This sources sought notice requests information from contractors interested in providing preventive maintenance and service orders for heating, ventilating, and air conditioning systems at various locations in the United States Naval Installations at Kanto Plain, Japan. The scope of work includes recurring preventive maintenance programs, non-recurring task work, and unit priced service orders. Interested parties should respond with their technical qualifications and pricing by July 31, 2020. The Naval Facilities Engineering Command will use the responses to determine whether to issue a solicitation for a new multiple-award contract to begin in 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-B

SCHEDULE OF PRICE
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide PM program Services for a period of one year.
From 1 September 2020 through 31 March 2021.
Item 0002Non-Recurring, Base Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.(NTE)
From 1 September 2020 through 31 March 2021.
Item 0003Recurring, First Option Period1LS¥
Provide PM program Services for a period of one year.
From 1 April 2021 through 31 March 2022.
Item 0004Non-Recurring, First Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.(NTE)
From 1 April 2021 through 31 March 2022.
Item 0005Recurring, Second Option Period1LS¥
Provide PM program Services for a period of one year.
From 1 April 2022 through 31 March 2023.
Item 0006Non-Recurring, Second Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.(NTE)
From 1 April 2022 through 31 March 2023.
Item 0007Recurring, Third Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.
From 1 April 2023 through 31 March 2024.
Item 0008Non-Recurring, Third Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.(NTE)
From 1 April 2023 through 31 March 2024.
Item 0009Recurring, Fourth Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.
From 1 April 2024 through 31 March 2025.
Item 0010Non-Recurring, Fourth Option Period1LS¥
Provide Unit Priced Task Work upon receipt of a Task Order.(NTE)
From 1 April 2024 through 31 March 2025.
TOTAL: (LINE ITEM 0001 through 0010)¥
CLIN 9000Exhibit A (Base Period)
CLIN 9001Exhibit B (First Option Period)
CLIN 9002Exhibit C (Second Option Period)
CLIN 9003Exhibit D (Third Option Period)
CLIN 9004Exhibit E (Fourth Option Period)
NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.
Detail line items for task order is located in Attachment J-0200000-07
CLIN = CONTRACT LINE ITEM, LS = LUMP SUM, NTE = NOT-TO-EXCEED
Q'TY = QUANTITY
If you will use below comments for GE, Print area should be chainge.
Note:GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement.

&CB-&P

B-F

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring - Base Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs A001 through A007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalPROPOSALTO GE
A001CNIC
A001-01CNIC CFAY PORTION
A001-01-01NDK-100134
A001-01-01-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-01-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-01-03Scheduled Repair Work for Other HVAC System1LS¥¥0.0%
A001-01-01-04Service Order Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
MDK-100134 Total, A001-01-01¥0.0%
A001-01-02YSK-5229
A001-01-02-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-02-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-02-03Service Order Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-5229 Total, A001-01-02¥0.0%
A001-01-03YSK-2046
A001-01-03-01Monthly Scheduled PM Work for Automatic Control System Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
A001-01-03-02Annual PM Work for Inverter1LS¥¥0.0%
A001-01-03-03Service Order Work7MO¥¥0.0%
YSK-2046 Total, A001-01-03¥0.0%
A001-01-04YSK-3816
A001-01-04-01Quarterly PM Work for Dust Collection System Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-01-04-02Quarterly PM Work for Engine Exhaust Removal System Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-01-04-03Annual PM Work for Engine Exhaust Removal System Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-04-04Service Order Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-3816 Total, A001-01-04¥0.0%
A001-01-05YSK-1558
A001-01-05-01Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-05-02Service Order Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1558 Total, A001-01-05¥0.0%
A001-01-06YSK-3387
A001-01-06-01Monthly On-season Cleaning Work for Cooling Tower Starting from 1 Sep 2020 to 31 Mar 20213MO¥¥0.0%
A001-01-06-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-01-06-03Annual PM Work Starting from 1 Sep 2020 to 31 Mar 2021 (Exception of Absorption Chiller Unit)1LS¥¥0.0%
A001-01-06-04Service Order Work7MO¥¥0.0%
YSK-3387 Total, A001-01-06¥0.0%
A001-01-07YSK-4807
A001-01-07-01Semiannual PM Work Starting from from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-07-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-07-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-4807 Total, A001-01-07¥0.0%
A001-01-08YSK-1942
A001-01-08-01Monthly On-season Cleaning Work for Cooling Tower Starting from 1 Sep 2020 to 31 Mar 20213MO¥¥0.0%
A001-01-08-02Cooling Season-off PM Work for Screw Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-08-03Annual PM Work for Screw Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-08-04Quarterly PM Work Starting from1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-01-08-05Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-08-06Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-08-07Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1942 Total, A001-01-08¥0.0%
A001-01-09YSK-1555
A001-01-09-01Scheduled Repair Work for Absorption Chiller (Base)1LS¥¥0.0%
A001-01-09-02Service Order7MO¥¥0.0%
YSK-1555 Total, A001-01-09¥0.0%
A001-01-10YSK-1997
A001-01-10-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A001-01-10-02Service Order7MO¥¥0.0%
YSK-1997 Total, A001-01-10¥0.0%
A001-01-11NDK-100137
A001-01-11-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-01-11-02Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥
NDK-100137 Total, A001-11¥0.0%
A001-01-12YSK-1516 (#9 TOWER)
A001-01-12-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A001-01-12-02Service Order7MO¥¥0.0%
YSK-1516 (#9 TOWER) Total, A001-01-12¥0.0%
CNIC CFAY Total, A001-01¥ -0.0%
A001-02CNIC-NAVFAC PORTION
A001-02-01YSK-4364
A001-02-01-01Scheduled Repair Work for Absorption Chiller (Base)1LS¥¥0.0%
A001-02-01-02Service Order7MO¥¥0.0%
YSK-4364 Total, A001-02-01¥0.0%
A001-02-02YSK-1938
A001-02-02-01Monthly Summer Season Cleaning Work Starting from 1 Sep 2020 to 31 Mar 20213LS¥¥0.0%
A001-02-02-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-02-02-03Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-02-02-04Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1938 Total, A001-02-02¥0.0%
CNIC NAVFAC Total, A001-02¥ -0.0%
A001-03CNIC-PSEFA PORTION
A001-03-01YSK-F69
A001-03-01-01Quarterly PM Work for Air Cooled Module Chiller (C-2) Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-03-01-02Scheduled Repair Work for Air Cooled Module Chiller (C-1, Base)1LS¥¥0.0%
A001-03-01-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-F69 Total, A001-01-01¥0.0%
CNIC PSEFA Total, A001-03¥ -0.0%
A001-04CNIC-SRF PORTION
A001-04-01YSK-A17
A001-04-01-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-01-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-01-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A17 Total, A001-04-01¥0.0%
A001-04-02YSK-A37
A001-04-02-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-02-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-02-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A37 Total, A001-04-02¥0.0%
A001-04-03YSK-A40
A001-04-03-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-03-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-03-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A40 Total, A001-04-03¥0.0%
A001-04-04YSK-A46
A001-04-04-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-04-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-04-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A46 Total, A001-04-04¥0.0%
A001-04-05YSK-A47
A001-04-05-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-05-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-05-03Once Three (3) Years Replacment Work of Parts for FDC-2 Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-05-04Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A47 Total, A001-04-05¥0.0%
A001-04-06YSK-A48
A001-06-06-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-06-06-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-06-06-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A48 Total, A001-04-06¥0.0%
A001-04-07YSK-A61
A001-04-07-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-07-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-07-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A61 Total, A001-04-07¥0.0%
A001-04-08YSK-A82
A001-04-08-01Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-08-02Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-A82 Total, A001-04-08¥0.0%
A001-04-09YSK-1649
A001-04-09-01Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-09-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1649 Total, A001-04-09¥0.0%
A001-04-10YSK-1922
A001-04-10-01Monthly On-season Cleaning Work for Cooling Tower Starting from 1 Sep 2020 to 31 Mar 20213MO¥¥0.0%
A001-04-10-02Quarterly PM PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-04-10-03Cooling Season-off PM Work for Screw Ciller Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-10-04Annual PM Work for Screw Ciller Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-10-05Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-04-10-06Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-10-07Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1922 Total, A001-04-10¥0.0%
A001-04-11YSK-2043
A001-04-11-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A001-04-11-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-11-03Annual PM Work Starting from 1 Sep 2020 to 31 Mar 2021 (Exception of Absorption Chiller Unit)1LS¥¥0.0%
A001-04-11-04Inicial Repair Work for Draft Chambers Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-11-05Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-2043 Total, A001-04-11¥0.0%
A001-04-12YSK-2053
A001-04-12-01Monthly On-season Cleaning Work for Cooling Tower Starting from 1 Sep 2020 to 31 Mar 20213MO¥¥0.0%
A001-04-12-02Cooling Season-off PM Work for Screw Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-12-03Annual PM Work for Screw Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-12-04Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-12-05Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-12-06Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-2053 Total, A001-04-12¥0.0%
A001-04-13YSK-2067
A001-04-13-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-13-02Annual PM Work Starting from to 31 Mar 20211LS¥¥0.0%
A001-04-13-03Once three (3) Years Replacement Work of parts for FE-19, 20 & FS-51LS¥¥0.0%
A001-04-13-04Quartely PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-04-13-05Service Order Starting from to 31 Mar 20217MO¥¥0.0%
YSK-2067 Total, A001-04-13¥0.0%
A001-04-14YSK-2068
A001-04-14-01Monthly On-season Cleaning Work for Cooling Tower Starting from 1 Sep 2020 to 31 Mar 20213MO¥¥0.0%
A001-04-14-02Scheduled Repair Work for Absorption Chiller Unit1LS¥¥0.0%
A001-04-14-03Quarterly PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A001-04-14-04Semiannual PM Work1LS¥¥0.0%
A001-04-14-05Annual PM Work (Exception of Absorption Chiller Unit) Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-14-06Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-2068 Total, A001-04-14¥0.0%
A001-04-15YSK-2078
A001-04-15-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-15-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-04-15-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-2078 Total, A001-04-15¥0.0%
CNIC SRF Total, A001-04¥
A001-05CNIC MWR CATEGORY A PORTION
A001-05-01YSK-3008
A001-05-01-01Scheduled Repair Work for Absorption Chiller Unit (Base)2LS¥¥0.0%
A001-05-01-02Service Order7MO¥¥0.0%
YSK-3008 Total, A001-05-01¥0.0%
A001-05-02YSK-3354
A001-05-02-01Biennial PM Work for Absorption Chiller2LS¥¥0.0%
A001-05-02-02Scheduled Repair Work for Absorption Chiller (RA-2)1LS¥¥0.0%
A001-05-02-03Service Order7MO¥¥0.0%
YSK-3354 Total, A001-05-02¥0.0%
A001-05-03YSK-3365
A001-05-03-01Scheduled Repair Work for Absorption Chiller (Base)1LS¥¥0.0%
A001-05-03-02Service Order7MO¥¥0.0%
YSK-3365 Total, A001-05-03¥0.0%
CNIC MWR CATEGORY A Total, A001-05¥ -0.0%
A001-06CNIC MWR CATEGORY C PORTION
A001-06-01YSK-1493
A001-06-01-01Scheduled Repair Work for Water Cooled Screw Chiller Unit1LS¥¥0.0%
A001-06-01-02Service Order7MO¥¥0.0%
YSK-1493 Total, A001-06-01¥0.0%
MWR CATEGORY C Total, A001-06¥ -0.0%
A001-07CNIC MWR OTHER NAF PORTION
A001-07-01YSK-3316
A001-07-01-01Scheduled Repair Work for Absorption Chiller Unit1LS¥¥0.0%
A001-07-01-02Service Order7MO¥¥0.0%
YSK-3316 Total, A001-07-01¥0.0%
A001-07-02YSK-H20
A001-07-02-01Scheduled Repair Work for Absorption Chiller (Base)1LS¥¥0.0%
A001-07-02-02Service Order7MO¥¥0.0%
YSK-H20 Total, A001-07-02¥0.0%
A001-07-03YSK-4849 (Cold Storage)
A001-07-03-01Scheduled Repair Work for Chiller (Base)1LS¥¥0.0%
A001-07-03-02Service Order7MO¥¥0.0%
YSK-4849 Total, A001-07-03¥0.0%
A001-07-04YSK-1390 (Cold Storage)
A001-07-04-01Scheduled Repair Work for Chiller (Base)1LS¥¥0.0%
A001-07-04-02Service Order7MO¥¥0.0%
YSK-1390 Total, A001-07-04¥0.0%
MWR OTHER NAF PORTION Total, A001-07¥ -0.0%
A001-08CNIC NEX PORTION
A001-08-01YSK-F157
A001-08-01-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-08-01-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A001-08-01-03Service Order7MO¥¥0.0%
YSK-F157 Total, A001-08-01¥0.0%
CNIC NEX PORTION Total, A001-08¥ -0.0%
CNIC PORTION Total, A001¥ -0.0%
A002SRF PORTION
A002-01Land Crane (LC) at YSK-DD4, 5, 6 &YSK-B8, 12
A002-01-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A002-01-02Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A002-01-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
LC Total, A002-01¥0.0%
A002-02CAVE-439
A002-02-01Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A002-02-02Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥ -¥0.0%
CAVE-439 Total, A002-03¥0.0%
A002-03CAVE-444
A002-03-01Quaterly PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A002-03-02Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
CAVE-444 Total, A002-18¥0.0%
A002-04Icemaker
A002-04-01Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A002-04-02Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥ -¥0.0%
Icemaker Total, A002-04¥0.0%
SRF Total, A002¥ -0.0%
A003DLA PORTION
A003-01YSK-J39
A003-01-01Monthly PM Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
A003-01-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A003-01-03Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A003-01-04Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-J39 Total, A003-01¥0.0%
A003-02YSK-J164
A003-02-01Monthly PM Work Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
A003-02-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A003-02-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-J164 Total, A003-02¥0.0%
A003-03YSK-4831
A003-03-01Scheduled Repair Work for Absorption Chiller (Base)1LS¥¥0.0%
A003-03-02Service Order7MO¥¥0.0%
YSK-4831 Total, A003-03¥0.0%
DLA Total, A003¥ -0.0%
A004USNH PORTION
A004-01YSK-1401
A004-02-01Monthly PM Work for Cooling Towers Including Water Examination Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
A004-02-02Winter Season-in PM Work for Air Cooled Water Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A004-02-03Winter Season-on PM Work for Air Cooled Water Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A004-02-04Winter Season-off PM Work for Air Cooled Water Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A004-02-05Annual PM Work for Air Cooled Water Chiller Unit Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A004-02-06Semiannual PM Work for HVAC System Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A004-02-07Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1401 Total, A004-01¥0.0%
A004-02Air Balance Inspection (YSK-1400 & 3008)
A004-02-01Semiannual Air Balance Inspection Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
Air Balance Inspection Total, A004-02¥0.0%
UNSH Total, A004¥ -0.0%
A005DODDS PORTION
A005-01YSK-1903
A005-01-01Scheduled Repair Work for Absorption Chiller Unit1LS¥¥0.0%
A005-01-02Service Order7MO¥¥0.0%
YSK-1903 Total, A005-01¥0.0%
A005-02YSK-3858
A005-02-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A005-02-02Service Order7MO¥¥0.0%
YSK-3858 Total, A005-02¥0.0%
A005-03YSK-3859
A005-03-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A005-03-02Service Order7MO¥¥0.0%
YSK-3859 Total, A005-03¥0.0%
A005-04IKE-824
A005-04-01Quarterly PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A005-04-02Semiannual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A005-04-03Annual PM Work Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A005-04-04Once Three (3) Years Replacement Work of Filters for AHU-5~71LS¥¥0.0%
A005-04-05Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
IKE-824 Total, A005-04¥0.0%
DODDS Total, A005¥ -0.0%
A006NCTS PORTION
A006-01YSK-1942
A006-01-01Quarterly PM Work Starting from 1 Sep 2020 to 31 Mar 20212LS¥¥0.0%
A006-01-02Annual PM Work for Absorption Chiller Starting from 1 Sep 2020 to 31 Mar 20211LS¥¥0.0%
A006-01-03Service Order Starting from 1 Sep 2020 to 31 Mar 20217MO¥¥0.0%
YSK-1942 Total, A006-01¥0.0%
NCTS Total, A006¥0.0%
A007HOUSING PORTION
A007-01YSK-1152 (#1 TOWER)
A007-01-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-01-02Service Order7MO¥¥0.0%
YSK-1152 (#1 TOWER) Total, A007-01¥0.0%
A007-02YSK-1151 (#2 TOWER)
A007-02-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-02-02Service Order7MO¥¥0.0%
YSK-1151 (#2 TOWER) Total, A007-02¥0.0%
A007-03YSK-1150 (#3 TOWER)
A007-03-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-03-02Service Order7MO¥¥0.0%
YSK-1150 (#3 TOWER) Total, A007-03¥0.0%
A007-04YSK-1149 (#4 TOWER)
A007-04-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-04-02Service Order7MO¥¥0.0%
YSK-1149 (#4 TOWER) Total, A007-04¥0.0%
A007-05YSK-1148 (#5 TOWER)
A007-05-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-05-02Service Order7MO¥¥0.0%
YSK-1148 (#5 TOWER) Total, A007-05¥0.0%
A007-06YSK-1147 (#6 TOWER)
A007-06-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-06-02Service Order7MO¥¥0.0%
YSK-1147 (#6 TOWER) Total, A007-06¥0.0%
A007-07YSK-1315 (#7 TOWER)
A007-07-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-07-02Service Order7MO¥¥0.0%
YSK-1315 (#7 TOWER) Total, A007-07¥0.0%
A007-08YSK-1316 (#8 TOWER)
A007-08-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-08-02Service Order7MO¥¥0.0%
YSK-1316 (#8 TOWER) Total, A007-08¥0.0%
A007-09YSK-3826 (FUJI)
A007-09-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-09-02Service Order7MO¥¥0.0%
YSK-3826 (FUJI) Total, A007-10¥0.0%
A007-10YSK-4447
A007-10-01Scheduled Repair Work for Absorption Chiller1LS¥¥0.0%
A007-10-02Service Order7MO¥¥0.0%
YSK-4447 Total, A007-10¥0.0%
Housing Total, A007¥ -0.0%
BASE PERIOD RECURRING LINE ITEMS TOTAL¥0.0%
LS=Lump Sum
MO =Monthly
LS =Time

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

B-IQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 None Recurring Price - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C,
SPEC ITEM 4
ELINs A700 through A755
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CACProposalGap
A700Major Repair Work (Negotiated)Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in IDIQ work. Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service call or PM repair. Task order completion times will be specified in task order.1LS0%
A701Inspect Air Balance At One (1) Room in YSK-1400 and 3008.The Contractor shall inspect air balance at one (1) room, and notify actual air flow and balance to the Government immediately. If the air balance is out of designated balance, the Government will adjust air volume. The Contractor shall inspect actual air balance again. Repeat those processes until the air balance meets the designed specifications, not to exceed two (2) days in the Government regular working hours since the start of the initial inspection. The Contractor shall submit the final actual air balance report to the Government within seven (7) calendar days after the site inspection is completed.10LS¥ -¥ -0%
A702Replace The Existing OA Pre-Filters for FS-9 at Paint Booth in Room114 of YSK-2078.The Contractor shall replace the existing OA pre-filters (4EA) with new ones. The existing OA filters to be replaced is 750 x 500 x 20t (PS-600). The Contractor shall dispose the removed filters. The Contractor shall be completed the replacement work within 21 calendar days after the date of order.4LS¥ -¥ -0%
A703Replace The Existing OA Pre-Filters for FS-9 at Paint Booth in Room114 of YSK-2078.The Contractor shall replace the existing OA pre-filters (16EA) with new ones. The existing OA filters to be replaced is 500 x 500 x 20t (PS-600). The Contractor shall dispose the removed filters. The Contractor shall be completed the replacement work within 21 calendar days after the date of order.4LS¥ -¥ -0%
A704Replace The Existing Supply Filters for FE-22 at Paint Booth in Room114 of YSK-2078.The Contractor shall replace the existing supply filters (39EA) with new ones. The existing supply filters to be replaced is 610 x 610 x 20t (PS-400). The Contractor shall dispose the removed filters. The Contractor shall be completed the replacement work within 21 calendar days after the date of order.8LS¥ -¥ -0%
A705Replace The Existing Exhaust Filters for FE-22 at Paint Booth in Room114 of YSK-2078.The Contractor shall replace the existing exhaust filters (39EA) with new ones. The existing exhaust filters to be replaced is 610 x 610 x 20t (PS-400). The Contractor shall dispose the removed filters. The Contractor shall be completed the replacement work within 21 calendar days after the date of order.8LS¥ -¥ -0%
A706Replace The Existing Exhaust Filters for FE-125 & FO-125 at Room 125 & 126 of YSK-2068.The Contractor shall replace the existing exhaust filters (10EA) with new ones. The existing exhaust filters to be replaced is 500 x 500 x 50t (Cool Pat). The Contractor shall dispose the removed filters. The Contractor shall be completed the replacement work within 21 calendar days after the date of order.9LS¥ -¥ -0%
A707Replace Diaphragm Valves of Fume Collection unit (FDC-2) at YSK- A47.Replace existing diaphragm valves (25A, AC200V: 7ea) of fume collection unit (FCD-2) at YSK- A47 with new ones. Replacement work shall be completed within 40 calendar days after the date of order.1LS¥ -¥ -0%
A708Replace Manometer and Filter Regulator of Fume Collection unit (FDC-2) at YSK- A47.Replace existing manometer (0 to 5kPa: 1ea) and filter regulator of fume collection unit (FCD-2) at YSK- A47 with new ones. Replacement work shall be completed within 40 calendar days after the date of order.1LS¥ -¥ -0%
A709Replace Pulse Shock Controller of Fume Collection unit (FDC-2) at YSK- A47.Replace existing pulse shock controller (HMG-10: 1ea) of fume collection unit (FCD-2) at YSK- A47 with new ones. Replacement work shall be completed within 40 calendar days after the date of order.1EA¥ -¥ -0%
A710Replace Metal Filters, Casters and Clamps of Fume Collection unit (FDC-2) at YSK- A47.Replace existing metal filters (300x300: 16ea), Casters (Ø40: 16ea) and clamps (8ea) of fume collection unit (FCD-2) at YSK- A47 with new ones. Replacement work shall be completed within 40 calendar days after the date of order.1LS¥ -¥ -0%
A711Replace CO2 Fire Extinguish Equipments of Fume Collection unit (FDC-2) at YSK- A47.Replace existing CO2 cylinders (IHP13.4L/8.9kg: 2ea), FE tube (20M) with fittings (1 LS), protection springs (6M: 3ea) and starting parts of fume collection unit (FCD-2) at YSK- A47 with new ones. Replacement work shall be completed within 40 calendar days after the date of order.1LS¥ -¥ -0%
A712Replace Differential Manometer of Bag Filter Unit for Dust Collection Unit (AFE-1) at YSK- 2078.Replace existing differential manometer (MU-500: 1 ea) and related parts of bag filter unit (AFE-1) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A713Replace Fan Bearings of Inducted Draft Fan for Dust Collection Unit (AFE-1) at YSK- 2078.Replace existing fan bearings (#6318: 2ea) of inducted draft fan for dust collection unit (AFE-1) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A714Replace Vibration Isolation Joints of Inducted Draft Fan for Dust Collection Unit (AFE-1) at YSK- 2078.Replace existing vibration isolation joints (Ø1200 x 250L: 1 ea, Ø1250 x 950 x 150L: 1ea) of inducted draft fan for dust collection unit (AFE-1) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A715Replace Motor Bearings of Inducted Draft Fan for Dust Collection Unit (AFE-1) at YSK- 2078.Replace existing motor bearings (#NU220CM: 1ea, #6318: 1ea) of inducted draft fan for dust collection unit (AFE-1) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A716Overhaul Compressor for Dust Collection System (AFE-1) at YSK- 2078.Overhaul compressor for dust collection system (AFE-1) at YSK- 2078. Overhauling work shall be completed within 60 calendar days after the date of order.2LS¥ -¥ -0%
A717Replace Motor of Motor Damper for Dust Collection Unit (AFE-1) at YSK- 2078.Replace existing motor of motor damper (MH-01: 1ea) for dust collection unit (AFE-1) at YSK- 2078 with new one. Replacement work shall be completed within 75 calendar days after the date of order.1EA¥ -¥ -0%
A718Overhaul Outside Air Supply Fan (FS-8) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-8) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.2LS¥ -¥ -0%
A719Overhaul Outside Air Supply Fan (FS-9) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-9) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.4LS¥ -¥ -0%
A720Overhaul Exhaust Air Fan (FE-22) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for exhaust air fan (FE-22) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.4LS¥ -¥ -0%
A721Overhaul Outside Air Supply Fan (FS-2, 3) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-2, 3) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.2LS¥ -¥ -0%
A722Overhaul Exhaust Air Fan (FE-20) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for exhaust air fan (FE-20) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A723Overhaul Outside Air Supply Fan (FS-4) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-2, 3) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A724Overhaul Exhaust Air Fan (FE-4) at YSK- 2078.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for exhaust air fan (FE-4) at YSK- 2078 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A725Replace 50A 2-Way Motor Control Valve for Steam Supply/Return System at YSK- 2078Replace existing 50A 2 way motor control valve including actuator for steam supply/return system at YSK- 2078 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.2EA¥ -¥ -0%
A726Replace 80A 2-Way Motor Control Valve for Steam Supply/Return System at YSK- 2078Replace existing 80A 2 way motor control valve including actuator for steam supply/return system at YSK- 2078 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.2EA¥ -¥ -0%
A727Replace Differential Manometers of Bag Filter Unit for Dust Collection Unit (AFE-2) at YSK- 2078.Replace existing differential manometers (MU-500: 1 ea) and related parts of bag filter unit (AFE-2) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A728Replace Fan Bearings of Inducted Draft Fan for Dust Collection Unit (AFE-2) at YSK- 2078.Replace existing fan bearings (#6318: 4ea) of inducted draft fan for dust collection unit (AFE-2) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A729Replace Vibration Isolation Joints of Inducted Draft Fan for Dust Collection Unit (AFE-2) at YSK- 2078.Replace existing vibration isolation joints (Ø850 x 250L: 1 ea, Ø770 x 640 x 150L: 1ea) of inducted draft fan for dust collection unit (AFE-2) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A730Replace Motor Bearings of Inducted Draft Fan for Dust Collection Unit (AFE-2) at YSK- 2078.Replace existing motor bearings (#6315ZZ: 1ea, #6312ZZ: 1ea) of inducted draft fan for dust collection unit (AFE-1) at YSK- 2078 with new ones. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A731Overhaul Compressor for Dust Collection System (AFE-2) at YSK- 2078.Overhaul compressor for dust collection system (AFE-2) at YSK- 2078. Overhauling work shall be completed within 60 calendar days after the date of order.2LS¥ -¥ -0%
A732Replace Differential Monometers for One Hepa Filter Unit at YSK- 1922.Replace existing differential manometers (0~500Pa) of high efficiency filter side for one heap filter unit at YSK- 1922 with new one. Replacement work shall be completed within 40 calendar days after the date of order.1EA¥ -¥ -0%
A733Replace Differential Monometers for one Hepa Filter Unit at YSK- 1922.Replace existing differential manometers (0~300Pa) of middle efficiency filter side for one heap filter unit at YSK- 1922 with new one. Replacement work shall be completed within 40 calendar days after the date of order.1EA¥ -¥ -0%
A734Replace Fan Bearings, Motor Bearings, V-Belts and V-Pulleys of One Ventilation Fan at YSK- 1922Replace existing fan bearings, motor bearings, v-belts and v-pulleys for one ventilation fan at YSK- 1922 with new one. Replacement work shall be completed within 45 calendar days after the date of order.2LS¥ -¥ -0%
A735Replace Fan Bearings, Motor Bearings, V-Belts and V-Pulleys of One Ventilation Fan (FE-1) at YSK- A47.Replace existing fan bearings, motor bearings, v-belts and v-pulleys for one ventilation fan (FE-1) at YSK- A47 with new one. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A736Replace Fan Bearings, Motor Bearings, V-Belts and V-Pulleys of One Ventilation Fan (FE-2) at YSK- A47.Replace existing fan bearings, motor bearings, v-belts and v-pulleys for one ventilation fan (FE-2) at YSK- A47 with new one. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A737Replace Fan Bearings, Motor Bearings, V-Belts and V-Pulleys of One Ventilation Fan (FE-1) at YSK- A48.Replace existing fan bearings, motor bearings, v-belts and v-pulleys for one ventilation fan (FE-1) at YSK- A48 with new one. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A738Replace Fan Bearings, Motor Bearings, V-Belts and V-Pulleys of One Ventilation Fan (FE-2) at YSK- A48.Replace existing fan bearings, motor bearings, v-belts and v-pulleys for one ventilation fan (FE-2) at YSK- A48 with new one. Replacement work shall be completed within 45 calendar days after the date of order.1LS¥ -¥ -0%
A739Replace Sliding Damper of Mist Collection unit (FED-3) at YSK- 2043.Replace existing sliding damper (Ø200 x 150L) of mist collection unit (FED-3) at YSK- 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1EA¥ -¥ -0%
A740Replace Manometer of Mist Collection unit (FED-3) at YSK- 2043.Replace existing manometer (1ea: WO-81) of mist collection unit (FED-3) at YSK- 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1EA¥ -¥ -0%
A741Overhaul Ventilation fan of Mist Collection unit (FED-3) at YSK- 2043.Replace existing fan bearings (2ea: #6308ZZ), motor bearings (2ea: 6308ZZ, #6306ZZ), V-belts (2ea: 3V-600), V-pulley (2ea: Ø100, Ø140) and canvas joints (Ø310x250L) at YSK- 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A742Replace Manometer of Fume Collection unit (FED-1) at Bldg. 2043.Replace existing manometer (MO-81: 1ea) fume collection unit (FED-1) at Bldg. 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A743Replace Sliding gate of Fume Collection unit (FED-1) at Bldg. 2043.Replace existing sliding gate (Ø200 x 150L) of fume collection unit (FED-1) at Bldg. 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A744Overhaul Fan of Fume Collection unit (FED-1) at Bldg. 2043.Replace existing motor bearings (#6207: 1ea, #6305: 1ea), impeller (Ø200 x 80L) and vibration isolation rubbers (Ø165 x 300L) of fume collection unit (FED-1) at Bldg. 2043 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A745Overhaul Outside Air Supply Fan (FS-113) for Paint Booth System at YSK- 2043.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-113) for paint booth system at YSK- 2043 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A746Overhaul Outside Air Supply Fan (FS-220) for Paint Booth System at YSK- 2043.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-220) for paint booth system at YSK- 2043 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A747Overhaul Outside Air Supply Fan (FO-125) for Paint Booth System at YSK- 2068.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for outside air supply fan (FS-220) for paint booth system at YSK- 2068 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.2LS¥ -¥ -0%
A748Overhaul Ventilation Fan (FE-125) for Paint Booth System at YSK- 2068.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for ventilation fan (FE-125) for paint booth system at YSK- 2068 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.2LS¥ -¥ -0%
A749Overhaul Ventilation Fan (FE-1) for Injection Ventilation system at YSK- J418.Replace existing fan bearings, motor bearings, V-pulleys (Fan and motor) and V-belts for ventilation fan (FE-1) for injection ventilation system at YSK- J418 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A750Replace V-Belts Outside Air Supply Fan (FS-113) for Paint Booth System at YSK- 2043.Replace existing V-belts for outside air supply fan (FS-113) for paint booth system at YSK- 2043 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A751Replace V-Belts Outside Air Supply Fan (FS-220) for Paint Booth System at YSK- 2043.Replace existing V-belts for outside air supply fan (FS-220) for paint booth system at YSK- 2043 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A752Replace V-Belts Outside Air Supply Fan (FO-125) for Paint Booth System at YSK- 2068.Replace existing V-belts for outside air supply fan (FS-220) for paint booth system at YSK- 2068 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A753Replace V-Belts Ventilation Fan (FE-125) for Paint Booth System at YSK- 2068.Replace existing V-belts for ventilation fan (FE-125) for paint booth system at YSK- 2068 with new ones. Replacement work shall be completed within 60 calendar days after the date of order.1LS¥ -¥ -0%
A754Replace V-Belts Ventilation Fan (FE-1) for Injection Ventilation system at YSK- J418.Replace existing V-belts for ventilation fan (FE-1) for injection ventilation system at YSK- J418 with new ones. Replacement work shall be completed within 30 calendar days after the date of order.1LS¥ -¥ -0%
A755Clean Exterior Duct Surfaces at Room 112 in Sand Blast Room of YSK-2078.Clean exterior duct surfaces at Room 112 in sand blast room of YSK-2078. Top of duct is approximately 8.5m high from floor level. Total cleaning area is approximately 50 square meters. Site plan is provided in Attachment J-1502000-09-002-15, Page 21 of 21. The Contractor shall complete the cleaning work within 21 calendar days after the date of order.1LS¥ -¥ -0%
TOTAL IDIQ PRICE¥ -0%
TM=Time
LS=Lump Sum
EA=Each

1-F

ATTBCHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITBTION/CONTRBCT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring - First Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs B001 through B007
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotalPROPOSALTO GE
B001CNIC
B001-01CNIC CFAY PORTION
B001-01-01NDK-100134
B001-01-01-01Semiannual PM Work2LS¥¥0.0%
B001-01-01-02Annual PM Work1LS¥¥0.0%
B001-01-01-03Service Order Work12MO¥¥0.0%
MDK-100134 Total, B001-01-01¥0.0%
B001-01-02YSK-5229
B001-01-02-01Semiannual PM Work2LS¥¥0.0%
B001-01-02-02Annual PM Work1LS¥¥0.0%
B001-01-02-03Service Order Work12MO¥¥0.0%
YSK-5229 Total, B001-01-02¥0.0%
B001-01-03YSK-2046
B001-01-03-01Monthly Scheduled PM Work for Automatic Control System12MO¥¥0.0%
B001-01-03-02Cooling Season-in PM Work for Absorption Chiller1LS¥¥0.0%
B001-01-03-03Cooling Season-on PM Work for Absorption Chiller1LS¥¥0.0%
B001-01-03-04Cooling Season-off PM Work for Absorption Chiller1LS¥¥0.0%

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .