21B5500_A0004_Atch(2)_PC002_30Jun2021.pdf
PDF 1 MB Posted
- Attached to
- Roofing and Exterior Painting IDIQ Contract at U. S. Marine Corps Air Station Iwakuni, Japan
- Solicitation number
- N4008421B5500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx | XLSX spreadsheet | |
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx | XLSX spreadsheet | |
| 21B5500_A0004_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0004.pdf | ||
| 21B5500_A0003.pdf | ||
| 21B5500_A0002_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0002.pdf | ||
| 21B5500_A0001_Atch(2)_PC001.pdf | ||
| 21B5500_A0001_Atch(1)_Government_Response.pdf | ||
| 21B5500_A0001.pdf | ||
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet | |
| Atch(1)_Roofing_and_Painting_IDIQ_Contract_Spec_05May2021.pdf | ||
| Atch(6)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| 21B5500_SF1442.pdf | ||
| Atch(5)_1-Day_Official_Entry-Exit_Request.pdf | ||
| Atch(2)_Summary_Schedule_of_Price.xlsx | XLSX spreadsheet | |
| Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI//FEDCON
Proposed Change No.PC002 - Page 1
DEPARTMENT OF THE NAVY
OFFICER IN CHARGE OF CONSTRUCTION
NAVAL FACILITIES ENGINEERING COMMAND
CONTRACTS, IWAKUNI
DATE: 06/30/2021
Proposed Change No.PC002
ROOFING AND EXTERIOR PAINTING IDIQ CONTRACT FOR VARIOUS PROJECTS
at the
U. S. Marine Corps Air Station, Iwakuni, Japan
GENERAL INTENT:
The following changes and revisions must be made to the NAVFAC specifications listed herein.
Revised NAVFAC specifications will be issued with this change.
1. Changes must be made to pages of the specifications as follows:
1.1 TITLE: “ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK”
ITEM NO.: 001
Delete “ITEM NO. 001”.
ITEM NO.: 001(a) Add “ITEM NO. 001(a)”: Remove existing mineral surfaced built-up roofing.
(300 SM)
ITEM NO.: 001(b) Add “ITEM NO. 001(b)”: Remove existing sheet waterproof. (50 SM)
ITEM NO.: 001(c) Add “ITEM NO. 001(c)”: Remove existing urethane waterproof coating. (50
SM)
ITEM NO.: 003
Delete “ITEM NO. 003”.
ITEM NO.: 003(a) Add “ITEM NO. 003(a)”: Remove existing asbestos contained existing mineral surfaced built-up roofing. (300 SM)
ITEM NO.: 003(b) Add “ITEM NO. 003(b)”: Remove existing asbestos contained existing sheet waterproof. (50 SM)
Proposed Change No.PC002 - Page 2
ITEM NO.: 003(c) Add “ITEM NO. 003(c)”: Remove existing asbestos contained waterproof coating. (50 SM)
ITEM NO.: 29
Change Unit Quantity “20 SM”, to read as ”50 SM”.
ITEM NO.: 039
Delete “ITEM NO. 039”.
ITEM NO.: 039(a) Add “ITEM NO. 039(a)”: Remove existing metal roof and provide new high profile folded sheet metal roof. (20 SM)
ITEM NO.: 039(b) Add “ITEM NO. 039(b)”: Remove existing metal roof and provide new low profile folded sheet metal roof. (30 SM)
ITEM NO.: 048
Delete “ITEM NO. 048”.
ITEM NO.: 048(a) Add “ITEM NO. 048(a)”: Remove existing aluminum coping and provide new aluminum coping. (100 LM)
ITEM NO.: 048(b) Add “ITEM NO. 048(b)”: Remove existing PC coping and provide new aluminum coping. (85 LM)
ITEM NO.: 050
Delete “ITEM NO. 050”.
ITEM NO.: 050(a) Add “ITEM NO. 050(a)”: Remove existing aluminum expansion cover (up to
W=450) and provide new aluminum expantion cover. (70 LM)
ITEM NO.: 050(b) Add “ITEM NO. 050(b)”: Remove existing aluminum expansion cover (W=450 ~
600)and provide new aluminum expantion cover. (100 LM)
ITEM NO.: 063
Delete “ITEM NO. 063”.
ITEM NO.: 063(a) Add “ITEM NO. 063(a)”: Remove existing rain gutter & gutter hanger and provide new PVC gutter & stainless gutter hanger. (50 LM)
ITEM NO.: 063(b) Add “ITEM NO. 063(b)”: Remove existing downspout with leader straps and provide new PVC downspout with stainless steel leader straps with splash block. (50 LM)
1.2 TITLE: “PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK”
ITEM NO.: 100
Change Unit “LM”, to read as ”SM”.
Proposed Change No.PC002 - Page 3
ITEM NO.: 101
Delete “ITEM NO. 101”.
ITEM NO.: 101(a) Add “ITEM NO. 101(a)”: Repaint existing steel door and frame. (100 SM)
ITEM NO.: 101(b) Add “ITEM NO. 101(b)”: Repaint existing steel window frame. (50 SM)
ITEM NO.: 101(c) Add “ITEM NO. 101(c)”: Repaint existing steel electrical power box. (50
SM)
ITEM NO.: 102
Delete “ITEM NO. 102”.
ITEM NO.: 102(a) Add “ITEM NO. 102(a)”: Repaint existing steel door and frame with polyurethane type coating. (150 SM)
ITEM NO.: 102(b) Add “ITEM NO. 102(b)”: Repaint existing steel window frame with polyurethane type coating. (30 SM)
ITEM NO.: 102(c) Add “ITEM NO. 102(c)”: Repaint existing steel electrical power box with polyurethane type coating. (20 SM)
ITEM NO.: 103
Delete “ITEM NO. 103”.
ITEM NO.: 103(a) Add “ITEM NO. 103(a)”: Repaint existing wood door and frame. (200 SM)
ITEM NO.: 103(b) Add “ITEM NO. 103(b)”: Repaint existing glazed wood window frame. (100 SM)
ITEM NO.: 123
Change “Repaint existing non-slip coating”, to read as “Repaint existing non-slip floor coating”.
ITEM NO.: 124
Change “Repaint existing built-up roofing”, to read as “Provide new urethane roof coating over existing roof coating”.
ITEM NO.: 132
Delete “ITEM NO. 132”.
ITEM NO.: 132(a) Add “ITEM NO. 132(a)”: Replace existing galvanized steel sheet with new.
(400 SM)
ITEM NO.: 132(b) Add “ITEM NO. 132(b)”: Replace existing reinforced FRP sheet with new.
(100 SM)
ITEM NO.: 142
Delete “ITEM NO. 142”.
Proposed Change No.PC002 - Page 4
ITEM NO.: 142(a) Add “ITEM NO. 142(a)”: Replace existing wood head, sill, jamb and mullion
(up to w=150) with new. (5 LM)
ITEM NO.: 142(b) Add “ITEM NO. 142(b)”: Replace existing wood window trim (up to w=70) with new. (5 LM)
ITEM NO.: 143
Delete “ITEM NO. 143”.
ITEM NO.: 143(a) Add “ITEM NO. 143(a)”: Replace damaged decorative wood post and filler (up to 150x150) with new. (1 LM)
ITEM NO.: 143(b) Add “ITEM NO. 143(b)”: Replace damaged wood beam (up to 400x200) with new. (1 LM)
ITEM NO.: 144
Delete “ITEM NO. 144”.
ITEM NO.: 144(a) Add “ITEM NO. 144(a)”: Replace half-round PVC gutter with new. (100 LM)
ITEM NO.: 144(b) Add “ITEM NO. 144(b)”: Replace square PVC gutter with new. (50 LM)
ITEM NO.: 144(c) Add “ITEM NO. 144(c)”: Replace PVC downspout with new. (50 LM)
ITEM NO.: 145
Change “Replace damaged polycarbonate roofing (10 EA)”, to read as
“Replace damaged polycarbonate (THK=5) roofing (10 SM)”.
ITEM NO.: 146
Delete “ITEM NO. 146”.
ITEM NO.: 146(a) Add “ITEM NO. 146(a)”: Replace damaged clear glass pane on aluminum door or window with new. (5 SM)
ITEM NO.: 146(b) Add “ITEM NO. 146(b)”: Replace damaged frosted glass pane on aluminum door
ITEM NO.: 146(c) Add “ITEM NO. 146(c)”: Replace damaged tempered glass pane on aluminum door or window with new. (5 SM)
ITEM NO.: 146(d) Add “ITEM NO. 146(d)”: Replace damaged wired glass pane on aluminum door
ITEM NO.: 164
Change “Provide gondola lift (10 EA)”, to read as “Provide bucket truck lift(10 DAY)”.
Proposed Change No.PC002 - Page 5
1.3 TITLE: “ROOFING SUPPLEMENTARY EXPLANATION OF WORK”
Page: 42
Change ITEM NO. “001”, to read as “001(a)~001(c)”.
Page: 42
ITEM NO.: 001
Change “Remove existing mineral surfaces built-up roofing, various sheet waterproof and urethane waterproof coatingand”, to read as “Remove existing (a) mineral surfaces built-up roofing, (b) sheet waterproof and
(c) urethane waterproof coating”.
ITEM NO.: 002
After "insulation", insert “(25mm ~ 60mm)”.
Change ITEM NO. “003”, to read as “003(a)~003(c)”.
Page: 42
ITEM NO.: 003
Change “Remove all existing asbestos contained mineral surfaced built-up roofing, various sheet waterproof and urethane waterproof coating”, to read as “Remove all existing asbestos contained (a)mineral surfaced built-up roofing, (b)sheet waterproof and (c)waterproof coating”.
Page: 44~46
ITEM NO.: 017~022 & 024~030
After "heat reflected top coating", insert “(solar reflectance 60% minimum)”.
Page: 46
ITEM NO.: 030
After " built-up roofing for maintenance ", insert “walking traffic path”.
Page: 46
ITEM NO.: 039
Change ITEM NO. “039”, to read as “039(a)~039(b)”.
Page: 46
ITEM NO.: 039
Change “Remove existing metal roof and provide new precoated galvanized metal roof.”, to read as “Remove existing metal roof and provide new precoated galvanized metal (a) high profile folded sheet metal roof. The size of sheet metal roof is 88mm ~ 150mm height., (b) low profile folded sheet metal roof. The size of sheet metal roof is 40mm ~ 80mm height”.
Page: 46
ITEM NO.: 040
At end of paragraph", insert “The size of existing metal roof deck is 50mm
~ 88mm height.”.
Page: 46
ITEM NO.: 041
After "gable", insert “(200mm ~ 300mm height)”.
Proposed Change No.PC002 - Page 6
Page: 46~47
ITEM NO.: 043~044
After "new", insert “1.2 THK”.
Page: 47
Change ITEM NO. “048”, to read as “048(a)~048(b)”.
Page: 47
ITEM NO.: 048
Change “Remove existing aluminum coping and provide new 1.5 thickness aluminum extruded type coping”, to read as “(a) Remove existing (aluminum coping) and provide new 1.5 thickness and up to w=200mm ~ 250mm aluminum extruded type coping”.
Add the subparagraph at the end: (b) Remove existing (PC coping) and provide new 1.5 thickness and up to w=200mm ~ 250mm aluminum extruded type coping. All new exposed aluminum should be factory pre- finished to match existing color schemes. As shown in the attached sketches A-10.
Page: 47
ITEM NO.: 049
After "fastners", insert “(standard size 6mm x 35mm)”.
ITEM NO.: 050
Change ITEM NO. “050”, to read as “050(a)~050(b)”.
Page: 48
ITEM NO.: 062
After "existing stainless mesh strainer", insert “(up to 150mm DIA)”.
Page: 48
ITEM NO.: 063
Change ITEM NO. “063”, to read as “063(a)~063(b)”.
Page: 48
ITEM NO.: 063
Before "Remove", insert “(a)”.
Page: 48
ITEM NO.: 063
Add the subparagraph at the end: (b) Remove existing downspout with leader straps and provide new PVC downspout with stainless steel leader straps with splash block.
Page: 50
ITEM NO.: 080
At end of paragraph", insert “Building height varies from 4.0m ~ 21m.”.
1.4 TITLE: “PAINTING SUPPLEMENTARY EXPLANATION OF WORK”
Page: 52
ITEM NO.: 097~125
Change ITEM NO. “097~125”, to read as “097~122”.
Proposed Change No.PC002 - Page 7
Page: 52
ITEM NO.: 097~125
Para. (a) Change “Line item 008 existing repainting aluminum panel and 017 repainting”, to read as “Line item 104 existing repainting aluminum panel and 113 repainting”.
ITEM NO.: 097~125
Para. (b) Change “Preparation for Line item 023 repainting existing asbestos cement board will apply item 045”, to read as “Preparation for Line item 122 repainting existing asbestos cement board must include item 150”.
ITEM NO.: 126
Change ITEM NO. “126”, to read as “123 & 126”.
Page: 52
ITEM NO.: 126
After "sealant", insert “(0.16kg/㎡ 1 layer)”.
After "coating", insert “(0.16kg/㎡ 2 layers)”.
Page: 53 Add “ITEM NO.124” before “ITEM NO.127” ITEM NO. 124: Prepare existing roof coating surface, apply primer and water proof urethane roof coating.
Page: 53
ITEM NO.: 131
Change ITEM NO. “450 mm”, to read as “200 mm”.
Page: 53
ITEM NO.: 132
Change ITEM NO. “132”, to read as “132(a)~132(b)”.
Page: 53
ITEM NO.: 132
Change “Replace existing GSS and/ or fiber reinforced panel”, to read as
“Replace existing (a) GSS and/ or (b) fiber reinforced panel”.
Page: 53
ITEM NO.: 133
After "wall vent", insert “(75 ~ 200mm diameter)”.
Page: 53
ITEM NO.: 134
After "vinyl building numbers", insert “(installation height up to 12 m)”.
Page: 54
ITEM NO.: 138
After "existing power source", insert “(the distance between the building sign and electrical power panel is up to 100m)”.
Page: 54
ITEM NO.: 139
After "power source", insert “(the distance for power panel is up to
100m)”.
Proposed Change No.PC002 - Page 8
Page: 54
ITEM NO.: 142
Change ITEM NO. “142”, to read as “142(a)~142(b)”.
ITEM NO.: 143
Change ITEM NO. “143”, to read as “143(a)~143(b)”.
Page: 54
ITEM NO.: 143
Change "Replace damaged wooden columns and beams ", to read as “Replace damaged decorative wood columns, filler and beams with new to match existing.”
ITEM NO.: 144
Change ITEM NO. “144”, to read as “144(a)~144(c)”.
ITEM NO.: 146
Change ITEM NO. “146”, to read as “146(a)~146(d)”.
Page: 54
ITEM NO.: 146
Change “New glass pane must be clear frosted, tempered (up to 6.0mm thickness) or wired pane (up to 6.8 mm thickness)”, to read as “New glass pane must be laminated clear and frosted, tempered glass (4.0mm ~ 6.0mm thickness) or wired pane (up to 6.8 mm thickness)”.
Page: 56
ITEM NO.: 164
Change “Provide two (2)gondola lift at one(1)High-rise capable of transporting resources in vertical distance up to 31 meters of ground”, to read as “Provide one (1) bucket truck lift at one(1)Mid-rise capable of transporting resources in vertical distance up to 22 meters from the ground.”
Page: 56
ITEM NO.: 165
At end of paragraph", insert “Building height varies from 4.0m ~ 21m.”.
2. Changes must be made to reference drawing as follows:
The following reference drawing is attached to this PC002 for reference:
TITLE PAGE
Drawing of Lighting Fixtures Attachment 1 PC002 1
-- End of Proposed Change No.PC002 --
Roofing and Painting IDIQ
Contract for Various Projects (Roofing)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
ROOF :
300 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
A002 Remove existing insulation board. 400 SM ¥ ¥ 0
300 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
A004 Clean up existing built‐up roofing surface by waterblasting. 1,000 SM ¥ ¥ 0
A005 Clean up existing gutter surface by waterblasting. 200 LM ¥ ¥ 0
A006 100 SM ¥ ¥ 0
A007 50 SM ¥ ¥ 0
A008 Repair existing concrete covering of the slab. 50 LM ¥ ¥ 0
A009 70 SM ¥ ¥ 0
A010 350 SM ¥ ¥ 0
A011 100 SM ¥ ¥ 0
A012 350 SM ¥ ¥ 0
A013 100 SM ¥ ¥ 0
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "A"
EXHIBIT A Price for Ordering Period 1
DESCRIPTION
Remove existing urethane waterproof coating.
Remove existing asbestos contained mineral surfaced built‐ up roofing.
Cut and remove existing local deteriorated ashalt roofing system and repair them.
A001(a) Remove existing mineral surfaced built‐up roofing.
A001(b) Remove existing sheet waterproof.
A001(c)
A003(a)
A003(b) Remove existing asbestos contained sheet waterproof.
A003(c) Remove existing asbestos contained waterproof coating.
Repair existing blister of asphalt roofing system.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (over
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (up to 300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A014 350 SM ¥ ¥ 0
A015 200 SM ¥ ¥ 0
A016 400 SM ¥ ¥ 0
A017 100 SM ¥ ¥ 0
A018 400 SM ¥ ¥ 0
A019 100 SM ¥ ¥ 0
A020 400 SM ¥ ¥ 0
A021 200 SM ¥ ¥ 0
A022 100 SM ¥ ¥ 0
A023 400 SM ¥ ¥ 0
A024 100 SM ¥ ¥ 0
A025 400 SM ¥ ¥ 0
A026 100 SM ¥ ¥ 0
A027 400 SM ¥ ¥ 0
A028 50 SM ¥ ¥ 0
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM).
Provide new urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to
300SM).
Provide new urethane membrane waterproof coating system on existing concrete surface (over 300SM).
Provide new urethane membrane waterproof coating system on existing riser surface.
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (up to 300SM)
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (over 300SM)
Provide new polymer modified bitumen roofing system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM).
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (over 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (over
300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A029 50 SM ¥ ¥ 0
A030 50 SM ¥ ¥ 0
A031 100 SM ¥ ¥ 0
A032 100 SM ¥ ¥ 0
A033 250 SM ¥ ¥ 0
A034 1,000 SM ¥ ¥ 0
A035 10 EA ¥ ¥ 0
A036 100 SM ¥ ¥ 0
A037 50 LM ¥ ¥ 0
A038 50 LM ¥ ¥ 0
20 SM ¥ ¥ 0
30 SM ¥ ¥ 0
A040 30 SM ¥ ¥ 0
A041 30 LM ¥ ¥ 0
A042 50 SM ¥ ¥ 0
A043 50 SM ¥ ¥ 0
A039(a)
A039(b)
Remove existing sheet roofing and provide new synthetic polymer roofing system.
Remove existing fascia & gable wood board and provide new wood fascia & gable board.
Provide new 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.
Remove existing metal roof and provide new high profile folded sheet metal roof.
Provide new precoated galvanized metal roof on existing metal roof.
Remove existing metal roof fascia & gable and provide new precoated galvanized metal fascia & gable.
Remove existing slate roofing system and provide new slate roofing system.
Remove existing metal roof and provide new low profile folded sheet metal roof.
Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide new asphalt shingle roofing & asphalt roofing felt.
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (up to 300SM).
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (over 300SM).
Provide new polymer modified bitumen roofing system on steel surface of vent pipe.
Remove existing roof tile & asphalt roofing felt and provide new structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.
Provide new urethane membrane waterproof coating system on existing & new concrete structure and foundation surface.
Provide new mineral surfaced built‐up roofing for maintenance.
Remove existing asphalt shingle roofing system and provide new asphalt shingle roofing system.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A044 70 SM ¥ ¥ 0
A045 100 LM ¥ ¥ 0
A046 10 EA ¥ ¥ 0
A047 5 EA ¥ ¥ 0
COPING :
100 LM ¥ ¥ 0
85 LM ¥ ¥ 0
A049 200 LM ¥ ¥ 0
70 LM ¥ ¥ 0
100 LM ¥ ¥ 0
FLASHING :
A051 100 LM ¥ ¥ 0
A052 100 LM ¥ ¥ 0
A053 100 LM ¥ ¥ 0
A054 50 LM ¥ ¥ 0
Remove existing PC coping and provide new aluminum coping.
Remove existing aluminum coping temporarily and reinstall existing aluminum coping.
Remove existing metal strap with sealant and provide new aluminum strap with sealant.
Remove existing aluminum strap or flashing with sealant and provide new aluminum frashing with sealant.
Remove existing metal flashing and provide new precoated galvanized frashing of roof edge.
Remove existing metal flashing and provide new aluminum or stainless steel flashing of roof edge.
Remove existing sheet roofing and provide new synthetic polymer roofing system with new heat resistant rigid insulation board.
Remove existing expansion joint filler & sealant and provide new.
Provide new stainless air ventilator pipe.
Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide new polymer modified bitumen roofing system around existing vent pipe with stainless tie band.
Remove existing aluminum coping and provide new aluminum coping.
A048(a)
A048(b)
A050(a) Remove existing aluminum expansion cover (up to W=450) and provide new aluminum expansion cover.
A050(b) Remove existing aluminum expansion cover (W=450 ~
600)and provide new aluminum expansion cover.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
DRAIN :
A055 20 EA ¥ ¥ 0
A056 10 EA ¥ ¥ 0
A057 20 EA ¥ ¥ 0
A058 10 EA ¥ ¥ 0
A059 20 LM ¥ ¥ 0
A060 20 LM ¥ ¥ 0
A061 20 LM ¥ ¥ 0
A062 5 EA ¥ ¥ 0
50 LM ¥ ¥ 0
50 LM ¥ ¥ 0
A064 3 CM ¥ ¥ 0
A065 5 SM ¥ ¥ 0
A063(a)
A063(b) Remove existing downspout with leader straps and provide new PVC downspout with stainless steel leader straps with splash block.
Remove existing cement mortar and provide new waterproof cement mortar for existing concrete foundation.
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(W=200~400)
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(over W=400)
Remove existing stainless mesh strainer in the gutter and provide new stainless mesh strainer.
Remove existing rain gutter & gutter hanger and provide new PVC gutter & stainless gutter hanger.
STEEL SUPPORT & FOUNDATION FOR MECH AND ELEC EQUIPMENT & PIPING :
Remove existing concrete foundation.
Remove existing horizontal roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐cast strainer.
Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.
Remove existing vertical roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐ cast strainer.
Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.
GUTTER AND DOWNSPOUT :
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(up to W=200)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
CUI//FEDCON
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A066 3 EA ¥ ¥ 0
A067 3 EA ¥ ¥ 0
A068 2 EA ¥ ¥ 0
A069 1 EA ¥ ¥ 0
A070 10 EA ¥ ¥ 0
A071 10 EA ¥ ¥ 0
A072 10 EA ¥ ¥ 0
A073 10 EA ¥ ¥ 0
A074 10 EA ¥ ¥ 0
A075 10 EA ¥ ¥ 0
A076 5 EA ¥ ¥ 0
A077 5 EA ¥ ¥ 0Remove existing steel leg with concrete base and provide new steel leg support with isolation rubber sheet.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or over
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Provide new raised concrete foundation.
(300x300~400x400x200H)
Provide new raised concrete foundation.
(400x400~600x600x300H)
Provide new raised concrete foundation. (over
600x600x300H)
Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti‐vibration rubber with new.
Remove existing electrical conductors and support materials for lightning protection and provide new ones to match existing.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A078 20 LM ¥ ¥ 0
A079 20 LM ¥ ¥ 0
A080 500 SM ¥ ¥ 0
ACM SAMPLING:
A081 1 EA ¥ ¥ 0
A082 1 EA ¥ ¥ 0
LBP SAMPLING:
A083 1 EA ¥ ¥ 0
A084 1 EA ¥ ¥ 0
A085 400 SM ¥ ¥ 0
A086 10 EA ¥ ¥ 0
A087 PCM air sampling and monitoring for asbestos/lead control 4 EA ¥ ¥ 0
A088 TEM air sampling and monitoring for asbestos/lead control. 4 EA ¥ ¥ 0
A089 Change room for asbestos/lead control area. 2 EA ¥ ¥ 0
A090 Disposal of ACM/LBP. 5 CM ¥ ¥ 0
Air, wipe and/or soil sampling and monitoring for asbestos/lead control area.
Asbestos sampling of existing roofing material.
Asbestos sampling of existing roofing material and request sampling analysis.
Lead based paint sampling of existing steel surface of roof.
Lead based paint sampling of existing steel surface of roof and request sampling analysis.
ACM/LBP ABATEMENT:
Temporary enclosure for asbestos/lead control area.
PAINTING :
Paint/Repaint exposed surface of new existing steel & wood surfaces.
Repaint exposed surface of existing lead based paint contained steel surfaces.
TEMPORARY WORK :
Erect and dismantle scaffolding.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
MISCELLANEOUS
A091 4 EA ¥ ¥ 0
A092 4 EA ¥ ¥ 0
A093 3 EA ¥ ¥ 0
A094 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (A001 through A094) Not‐To‐Exceed ¥
Abbreviations:
Other related miscellaneous work (must be negotiated at time of order).
SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACM = Asbestos Containing Material, LBP = Lead Based Paint
W=width, H=height
Replace existing acrylic skylight with new. (600x600)
Replace existing acrylic skylight with new. (900x900)
Replace existing acrylic skylight with new. (1300x1300)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
Roofing and Exterior Painting IDIQ
Contract for Various Projects (Painting)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
A095 15,000 SM ¥ ¥ 0
A096 Prepare Lead‐free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
A097 2,500 SM ¥ ¥ 0
A098 200 SM ¥ ¥ 0
A099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
A100 500 SM ¥ ¥ 0
100 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
150 SM ¥ ¥ 0
30 SM ¥ ¥ 0
20 SM ¥ ¥ 0
200 SM ¥ ¥ 0
100 SM ¥ ¥ 0
A104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
A105 250 LM ¥ ¥ 0
A106 150 LM ¥ ¥ 0
A107 200 LM ¥ ¥ 0
A103(b) Repaint existing glazed wood window and frame.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
A102(b) Repaint existing steel window frame with polyurethane type coating.
A102(c) Repaint existing steel electrical power box with polyurethane type coating.
A103(a)
A101(b) Repaint existing steel window frame.
A101(c) Repaint existing steel electrical power box.
A102(a)
PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "A"
Repaint existing wooden beams and columns after surface preparation.
Repaint existing steel door and frame.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM >
DESCRIPTION
Prepare Lead‐free surfaces with water cleaning.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM <
A101(a)
EXHIBIT A Price for Ordering Period 1
Repaint existing steel door and frame with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
Repaint existing wood door and frame.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A108 150 LM ¥ ¥ 0
A109 200 LM ¥ ¥ 0
A110 150 LM ¥ ¥ 0
A111 100 LM ¥ ¥ 0
A112 50 LM ¥ ¥ 0
A113 350 LM ¥ ¥ 0
A114 2,000 SM ¥ ¥ 0
A115 250 SM ¥ ¥ 0
A116 2,000 SM ¥ ¥ 0
A117 250 SM ¥ ¥ 0
A118 2,000 SM ¥ ¥ 0
A119 250 SM ¥ ¥ 0
A120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
A121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
A122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
A123 Repaint existing non‐slip floor coating. 400 SM ¥ ¥ 0
A124 500 SM ¥ ¥ 0
A125 Provide rubber type multi‐layer coating system. 300 SM ¥ ¥ 0
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating.
Repaint existing PVC gutter/ downspout surfaces after surface preparation.
Provide new urethane roof coating over existing roof coating.
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM <
Repaint existing multi‐layer coating surfaces with top coating. 300SM >
Repaint existing multi‐layer coating surfaces with top coating. 300SM <
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM >
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A126 50 SM ¥ ¥ 0
A127 50 SM ¥ ¥ 0
A128 Repair spalling. 50 SM ¥ ¥ 0
A129 Repair crack with U‐cut. 1,000 LM ¥ ¥ 0
A130 Replace existing non‐ACB with new. 250 SM ¥ ¥ 0
A131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
400 SM ¥ ¥ 0
100 SM ¥ ¥ 0
A133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
A134 Provide new building number sign. 20 EA ¥ ¥ 0
A135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
A136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
A137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
A138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
A139 Remove existing building signs. 50 EA ¥ ¥ 0
A140 1,500 LM ¥ ¥ 0
A141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
5 LM ¥ ¥ 0
5 LM ¥ ¥ 0
1 LM ¥ ¥ 0
1 LM ¥ ¥ 0
Replace half‐round PVC gutter with new. 100 LM ¥ ¥ 0
Replace square PVC gutter with new. 100 LM ¥ ¥ 0
Replace PVC downspout with new. 50 LM ¥ ¥ 0
A145 Replace damaged polycarbonate (THK=5mm) roofing. 10 SM ¥ ¥ 0
5 SM ¥ ¥ 0
Remove existing cement mortar, and provide waterproof cement mortar.
Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
Replace existing galvanized steel sheet with new.A132(a)
A132(b) Replace existing reinforced FRP sheet with new.
A142(a)
A142(b) Replace existing wood window trim (up to w=70) with
Replace existing wood window head, sill, jamb and mullion
(up to w=150) with new.
Replace existing sealants for windows/ doors with new.
A143(a) Replace damaged decorative wood post and filler (up to
150x150) with new.
A144(a)
A144(b)
A146(a) Replace damaged clear glass pane on aluminum framed door or window with new.
A143(b) Replace damaged wood beam (up to 400x200) with new.
A144(c)
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
5 SM ¥ ¥ 0
5 SM ¥ ¥ 0
5 SM ¥ ¥ 0
A147 20 EA ¥ ¥ 0
A148 100 EA ¥ ¥ 0
A149 Replace existing ACB with new non‐ACB. 200 SM ¥ ¥ 0
A150 20 EA ¥ ¥ 0
A151 Lead‐containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
A152 Lead‐containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
A153 400 SM ¥ ¥ 0
A154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
A155 25 EA ¥ ¥ 0
A156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
A157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
A158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
A159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
A160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
A161 10 EA ¥ ¥ 0
A162 10 EA ¥ ¥ 0
A163 10 EA ¥ ¥ 0
A164 Provide bucket truck lift. 10 DAY ¥ ¥ 0
A165 Provide scaffolding. 9,000 SM ¥ ¥ 0
A166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
A146(b) Replace damaged frosted glass pane on aluminum framed door or window with new.
A146(c) Replace damaged tempered glass pane on aluminum framed door or window with new.
A146(d) Replace damaged wired glass pane on aluminum framed door or window with new.
Asbestos sampling of existing material and request sampling analysis.
Lead based paint sampling of existing steel surfaces of material.
Lead based paint sampling of existing steel surfaces of material and request sampling analysis.
Asbestos‐containing surface preparation with solvent cleaning.
Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
Replace existing acrylic lighting fixture covers with new.
Air, wipe and/or soil sampling and monitoring for lead control area.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A167 50 EA ¥ ¥ 0
A168 50 EA ¥ ¥ 0
A169 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (A095 through A169) Not‐To‐Exceed ¥
Abbreviations:
EST AMT = Estimated Amount, EST QTY = Estimated
Quantity, SM = Square Meter, LM = Linear Meter, CM
Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos
Cement Board, PCM = Phase Contrast Microscopy, TEM =
Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction
Work
Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
Other related miscellaneous work (must be negotiated at time of order).
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
ROOF :
300 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
B002 Remove existing insulation board. 400 SM ¥ ¥ 0
300 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
B004 Clean up existing built‐up roofing surface by waterblasting. 1,000 SM ¥ ¥ 0
B005 Clean up existing gutter surface by waterblasting. 200 LM ¥ ¥ 0
B006 100 SM ¥ ¥ 0
B007 50 SM ¥ ¥ 0
B008 Repair existing concrete covering of the slab. 50 LM ¥ ¥ 0
B009 70 SM ¥ ¥ 0
B010 350 SM ¥ ¥ 0
B011 100 SM ¥ ¥ 0
B012 350 SM ¥ ¥ 0
B013 100 SM ¥ ¥ 0
Repair existing blister of asphalt roofing system.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (over
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (up to 300SM)
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "B"
EXHIBIT B Price for Ordering Period 2
DESCRIPTION
Remove existing mineral surfaced built‐up roofing.
Remove existing asbestos contained mineral surfaced built‐ up roofing.
Cut and remove existing local deteriorated ashalt roofing system and repair them.
B001(a)
B001(b) Remove existing sheet waterproof.
B001(c) Remove existing urethane waterproof coating.
B003(a)
B003(b) Remove existing asbestos contained sheet waterproof.
B003(c) Remove existing asbestos contained waterproof coating.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B014 350 SM ¥ ¥ 0
B015 200 SM ¥ ¥ 0
B016 400 SM ¥ ¥ 0
B017 100 SM ¥ ¥ 0
B018 400 SM ¥ ¥ 0
B019 100 SM ¥ ¥ 0
B020 400 SM ¥ ¥ 0
B021 200 SM ¥ ¥ 0
B022 100 SM ¥ ¥ 0
B023 400 SM ¥ ¥ 0
B024 100 SM ¥ ¥ 0
B025 400 SM ¥ ¥ 0
B026 100 SM ¥ ¥ 0
B027 400 SM ¥ ¥ 0
Provide new urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to
300SM).
Provide new urethane membrane waterproof coating system on existing concrete surface (over 300SM).
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (up to 300SM)
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (over 300SM)
Provide new polymer modified bitumen roofing system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM).
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM).
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (over 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (over 300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B028 50 SM ¥ ¥ 0
B029 50 SM ¥ ¥ 0
B030 50 SM ¥ ¥ 0
B031 100 SM ¥ ¥ 0
B032 100 SM ¥ ¥ 0
B033 250 SM ¥ ¥ 0
B034 1,000 SM ¥ ¥ 0
B035 10 EA ¥ ¥ 0
B036 100 SM ¥ ¥ 0
B037 50 LM ¥ ¥ 0
B038 50 LM ¥ ¥ 0
20 SM ¥ ¥ 0
30 SM ¥ ¥ 0
B040 30 SM ¥ ¥ 0
B041 30 LM ¥ ¥ 0
B042 50 SM ¥ ¥ 0
B039(a)
B039(b) Remove existing metal roof and provide new low profile folded sheet metal roof.
Remove existing fascia & gable wood board and provide new wood fascia & gable board.
Provide new 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.
Remove existing metal roof and provide new high profile folded sheet metal roof.
Provide new precoated galvanized metal roof on existing metal roof.
Remove existing metal roof fascia & gable and provide new precoated galvanized metal fascia & gable.
Remove existing slate roofing system and provide new slate roofing system.
Remove existing asphalt shingle roofing system and provide new asphalt shingle roofing system.
Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide new asphalt shingle roofing & asphalt roofing felt.
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (up to 300SM).
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (over 300SM).
Provide new polymer modified bitumen roofing system on steel surface of vent pipe.
Remove existing roof tile & asphalt roofing felt and provide new structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.
Provide new urethane membrane waterproof coating system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing & new concrete structure and foundation surface.
Provide new mineral surfaced built‐up roofing for maintenance.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B043 50 SM ¥ ¥ 0
B044 70 SM ¥ ¥ 0
B045 100 LM ¥ ¥ 0
B046 10 EA ¥ ¥ 0
B047 5 EA ¥ ¥ 0
COPING :
100 LM ¥ ¥ 0
85 LM ¥ ¥ 0
B049 200 LM ¥ ¥ 0
70 LM ¥ ¥ 0
100 LM ¥ ¥ 0
FLASHING :
B051 100 LM ¥ ¥ 0
B052 100 LM ¥ ¥ 0
B053 100 LM ¥ ¥ 0
B054 50 LM ¥ ¥ 0
Remove existing aluminum coping temporarily and reinstall existing aluminum coping.
Remove existing aluminum expansion cover (up to W=450) and provide new aluminum expansion cover.
Remove existing metal strap with sealant and provide new aluminum strap with sealant.
Remove existing aluminum strap or flashing with sealant and provide new aluminum frashing with sealant.
Remove existing metal flashing and provide new precoated galvanized frashing of roof edge.
Remove existing metal flashing and provide new aluminum or stainless steel flashing of roof edge.
Remove existing sheet roofing and provide new synthetic polymer roofing system.
Remove existing sheet roofing and provide new synthetic polymer roofing system with new heat resistant rigid insulation board.
Remove existing expansion joint filler & sealant and provide new.
Provide new stainless air ventilator pipe.
Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide new polymer modified bitumen roofing system around existing vent pipe with stainless tie band.
Remove existing aluminum coping and provide new aluminum coping.
Remove existing PC coping and provide new aluminum coping.
B048(a)
B048(b)
B050(a)
B050(b) Remove existing aluminum expansion cover (W=450 ~
600)and provide new aluminum expansion cover.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
masayuki.tsukamoto Polygon
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
DRAIN :
B055 20 EA ¥ ¥ 0
B056 10 EA ¥ ¥ 0
B057 20 EA ¥ ¥ 0
B058 10 EA ¥ ¥ 0
B059 20 LM ¥ ¥ 0
B060 20 LM ¥ ¥ 0
B061 20 LM ¥ ¥ 0
B062 5 EA ¥ ¥ 0
50 LM ¥ ¥ 0
50 LM ¥ ¥ 0
B064 3 CM ¥ ¥ 0
B065 5 SM ¥ ¥ 0
B063(a)
B063(b) Remove existing downspout with leader straps and provide new PVC downspout with stainless steel leader straps with splash block.
Remove existing cement mortar and provide new waterproof cement mortar for existing concrete foundation.
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(W=200~400)
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(over W=400)
Remove existing stainless mesh strainer in the gutter and provide new stainless mesh strainer.
Remove existing rain gutter & gutter hanger and provide new PVC gutter & stainless gutter hanger.
STEEL SUPPORT & FOUNDATION FOR MECH AND ELEC EQUIPMENT & PIPING :
Remove existing concrete foundation.
Remove existing horizontal roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐cast strainer.
Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.
Remove existing vertical roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐ cast strainer.
Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.
GUTTER AND DOWNSPOUT :
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(up to W=200)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B066 3 EA ¥ ¥ 0
B067 3 EA ¥ ¥ 0
B068 2 EA ¥ ¥ 0
B069 1 EA ¥ ¥ 0
B070 10 EA ¥ ¥ 0
B071 10 EA ¥ ¥ 0
B072 10 EA ¥ ¥ 0
B073 10 EA ¥ ¥ 0
B074 10 EA ¥ ¥ 0
B075 10 EA ¥ ¥ 0
B076 5 EA ¥ ¥ 0
B077 5 EA ¥ ¥ 0Remove existing steel leg with concrete base and provide new steel leg support with isolation rubber sheet.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or over
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Provide new raised concrete foundation.
(300x300~400x400x200H)
Provide new raised concrete foundation.
(400x400~600x600x300H)
Provide new raised concrete foundation. (over
600x600x300H)
Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti‐vibration rubber with new.
Remove existing electrical conductors and support materials for lightning protection and provide new ones to match existing.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B078 20 LM ¥ ¥ 0
B079 20 LM ¥ ¥ 0
B080 500 SM ¥ ¥ 0
ACM SAMPLING:
B081 1 EA ¥ ¥ 0
B082 1 EA ¥ ¥ 0
LBP SAMPLING:
B083 1 EA ¥ ¥ 0
B084 1 EA ¥ ¥ 0
B085 400 SM ¥ ¥ 0
B086 10 EA ¥ ¥ 0
B087 PCM air sampling and monitoring for asbestos/lead control 4 EA ¥ ¥ 0
B088 TEM air sampling and monitoring for asbestos/lead control. 4 EA ¥ ¥ 0
B089 Change room for asbestos/lead control area. 2 EA ¥ ¥ 0
B090 Disposal of ACM/LBP. 5 CM ¥ ¥ 0
PAINTING :
Paint/Repaint exposed surface of new existing steel & wood surfaces.
Repaint exposed surface of existing lead based paint contained steel surfaces.
TEMPORARY WORK :
Erect and dismantle scaffolding.
Asbestos sampling of existing roofing material.
Asbestos sampling of existing roofing material and request sampling analysis.
Lead based paint sampling of existing steel surface of roof.
Lead based paint sampling of existing steel surface of roof and request sampling analysis.
ACM/LBP ABATEMENT:
Temporary enclosure for asbestos/lead control area.
Air, wipe and/or soil sampling and monitoring for asbestos/lead control area.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
MISCELLANEOUS
B091 4 EA ¥ ¥ 0
B092 4 EA ¥ ¥ 0
B093 3 EA ¥ ¥ 0
B094 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (B001 through B094) Not‐To‐Exceed ¥
Abbreviations:
Replace existing acrylic skylight with new. (600x600)
Replace existing acrylic skylight with new. (900x900)
Replace existing acrylic skylight with new. (1300x1300)
Other related miscellaneous work (must be negotiated at time of order).
SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACM = Asbestos Containing Material, LBP = Lead Based Paint
W=width, H=height
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
B095 15,000 SM ¥ ¥ 0
B096 Prepare Lead‐free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
B097 2,500 SM ¥ ¥ 0
B098 200 SM ¥ ¥ 0
B099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
B100 500 SM ¥ ¥ 0
100 SM ¥ ¥ 0
50 SM ¥ ¥ 0
50 SM ¥ ¥ 0
150 SM ¥ ¥ 0
30 SM ¥ ¥ 0
20 SM ¥ ¥ 0
200 SM ¥ ¥ 0
100 SM ¥ ¥ 0
B104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
B105 250 LM ¥ ¥ 0
B106 150 LM ¥ ¥ 0
B107 200 LM ¥ ¥ 0
B103(a)
B103(b) Repaint existing glazed wood window and frame.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
B102(a)
B102(b) Repaint existing steel window frame with polyurethane type coating.
B102(c) Repaint existing steel electrical power box with polyurethane type coating.
PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "B"
EXHIBIT B Price for Ordering Period 2
DESCRIPTION
Prepare Lead‐free surfaces with water cleaning.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM >
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM <
Repaint existing wooden beams and columns after surface preparation.
Repaint existing steel door and frame.
Repaint existing steel door and frame with polyurethane type coating.
Repaint existing wood door and frame.
Repaint existing steel electrical power box.
B101(a)
B101(b) Repaint existing steel window frame.
B101(c)
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
CUI//FEDCON
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B108 150 LM ¥ ¥ 0
B109 200 LM ¥ ¥ 0
B110 150 LM ¥ ¥ 0
B111 100 LM ¥ ¥ 0
B112 50 LM ¥ ¥ 0
B113 350 LM ¥ ¥ 0
B114 2,000 SM ¥ ¥ 0
B115 250 SM ¥ ¥ 0
B116 2,000 SM ¥ ¥ 0
B117 250 SM ¥ ¥ 0
B118 2,000 SM ¥ ¥ 0
B119 250 SM ¥ ¥ 0
B120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
B121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
B122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
B123 Repaint existing non‐slip floor coating. 400 SM ¥ ¥ 0
B124 500 SM ¥ ¥ 0
B125 Provide rubber type multi‐layer coating system. 300 SM ¥ ¥ 0
B126 50 SM ¥ ¥ 0
Provide new urethane roof coating over existing roof coating.
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM <
Repaint existing multi‐layer coating surfaces with top coating. 300SM >
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating.
Repaint existing PVC gutter/ downspout surfaces after surface preparation.
Repaint existing concrete,…