Atch(1)_Roofing_and_Painting_IDIQ_Contract_Spec_05May2021.pdf
PDF 16 MB Posted
- Attached to
- Roofing and Exterior Painting IDIQ Contract at U. S. Marine Corps Air Station Iwakuni, Japan
- Solicitation number
- N4008421B5500
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx | XLSX spreadsheet | |
| 21B5500_A0004_Atch(2)_PC002_30Jun2021.pdf | ||
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work_PC002_A0004.xlsx | XLSX spreadsheet | |
| 21B5500_A0004_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0004.pdf | ||
| 21B5500_A0003.pdf | ||
| 21B5500_A0002_Atch(1)_Pre-Bid_Inquiries.pdf | ||
| 21B5500_A0002.pdf | ||
| 21B5500_A0001_Atch(2)_PC001.pdf | ||
| 21B5500_A0001_Atch(1)_Government_Response.pdf | ||
| 21B5500_A0001.pdf | ||
| Atch(4)_Roofing_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet | |
| Atch(6)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| 21B5500_SF1442.pdf | ||
| Atch(5)_1-Day_Official_Entry-Exit_Request.pdf | ||
| Atch(2)_Summary_Schedule_of_Price.xlsx | XLSX spreadsheet | |
| Atch(3)_Painting_Schedule_of_Indefinite_Quantity_Work.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC FE
FEAD Iwakuni
CUI//FEDCON
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
FEAD IWAKUNI
IDIQ CONTRACT, NAVFAC SPECIFICATION
FOR
ROOFING AND EXTERIOR PAINTING IDIQ CONTRACT
FOR VARIOUS PROJECTS
AT THE
U. S. MARINE CORPS AIR STATION, IWAKUNI, JAPAN
DESIGN PREPARED BY:
PROJECT MANAGEMENT AND ENGINEERING BRANCH
FACILITIES ENGINEERING AND AQUISITION DIVISION
FACILITIES DEPARTMENT, MCAS IWAKUNI
SPECIFICATION PREPARED BY:
K. TOKUNAGA (General Sections) N. SHIOTA (General Sections) T. SUYAMA (Architectural Sections) M. TSUKAMOTO (Architectural Sections)
Date: 05/MAY/2021
SPECIFICATION APPROVED BY:
Architectural Branch: ______A. PINEDA__________Date: 05/MAY/2021
For Commander, NAVFAC: ________________________Date: _
05MAY2021
Roofing and Exterior Painting IDIQ Contract for Various Projects
MCAS Iwakuni, Japan
Table of Contents Page 1
TABLE OF CONTENTS
NOTICE TO BIDDERS
ORDER LIMITATION
SCHEDULE OF PRICE
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK
PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING SUPPLEMENTARY EXPLANATION OF WORK
PAINTING SUPPLEMENTARY EXPLANATION OF WORK
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTACT
MANAGEMENT SYSTEM (eCMS)
01 32 16.00 20 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 26A AIRFIELD SAFETY PRECAUTIONS
01 45 00.10 20 CONSTRUCTION QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
Table of Contents Page 2
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 82 16.00 20A BULK SAMPLING FOR ASBESTOS ANALYSIS
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 13.00 20A PAINT CHIP SAMPLING FOR LEAD ANALYSIS
DIVISION 03 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 31 13 ASPHALT SHINGLES
07 32 13 ROOF TILES
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANT
DIVISION 08 – OPENINGS
08 81 00 GLAZING
DIVISION 09 – FINISHES
09 24 23 CEMENT STUCCO
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
Table of Contents Page 3
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
DRAWINGS OF ROOFING PROJECT
DRAWINGS OF EXTERIOR PAINTING PROJECT
-- End of Table of Contents --
NOTICE TO BIDDERS PAGE 1
NOTICE TO BIDDERS
1. CONTRACT LINE ITEMS AND CONTRACT SUBLINE ITEMS
a. Bidders/Offerors shall enter unit prices and amounts for contract line item numbers (CLINs), and exhibit line item numbers (ELINs) as indicated in the schedules.
b. In the event that there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid/offer and the total of the CLINs, or ELINs will be recomputed accordingly. The CLIN which includes recomputed contract ELINs will also be recomputed to take into account the change in the exhibit line item number (ELIN). If the bidder/offeror provides a total amount for a CLIN, or ELIN but fails to enter the unit price, the total amount divided by the CLIN, or ELIN will be held to be the intended unit price.
2. SUPPLEMENTAL PRICING INFORMATION
a. Bidders/Offerors shall also enter the supplemental pricing information on the Exhibits. The offered price for CLINs in the Schedule must be broken down by the ELINs listed on the Exhibits.
b. The supplemental pricing information that the Bidders/Offerors shall provide is composed of unit price, extended amounts and its total.
c. Include all necessary costs in the Unit Price to accomplish exhibit line item work. The costs shall be composed of direct and indirect labor, material, equipment, tools, overhead, transportation, profits, taxes, insurance, estimates and all other associated costs.
3. INDEFINITE QUANTITY INDIVIDUAL CONTRACT LINE ITEM QUANTITIES
Once the estimated quantities for individual line items shown in the Schedule and any accompanying exhibits have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
-- End of Section –
ORDER LIMITATION PAGE 2
ORDER LIMITATION (FAR 52.216-19)
a. Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ¥ 500,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
b. Maximum order. The Contractor is not obligated to honor.
(1) Any order for single item in excess of ¥ 220,000,000.
(2) Any order for a combination of items in excess of ¥ 390,000,000.
(3) A series of orders from the same ordering office within seven working days that together call for quantities exceeding the limitation in subparagraphs (1) or (2) above.
c. Minimum and Maximum Quantities: As referred to in paragraph (b) of FAR
52.216-22, "INDEFINITE QUANTITY" clause, the contract minimum quantity is a total of ¥ 1,000,000 for three years.
-- End of Section --
NAME OF OFFEROR OR CONTRACTOR:
ITEM NO. Q'TY UNIT
CLIN 0001 Ordering Period 1
Roofing Schedule of Indefinity Quantity Work - " A", the summation of the total prices for exhibit line item ELINs A001 through A094 1 LS ¥ Painting Schedule of Indefinity Quantity Work - " A", the summation of the total prices for exhibit line item ELINs A095 through A169 1 LS ¥
Ordering Period 1 Total ¥
Ordering Period 2
Roofing Schedule of Indefinity Quantity Work - " B", the summation of the total prices for exhibit line item ELINs B001 through B094 1 LS ¥ Painting Schedule of Indefinity Quantity Work - " B", the summation of the total prices for exhibit line item ELINs B095 through B169 1 LS ¥
Ordering Period 2 Total ¥
Ordering Period 3
Roofing Schedule of Indefinity Quantity Work - " C", the summation of the total prices for exhibit line item ELINs C001 through C094 1 LS ¥ Painting Schedule of Indefinity Quantity Work - " C", the summation of the total prices for exhibit line item ELINs C095 through C169 1 LS ¥
Ordering Period 3 Total ¥
GRAND TOTAL, NTE AMOUNT (CLIN 0001) ¥
Abbreviations:
CLIN = Contract Line Item Number NTE = Not-to-Exceed LS = Lump Sum
SCHEDULE OF PRICE
(365 calendar days from the completion date of Ordering Period 2 or when the NTE amount is met whichever comes first.)
(365 calendar days from the completion date of Ordering Period 1 or when the NTE amount is met whichever comes first.)
ITEM AMOUNT
(365 calendar days from the date of award or when the Not-to- Exceed (NTE) amount is met whichever comes first.)
SCHEDULE OF PRICE PAGE 3
Roofing and Painting IDIQ
Contract for Various Projects (Roofing)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
ROOF :
A001 400 SM ¥ ¥ 0
A002 Remove existing insulation board. 400 SM ¥ ¥ 0
A003 400 SM ¥ ¥ 0
A004 Clean up existing built‐up roofing surface by waterblasting. 1,000 SM ¥ ¥ 0
A005 Clean up existing gutter surface by waterblasting. 200 LM ¥ ¥ 0
A006 100 SM ¥ ¥ 0
A007 50 SM ¥ ¥ 0
A008 Repair existing concrete covering of the slab. 50 LM ¥ ¥ 0
A009 70 SM ¥ ¥ 0
A010 350 SM ¥ ¥ 0
A011 100 SM ¥ ¥ 0
A012 350 SM ¥ ¥ 0
A013 100 SM ¥ ¥ 0
A014 350 SM ¥ ¥ 0
Repair existing blister of asphalt roofing system.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (over
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (up to 300SM)
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "A"
EXHIBIT A Price for Ordering Period 1
DESCRIPTION
Remove existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Remove existing asbestos contained existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Cut and remove existing local deteriorated ashalt roofing system and repair them.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (over 300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A015 200 SM ¥ ¥ 0
A016 400 SM ¥ ¥ 0
A017 100 SM ¥ ¥ 0
A018 400 SM ¥ ¥ 0
A019 100 SM ¥ ¥ 0
A020 400 SM ¥ ¥ 0
A021 200 SM ¥ ¥ 0
A022 100 SM ¥ ¥ 0
A023 400 SM ¥ ¥ 0
A024 100 SM ¥ ¥ 0
A025 400 SM ¥ ¥ 0
A026 100 SM ¥ ¥ 0
A027 400 SM ¥ ¥ 0
A028 50 SM ¥ ¥ 0
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (up to 300SM)
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (over 300SM)
Provide new polymer modified bitumen roofing system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM).
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM).
Provide new urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to
300SM).
Provide new urethane membrane waterproof coating system on existing concrete surface (over 300SM).
Provide new urethane membrane waterproof coating system on existing riser surface.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A029 50 SM ¥ ¥ 0
A030 20 SM ¥ ¥ 0
A031 100 SM ¥ ¥ 0
A032 100 SM ¥ ¥ 0
A033 250 SM ¥ ¥ 0
A034 1,000 SM ¥ ¥ 0
A035 10 EA ¥ ¥ 0
A036 100 SM ¥ ¥ 0
A037 50 LM ¥ ¥ 0
A038 50 LM ¥ ¥ 0
A039 50 SM ¥ ¥ 0
A040 30 SM ¥ ¥ 0
A041 30 LM ¥ ¥ 0
A042 50 SM ¥ ¥ 0
A043 50 SM ¥ ¥ 0
A044 70 SM ¥ ¥ 0
Remove existing asphalt shingle roofing system and provide new asphalt shingle roofing system.
Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide new asphalt shingle roofing & asphalt roofing felt.
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (up to 300SM).
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (over 300SM).
Provide new polymer modified bitumen roofing system on steel surface of vent pipe.
Remove existing roof tile & asphalt roofing felt and provide new structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.
Provide new urethane membrane waterproof coating system on existing & new concrete structure and foundation surface.
Provide new mineral surfaced built‐up roofing for maintenance.
Remove existing sheet roofing and provide new synthetic polymer roofing system.
Remove existing sheet roofing and provide new synthetic polymer roofing system with new heat resistant rigid insulation board.
Remove existing fascia & gable wood board and provide new wood fascia & gable board.
Provide new 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.
Remove existing metal roof and provide new precoated galvanized metal roof.
Provide new precoated galvanized metal roof on existing metal roof.
Remove existing metal roof fascia & gable and provide new precoated galvanized metal fascia & gable.
Remove existing slate roofing system and provide new slate roofing system.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A045 100 LM ¥ ¥ 0
A046 10 EA ¥ ¥ 0
A047 5 EA ¥ ¥ 0
COPING :
A048 200 LM ¥ ¥ 0
A049 200 LM ¥ ¥ 0
A050 200 LM ¥ ¥ 0
FLASHING :
A051 100 LM ¥ ¥ 0
A052 100 LM ¥ ¥ 0
A053 100 LM ¥ ¥ 0
A054 50 LM ¥ ¥ 0
DRAIN :
A055 20 EA ¥ ¥ 0
A056 10 EA ¥ ¥ 0
Remove existing expansion joint filler & sealant and provide new.
Provide new stainless air ventilator pipe.
Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide new polymer modified bitumen roofing system around existing vent pipe with stainless tie band.
Remove existing aluminum coping and provide new aluminum coping.
Remove existing horizontal roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐cast strainer.
Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.
Remove existing aluminum coping temporarily and reinstall existing aluminum coping.
Remove existing aluminum expansion cover and provide new aluminum expantion cover.
Remove existing metal strap with sealant and provide new aluminum strap with sealant.
Remove existing aluminum strap or flashing with sealant and provide new aluminum frashing with sealant.
Remove existing metal flashing and provide new precoated galvanized frashing of roof edge.
Remove existing metal flashing and provide new aluminum or stainless steel flashing of roof edge.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A057 20 EA ¥ ¥ 0
A058 10 EA ¥ ¥ 0
A059 20 LM ¥ ¥ 0
A060 20 LM ¥ ¥ 0
A061 20 LM ¥ ¥ 0
A062 5 EA ¥ ¥ 0
A063 20 LM ¥ ¥ 0
A064 3 CM ¥ ¥ 0
A065 5 SM ¥ ¥ 0
A066 3 EA ¥ ¥ 0
A067 3 EA ¥ ¥ 0
A068 2 EA ¥ ¥ 0
A069 1 EA ¥ ¥ 0
Remove existing vertical roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐ cast strainer.
Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.
GUTTER AND DOWNSPOUT :
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(up to W=200)
Remove existing cement mortar and provide new waterproof cement mortar for existing concrete foundation.
Provide new raised concrete foundation.
(300x300~400x400x200H)
Provide new raised concrete foundation.
(400x400~600x600x300H)
Provide new raised concrete foundation. (over
600x600x300H)
Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti‐vibration rubber with new.
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(W=200~400)
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(over W=400)
Remove existing stainless mesh strainer in the gutter and provide new stainless mesh strainer.
Remove exisitng rain gutter & gurret hanger and provide new PVC gutter & stainless gutter hanger.
STEEL SUPPORT & FOUNDATION FOR MECH AND ELEC EQUIPMENT & PIPING :
Remove existing concrete foundation.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A070 10 EA ¥ ¥ 0
A071 10 EA ¥ ¥ 0
A072 10 EA ¥ ¥ 0
A073 10 EA ¥ ¥ 0
A074 10 EA ¥ ¥ 0
A075 10 EA ¥ ¥ 0
A076 5 EA ¥ ¥ 0
A077 5 EA ¥ ¥ 0
A078 20 LM ¥ ¥ 0
A079 20 LM ¥ ¥ 0
A080 500 SM ¥ ¥ 0
Remove existing electrical conductors and support materials for lightning protection and provide new ones to match existing.
Remove existing steel leg with concrete base and provide new steel leg support with isolation rubber sheet.
PAINTING :
Paint/Repaint exposed surface of new existing steel & wood surfaces.
Repaint exposed surface of existing lead based paint contained steel surfaces.
TEMPORARY WORK :
Erect and dismantle scaffolding.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or over
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ACM SAMPLING:
A081 1 EA ¥ ¥ 0
A082 1 EA ¥ ¥ 0
LBP SAMPLING:
A083 1 EA ¥ ¥ 0
A084 1 EA ¥ ¥ 0
A085 400 SM ¥ ¥ 0
A086 10 EA ¥ ¥ 0
A087 PCM air sampling and monitoring for asbestos/lead control 4 EA ¥ ¥ 0
A088 TEM air sampling and monitoring for asbestos/lead control. 4 EA ¥ ¥ 0
A089 Change room for asbestos/lead control area. 2 EA ¥ ¥ 0
A090 Disposal of ACM/LBP. 5 CM ¥ ¥ 0
MISCELLANEOUS
A091 4 EA ¥ ¥ 0
A092 4 EA ¥ ¥ 0
A093 3 EA ¥ ¥ 0
A094 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (A001 through A094) Not‐To‐Exceed ¥
Air, wipe and/or soil sampling and monitoring for asbestos/lead control area.
Asbestos sampling of existing roofing material.
Asbestos sampling of existing roofing material and request sampling analysis.
Lead based paint sampling of existing steel surface of roof.
Lead based paint sampling of existing steel surface of roof and request sampling analysis.
ACM/LBP ABATEMENT:
Temporary enclosure for asbestos/lead control area.
Other related miscellaneous work (must be negotiated at time of order).
Replace existing acrylic skylight with new. (600x600)
Replace existing acrylic skylight with new. (900x900)
Replace existing acrylic skylight with new. (1300x1300)
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
Abbreviations:
SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACM = Asbestos Containing Material, LBP = Lead Based Paint
W=width, H=height
ROOFING AND PAINTING SCHEDULE OF INDEFINITY QUANTITY WORK
Roofing and Exterior Painting IDIQ
Contract for Various Projects (Painting)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
A095 15,000 SM ¥ ¥ 0
A096 Prepare Lead‐free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
A097 2,500 SM ¥ ¥ 0
A098 200 SM ¥ ¥ 0
A099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
A100 500 LM ¥ ¥ 0
A101 200 SM ¥ ¥ 0
A102 150 SM ¥ ¥ 0
A103 300 SM ¥ ¥ 0
A104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
A105 250 LM ¥ ¥ 0
A106 150 LM ¥ ¥ 0
A107 200 LM ¥ ¥ 0
A108 150 LM ¥ ¥ 0
A109 200 LM ¥ ¥ 0
A110 150 LM ¥ ¥ 0
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating.
PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "A"
Repaint existing wooden beams and columns after surface preparation.
Repaint existing steel and galvanized steel framing/ box/ casing/ door/ window surfaces.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM >
DESCRIPTION
Prepare Lead‐free surfaces with water cleaning.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM <
EXHIBIT A Price for Ordering Period 1
Repaint existing steel and galvanized steel framing/ box/ casing/ door/ window surfaces with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
Repaint existing wooden framing/ box/ casing/ base board/ door/ window surfaces.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A111 100 LM ¥ ¥ 0
A112 50 LM ¥ ¥ 0
A113 350 LM ¥ ¥ 0
A114 2,000 SM ¥ ¥ 0
A115 250 SM ¥ ¥ 0
A116 2,000 SM ¥ ¥ 0
A117 250 SM ¥ ¥ 0
A118 2,000 SM ¥ ¥ 0
A119 250 SM ¥ ¥ 0
A120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
A121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
A122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
A123 Repaint existing non‐slip coating. 400 SM ¥ ¥ 0
A124 Repaint existing built‐up roofing. 500 SM ¥ ¥ 0
A125 Provide rubber type multi‐layer coating system. 300 SM ¥ ¥ 0
A126 50 SM ¥ ¥ 0
A127 50 SM ¥ ¥ 0
A128 Repair spalling. 50 SM ¥ ¥ 0
A129 Repair crack with U‐cut. 1,000 LM ¥ ¥ 0
A130 Replace existing non‐ACB with new. 250 SM ¥ ¥ 0
A131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating.
Repaint existing PVC gutter/ downspout surfaces after surface preparation.
Remove existing cement mortar, and provide waterproof cement mortar.
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM <
Repaint existing multi‐layer coating surfaces with top coating. 300SM >
Repaint existing multi‐layer coating surfaces with top coating. 300SM <
Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM >
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A132 500 SM ¥ ¥ 0
A133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
A134 Provide new building number sign. 20 EA ¥ ¥ 0
A135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
A136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
A137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
A138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
A139 Remove existing building signs. 50 EA ¥ ¥ 0
A140 1,500 LM ¥ ¥ 0
A141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
A142 10 CM ¥ ¥ 0
A143 Replace damaged wooden column and beams. 2 CM ¥ ¥ 0
A144 Replace PVC gutter/ downspout with new. 150 LM ¥ ¥ 0
A145 Replace damaged polycarbonate roofing. 10 EA ¥ ¥ 0
A146 20 SM ¥ ¥ 0
A147 20 EA ¥ ¥ 0
A148 100 EA ¥ ¥ 0
A149 Replace existing ACB with new non‐ACB. 200 SM ¥ ¥ 0
A150 20 EA ¥ ¥ 0
A151 Lead‐containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
A152 Lead‐containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
A153 400 SM ¥ ¥ 0
A154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
A155 25 EA ¥ ¥ 0
A156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
A157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
Air, wipe and/or soil sampling and monitoring for lead control area.
Asbestos‐containing surface preparation with solvent cleaning.
Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
Replace existing acrylic lighting fixture covers with new.
Replace existing glass pane in door or window with new.
Replace existing wooden framing/ casing/ trim/ baseboard with new.
Replace existing sealants for windows/ doors with new.
Replace existing galvanized steel sheet/ FRP with new.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
A158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
A159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
A160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
A161 10 EA ¥ ¥ 0
A162 10 EA ¥ ¥ 0
A163 10 EA ¥ ¥ 0
A164 Provide gondola lift. 10 EA ¥ ¥ 0
A165 Provide scaffolding. 9,000 SM ¥ ¥ 0
A166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
A167 50 EA ¥ ¥ 0
A168 50 EA ¥ ¥ 0
A169 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (A095 through A169) Not‐To‐Exceed ¥
Abbreviations:
Other related miscellaneous work (must be negotiated at time of order).
EST AMT = Estimated Amount, EST QTY = Estimated
Quantity, SM = Square Meter, LM = Linear Meter, CM
Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos
Cement Board, PCM = Phase Contrast Microscopy, TEM =
Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction
Work
Asbestos sampling of existing material and request sampling analysis.
Lead based paint sampling of existing steel surfaces of material.
Lead based paint sampling of existing steel surfaces of material and request sampling analysis.
Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
ROOFING AND PAINTING SCHDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
ROOF :
B001 400 SM ¥ ¥ 0
B002 Remove existing insulation board. 400 SM ¥ ¥ 0
B003 400 SM ¥ ¥ 0
B004 Clean up existing built‐up roofing surface by waterblasting. 1,000 SM ¥ ¥ 0
B005 Clean up existing gutter surface by waterblasting. 200 LM ¥ ¥ 0
B006 100 SM ¥ ¥ 0
B007 50 SM ¥ ¥ 0
B008 Repair existing concrete covering of the slab. 50 LM ¥ ¥ 0
B009 70 SM ¥ ¥ 0
B010 350 SM ¥ ¥ 0
B011 100 SM ¥ ¥ 0
B012 350 SM ¥ ¥ 0
B013 100 SM ¥ ¥ 0
B014 350 SM ¥ ¥ 0
Repair existing blister of asphalt roofing system.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (over
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (up to 300SM)
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "B"
EXHIBIT B Price for Ordering Period 2
DESCRIPTION
Remove existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Remove existing asbestos contained existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Cut and remove existing local deteriorated ashalt roofing system and repair them.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (over 300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B015 200 SM ¥ ¥ 0
B016 400 SM ¥ ¥ 0
B017 100 SM ¥ ¥ 0
B018 400 SM ¥ ¥ 0
B019 100 SM ¥ ¥ 0
B020 400 SM ¥ ¥ 0
B021 200 SM ¥ ¥ 0
B022 100 SM ¥ ¥ 0
B023 400 SM ¥ ¥ 0
B024 100 SM ¥ ¥ 0
B025 400 SM ¥ ¥ 0
B026 100 SM ¥ ¥ 0
B027 400 SM ¥ ¥ 0
B028 50 SM ¥ ¥ 0
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (up to 300SM)
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (over 300SM)
Provide new polymer modified bitumen roofing system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM).
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (over 300SM).
Provide new urethane membrane waterproof coating system on existing concrete slab or concrete cover (up to
300SM).
Provide new urethane membrane waterproof coating system on existing concrete surface (over 300SM).
Provide new urethane membrane waterproof coating system on existing riser surface.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B029 50 SM ¥ ¥ 0
B030 20 SM ¥ ¥ 0
B031 100 SM ¥ ¥ 0
B032 100 SM ¥ ¥ 0
B033 250 SM ¥ ¥ 0
B034 1,000 SM ¥ ¥ 0
B035 10 EA ¥ ¥ 0
B036 100 SM ¥ ¥ 0
B037 50 LM ¥ ¥ 0
B038 50 LM ¥ ¥ 0
B039 50 SM ¥ ¥ 0
B040 30 SM ¥ ¥ 0
B041 30 LM ¥ ¥ 0
B042 50 SM ¥ ¥ 0
B043 50 SM ¥ ¥ 0
B044 70 SM ¥ ¥ 0
Remove existing asphalt shingle roofing system and provide new asphalt shingle roofing system.
Remove existing asbestos contained asphalt shingle roofing & asphalt roofing felt and provide new asphalt shingle roofing & asphalt roofing felt.
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (up to 300SM).
Apply heat resistant coating on existing mineral surfaced built‐up roofing or urethane membrane waterproof coating surface (over 300SM).
Provide new polymer modified bitumen roofing system on steel surface of vent pipe.
Remove existing roof tile & asphalt roofing felt and provide new structural plywood, asphalt roofing felt and roof tile on existing sheathing roof board.
Provide new urethane membrane waterproof coating system on existing & new concrete structure and foundation surface.
Provide new mineral surfaced built‐up roofing for maintenance.
Remove existing sheet roofing and provide new synthetic polymer roofing system.
Remove existing sheet roofing and provide new synthetic polymer roofing system with new heat resistant rigid insulation board.
Remove existing fascia & gable wood board and provide new wood fascia & gable board.
Provide new 0.6 thk precoated galvanized metal sheet on the existing fascia & gable board.
Remove existing metal roof and provide new precoated galvanized metal roof.
Provide new precoated galvanized metal roof on existing metal roof.
Remove existing metal roof fascia & gable and provide new precoated galvanized metal fascia & gable.
Remove existing slate roofing system and provide new slate roofing system.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B045 100 LM ¥ ¥ 0
B046 10 EA ¥ ¥ 0
B047 5 EA ¥ ¥ 0
COPING :
B048 200 LM ¥ ¥ 0
B049 200 LM ¥ ¥ 0
B050 200 LM ¥ ¥ 0
FLASHING :
B051 100 LM ¥ ¥ 0
B052 100 LM ¥ ¥ 0
B053 100 LM ¥ ¥ 0
B054 50 LM ¥ ¥ 0
DRAIN :
B055 20 EA ¥ ¥ 0
B056 10 EA ¥ ¥ 0
Remove existing expansion joint filler & sealant and provide new.
Provide new stainless air ventilator pipe.
Remove existing cement mortar cover and/or various sheet waterproof for existing vent pipe and provide new polymer modified bitumen roofing system around existing vent pipe with stainless tie band.
Remove existing aluminum coping and provide new aluminum coping.
Remove existing horizontal roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐cast strainer.
Remove existing horizontal roof drain strainer with clamping base temporarily. Clean/repaint existing roof drain, strainer and clamping base and reinstall them.
Remove existing aluminum coping temporarily and reinstall existing aluminum coping.
Remove existing aluminum expansion cover and provide new aluminum expantion cover.
Remove existing metal strap with sealant and provide new aluminum strap with sealant.
Remove existing aluminum strap or flashing with sealant and provide new aluminum frashing with sealant.
Remove existing metal flashing and provide new precoated galvanized frashing of roof edge.
Remove existing metal flashing and provide new aluminum or stainless steel flashing of roof edge.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B057 20 EA ¥ ¥ 0
B058 10 EA ¥ ¥ 0
B059 20 LM ¥ ¥ 0
B060 20 LM ¥ ¥ 0
B061 20 LM ¥ ¥ 0
B062 5 EA ¥ ¥ 0
B063 20 LM ¥ ¥ 0
B064 3 CM ¥ ¥ 0
B065 5 SM ¥ ¥ 0
B066 3 EA ¥ ¥ 0
B067 3 EA ¥ ¥ 0
B068 2 EA ¥ ¥ 0
B069 1 EA ¥ ¥ 0
Remove existing vertical roof drain strainer with clamping base and provide new copper roof drain and aluminum die‐ cast strainer.
Remove existing vertical roof drain strainer with clamping base temporarily. and clean/repaint existing roof drain, strainer and clamping base and reinstall them.
GUTTER AND DOWNSPOUT :
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(up to W=200)
Remove existing cement mortar and provide new waterproof cement mortar for existing concrete foundation.
Provide new raised concrete foundation.
(300x300~400x400x200H)
Provide new raised concrete foundation.
(400x400~600x600x300H)
Provide new raised concrete foundation. (over
600x600x300H)
Remove temporarily and reinstall existing mechanical equipment (various capacity A/C outside unit) and concrete block base. Replace existing rubber sheet and anti‐vibration rubber with new.
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(W=200~400)
Provide new urethane membrane waterproof coating system on existing cement mortar surface of roof gutter.
(over W=400)
Remove existing stainless mesh strainer in the gutter and provide new stainless mesh strainer.
Remove exisitng rain gutter & gurret hanger and provide new PVC gutter & stainless gutter hanger.
STEEL SUPPORT & FOUNDATION FOR MECH AND ELEC EQUIPMENT & PIPING :
Remove existing concrete foundation.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B070 10 EA ¥ ¥ 0
B071 10 EA ¥ ¥ 0
B072 10 EA ¥ ¥ 0
B073 10 EA ¥ ¥ 0
B074 10 EA ¥ ¥ 0
B075 10 EA ¥ ¥ 0
B076 5 EA ¥ ¥ 0
B077 5 EA ¥ ¥ 0
B078 20 LM ¥ ¥ 0
B079 20 LM ¥ ¥ 0
B080 500 SM ¥ ¥ 0
Remove existing electrical conductors and support materials for lightning protection and provide new ones to match existing.
Remove existing steel leg with concrete base and provide new steel leg support with isolation rubber sheet.
PAINTING :
Paint/Repaint exposed surface of new existing steel & wood surfaces.
Repaint exposed surface of existing lead based paint contained steel surfaces.
TEMPORARY WORK :
Erect and dismantle scaffolding.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing isolation rubber sheet with new.
Cut and weld existing steel leg (up to 40x40 angle or up to
40x75 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (up to 75x75 angle or up to
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
Cut and weld existing steel leg (over 75x75 angle or over
65x125 channel) of steel pipe support for mechanical pipe lines (including associated works). Replace existing existing concrete base and isolation rubber sheet with new.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ACM SAMPLING:
B081 1 EA ¥ ¥ 0
B082 1 EA ¥ ¥ 0
LBP SAMPLING:
B083 1 EA ¥ ¥ 0
B084 1 EA ¥ ¥ 0
B085 400 SM ¥ ¥ 0
B086 10 EA ¥ ¥ 0
B087 PCM air sampling and monitoring for asbestos/lead control 4 EA ¥ ¥ 0
B088 TEM air sampling and monitoring for asbestos/lead control. 4 EA ¥ ¥ 0
B089 Change room for asbestos/lead control area. 2 EA ¥ ¥ 0
B090 Disposal of ACM/LBP. 5 CM ¥ ¥ 0
MISCELLANEOUS
B091 4 EA ¥ ¥ 0
B092 4 EA ¥ ¥ 0
B093 3 EA ¥ ¥ 0
B094 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (B001 through B094) Not‐To‐Exceed ¥
Asbestos sampling of existing roofing material.
Asbestos sampling of existing roofing material and request sampling analysis.
Lead based paint sampling of existing steel surface of roof.
Lead based paint sampling of existing steel surface of roof and request sampling analysis.
ACM/LBP ABATEMENT:
Temporary enclosure for asbestos/lead control area.
Air, wipe and/or soil sampling and monitoring for asbestos/lead control area.
Replace existing acrylic skylight with new. (600x600)
Replace existing acrylic skylight with new. (900x900)
Replace existing acrylic skylight with new. (1300x1300)
Other related miscellaneous work (must be negotiated at time of order).
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
Abbreviations:
SM = Square Meter, LM = Linear Meter, CM Cubic Meter, EA = Each, LS = Lump Sum, ACM = Asbestos Containing Material, LBP = Lead Based Paint
W=width, H=height
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
B095 15,000 SM ¥ ¥ 0
B096 Prepare Lead‐free surfaces with SSPCW type 3. 2,000 SM ¥ ¥ 0
B097 2,500 SM ¥ ¥ 0
B098 200 SM ¥ ¥ 0
B099 Repaint existing wooden siding and board surfaces. 500 SM ¥ ¥ 0
B100 500 LM ¥ ¥ 0
B101 200 SM ¥ ¥ 0
B102 150 SM ¥ ¥ 0
B103 300 SM ¥ ¥ 0
B104 Repaint existing aluminum panel surfaces. 500 SM ¥ ¥ 0
B105 250 LM ¥ ¥ 0
B106 150 LM ¥ ¥ 0
B107 200 LM ¥ ¥ 0
B108 150 LM ¥ ¥ 0
B109 200 LM ¥ ¥ 0
B110 150 LM ¥ ¥ 0
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter with polyurethane type coating.
PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "B"
EXHIBIT B Price for Ordering Period 2
DESCRIPTION
Prepare Lead‐free surfaces with water cleaning.
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM >
Repaint existing steel and galvanized steel siding/ roof/ wall surfaces. 300SM <
Repaint existing wooden beams and columns after surface preparation.
Repaint existing steel and galvanized steel framing/ box/ casing/ door/ window surfaces.
Repaint existing steel and galvanized steel framing/ box/ casing/ door/ window surfaces with polyurethane type coating.
Repaint existing wooden framing/ box/ casing/ base board/ door/ window surfaces.
Repaint existing steel and galvanized steel pipe surfaces, up to 50 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 150 mm outside diameter with polyurethane type coating.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, up to 300 mm outside diameter with polyurethane type coating.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B111 100 LM ¥ ¥ 0
B112 50 LM ¥ ¥ 0
B113 350 LM ¥ ¥ 0
B114 2,000 SM ¥ ¥ 0
B115 250 SM ¥ ¥ 0
B116 2,000 SM ¥ ¥ 0
B117 250 SM ¥ ¥ 0
B118 2,000 SM ¥ ¥ 0
B119 250 SM ¥ ¥ 0
B120 Repaint existing building numbers and unit number text. 25 EA ¥ ¥ 0
B121 Repaint letters, unit: continuous letters (one word)/ EA. 100 EA ¥ ¥ 0
B122 Repaint existing ACB/Cement board surfaces. 50 SM ¥ ¥ 0
B123 Repaint existing non‐slip coating. 400 SM ¥ ¥ 0
B124 Repaint existing built‐up roofing. 500 SM ¥ ¥ 0
B125 Provide rubber type multi‐layer coating system. 300 SM ¥ ¥ 0
B126 50 SM ¥ ¥ 0
B127 50 SM ¥ ¥ 0
B128 Repair spalling. 50 SM ¥ ¥ 0
B129 Repair crack with U‐cut. 1,000 LM ¥ ¥ 0
B130 Replace existing non‐ACB with new. 250 SM ¥ ¥ 0
B131 Replace existing metal flashing with new. 500 LM ¥ ¥ 0
Repaint existing multi‐layer coating surfaces with top coating. 300SM >
Repaint existing steel and galvanized steel pipe surfaces, up to 600 mm outside diameter.
Repaint existing steel and galvanized steel pipe surfaces, over 600 mm outside diameter with polyurethane type coating.
Repaint existing PVC gutter/ downspout surfaces after surface preparation.
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM >
Repaint existing concrete, concrete masonary unit(CMU), and cement mortar surfaces. 300SM <
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM >
Repaint existing multi‐layer coating surfaces with rubber type top coating. 300SM <
Repaint existing multi‐layer coating surfaces with top coating. 300SM <
Provide waterproof urethane type floor coating on concrete and cement mortar surfaces.
Remove existing cement mortar, and provide waterproof cement mortar.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B132 500 SM ¥ ¥ 0
B133 Replace existing plastic vent cover with aluminum air vent. 20 EA ¥ ¥ 0
B134 Provide new building number sign. 20 EA ¥ ¥ 0
B135 Provide new building identification signs (H=610). 100 EA ¥ ¥ 0
B136 Provide new building identification signs (H=457). 100 EA ¥ ¥ 0
B137 Provide new building identification signs (H=305). 100 EA ¥ ¥ 0
B138 Provide illuminated signs with Electrical work. 30 EA ¥ ¥ 0
B139 Remove existing building signs. 50 EA ¥ ¥ 0
B140 1,500 LM ¥ ¥ 0
B141 Replace existing joint sealants with new. 1,000 LM ¥ ¥ 0
B142 10 CM ¥ ¥ 0
B143 Replace damaged wooden column and beams. 2 CM ¥ ¥ 0
B144 Replace PVC gutter/ downspout with new. 150 LM ¥ ¥ 0
B145 Replace damaged polycarbonate roofing. 10 EA ¥ ¥ 0
B146 20 SM ¥ ¥ 0
B147 20 EA ¥ ¥ 0
B148 100 EA ¥ ¥ 0
B149 Replace existing ACB with new non‐ACB. 200 SM ¥ ¥ 0
B150 20 EA ¥ ¥ 0
B151 Lead‐containing surface preparation with SSPCW type 3. 200 SM ¥ ¥ 0
B152 Lead‐containing surface preparation with solvent cleaning. 200 SM ¥ ¥ 0
B153 400 SM ¥ ¥ 0
B154 Temporary enclosure for lead/ asbestos control area. 800 SM ¥ ¥ 0
B155 25 EA ¥ ¥ 0
B156 PCM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
B157 TEM air sampling and monitoring for asbestos control. 25 EA ¥ ¥ 0
Patch repair hole of steel and galvanized steel with galvanized steel sheet, Unit: up to 0.05 SM hole/EA.
Patch repair hole of ACB with galvanized steel sheet/FRP, Unit: Up to 0.50 SM hole/EA.
Asbestos‐containing surface preparation with solvent cleaning.
Replace existing galvanized steel sheet/ FRP with new.
Replace existing sealants for windows/ doors with new.
Replace existing wooden framing/ casing/ trim/ baseboard with new.
Replace existing glass pane in door or window with new.
Replace existing acrylic lighting fixture covers with new.
Air, wipe and/or soil sampling and monitoring for lead control area.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
B158 Change room for lead/ asbestos control area. 10 EA ¥ ¥ 0
B159 Disposal of LBP/ACM. 5 CM ¥ ¥ 0
B160 Asbestos sampling of existing material. 10 EA ¥ ¥ 0
B161 10 EA ¥ ¥ 0
B162 10 EA ¥ ¥ 0
B163 10 EA ¥ ¥ 0
B164 Provide gondola lift. 10 EA ¥ ¥ 0
B165 Provide scaffolding. 9,000 SM ¥ ¥ 0
B166 Provide safety baricade and safety sign. 2,000 LM ¥ ¥ 0
B167 50 EA ¥ ¥ 0
B168 50 EA ¥ ¥ 0
B169 1 LS ¥ ¥ 10,000,000
(Not‐to‐exceed)
TOTAL (B095 through B169) Not‐To‐Exceed ¥
Abbreviations:
Lead based paint sampling of existing steel surfaces of material and request sampling analysis.
Remove and reinstall pigeon net, Unit: Up to 16 SM of opening size/EA.
Remove and reinstall window guard, Unit: Up to 2 SM of guard size/EA.
EST AMT = Estimated Amount, EST QTY = Estimated
Quantity, SM = Square Meter, LM = Linear Meter, CM
Cubic Meter, EA = Each, LS = Lump Sum, ACB = Asbestos
Cement Board, PCM = Phase Contrast Microscopy, TEM =
Transmission Electron Microscopy, LBP = Lead Based Paint, ACM = Asbestos Contain Material, H = Hight, W = Width, SSPCW = Standard Specifications for Public Construction
Work
Other related miscellaneous work (must be negotiated at time of order).
Asbestos sampling of existing material and request sampling analysis.
Lead based paint sampling of existing steel surfaces of material.
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
ITEM EST UT UNIT EST AMT
NO QTY PRICE TOTAL
ROOF :
C001 400 SM ¥ ¥ 0
C002 Remove existing insulation board. 400 SM ¥ ¥ 0
C003 400 SM ¥ ¥ 0
C004 Clean up existing built‐up roofing surface by waterblasting. 1,000 SM ¥ ¥ 0
C005 Clean up existing gutter surface by waterblasting. 200 LM ¥ ¥ 0
C006 100 SM ¥ ¥ 0
C007 50 SM ¥ ¥ 0
C008 Repair existing concrete covering of the slab. 50 LM ¥ ¥ 0
C009 70 SM ¥ ¥ 0
C010 350 SM ¥ ¥ 0
C011 100 SM ¥ ¥ 0
C012 350 SM ¥ ¥ 0
C013 100 SM ¥ ¥ 0
C014 350 SM ¥ ¥ 0
Repair existing blister of asphalt roofing system.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing urethane membrane waterproof coating. (over
300SM)
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (up to 300SM)
ROOFING SCHEDULE OF INDEFINITE QUANTITY WORK ‐ "C"
EXHIBIT C Price for Ordering Period 3
DESCRIPTION
Remove existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Remove existing asbestos contained existing mineral surfaced built‐up roofing, various sheet waterproof and urethane waterproof coating.
Cut and remove existing local deteriorated ashalt roofing system and repair them.
Provide new polymer modified bitumen roofing system with new heat resistant rigid urethane insulation board on existing concrete slab or concrete covering. (over 300SM)
ROOFING AND PAINTING SCHEDULE OF INDEFINITE QUANTITY WORK
ROOFING AND PAINTING SCHEDULE OF INDEFINITE
QUANTITY WORK
C015 200 SM ¥ ¥ 0
C016 400 SM ¥ ¥ 0
C017 100 SM ¥ ¥ 0
C018 400 SM ¥ ¥ 0
C019 100 SM ¥ ¥ 0
C020 400 SM ¥ ¥ 0
C021 200 SM ¥ ¥ 0
C022 100 SM ¥ ¥ 0
C023 400 SM ¥ ¥ 0
C024 100 SM ¥ ¥ 0
C025 400 SM ¥ ¥ 0
C026 100 SM ¥ ¥ 0
C027 400 SM ¥ ¥ 0
C028 50 SM ¥ ¥ 0
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (up to 300SM)
Provide new polymer modified bitumen roofing system on concrete slab or concrete cover. (over 300SM)
Provide new polymer modified bitumen roofing system on existing riser surface.
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new urethane membrane waterproof coating system on existing mineral surfaced built‐up roofing. (over
300SM)
Provide new urethane membrane waterproof coating system on existing urethane membrane waterproof coating (up to 300SM).
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (up to 300SM)
Provide new polymer modified bitumen roofing system on existing mineral surfaced built‐up roofing. (over 300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (up to
300SM)
Provide new polymer modified bitumen roofing system on existing urethane membrane waterproof coating. (over
300SM)
Provide new urethane…