 SM ¥ ¥ 0
A133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
A134 Provide new building number sign. 20 EA ¥ ¥ 0
A135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
A136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
A137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
A138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
A139 Remove existing building signs. 50 EA ¥ ¥ 0
A140 Replace existing sealants for windows/ doors with new.
1,500 LM ¥ ¥ 0
A141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
A142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.
5 LM ¥ ¥ 0
A142(b) Replace existing wood window trim (up to w=70) with new.
5 LM ¥ ¥ 0
A143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.
1 LM ¥ ¥ 0
A143(b) Replace damaged wood beam (up to 400x200) with new.
1 LM ¥ ¥ 0
A144(a) Replace half-round PVC gutter with new. 100 LM ¥ ¥ 0
A144(b) Replace square PVC gutter with new. 100 LM ¥ ¥ 0
A144(c) Replace PVC downspout with new. 50 LM ¥ ¥ 0
A145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0
A146(a) Replace damaged clear glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
A146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
A146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
A146(d) Replace damaged wired glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
A147 Replace existing acrylic lighting fixture covers with new.
20 EA ¥ ¥ 0
A148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
100 EA ¥ ¥ 0
A149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0
A150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
20 EA ¥ ¥ 0
A151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
A152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
A153 Asbestos-containing surface preparation with solvent cleaning.
400 SM ¥ ¥ 0
A154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
A155 Air, wipe and/or soil sampling and monitoring for lead control area.
25 EA ¥ ¥ 0
A156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
A157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
A158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
A159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
A160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
A161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0
A162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0
A163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0
A164 Provide bucket truck lift. 10 DAY ¥ ¥ 0
A165 Provide scaffolding. 9,000 SM ¥ ¥ 0
A166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
A167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
50 EA ¥ ¥ 0
A168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
50 EA ¥ ¥ 0
A169 Other related miscellaneous work (must be negotiated at time of order).
| 1 | LS | ¥ | ¥ | 10,000,000 | |
| (Not-to-exceed) |
| TOTAL (A095 through A169) Not-To-Exceed | ¥ |
| Abbreviations: | |
| EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work |
&9&K000000Roofing and Exterior Painting IDIQ Contract for Various Projects (Painting)
| &"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE | |
| QUANTITY WORK | &KFF0000IFB N4008421B5500 |
Amendment 0004
&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON&11&K000000
&10PAGE &P
Painting-B
| PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "B" | |
| EXHIBIT B Price for Ordering Period 2 |
| ITEM | DESCRIPTION | EST | UT | UNIT | EST AMT |
| NO | QTY | PRICE | TOTAL |
B095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0
B096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
B097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0
B098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0
B099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
B100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0
B101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0
B101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0
B101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0
B102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0
B102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0
B102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0
B103(a) Repaint existing wood door and frame surfaces.
200 SM ¥ ¥ 0
B103(b) Repaint existing grazed wood window and frame surfaces.
100 SM ¥ ¥ 0
B104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
| B105 | Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter. | ||||
| 250 | LM | ¥ | ¥ | 0 |
B106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
B107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
200 LM ¥ ¥ 0
B108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
B109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
200 LM ¥ ¥ 0
B110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
B111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
100 LM ¥ ¥ 0
B112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0
B113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.
350 LM ¥ ¥ 0
B114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
2,000 SM ¥ ¥ 0
B115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
250 SM ¥ ¥ 0
B116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >
2,000 SM ¥ ¥ 0
B117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <
250 SM ¥ ¥ 0
B118 Repaint existing multi-layer coating surfaces with top coating. 300SM >
2,000 SM ¥ ¥ 0
B119 Repaint existing multi-layer coating surfaces with top coating. 300SM <
250 SM ¥ ¥ 0
B120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
B121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
B122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
B123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0
B124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0
B125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0
B126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
50 SM ¥ ¥ 0
B127 Remove existing cement mortar, and provide waterproof cement mortar.
50 SM ¥ ¥ 0
B128 Repair spalling. 50 SM ¥ ¥ 0
B129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0
B130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0
B131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
B132(a) Replace existing galvanized steel sheet with new.
400 SM ¥ ¥ 0
B132(b) Replace existing reinforced FRP with new.
100 SM ¥ ¥ 0
B133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
B134 Provide new building number sign. 20 EA ¥ ¥ 0
B135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
B136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
B137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
B138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
B139 Remove existing building signs. 50 EA ¥ ¥ 0
B140 Replace existing sealants for windows/ doors with new.
1,500 LM ¥ ¥ 0
B141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
B142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.
5 LM ¥ ¥ 0
B142(b) Replace existing wood window trim (up to w=70) with new.
5 LM ¥ ¥ 0
B143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.
1 LM ¥ ¥ 0
B143(b) Replace damaged wood beam (up to 400x200) with new.
1 LM ¥ ¥ 0
B144(a) Replace half-round PVC gutter with new. 100 LM ¥ ¥ 0
B144(b) Replace square PVC gutter with new. 100 LM ¥ ¥ 0
B144(c) Replace PVC downspout with new. 50 LM ¥ ¥ 0
B145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0
B146(a) Replace damaged clear glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
B146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
B146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
B146(d) Replace damaged wired glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
B147 Replace existing acrylic lighting fixture covers with new.
20 EA ¥ ¥ 0
B148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
100 EA ¥ ¥ 0
B149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0
B150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
20 EA ¥ ¥ 0
B151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
B152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
B153 Asbestos-containing surface preparation with solvent cleaning.
400 SM ¥ ¥ 0
B154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
B155 Air, wipe and/or soil sampling and monitoring for lead control area.
25 EA ¥ ¥ 0
B156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
B157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
B158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
B159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
B160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
B161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0
B162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0
B163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0
B164 Provide bucket truck lift. 10 DAY ¥ ¥ 0
B165 Provide scaffolding. 9,000 SM ¥ ¥ 0
B166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
B167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
50 EA ¥ ¥ 0
B168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
50 EA ¥ ¥ 0
B169 Other related miscellaneous work (must be negotiated at time of order).
| 1 | LS | ¥ | ¥ | 10,000,000 | |
| (Not-to-exceed) |
TOTAL (B095 through B169) Not-To-Exceed ¥
| Abbreviations: |
| EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work |
| &"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE | |
| QUANTITY WORK | &KFF0000IFB N4008421B5500 |
Amendment 0004
&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
&10PAGE &P
Painting-C
| PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK - "C" | |
| EXHIBIT C Price for Ordering Period 3 |
| ITEM | DESCRIPTION | EST | UT | UNIT | EST AMT |
| NO | QTY | PRICE | TOTAL |
C095 Prepare Lead-free surfaces with water cleaning. 15,000 SM ¥ ¥ 0
C096 Prepare Lead-free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
C097 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM > 2,500 SM ¥ ¥ 0
C098 Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM < 200 SM ¥ ¥ 0
C099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
C100 Repaint existing wooden beams and columns after surface preparation. 500 SM ¥ ¥ 0
C101(a) Repaint existing steel and galvanized steel frame with door surfaces. 100 SM ¥ ¥ 0
C101(b) Repaint existing steel and galvanized steel frame with window surfaces. 50 SM ¥ ¥ 0
C101(c) Repaint existing steel and galvanized steel box surfaces. 50 SM ¥ ¥ 0
C102(a) Repaint existing steel and galvanized steel frame with door surfaces with polyurethane type coating. 150 SM ¥ ¥ 0
C102(b) Repaint existing steel and galvanized steel frame with window surfaces with polyurethane type coating. 30 SM ¥ ¥ 0
C102(c) Repaint existing steel and galvanized steel box surfaces with polyurethane type coating. 20 SM ¥ ¥ 0
C103(a) Repaint existing wood door and frame surfaces.
200 SM ¥ ¥ 0
C103(b) Repaint existing grazed wood window and frame surfaces.
100 SM ¥ ¥ 0
C104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
| C105 | Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter. | ||||
| 250 | LM | ¥ | ¥ | 0 |
C106 Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
C107 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
200 LM ¥ ¥ 0
C108 Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
C109 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
200 LM ¥ ¥ 0
C110 Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating. 150 LM ¥ ¥ 0
C111 Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
100 LM ¥ ¥ 0
C112 Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating. 50 LM ¥ ¥ 0
C113 Repaint existing PVC gutter/ downspout surfaces after surface preparation.
350 LM ¥ ¥ 0
C114 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
2,000 SM ¥ ¥ 0
C115 Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
250 SM ¥ ¥ 0
C116 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM >
2,000 SM ¥ ¥ 0
C117 Repaint existing multi-layer coating surfaces with rubber type top coating. 300SM <
250 SM ¥ ¥ 0
C118 Repaint existing multi-layer coating surfaces with top coating. 300SM >
2,000 SM ¥ ¥ 0
C119 Repaint existing multi-layer coating surfaces with top coating. 300SM <
250 SM ¥ ¥ 0
C120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
C121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
C122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
C123 Repaint existing non-slip floor coating. 400 SM ¥ ¥ 0
C124 Provide new urethane roof coating over existing roof coating. 500 SM ¥ ¥ 0
C125 Provide rubber type multi-layer coating system. 300 SM ¥ ¥ 0
C126 Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
50 SM ¥ ¥ 0
C127 Remove existing cement mortar, and provide waterproof cement mortar.
50 SM ¥ ¥ 0
C128 Repair spalling. 50 SM ¥ ¥ 0
C129 Repair crack with U-cut. 1,000 LM ¥ ¥ 0
C130 Replace existing non-ACB with new. 250 SM ¥ ¥ 0
C131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
C132(a) Replace existing galvanized steel sheet with new.
400 SM ¥ ¥ 0
C132(b) Replace existing reinforced FRP with new.
100 SM ¥ ¥ 0
C133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
C134 Provide new building number sign. 20 EA ¥ ¥ 0
C135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
C136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
C137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
C138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
C139 Remove existing building signs. 50 EA ¥ ¥ 0
C140 Replace existing sealants for windows/ doors with new.
1,500 LM ¥ ¥ 0
C141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
C142(a) Replace existing wood window head, sill, jamb and mullion (up to w=150) with new.
5 LM ¥ ¥ 0
C142(b) Replace existing wood window trim (up to w=70) with new.
5 LM ¥ ¥ 0
C143(a) Replace damaged decorative wood post and filler (up to 150x150) with new.
1 LM ¥ ¥ 0
C143(b) Replace damaged wood beam (up to 400x200) with new.
1 LM ¥ ¥ 0
C144(a) Replace half-round PVC gutter with new. 100 LM ¥ 8,000 ¥ 800,000
C144(b) Replace square PVC gutter with new. 100 LM ¥ 10,000 ¥ 1,000,000
C144(c) Replace PVC downspout with new. 50 LM ¥ 8,000 ¥ 400,000
C145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0
C146(a) Replace damaged clear glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
C146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
C146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
C146(d) Replace damaged wired glass pane on aluminum framed door or window with new.
5 SM ¥ ¥ 0
C147 Replace existing acrylic lighting fixture covers with new.
20 EA ¥ ¥ 0
C148 Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
100 EA ¥ ¥ 0
C149 Replace existing ACB with new non-ACB. 200 SM ¥ ¥ 0
C150 Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
20 EA ¥ ¥ 0
C151 Lead-containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
C152 Lead-containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
C153 Asbestos-containing surface preparation with solvent cleaning.
400 SM ¥ ¥ 0
C154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
C155 Air, wipe and/or soil sampling and monitoring for lead control area.
25 EA ¥ ¥ 0
C156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
C157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
C158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
C159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
C160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
C161 Asbestos sampling of existing material and request sampling analysis. 10 EA ¥ ¥ 0
C162 Lead based paint sampling of existing steel surfaces of material. 10 EA ¥ ¥ 0
C163 Lead based paint sampling of existing steel surfaces of material and request sampling analysis. 10 EA ¥ ¥ 0
C164 Provide bucket truck lift. 10 DAY ¥ ¥ 0
C165 Provide scaffolding. 9,000 SM ¥ ¥ 0
C166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
C167 Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
50 EA ¥ ¥ 0
C168 Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
50 EA ¥ ¥ 0
C169 Other related miscellaneous work (must be negotiated at time of order).
| 1 | LS | ¥ | ¥ | 10,000,000 | |
| (Not-to-exceed) |
TOTAL (C095 through C169) Not-To-Exceed ¥
| Abbreviations: |
| EST AMT = Estimated Amount, EST QTY = Estimated Quantity, SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos Cement Board, PCM = Phase Contrast Microscopy, TEM = Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction Work |
| &"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE | |
| QUANTITY WORK | &KFF0000IFB N4008421B5500 |
Amendment 0004
&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
&10PAGE &P
Painting-Summary
Summary - Painting Schedule of Indefinite Quantity Work
| A-Ordering Period 1 (ELINs A095 through A169) | ¥ |
| B-Ordering Period 2 (ELINs B095 through B169) | ¥ |
| C-Ordering Period 3 (ELINs C095 through C169) | ¥ |
| TOTAL (A through C) Not-To-Exceed | ¥ |
| &"-,Bold"&10ROOFING AND PAINTING SCHEDULE OF INDEFINITE | |
| QUANTITY WORK | &KFF0000IFB N4008421B5500 |
Amendment 0004
&10&K000000ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK