CLINS
ATTACHMENT J-0200000-07
GROUNDS MAINTENANCE AND LANDSCAPING AT COMMANDER, FLEET ACTIVITIES, SASEBO (CFAS), JAPAN
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40084-20-R-6XXX
EXHIBIT A
| Contract Line Item Number (CLIN) and Exhibit line Item Number (ELIN) Spread Sheet | |||
| CLIN | Description | Amount (Yen) | |
| per CLIN | Amount (Yen) |
per period
| 0001 | BASE PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at Commander, Fleet Activities, Sasebo (CFAS), Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0002 | BASE PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0003 | FIRST OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0004 | FIRST OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0005 | SECOND OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0006 | SECOND OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0007 | THIRD OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0008 | THIRD OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0009 | FOURTH OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0010 | FOURTH OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0011 | FIFTH OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0012 | FIFTH OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0013 | SIXTH OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0014 | SIXTH OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 | |
| 0015 | SEVENTH OPTION PERIOD - Recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥0 | ¥1,400,000 |
| 0016 | SEVENTH OPTION PERIOD - Non-recurring Work | |
| The contractor shall provide all labor, materials, equipment, coordination and supervision to provide Grounds Maintenance and Landscaping at CFAS, Japan. The price for this CLIN is made up of all the line items being awarded for the base period, and are identified in the ELINs in Attachment J-02000000-07. | ¥1,400,000 |
TOTAL OF CONTRACT AMOUNT FOR EIGHT YEARS ¥11,200,000
ELINs-Base Period-RW
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-R-63XX |
| EXHIBIT A - CLIN 0001 |
| Line Item 0001 Recurring Work Price - Base Period (1 April 2021 - 31 March 2022) | |||||
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 through A013 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| 1503050 Grounds Maintenance and Landscaping | |||||
| 000101 | CFAS Funded Areas | ||||
| Services for Improved Grounds Areas, Operational Areas, Storm Drainage Systems indicated in the Site Maps provided in J-1503050-04 performed as specified per the Common Output Level Standards listed in J-1503050-07. |
| A001 | Main Base Areas, Spec Item 3.1 | ||||
| A001AA | Prestige Grounds/COL 2 | 12 | MO | ¥0 | |
| A001AB | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A001AC | Improved Grounds/Field Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A001AD | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A001AE | Improved Grounds/Field Maintenance/COL3 | 12 | MO | ¥0 | |
| Sub total of A001 | ¥0 | ||||
| A002 | Hario Housing Areas, Spec Item 3.1 | ||||
| A002AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A002AB | Improved Grounds/Field Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A002AC | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A002AD | Improved Grounds/Field Maintenance/COL3 | 12 | MO | ¥0 | |
| Sub total of A002 | ¥0 | ||||
| A003 | Operational Areas/Maebata, Spec Item 3.1, 3.2, 3.3 | ||||
| A003AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A003AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A003AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| A003AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| A003AE | Roadways | 12 | MO | ¥0 | |
| A003AF | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of A003 | ¥0 | ||||
| A004 | Operational Areas/Hario-Shima, Spec Item 3.1, 3.2 | ||||
| A004AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A004AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A004AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| A004AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| A004AE | Roadways | 12 | MO | ¥0 | |
| Sub total of A004 | ¥0 | ||||
| A005 | Operational Areas/Akasaki, Spec Item 3.1, 3.2, 3.3 | ||||
| A005AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A005AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A005AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| A005AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| A005AE | Roadways | 12 | MO | ¥0 | |
| A005AF | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of A005 | ¥0 | ||||
| A006 | Operational Areas/Iorizaki, Spec Item 3.1, 3.2, 3.3 | ||||
| A006AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A006AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A006AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| A006AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| A006AE | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of A006 | ¥0 | ||||
| A007 | Operational Areas/Yokose,Spec Item 3.1, 3.2, 3.3 | ||||
| A007AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| A007AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| A007AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| A007AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| A007AE | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of A007 | ¥0 | ||||
| A001 thru A007 CFAS Funded Areas Subtotal | ¥0 |
| 000102 | FAMILY HOUSING Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| A008 | Main Base Areas, Spec Item 3.1 | ||||
| A008AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| A008AB | Improved Grounds/Fields Maintenance | 12 | MO | ¥0 | |
| Sub total of A008 | ¥0 | ||||
| A009 | Hario Housing Areas, Spec Item 3.1 | ||||
| A009AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| A009AB | Improved Grounds/Fields Maintenance | 12 | MO | ¥0 | |
| Sub total of A009 | ¥0 | ||||
| A008 thru A009 FAMILY HOUSING Funded Areas Subtotal | ¥0 |
| 000103 | DoDEA Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| A010 | Main Base Areas, Spec Item 3.1 | ||||
| A010AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| Sub total of A010 | ¥0 | ||||
| A011 | Hario Housing Areas, Spec Item 3.1 | ||||
| A011AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| Sub total of A011 | ¥0 | ||||
| A010 thru A011 DoDEA Funded Areas Subtotal | ¥0 |
| 000104 | NAVY LODGE Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| A012 | Main Base Areas, Spec Item 3.1 | |||
| A012AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 |
| A012 NAVY LODGE Funded Areas Subtotal | ¥0 |
| 000105 | NGIS Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| A013 | Main Base Areas, Spec Item 3.1 | |||
| A013AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 |
| A013 NGIS Funded Areas Subtotal | ¥0 | |||
| TOTAL RECURRING WORK PRICE BASE PERIOD | ¥0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period-NRW
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-R-6XXX |
| EXHIBIT A - CLIN 0002 |
| Line Item 0002 Non-Recurring Work - Base Period (1 April 2021 - 31 March 2022) |
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A724 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A700 | Housing Vacant Quarters Grass Cutting | ||||||
| Grass shall be mowed and trimmed to a uniform height of 2 inches. Grass shall be edged to provide a uniform edged cut. Clippings and debris shall be removed. Complete all work within 3 calendar days of receipt of each order. | 25,000 | SM | ¥0 | ||||
| A701 | Special Event Grass Cutting | ||||||
| Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed. Complete all work within 3 calendar days of receipt of each order. | 6,000 | SM | ¥0 | ||||
| A702 | Sodding | ||||||
| Sod shall be of species specified on each order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. Work shall be completed within 5 calendar days of receipt of each order. | 600 | SM | ¥0 | ||||
| A703 | Weed Prevention Sheeting | ||||||
| Apply or replace sheet onto grounds properly to prevent weed within the area of the grounds ordered. The best material of sheet shall be chosen with approval of the COR. Work shall be completed within 5 calendar days of receipt of each order. | 20 | SM | ¥0 | ||||
| A704 | Mulching | ||||||
| Apply or replace mulch to grounds properly within the area of the grounds ordered. The best material of mulch shall be chosen with approval of the COR. Mulching shall improve appearance of landscape, protect the plants' root systems, enable effective provision of nutrients to the soil, slow the erosion of topsoil, prevent weeds, and retain moisture. Work shall be completed within 5 calendar days of receipt of each order. | |||||||
| 40 | SM | ¥0 | |||||
| A705 | Shrub Pruning | ||||||
| - Less than 1 meter in height | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Work shall be completed within 3 calendar days of receipt of each order. | 4,000 | EA | ¥0 | |||
| A706 | Shrub Planting | ||||||
| All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered of the highest quality stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species will be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | |||||||
| 60 | EA | ¥0 | |||||
| A707 | Shrub Removing, Relocating, and Replanting | ||||||
| - Less than 1 meter in height | Shrub shall be removed, relocated, and replanted properly. All shrubs shall be nursery grown. Work procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure replanted shrubs develop properly. Shrubs shall be replanted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrubs shall be guyed and staked properly. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days of receipt of each order. | ||||||
| 2 | EA | ¥0 | |||||
| A708 | Shrub and Stump Removal | ||||||
| Remove shrubs including stumps and roots. Remove stumps and roots properly. Backfill all excavated holes. Work shall be completed within 3 calendar days of receipt of each order. | |||||||
| 60 | EA | ¥0 | |||||
| A709 | Tree and Stump Removal, |
- Up to 3 inches (10cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 3 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 30 | EA | ¥0 |
| A710 | Tree and Stump Removal, |
- Up to 6 inches (15cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 5 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 10 | EA | ¥0 |
| A711 | Tree and Stump Removal, |
- Up to 12 inches (30cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 5 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| A712 | Tree and Stump Removal, |
- Up to 24 inches (60cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 15 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| A713 | Tree and Stump Removal, |
- Up to 40 inches (100cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 15 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| A714 | Tree Planting |
- Less than 3 meters in height
| All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered of the highest quality stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees planted shall have trunk diameters (measured six inches up from the ground) of at least three inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 30 | EA | ¥0 |
| A715 | Tree Removing, Relocating, and Replanting |
- Less than 3 meters in height
| Tree shall be removed, relocated, and replanted properly. All trees shall be nursery grown. Work procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure replanted trees develop properly. Trees shall be replanted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 5 | EA | ¥0 |
| A716 | Staking and Guy-Wiring | |
| Trees shall be staked and guy-wired properly. Work shall be accomplished by or under the guidance of a certified arborist. |
Work shall be completed within 3 calendar days of receipt of each order.
| 2 | EA | ¥0 | |
| A717 | Tree Pruning - Japanese Pine Tree | The Contractor shall prune trees according to their appearances and natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified arborist. Debris shall be removed. Work shall be completed within 5 calendar days of receipt of each order. | |
| 30 | EA | ¥0 | |
| A718 | Tree / Shrub Pruning |
- Up to 4 meters in height
| The Contractor shall prune trees / shrubs according to their appearances and natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified arborist. Debris shall be removed. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 530 | EA | ¥0 |
| A719 | Tree Pruning |
- Up to 8 meters in height
| The Contractor shall prune trees according to their appearances and natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified arborist. Debris shall be removed. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 250 | EA | ¥0 |
| A720 | Tree Pruning |
- Up to 15 meters in height
| The Contractor shall prune trees according to their appearances and natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified arborist. Debris shall be removed. Work shall be completed within 10 calendar days of receipt of each order. | ||||
| 20 | EA | ¥0 | ||
| A721 | Bush / Vegetation Removal | |||
| All unwanted vegetation (grass, weeds, bush, and small trees up to 7 feet) shall be cut back to within 1 inch of grounds level. Work shall be completed within 5 calendar days of receipt of each order. | 380 | SM | ¥0 | |
| A722 | Debris Removal | |||
| All debris (grass, leaves, pine straw and pinecones, limbs, and other debris) from the specified area shall be removed. Work shall be completed within 3 calendar days of receipt of each order. | 2,500 | SM | ¥0 | |
| A723 | Labor: Unit Priced Labor (UPL)Work |
Provide labor cost to accomplish a task not required by the recurring work portion of the contract.
The Contractor shall provide labor cost to accomplish a task not required by the recurring work portion of the contract.
| The price for this ELIN shall include all direct labor costs, all indirect labor costs, all overheads, and profit associate with performing one (1) hour of direct labor. There will be no separate ELIN(s) for any indirect labor costs, overhead(s), and/or profit associate with performing one (1) hour of direct labor. | 1,400 | LH | ¥0 |
| A724 | Material and Equipment: UPL Work (Negotiated) | ||
| Provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. | The Contractor shall provide material and equipment cost to accomplish a task not required by the recurring work portion of the contract. |
The price for this ELIN shall include all costs associated with the equipment and materials including all overheads and profit associate with the equipment and materials. There will be no separate ELIN(s) for any overheads and profit associate with the equipment and materials.
| 1,400,000 | LS | Negotiated at time of order. | ¥1,400,000 | |
| TOTAL NON-RECURRING WORK PRICE BASE PERIOD | ¥ 1,400,000 |
ELINs-1st Period-RW
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-R-63XX |
| EXHIBIT A - CLIN 0003 |
| Line Item 0003 Recurring Work Price - 1st Option Period (1 April 2022 - 31 March 2023) | |||||
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 through B013 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| 1503050 Grounds Maintenance and Landscaping | |||||
| 000101 | CFAS Funded Areas | ||||
| Services for Improved Grounds Areas, Operational Areas, Storm Drainage Systems indicated in the Site Maps provided in J-1503050-04 performed as specified per the Common Output Level Standards listed in J-1503050-07. |
| B001 | Main Base Areas, Spec Item 3.1 | ||||
| B001AA | Prestige Grounds/COL 2 | 12 | MO | ¥0 | |
| B001AB | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B001AC | Improved Grounds/Field Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B001AD | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B001AE | Improved Grounds/Field Maintenance/COL3 | 12 | MO | ¥0 | |
| Sub total of B001 | ¥0 | ||||
| B002 | Hario Housing Areas, Spec Item 3.1 | ||||
| B002AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B002AB | Improved Grounds/Field Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B002AC | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B002AD | Improved Grounds/Field Maintenance/COL3 | 12 | MO | ¥0 | |
| Sub total of B002 | ¥0 | ||||
| B003 | Operational Areas/Maebata, Spec Item 3.1, 3.2, 3.3 | ||||
| B003AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B003AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B003AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| B003AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| B003AE | Roadways | 12 | MO | ¥0 | |
| B003AF | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of B003 | ¥0 | ||||
| B004 | Operational Areas/Hario-Shima, Spec Item 3.1, 3.2 | ||||
| B004AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B004AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B004AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| B004AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| B004AE | Roadways | 12 | MO | ¥0 | |
| Sub total of B004 | ¥0 | ||||
| B005 | Operational Areas/Akasaki, Spec Item 3.1, 3.2, 3.3 | ||||
| B005AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B005AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B005AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| B005AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| B005AE | Roadways | 12 | MO | ¥0 | |
| B005AF | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of B005 | ¥0 | ||||
| B006 | Operational Areas/Iorizaki, Spec Item 3.1, 3.2, 3.3 | ||||
| B006AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B006AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B006AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| B006AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| B006AE | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of B006 | ¥0 | ||||
| B007 | Operational Areas/Yokose,Spec Item 3.1, 3.2, 3.3 | ||||
| B007AA | Improved Grounds/Lawn Maintenance/COL4 | 12 | MO | Unit Price Only | |
| B007AB | Improved Grounds/Lawn Maintenance/COL3 | 12 | MO | ¥0 | |
| B007AC | Improved Grounds/Field Maintenance | 12 | MO | ¥0 | |
| B007AD | Anti-Terrorism Force Protection (ATFP) Area | 12 | MO | ¥0 | |
| B007AE | Storm Drainage System Cleaning | 12 | MO | ¥0 | |
| Sub total of B007 | ¥0 | ||||
| B001 thru B007 CFAS Funded Areas Subtotal | ¥0 |
| 000102 | FAMILY HOUSING Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| B008 | Main Base Areas, Spec Item 3.1 | ||||
| B008AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| B008AB | Improved Grounds/Fields Maintenance | 12 | MO | ¥0 | |
| Sub total of B008 | ¥0 | ||||
| B009 | Hario Housing Areas, Spec Item 3.1 | ||||
| B009AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| B009AB | Improved Grounds/Fields Maintenance | 12 | MO | ¥0 | |
| Sub total of B009 | ¥0 | ||||
| B008 thru B009 FAMILY HOUSING Funded Areas Subtotal | ¥0 |
| 000103 | DoDEA Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| B010 | Main Base Areas, Spec Item 3.1 | ||||
| B010AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| Sub total of B010 | ¥0 | ||||
| B011 | Hario Housing Areas, Spec Item 3.1 | ||||
| B011AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 | |
| Sub total of B011 | ¥0 | ||||
| B010 thru B011 DoDEA Funded Areas Subtotal | ¥0 |
| 000104 | NAVY LODGE Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| B012 | Main Base Areas, Spec Item 3.1 | |||
| B012AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 |
| B012 NAVY LODGE Funded Areas Subtotal | ¥0 |
| 000105 | NGIS Funded Areas |
| Services for Improved Grounds Areas indicated in the Site Maps provided in J-1503050-04 performed as specified per the Customers' Level Standards listed in J-1503050-07. |
| B013 | Main Base Areas, Spec Item 3.1 | |||
| B013AA | Improved Grounds/Lawn Maintenance | 12 | MO | ¥0 |
| B013 NGIS Funded Areas Subtotal | ¥0 | |||
| TOTAL RECURRING WORK PRICE FIRST OPTION PERIOD | ¥0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-1st Period-NRW
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-R-6XXX |
| EXHIBIT A - CLIN 0004 |
| Line Item 0004 Non-Recurring Work - 1st Option Period (1 April 2022 - 31 March 2023) |
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B724 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| B700 | Housing Vacant Quarters Grass Cutting | ||||||
| Grass shall be mowed and trimmed to a uniform height of 2 inches. Grass shall be edged to provide a uniform edged cut. Clippings and debris shall be removed. Complete all work within 3 calendar days of receipt of each order. | 25,000 | SM | ¥0 | ||||
| B701 | Special Event Grass Cutting | ||||||
| Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed. Complete all work within 3 calendar days of receipt of each order. | 6,000 | SM | ¥0 | ||||
| B702 | Sodding | ||||||
| Sod shall be of species specified on each order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. Work shall be completed within 5 calendar days of receipt of each order. | 600 | SM | ¥0 | ||||
| B703 | Weed Prevention Sheeting | ||||||
| Apply or replace sheet onto grounds properly to prevent weed within the area of the grounds ordered. The best material of sheet shall be chosen with approval of the COR. Work shall be completed within 5 calendar days of receipt of each order. | 20 | SM | ¥0 | ||||
| B704 | Mulching | ||||||
| Apply or replace mulch to grounds properly within the area of the grounds ordered. The best material of mulch shall be chosen with approval of the COR. Mulching shall improve appearance of landscape, protect the plants' root systems, enable effective provision of nutrients to the soil, slow the erosion of topsoil, prevent weeds, and retain moisture. Work shall be completed within 5 calendar days of receipt of each order. | |||||||
| 40 | SM | ¥0 | |||||
| B705 | Shrub Pruning | ||||||
| - Less than 1 meter in height | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Work shall be completed within 3 calendar days of receipt of each order. | 4,000 | EA | ¥0 | |||
| B706 | Shrub Planting | ||||||
| All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered of the highest quality stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species will be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | |||||||
| 60 | EA | ¥0 | |||||
| B707 | Shrub Removing, Relocating, and Replanting | ||||||
| - Less than 1 meter in height | Shrub shall be removed, relocated, and replanted properly. All shrubs shall be nursery grown. Work procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure replanted shrubs develop properly. Shrubs shall be replanted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrubs shall be guyed and staked properly. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days of receipt of each order. | ||||||
| 2 | EA | ¥0 | |||||
| B708 | Shrub and Stump Removal | ||||||
| Remove shrubs including stumps and roots. Remove stumps and roots properly. Backfill all excavated holes. Work shall be completed within 3 calendar days of receipt of each order. | |||||||
| 60 | EA | ¥0 | |||||
| B709 | Tree and Stump Removal, |
- Up to 3 inches (10cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 3 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 30 | EA | ¥0 |
| B710 | Tree and Stump Removal, |
- Up to 6 inches (15cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 5 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 10 | EA | ¥0 |
| B711 | Tree and Stump Removal, |
- Up to 12 inches (30cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 5 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| B712 | Tree and Stump Removal, |
- Up to 24 inches (60cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 15 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| B713 | Tree and Stump Removal, |
- Up to 40 inches (100cm) Diameter
| Remove trees including stumps and roots. Stumps and above roots shall be removed to a depth of 6 inches (15cm) below normal ground elevation. Treat to prevent regrowth. Backfill all excavated holes and any other damage caused by removal work shall be restored. Ground level shall be the same as surrounding area. Work shall be completed within 15 calendar days of receipt of each order unless ordered quantity exceeds 10 EA. The diameter may be calculated based on trunk circumference at 3 feet from ground level. | ||
| 3 | EA | ¥0 |
| B714 | Tree Planting |
- Less than 3 meters in height
| All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered of the highest quality stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees planted shall have trunk diameters (measured six inches up from the ground) of at least three inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 30 | EA | ¥0 |
| B715 | Tree Removing, Relocating, and Replanting |
- Less than 3 meters in height
| Tree shall be removed, relocated, and replanted properly. All trees shall be nursery grown. Work procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure replanted trees develop properly. Trees shall be replanted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked properly. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be accomplished by or under the guidance of a certified arborist. Work shall be completed within 5 calendar days of receipt of each order. | ||
| 5 | EA | ¥0 |
| B716 | Staking and Guy-Wiring | |
| Trees shall be staked and guy-wired properly. Work shall be accomplished by or under the guidance of a certified arborist. |
Work shall be completed within 3 calendar days of receipt of each order.
| 2 | EA | ¥0 |