Grand_Forks_Cost_Breakdown.xls
XLS spreadsheet 77 KB Posted
- Solicitation number
- N4008313R0032
About this file
Cost Breakdown Sheet
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA INSTALL
| NAVFAC | COST ESTIMATE | DATE PREPARED | SHEET 2 | ||||||||
| ACTIVITY AND LOCATION | Grand Forks AFB | CONSTRUCTION CONTRACT NO. | IDENTIFICATION NUMBER | ||||||||
| BUILDNG | ESTIMATED BY: | CATEGORY CODE NUMBER | |||||||||
| PROJECT TITLE | SmartMAG | ||||||||||
| STATUS OF DESIGN | WORK ORDER NUMBER | ||||||||||
| ITEM DESCRIPTION | QUANTITY | CSI MASTERFORMAT CLASS | ENGINEERING ESTIMATE | ||||||||
| NUMBER | UNIT | LINE NUMBERS | UNIT COST | TOTAL | |||||||
| EXTERIOR CONSTRUCTION | |||||||||||
| 1.11 | 2.22 | $0 | $0 | $0 | |||||||
| Demolish steel swing magazine doors | 1 | EA | |||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| Remove existing conc pavement | 1 | LS | |||||||||
| 1.09 | 2.09 | 0 | $0.00 | $0 | $0.00 | $0 | |||||
| Sawcut and demolish existing conc foundation | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Localized excavation | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Soil replacement with lean concrete fill | CY | ||||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Roughen exist. conc. and epoxy/welded dowels | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Reinforced concrete foundation | CY | ||||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| Reinforced concrete wall and pilaster | CY | $0.00 | |||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | |||||
| Existing concrete coring | 6 | EA | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Magazine door steel supports and trolley beam | 1 | EA | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Metal canopy and support framing | SF | ||||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Metal security hood | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Steel jamb embed | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Steel trench embeds, door guides, trench covers | 2 | EA | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Trench drains and leach bed | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Replace concrete pavement, dowel to existing | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| INTERIOR CONSTRUCTION | 0 | $0.00 | |||||||||
| New security insert in existing vent shaft | 1 | LS | |||||||||
| New vent box and covers | 4 | EA | |||||||||
| SECURITY DOOR | 0 | $0.00 | |||||||||
| Magazine Door (11' W x 10.5' H) with trolley sets | 1 | EA | |||||||||
| Magazine door operator | 1 | EA | |||||||||
| ELECTRICAL CONSTRUCTION | |||||||||||
| 1.11 | 2.22 | $0 | $0 | $0 | |||||||
| Sliding door power | LF | ||||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| Door disconnect, 30A, 240V | 1 | EA | |||||||||
| 1.09 | 2.09 | 0 | $0.00 | $0 | $0.00 | $0 | |||||
| Removal of existing electrical | 1 | LS | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| RGS conduit / SEC | LF | ||||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Door and rebar grounding | 1 | EA | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Door remote | 1 | EA | |||||||||
| $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||||
| Heat trace at drains, lock compartment, and slab | FT | ||||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| Relocate existing floodlight | 1 | EA | |||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | |||||
| SUB TOTAL | $0 | ||||||||||
| Construction / Design Contingency @ | |||||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| SUB TOTAL | $0 | ||||||||||
| General Conditions & Fee @ | |||||||||||
| 1.09 | 2.09 | $0.00 | 0 | $0.00 | $0 | $0.00 | $0 | ||||
| TOTAL | $0 |
&L&F
FA INSTALL CONT
| NAVFAC 11013/7(1-78) | COST ESTIMATE | DATE PREPARED | SHEET 3 | 0 | |||||||
| December 31, 1899 | |||||||||||
| ACTIVITY AND LOCATION | CONSTRUCTION CONTRACT NO. | IDENTIFICATION NUMBER | |||||||||
| NAVAL STATION GREAT LAKES | 0 | ||||||||||
| 0 | ESTIMATED BY: | CATEGORY CODE NUMBER | |||||||||
| PROJECT TITLE | 0 | ||||||||||
| 0 | STATUS OF DESIGN | WORK ORDER NUMBER | |||||||||
| 0 | 0 | ||||||||||
| ITEM DESCRIPTION | QUANTITY | MATERIAL COST | LABOR COST | ENGINEERING ESTIMATE | |||||||
| NUMBER | UNIT | UNIT COST | TOTAL | UNIT COST | TOTAL | UNIT COST | TOTAL | ||||
| FIRE ALARM SYSTEM INSTALL CON'T | |||||||||||
| 1.11 | 2.22 | $0 | $0 | $0 | |||||||
| FA DESIGN FEES (PARTIAL NICET & FPE) | HR | $0.00 | |||||||||
| FINAL TESTING - FA PROGRAMMER | HR | $0.00 | |||||||||
| ONE ELECTRICIANS FOR FINAL TEST | HOURS | $0.00 | |||||||||
| SUBTOTAL THIS PAGE | $0.00 | ||||||||||
| SUBTOTAL FIRST PAGE FA INSTALL | $0.00 | ||||||||||
| TOTAL FIRE ALARM SYSTEM INSTALLATION | $0 |
&L&F
File details come from the government source that posted it. Updated .