Attach_(2)_19R2008_J-0200000-10_ELINs.XLSX
XLSX spreadsheet 120 KB Posted
- Attached to
- North Grounds Maintenance Services at U. S. Government Installations, MCB Butler Okinawa, Japan
- Solicitation number
- N4008419R2008
About this file
This document provides details for a federal contract solicitation for grounds maintenance services at various Marine Corps installations in Okinawa, Japan. The single-award IDIQ contract will have a 12-month base period with four one-year option periods and include recurring and non-recurring work requirements. The scope of work involves providing all labor, equipment, and materials to maintain grounds at Camp Courtney, Camp McTureous, ASP #2, Camp Hansen, Camp Schwab, Henoko Station, NTA, and CTA. The solicitation is anticipated for release on or about September 30, 2019 and will be open for 30 days with proposals due at NAVFAC Far East Camp Butler, Okinawa. The contract will be awarded using LPTA with evaluation factors including management plan, technical approach, safety, corporate experience, and past performance.
Attach (2) 19R2008_J-0200000-10 ELINs
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| ATTACHMENT J-0200000-10 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-19-R-2008 |
GROUNDS MAINTENANCE AT NORTHERN CAMPS MCB BUTLER OKINAWA, JAPAN
| CLIN | Description | Period | Total |
| CLIN 0001 | PHASE IN Period (Base period only) - A022 | Award date ~ 31 Mar 2020 | |
| RECURRING WORK for BASE Period | 1 Apr ~ 31 Dec 2020 | ||
| CLIN 0002 | NON-RECURRING WORK for BASE Period | 1 Jan 2020 ~ 31 Dec 2020 | |
| Subtotal for BASIC: | ¥0 |
| CLIN 0003 | RECURRING WORK for 1ST OPTION Period | 1 Jan 2021 ~ 31 Dec 2021 | |
| CLIN 0004 | NON-RECURRING WORK for 1ST OPTION Period | 1 Jan 2021 ~ 31 Dec 2021 | |
| Subtotal for OPTION 1: | ¥0 |
| CLIN 0005 | RECURRING WORK for 2ND OPTION Period | 1 Jan 2022 ~ 31 Dec 2022 | |
| CLIN 0006 | NON-RECURRING WORK for 2ND OPTION Period | 1 Jan 2022 ~ 31 Dec 2022 | |
| Subtotal for OPTION 2: | ¥0 |
| CLIN 0007 | RECURRING WORK for 3RD OPTION Period | 1 Jan 2023 ~ 31 Dec 2023 | |
| CLIN 0008 | NON-RECURRING WORK for 3RD OPTION Period | 1 Jan 2023 ~ 31 Dec 2023 | |
| Subtotal for OPTION 3: | ¥0 |
| CLIN 0009 | RECURRING WORK for 4TH OPTION Period | 1 Jan 2024 ~ 31 Dec 2024 | |
| CLIN 0010 | NON-RECURRING WORK for 4TH OPTION Period | 1 Jan 2024 ~ 31 Dec 2024 | |
| Subtotal for OPTION 4: | ¥0 |
TOTAL AMOUNTS (Basic ~ Opt4): ¥0
BASE_RECURRING
RFP N4008419R2008 ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT A - CLIN 0001
| CLIN 0001 RECURRING WORK -Price -BASE Period | |||||||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping | |||||||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards. | |||||||||||
| ELIN | DESCRIPTION | Month(s) | Total Acreage | Unit Acre | PROPOSED AWARD | COL 1 | COL 2 (Prstg NTE 5%) (2-3") | COL 3 LV2 (3-4.5") | COL 3 Min (3-6") (Semi-Imp) | ||
| Unit Price | Total Price Yen | Total Price Dollar | Unit Price | Unit Price | Unit Price | Unit Price | |||||
| MCB PORTION (A001 ~ A013) | |||||||||||
| A001 | MCB (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A001AA | Prestige COL 2 Spec Item 3 | 9 | 9.18 | AC | ¥0 | $0.00 | |||||
| A001AB | Improved Spec. Item 3.1 | 9 | 71.25 | AC | ¥0 | $0.00 | |||||
| A001AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A001AD | Fence line Spec. Item 3.1.2 | 9 | 2.77 | AC | ¥0 | $0.00 | |||||
| A001AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A001AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A001AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A001AB | Improved Spec. Item 3.1 | 9 | 28.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A002 | MCB (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A002AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A002AB | Improved Spec. Item 3.1 | 9 | 4.88 | AC | ¥0 | $0.00 | |||||
| A002AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A002AD | Fence line Spec. Item 3.1.2 | 9 | 0.72 | AC | ¥0 | $0.00 | |||||
| A002AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A002AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A002AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (McTUREOUS) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A002AB | Improved Spec. Item 3.1 | 9 | 0.60 | AC | ¥0 | $0.00 | |||||
| Total for MCB McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A003 | MCB (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A003AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A003AB | Improved Spec. Item 3.1 | 9 | 6.55 | AC | ¥0 | $0.00 | |||||
| A003AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A003AD | Fence line Spec. Item 3.1.2 | 9 | 1.74 | AC | ¥0 | $0.00 | |||||
| A003AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A003AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A003AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| N/A | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A004 | MCB (HANSEN) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A004AA | Prestige COL 2 Spec Item 3 | 9 | 14.87 | AC | ¥0 | $0.00 | |||||
| A004AB | Improved Spec. Item 3.1 | 9 | 160.81 | AC | ¥0 | $0.00 | |||||
| A004AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A004AD | Fence line Spec. Item 3.1.2 | 9 | 2.39 | AC | ¥0 | $0.00 | |||||
| A004AE | Drainage Spec. Item 3.4 | 9 | 0.23 | AC | ¥0 | $0.00 | |||||
| A004AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A004AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (HANSEN) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A004AB | Improved Spec. Item 3.1 | 9 | 20.57 | AC | ¥0 | $0.00 | |||||
| Total for MCB Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A005 | MCB (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A005AA | Prestige COL 2 Spec Item 3 | 9 | 0.72 | AC | ¥0 | $0.00 | |||||
| A005AB | Improved Spec. Item 3.1 | 9 | 76.10 | AC | ¥0 | $0.00 | |||||
| A005AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A005AD | Fence line Spec. Item 3.1.2 | 9 | 0.66 | AC | ¥0 | $0.00 | |||||
| A005AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A005AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A005AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (SCHWAB) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A005AB | Improved Spec. Item 3.1 | 9 | 8.00 | AC | ¥0 | $0.00 | |||||
| Total for MCB Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A006 | MCB (HENOKO) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A006AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| A006AB | Improved Spec. Item 3.1 | 9 | 7.11 | AC | ¥0 | $0.00 | |||||
| A006AC | Semi-Improved Spec. Item 3.1 | 9 | 69.64 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Combines bunkers and Open areas. | AC | ¥0 | $0.00 | |||||||||
| A006AD | Fence line Spec. Item 3.1.2 | 9 | 6.90 | AC | ¥0 | $0.00 | ||||||
| A006AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A006AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A006AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| MCB (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||||
| A006AB | Improved Spec. Item 3.1 | 9 | 3.02 | AC | ¥0 | $0.00 | ||||||
| Total for MCB Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||||
| A007 | MCB (NTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A007AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A007AB | Improved Spec. Item 3.1 | 9 | 12.54 | AC | ¥0 | $0.00 | ||||||
| A007AC | Semi-Improved Spec. Item 3.1 | 9 | 7.56 | AC | ¥0 | $0.00 | ||||||
| A007AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A007AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A007AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A007AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 59,418 | LF | ¥0 | $0.00 | ||||||
| Total for MCB NTA: | ¥0 | $0.00 | ||||||||||
| A008 | MCB (CTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| A008AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A008AB | Improved Spec. Item 3.1 | 9 | 2.66 | AC | ¥0 | $0.00 | ||||||
| A008AC | Semi-Improved (2"-6") Spec. Item 3.2 | 9 | 121.77 | AC | ¥0 | $0.00 | ||||||
| A008AC | Semi-Improved (2"-9") Spec. Item 3.2 | 9 | 91.89 | AC | ¥0 | $0.00 | ||||||
| A008AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A008AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A008AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| A008AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 250,083 | LF | ¥0 | $0.00 | ||||||
| Total for MCB CTA: | ¥0 | $0.00 | ||||||||||
| TOTAL OF MCB PORTION (A001 ~ A013): | ¥0 | $0.00 |
| MCB (MCCS) PORTION (A014 ~ A021)-TO BE ADDED TO MCB | |||||||||||
| A009 | MCB (MCCS) (NTA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A009AB | Improved Spec. Item 3.1 | 9 | 1.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) NTA: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A010 | MCB (MCCS) (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A010AB | Improved Spec. Item 3.1 | 9 | 7.99 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A011 | MCB (MCCS) (HANSEN) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A011AB | Improved Spec. Item 3.1 | 9 | 9.87 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A012 | MCB (MCCS) (SCHWAB) (COL 3 MIN -1503050 Grounds Maintenance and Landscaping | ||||||||||
| A012AB | Improved Spec. Item 3.1 | 9 | 2.16 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A013 | MCB (MCCS) (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A013AB | Improved Spec. Item 3.1 | 9 | 2.30 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB (MCCS) PORTION (A009 ~ A013): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| DODDS PORTION (A014) | |||||||||||
| A014 | DODDS (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A014AB | Improved Spec. Item 3.1 | 9 | 7.57 | AC | ¥0 | $0.00 | |||||
| Total for DoDDS McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DODDS PORTION (A014): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| USNH NAVY PORTION (A015 ~ A017) | |||||||||||
| A015 | USNH (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A015AB | Improved Spec. Item 3.1 | 9 | 0.50 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A016 | USNH (HANSEN)(COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A016AB | Improved Spec. Item 3.1 | 9 | 2.51 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Hansen): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| A017 | USNH (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A017AB | Improved Spec. Item 3.1 | 9 | 0.83 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| USNH NAVY PORTION (A015 ~ A017): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| USARJ PORTON (A18) | |||
| A018 | ARMY (CTA) / (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||
| A018AB | (SCHWAB) Improved Spec. Item 3.1 | 9 | 0.14 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Schwab map identifies only Army Improved. At .14ac. | AC | ¥0 | $0.00 | |||||||||
| A018AC | (CTA) Semi- Improved Spec. Item 3.2 | 9 | 26.97 | AC | ¥0 | $0.00 | ||||||
| Total for Army (CTA/Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||||
| TOTAL OF USARJ PORTION (A018): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| DECA PORTION (A019) | |||||||||||
| A019 | DECA (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A019AB | Improved Spec. Item 3.1 | 9 | 1.12 | AC | ¥0 | $0.00 | |||||
| Total for DECA (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DECA PORTION (A019): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| DLA Energy PORTION (A020) | |||||||||||
| A020 | DLA (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| A020AB | Improved Spec. Item 3.1 | 9 | 1.71 | AC | ¥0 | $0.00 | |||||
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DLA Energy PORTION (A020): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| MCB North Clear, Grub & Maintain (A021) | |||||||||||
| A021 | MCB North Clear, Grub & Maintain COL 3 MIN | ||||||||||
| A021AB | Improved Spec. Item 3.3.3 | 9 | 15.05 | AC | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB North Clear & Grub (A021): | ¥0 | $0.00 |
Total BASE PERIOD- RECURRING WORK : ¥0 $0.00 N/A N/A N/A N/A
| PHASE IN PERIOD (A022) | |||||||||||
| A022 | Phase-In-Period (Baes period only) | ||||||||||
| Price for administrative matter that includes, but not lilmited to, submittals/deliverables, passes, manposr/ equipment,etc. | From Award ~ 31 Mar 2020 | ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||
| ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||||
| TOTAL OF PHASE IN PERIOD (A022): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| N/A | N/A | N/A | N/A | ||||||||
| Ground Total BASE PERIOD CLIN 0001 : | |||||||||||
| (RECURRING WORK & PHASE IN PERIOD) | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
&9Page &P of &N
BASE_NON RECURRING
RFP N4008419R2008 ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT A - CLIN 0002
| CLIN 0002 NON-RECURRING WORK (IDIQ) Price -BASE Period | |||||||
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A301 through A317 | |||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot | |||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | Estimated Quantity | UNIT OF ISSUE | Unit Price | Total Price | |
| A301 | Mowing, Unimproved Fence Line | Grass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 15 | AC | ¥0 | ||
| A302 | Reserved | ||||||
| A303 | Mowing, cutting of Unimproved grounds | Grass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 100 | AC | ¥0 | ||
| A304 | Tree Removal Large 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 30 | EA | ¥0 | ||
| A305 | Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| A306 | Tree Removal Medium 6" DBH to 12" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 50 | EA | ¥0 | ||
| A307 | Stump Removal | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| A308 | Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 150 | EA | ¥0 | ||
| A309 | Shrubs/Hedges Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 20 | EA | ¥0 | ||
| A310 | Hydro-Seeding | The latest season’s crop delivered in original sealed packages bearing the producer’s guaranteed analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Mixes will be acceptable when the field mix is performed indie the presence of the Contracting Officer or designated representative. Fertilizer shall be controlled release with hydro seeding and it shall be applied in accordance with manufactures recommendation. Wood cellulose fiber or emulsified asphalt shall be used with hydraulic application of graded seed, fertilizer, and soil binder. The contractor shall re-preform hydro seeding areas which fail to firmly knit to the soil bed and/or develop the good stand of grass at no additional cost to the Government. | 25,000 | SF | ¥0 | ||
| A311 | Topsoiling | Topsoil to be provided by the Contractor shall be from approved sources. The topsoil shall be reasonability free from subsoil, clay clumps, weeds, or substances which might be harmful to plants. Soil proposed for use shall be inspected and approved by the Contracting Officer. | 50 | CY | ¥0 | ||
| A312 | Sand Filling | Sand shall be clan and free of toxic materials. | 20 | CY | ¥0 | ||
| A313 | Sodding | Sod shall be Korai-shiba. It shall be dense, uniform, weed free, and have good sod strength at minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The contractor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. | 5,000 | SF | ¥0 | ||
| A314 | Bamboo Bracing | The Contractor shall install or remove and replace existing bamboo bracing for shrubs and hedges, and shall use help rope for tying. | 250 | LF | ¥0 | ||
| A315 | |||||||
| MCB | Typhoon Clean-up (MCB Butler Only) | The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property. | |||||
| The Contractor shall collect and remove all vegetation debris (tree limbs, fallen trees, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon. | 5 | EA | ¥0 | ||||
| A316 | Composite Hourly Labor Rate | Composite hourly labor rate is used for performing work included within the IDIQ portion of the contract. | |||||
| The composite hourly labor rate shall include all direct and indirect costs, wages, profit, insurance, overhead, applicable taxes, travel time, operating expenses, tool and all other chargers that contribute to the composite hourly labor rate. | 1000 | Hours | ¥0 | ||||
| A317 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Equipment costs will be based on Means Cost Data Catalogs or area equipment rates, whichever proves more reasonable. To be used with ELIN A316. Prices shall also include mobilization costs, bonds, and State and Local sales taxes. MUST BE NEGOTIATED BY KO | 40 | EA | (Estimated Maximum Equip cost) | ¥1,000,000 | |
| A318 | Clear and Grub | Clear area of vegetation to COL 3 MIN. Remove vegetation and trees under 6 inches measered at breast heigh (4ft). Level, fill, and hydro-seed as required. | 20 | AC | ¥0 | ||
| Total BASE PERIOD- NON RECURRING WORK | ¥1,000,000 |
&9Page &P of &N
OPT1_RECURRING
RFP N4008419R2008 ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT B - CLIN 0003
| CLIN 0003 RECURRING WORK -Price - First Option Period | |||||||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping | |||||||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards. | |||||||||||
| ELIN | DESCRIPTION | Month(s) | Total Acreage | Unit Acre | PROPOSED AWARD | COL 1 | COL 2 (Prstg NTE 5%) (2-3") | COL 3 LV2 (3-4.5") | COL 3 Min (3-6") (Semi-Imp) | ||
| Unit Price | Total Price Yen | Total Price Dollar | Unit Price | Unit Price | Unit Price | Unit Price | |||||
| MCB PORTION (B001 ~ B008) | |||||||||||
| B001 | MCB (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B001AA | Prestige COL 2 Spec Item 3 | 12 | 9.18 | AC | ¥0 | $0.00 | |||||
| B001AB | Improved Spec. Item 3.1 | 12 | 71.25 | AC | ¥0 | $0.00 | |||||
| B001AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B001AD | Fence line Spec. Item 3.1.2 | 12 | 2.77 | AC | ¥0 | $0.00 | |||||
| B001AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B001AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B001AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B001AB | Improved Spec. Item 3.1 | 12 | 28.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B002 | MCB (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B002AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B002AB | Improved Spec. Item 3.1 | 12 | 4.88 | AC | ¥0 | $0.00 | |||||
| B002AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B002AD | Fence line Spec. Item 3.1.2 | 12 | 0.72 | AC | ¥0 | $0.00 | |||||
| B002AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B002AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B002AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (McTUREOUS) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B002AB | Improved Spec. Item 3.1 | 12 | 0.60 | AC | ¥0 | $0.00 | |||||
| Total for MCB McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B003 | MCB (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B003AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B003AB | Improved Spec. Item 3.1 | 12 | 6.55 | AC | ¥0 | $0.00 | |||||
| B003AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B003AD | Fence line Spec. Item 3.1.2 | 12 | 1.74 | AC | ¥0 | $0.00 | |||||
| B003AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B003AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B003AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| N/A | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B004 | MCB (HANSEN) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B004AA | Prestige COL 2 Spec Item 3 | 12 | 14.87 | AC | ¥0 | $0.00 | |||||
| B004AB | Improved Spec. Item 3.1 | 12 | 160.81 | AC | ¥0 | $0.00 | |||||
| B004AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B004AD | Fence line Spec. Item 3.1.2 | 12 | 2.39 | AC | ¥0 | $0.00 | |||||
| B004AE | Drainage Spec. Item 3.4 | 12 | 0.23 | AC | ¥0 | $0.00 | |||||
| B004AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B004AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (HANSEN) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B004AB | Improved Spec. Item 3.1 | 12 | 20.57 | AC | ¥0 | $0.00 | |||||
| Total for MCB Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B005 | MCB (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B005AA | Prestige COL 2 Spec Item 3 | 12 | 0.72 | AC | ¥0 | $0.00 | |||||
| B005AB | Improved Spec. Item 3.1 | 12 | 76.10 | AC | ¥0 | $0.00 | |||||
| B005AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B005AD | Fence line Spec. Item 3.1.2 | 12 | 0.66 | AC | ¥0 | $0.00 | |||||
| B005AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B005AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B005AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (SCHWAB) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B005AB | Improved Spec. Item 3.1 | 12 | 8.00 | AC | ¥0 | $0.00 | |||||
| Total for MCB Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B006 | MCB (HENOKO) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B006AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| B006AB | Improved Spec. Item 3.1 | 12 | 7.11 | AC | ¥0 | $0.00 | |||||
| B006AC | Semi-Improved Spec. Item 3.1 | 12 | 69.64 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Combines bunkers and Open areas. | AC | ¥0 | $0.00 | |||||||||
| B006AD | Fence line Spec. Item 3.1.2 | 12 | 6.90 | AC | ¥0 | $0.00 | ||||||
| B006AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B006AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B006AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| MCB (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||||
| B006AB | Improved Spec. Item 3.1 | 12 | 3.02 | AC | ¥0 | $0.00 | ||||||
| Total for MCB Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||||
| B007 | MCB (NTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B007AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B007AB | Improved Spec. Item 3.1 | 12 | 12.54 | AC | ¥0 | $0.00 | ||||||
| B007AC | Semi-Improved Spec. Item 3.1 | 12 | 7.56 | AC | ¥0 | $0.00 | ||||||
| B007AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B007AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B007AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B007AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 59,418 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
This is identified as linear feet, 58971.74 and needs to be in acreage
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Combines bunkers and Open areas. | LF | ¥0 | $0.00 | |||||||||
| Total for MCB NTA: | ¥0 | $0.00 | ||||||||||
| B008 | MCB (CTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| B008AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B008AB | Improved Spec. Item 3.1 | 12 | 2.66 | AC | ¥0 | $0.00 | ||||||
| B008AC | Semi-Improved (2"-6") Spec. Item 3.2 | 12 | 121.77 | AC | ¥0 | $0.00 | ||||||
| B008AC | Semi-Improved (2"-9") Spec. Item 3.2 | 12 | 91.89 | AC | ¥0 | $0.00 | ||||||
| B008AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B008AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B008AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| B008AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 250,083 | LF | ¥0 | $0.00 | ||||||
| Total for MCB CTA: | ¥0 | $0.00 | ||||||||||
| TOTAL OF MCB PORTION (B001 ~ B008): | ¥0 | $0.00 |
| MCB (MCCS) PORTION (B009 ~ B013)-TO BE ADDED TO MCB | |||||||||||
| B009 | MCB (MCCS) (NTA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B009AB | Improved Spec. Item 3.1 | 12 | 1.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) NTA: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B010 | MCB (MCCS) (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B010AB | Improved Spec. Item 3.1 | 12 | 7.99 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B011 | MCB (MCCS) (HANSEN) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B011AB | Improved Spec. Item 3.1 | 12 | 9.87 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B012 | MCB (MCCS) (SCHWAB) (COL 3 MIN -1503050 Grounds Maintenance and Landscaping | ||||||||||
| B012AB | Improved Spec. Item 3.1 | 12 | 2.16 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B013 | MCB (MCCS) (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B013AB | Improved Spec. Item 3.1 | 12 | 2.30 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB (MCCS) PORTION (B009 ~ B013): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| DODDS PORTION (B014) | |||||||||||
| B014 | DODDS (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B014AB | Improved Spec. Item 3.1 | 12 | 7.57 | AC | ¥0 | $0.00 | |||||
| Total for DoDDS McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DODDS PORTION (B014): | ¥0 | $0.00 |
| USNH NAVY PORTION (B015 ~ B017) | |||||||||||
| B015 | USNH (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B015AB | Improved Spec. Item 3.1 | 12 | 0.50 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B016 | USNH (HANSEN)(COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B016AB | Improved Spec. Item 3.1 | 12 | 2.51 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Hansen): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| B017 | USNH (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B017AB | Improved Spec. Item 3.1 | 12 | 0.83 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| USNH NAVY PORTION (B015 ~ B017): | ¥0 | $0.00 |
| USARJ PORTON (B018) | |||||||||||
| B018 | ARMY (CTA) / (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B018AB | (SCHWAB) Improved Spec. Item 3.1 | 12 | 0.14 | AC | ¥0 | $0.00 | |||||
| B018AC | (CTA) Semi- Improved Spec. Item 3.2 | 12 | 26.97 | AC | ¥0 | $0.00 | |||||
| Total for Army (CTA/Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF USARJ PORTION (B018): | ¥0 | $0.00 |
| DECA PORTION (B019) | |||||||||||
| B019 | DECA (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B019AB | Improved Spec. Item 3.1 | 12 | 1.12 | AC | ¥0 | $0.00 | |||||
| Total for DECA (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DECA PORTION (B019): | ¥0 | $0.00 |
| DLA Energy PORTION (B020) | |||||||||||
| B020 | DLA (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| B020AB | Improved Spec. Item 3.1 | 12 | 1.71 | AC | ¥0 | $0.00 | |||||
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DLA Energy PORTION (B020): | ¥0 | $0.00 |
| MCB North Clear, Grub & Maintain (B021) | |||||||||||
| B021 | MCB North Clear, Grub & Maintain COL 3 MIN | ||||||||||
| B021AB | Improved Spec. Item 3.3.3 | 12 | 15.05 | AC | ¥0 | $0.00 | |||||
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB North Clear & Grub (B021): | ¥0 | $0.00 |
Ground Total 1ST OPTION PERIOD- RECURRING WORK CLIN 0003 : ¥0 $0.00 N/A N/A N/A N/A
&9Page &P of &N
1OPT_NON RECURRING
RFP N4008419R2008 ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT B - CLIN 0004
| CLIN 0004 NON-RECURRING WORK (IDIQ) Price -1ST OPTION Period | |||||||
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B301 through B317 | |||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot | |||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | Estimated Quantity | UNIT OF ISSUE | Unit Price | Total Price | |
| B301 | Mowing, Unimproved Fence Line | Grass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 15 | AC | ¥0 | ||
| B302 | Reserved | ||||||
| B303 | Mowing, cutting of Unimproved grounds | Grass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 100 | AC | ¥0 | ||
| B304 | Tree Removal Large 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 30 | EA | ¥0 | ||
| B305 | Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| B306 | Tree Removal Medium 6" DBH to 12" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 50 | EA | ¥0 | ||
| B307 | Stump Removal | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| B308 | Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 150 | EA | ¥0 | ||
| B309 | Shrubs/Hedges Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 20 | EA | ¥0 | ||
| B310 | Hydro-Seeding | The latest season’s crop delivered in original sealed packages bearing the producer’s guaranteed analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Mixes will be acceptable when the field mix is performed indie the presence of the Contracting Officer or designated representative. Fertilizer shall be controlled release with hydro seeding and it shall be applied in accordance with manufactures recommendation. Wood cellulose fiber or emulsified asphalt shall be used with hydraulic application of graded seed, fertilizer, and soil binder. The contractor shall re-preform hydro seeding areas which fail to firmly knit to the soil bed and/or develop the good stand of grass at no additional cost to the Government. | 25,000 | SF | ¥0 | ||
| B311 | Topsoiling | Topsoil to be provided by the Contractor shall be from approved sources. The topsoil shall be reasonability free from subsoil, clay clumps, weeds, or substances which might be harmful to plants. Soil proposed for use shall be inspected and approved by the Contracting Officer. | 50 | CY | ¥0 | ||
| B312 | Sand Filling | Sand shall be clan and free of toxic materials. | 20 | CY | ¥0 | ||
| B313 | Sodding | Sod shall be Korai-shiba. It shall be dense, uniform, weed free, and have good sod strength at minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The contractor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. | 5,000 | SF | ¥0 | ||
| B314 | Bamboo Bracing | The Contractor shall install or remove and replace existing bamboo bracing for shrubs and hedges, and shall use help rope for tying. | 250 | LF | ¥0 | ||
| B315 | |||||||
| MCB | Typhoon Clean-up (MCB Butler Only) | The Contractor shall mobilize his entire workforce within eight (8) working hours or the “All Clear” Typhoon Condition announcement and be on the job site working. All collected debris shall be removed and disposed of off Government Property. | |||||
| The Contractor shall collect and remove all vegetation debris (tree limbs, fallen trees, leaves. Etc.), as a result of the typhoon along fence lines and other locations within the installation. In addition, the Contractor shall remove all cracked, broken or damaged tree limbs from any tree damaged during the severe weather. The Contractor shall also commence righting, re-planting, and re-staking for any trees, shrubs, and flower beds around the installation which have been uprooted and/or blown over by the typhoon. | 5 | EA | ¥0 | ||||
| B316 | Composite Hourly Labor Rate | Composite hourly labor rate is used for performing work included within the IDIQ portion of the contract. | |||||
| The composite hourly rate labor rate shall include all direct and indirect costs, wages, profit, insurance, overhead, applicable taxes, travel time, operating expenses, tool and all other chargers that contribute to the composite hourly labor rate. | 1000 | Hours | ¥0 | ||||
| B317 | Equipment Costs- MUST BE NEGOTIATED BY KO. | Equipment costs will be based on Means Cost Data Catalogs or area equipment rates, whichever proves more reasonable. To be used with ELIN B316. Prices shall also include mobilization costs, bonds, and State and Local sales taxes. MUST BE NEGOTIATED BY KO | 40 | EA | (Estimated Maximum Equip cost) | ¥1,000,000 | |
| B318 | Clear and Grub | Clear area of vegetation to COL 3 MIN. Remove vegetation and trees under 6 inches measered at breast heigh (4ft). Level, fill, and hydro-seed as required. | 20 | AC | ¥0 | ||
| Total 1st OPTION PERIOD- NON RECURRING WORK | ¥1,000,000 |
&9Page &P of &N
OPT2_RECURRING
V ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT C - CLIN 0005
| CLIN 0005 RECURRING WORK -Price - Second Option Period | |||||||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, 1503050 Grounds Maintenance and Landscaping | |||||||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot / COL - Common Output level Standards. | |||||||||||
| ELIN | DESCRIPTION | Month(s) | Total Acreage | Unit Acre | PROPOSED AWARD | COL 1 | COL 2 (Prstg NTE 5%) (2-3") | COL 3 LV2 (3-4.5") | COL 3 Min (3-6") (Semi-Imp) | ||
| Unit Price | Total Price Yen | Total Price Dollar | Unit Price | Unit Price | Unit Price | Unit Price | |||||
| MCB PORTION (C001 ~ C008) | |||||||||||
| C001 | MCB (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C001AA | Prestige COL 2 Spec Item 3 | 12 | 9.18 | AC | ¥0 | $0.00 | |||||
| C001AB | Improved Spec. Item 3.1 | 12 | 71.25 | AC | ¥0 | $0.00 | |||||
| C001AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C001AD | Fence line Spec. Item 3.1.2 | 12 | 2.77 | AC | ¥0 | $0.00 | |||||
| C001AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C001AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C001AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C001AB | Improved Spec. Item 3.1 | 12 | 28.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C002 | MCB (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C002AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C002AB | Improved Spec. Item 3.1 | 12 | 4.88 | AC | ¥0 | $0.00 | |||||
| C002AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C002AD | Fence line Spec. Item 3.1.2 | 12 | 0.72 | AC | ¥0 | $0.00 | |||||
| C002AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C002AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C002AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (McTUREOUS) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C002AB | Improved Spec. Item 3.1 | 12 | 0.60 | AC | ¥0 | $0.00 | |||||
| Total for MCB McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C003 | MCB (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C003AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C003AB | Improved Spec. Item 3.1 | 12 | 6.55 | AC | ¥0 | $0.00 | |||||
| C003AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C003AD | Fence line Spec. Item 3.1.2 | 12 | 1.74 | AC | ¥0 | $0.00 | |||||
| C003AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C003AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C003AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| N/A | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C004 | MCB (HANSEN) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C004AA | Prestige COL 2 Spec Item 3 | 12 | 14.87 | AC | ¥0 | $0.00 | |||||
| C004AB | Improved Spec. Item 3.1 | 12 | 160.81 | AC | ¥0 | $0.00 | |||||
| C004AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C004AD | Fence line Spec. Item 3.1.2 | 12 | 2.39 | AC | ¥0 | $0.00 | |||||
| C004AE | Drainage Spec. Item 3.4 | 12 | 0.23 | AC | ¥0 | $0.00 | |||||
| C004AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C004AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (HANSEN) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C004AB | Improved Spec. Item 3.1 | 12 | 20.57 | AC | ¥0 | $0.00 | |||||
| Total for MCB Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C005 | MCB (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C005AA | Prestige COL 2 Spec Item 3 | 12 | 0.72 | AC | ¥0 | $0.00 | |||||
| C005AB | Improved Spec. Item 3.1 | 12 | 76.10 | AC | ¥0 | $0.00 | |||||
| C005AC | Semi-Improved Spec. Item 3.1 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C005AD | Fence line Spec. Item 3.1.2 | 12 | 0.66 | AC | ¥0 | $0.00 | |||||
| C005AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C005AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C005AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| MCB (SCHWAB) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C005AB | Improved Spec. Item 3.1 | 12 | 8.00 | AC | ¥0 | $0.00 | |||||
| Total for MCB Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C006 | MCB (HENOKO) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C006AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A |
| C006AB | Improved Spec. Item 3.1 | 12 | 7.11 | AC | ¥0 | $0.00 | |||||
| C006AC | Semi-Improved Spec. Item 3.1 | 12 | 69.64 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Combines bunkers and Open areas. | AC | ¥0 | $0.00 | |||||||||
| C006AD | Fence line Spec. Item 3.1.2 | 12 | 6.90 | AC | ¥0 | $0.00 | ||||||
| C006AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C006AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C006AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| MCB (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||||
| C006AB | Improved Spec. Item 3.1 | 12 | 3.02 | AC | ¥0 | $0.00 | ||||||
| Total for MCB Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | ||||||
| C007 | MCB (NTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C007AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C007AB | Improved Spec. Item 3.1 | 12 | 12.54 | AC | ¥0 | $0.00 | ||||||
| C007AC | Semi-Improved Spec. Item 3.1 | 12 | 7.56 | AC | ¥0 | $0.00 | ||||||
| C007AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C007AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C007AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C007AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 59,418 |
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
This is identified as linear feet, 58971.74 and needs to be in acreage
Lovell CIV Jimmy D: Lovell CIV Jimmy D:
| Combines bunkers and Open areas. | LF | ¥0 | $0.00 | |||||||||
| Total for MCB NTA: | ¥0 | $0.00 | ||||||||||
| C008 | MCB (CTA) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | |||||||||||
| C008AA | Prestige COL 2 Spec Item 3 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C008AB | Improved Spec. Item 3.1 | 12 | 2.66 | AC | ¥0 | $0.00 | ||||||
| C008AC | Semi-Improved (2"-6") Spec. Item 3.2 | 12 | 121.77 | AC | ¥0 | $0.00 | ||||||
| C008AC | Semi-Improved (2"-9") Spec. Item 3.2 | 12 | 91.89 | AC | ¥0 | $0.00 | ||||||
| C008AD | Fence line Spec. Item 3.1.2 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C008AE | Drainage Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C008AF | Airfield Spec. Item 3.4 | N/A | N/A | N/A | N/A | N/A | $0.00 | N/A | N/A | N/A | N/A | |
| C008AG | Roadside/Drainage(2"-16") Spec. Item 3.4 | 6 | 250,083 | LF | ¥0 | $0.00 | ||||||
| Total for MCB CTA: | ¥0 | $0.00 | ||||||||||
| TOTAL OF MCB PORTION (C001 ~ C008): | ¥0 | $0.00 |
| MCB (MCCS) PORTION (C009 ~ C013)-TO BE ADDED TO MCB | |||||||||||
| C009 | MCB (MCCS) (NTA) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C009AB | Improved Spec. Item 3.1 | 12 | 1.49 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) NTA: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C010 | MCB (MCCS) (COURTNEY) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C010AB | Improved Spec. Item 3.1 | 12 | 7.99 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Courtney: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C011 | MCB (MCCS) (HANSEN) (COL 3 MIN - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C011AB | Improved Spec. Item 3.1 | 12 | 9.87 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Hansen: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C012 | MCB (MCCS) (SCHWAB) (COL 3 MIN -1503050 Grounds Maintenance and Landscaping | ||||||||||
| C012AB | Improved Spec. Item 3.1 | 12 | 2.16 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Schwab: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C013 | MCB (MCCS) (HENOKO) (COL 3 MIN) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C013AB | Improved Spec. Item 3.1 | 12 | 2.30 | AC | ¥0 | $0.00 | |||||
| Total for MCB (MCCS) Henoko: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB (MCCS) PORTION (C019 ~ C013): | ¥0 | $0.00 | N/A | N/A | N/A | N/A |
| DODDS PORTION (C014) | |||||||||||
| C014 | DODDS (McTUREOUS) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C014AB | Improved Spec. Item 3.1 | 12 | 7.57 | AC | ¥0 | $0.00 | |||||
| Total for DoDDS McTureous: | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DODDS PORTION (C014): | ¥0 | $0.00 |
| USNH NAVY PORTION (C015 ~ C017) | |||||||||||
| C015 | USNH (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C015AB | Improved Spec. Item 3.1 | 12 | 0.50 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C016 | USNH (HANSEN)(COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C016AB | Improved Spec. Item 3.1 | 12 | 2.51 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Hansen): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| C017 | USNH (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C017AB | Improved Spec. Item 3.1 | 12 | 0.83 | AC | ¥0 | $0.00 | |||||
| Total for USNH (Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| USNH NAVY PORTION (C015 ~ C017): | ¥0 | $0.00 |
| USARJ PORTON (C018) | |||||||||||
| C018 | ARMY (CTA) / (SCHWAB) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C018AB | (SCHWAB) Improved Spec. Item 3.1 | 12 | 0.14 | AC | ¥0 | $0.00 | |||||
| C018AC | (CTA) Semi- Improved Spec. Item 3.2 | 12 | 26.97 | AC | ¥0 | $0.00 | |||||
| Total for Army (CTA/Schwab): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF USARJ PORTION (C018): | ¥0 | $0.00 |
| DECA PORTION (C019) | |||||||||||
| C019 | DECA (COURTNEY) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C019AB | Improved Spec. Item 3.1 | 12 | 1.12 | AC | ¥0 | $0.00 | |||||
| Total for DECA (Courtney): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DECA PORTION (C019): | ¥0 | $0.00 |
| DLA Energy PORTION (C020) | |||||||||||
| C020 | DLA (ASP-2) (COL 3 LV2) - 1503050 Grounds Maintenance and Landscaping | ||||||||||
| C020AB | Improved Spec. Item 3.1 | 12 | 1.71 | AC | ¥0 | $0.00 | |||||
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF DLA Energy PORTION (C020): | ¥0 | $0.00 |
| MCB North Clear, Grub & Maintain (C021) | |||||||||||
| C021 | MCB North Clear, Grub & Maintain COL 3 MIN | ||||||||||
| C021AB | Improved Spec. Item 3.3.3 | 12 | 15.05 | AC | ¥0 | $0.00 | |||||
| Total for DLA (ASP-2): | ¥0 | $0.00 | N/A | N/A | N/A | N/A | |||||
| TOTAL OF MCB North Clear & Grub (C021): | ¥0 | $0.00 |
Ground Total 2ND OPTION PERIOD- RECURRING WORK CLIN 0005 : ¥0 $0.00 N/A N/A N/A N/A
&9Page &P of &N
2OPT_NON RECURRING
RFP N4008419R2008 ATTACHMENT J-0200000-10
EXHIBIT LINE ITEM NUMBERS (ELIN)
EXHIBIT C - CLIN 0006
| CLIN 0006 NON-RECURRING WORK (IDIQ) Price -2ND OPTION Period | |||||||
| PROVIDE PRICES FOR GROUNDS MAINTENANCE AND LANDSCAPING - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C301 through C317 | |||||||
| Unit of Measure: AC -Acre, EA- Each, SF-Square Foot, CY-Cylinder, LF-Linear Foot | |||||||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | Estimated Quantity | UNIT OF ISSUE | Unit Price | Total Price | |
| C301 | Mowing, Unimproved Fence Line | Grass shall be mowed and trimmed to a uniform height per COL 2 specifications. All clippings and debris shall be removed. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 15 | AC | ¥0 | ||
| C302 | Reserved | ||||||
| C303 | Mowing, cutting of Unimproved grounds | Grass shall be cut/mowed and trimmed to a uniform height per COL 2 specificatins. All clippings and debris shall be removed. Mowing, cutting of Unimproved grounds allowed to grow wild. Unimproved grounds is mainly consisting of grass, shrub, and vegetations less than 6" DBH. | 100 | AC | ¥0 | ||
| C304 | Tree Removal Large 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 30 | EA | ¥0 | ||
| C305 | Tree Removal Medium 12" DBH to 20" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| C306 | Tree Removal Medium 6" DBH to 12" DBH and above Tree Removal. | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 50 | EA | ¥0 | ||
| C307 | Stump Removal | Remove trees. Plants shall be cut down and treated to prevent regrowth. Backfill all excavated holes. All debris resulted from the work shall be removed off from the Government property. Trees are sized by Diameter at Breast Height (DBH). DBH is measured at 4 feet above ground level. | 75 | EA | ¥0 | ||
| C308 | Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 150 | EA | ¥0 | ||
| C309 | Shrubs/Hedges Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from the work shall be removed off from the Government property. | 20 | EA | ¥0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .