Solicitation N4008025R10060001 SF33.pdf

PDF 3 MB Posted

Attached to
Multi-Media Environmental Compliance Services-Water
Solicitation number
N4008025R1006
Issued by

About this file

This is a Request for Proposal (RFP) for Multi-Media Environmental Compliance Services with an emphasis on Stormwater, Wastewater, and Drinking Water for the Naval Facilities Engineering Command (NAVFAC) Washington DC Area of Responsibility (AOR) and US Territories. The solicitation is a Total Small Business Set-Aside with a Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity (IDIQ) contract for a five-year ordering period, with an option to extend services for up to six months. The contract will support environmental compliance services primarily within Washington DC, Maryland, and Virginia, with a minimum order of $50,000 and a maximum of $45,000,000 per order.

The solicitation requires offerors to submit detailed proposals addressing four evaluation factors: Technical/Management Approach, Corporate Experience, Safety, and Past Performance. Proposals must include recent and relevant projects demonstrating experience in Stormwater, Wastewater, and Drinking Water services, with specific requirements for project scope, size, and complexity. Offerors will be evaluated using a Lowest Price Technically Acceptable (LPTA) process, with technical factors and past performance given approximately equal importance to price. The proposal must include detailed information on team composition, safety records, proximity to Naval District Washington facilities, and past performance references.

View the file

Other files

File Type Posted
Amendment 0006 SF30.pdf PDF
N4008025R1006_Revised PPIs dated 15OCT2025_Amendment 0005.pdf PDF
Amendment 0005 SF30.pdf PDF
REVISED Attachment C_Price Template_N4008025R1006_9OCT2025_Amendment 0004.xlsx XLSX spreadsheet
REVISED Attachment C_Price Template_N4008025R1006_8 October 2025_Amendment 0004.xlsx XLSX spreadsheet
SCA WD 2015-4265_MD_8JULY2025_Amendment 0004.pdf PDF
Amendment 0004 SF30.pdf PDF
SCA WD 2015-4281_DC_8JULY2025_Amendment 0004.pdf PDF
REVISED Attachment F_Table 2 Wastewater dated 8 October 2025_Amendment 0004.docx DOCX document
N4008025R1006_PPIs dated 8 October 2025_Amendment 0004.pdf PDF
REVISED Attachment G_Table 3 Drinking Water dated 8 October 2025_Amendment 0004.docx DOCX document
REVISED Attachment E_Table 1 Stormwater dated 8 October 2025_Amendment 0004.docx DOCX document
SCA WD 2015-4329_VA_8JULY2025_Amendment 0004.pdf PDF
Amendment 0003 SF 30.pdf PDF
Amendment 0002 SF30.pdf PDF
Amendment 0001 SF30.pdf PDF
Attachment E_Table 1 Stormwater.docx DOCX document
Attachment D_Project Information Form.docx DOCX document
Attachment B_PPI Log_N4008025R1006.xlsx XLSX spreadsheet
Attachment H_PPQ Form.docx DOCX document
Attachment G_Table 3 Drinking Water.docx DOCX document
Attachment A_PIEE Vendor Registration Instructions.pdf PDF
Attachment C_Price Template Water IDIQ_N4008025R1006.xlsx XLSX spreadsheet
Attachment F_Table 2 Wastewater.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 7900)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

N4008025R10060001

Section A - Solicitation/Contract Form

MULTI-MEDIA ENVIRONMENTAL COMPLIANCE SERVICES-WATER

GENERAL INFORMATION

A.1 CONTRACT TITLE: Multi-Media Environmental Compliance Services, with an Emphasis on Storm Water, Wastewater, and Drinking Water for the Naval Facilities Engineering Command (NAVFAC) Washington DC Area of Responsibility (AOR) and US Territories.

A.2 TYPE OF CONTRACT: This procurement will result in a single award Firm-Fixed-Price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract for a full range of multi-media environmental compliance services with an emphasis on Stormwater, Wastewater and Drinking Water, in Naval Facilities Engineering Command (NAVFAC) Washington's Area of Responsibility and US Territories.

A.3 SET- ASIDE: This contract is solicited as a Total Small Business Set-Aside (Refer to Section I).

A.4 NAICS CODE: The NAICS code is 541620, Environmental Consulting Services, with a Size Standard of $19M. Refer to SAM.gov website, for further information.

A.5 BID GUARANTEE / BONDING REQUIREMENTS: A bid guarantee is not required.

A.6 CONTRACT TERM: The resulting award will provide for a five-year ordering period and the Federal Acquisition Regulation (FAR 52.217-8 Option Period), for up to six months, if necessary. The total period of performance is not to exceed a total of 66 months.

A.7 PLACE OF PERFORMANCE: Services will be performed primarily within the NAVFAC Washington Area of Responsibility (AOR), to include, Washington DC, Maryland, and Virginia, and additionally CONUS lands and waters that support the U.S. Navy, Marine Corps, and other federal entities supported by NAVFAC Washington; and US Territories.

The start date will be determined at the time of award, and the completion date will be determined at the time A.8 PERIOD OF PERFORMANCE:

of award. Estimated Delivery Dates are provided under Section F-Deliveries or Performance.

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Allowed Per Order Minimum: 50,000.00 Dollars, U.S.

Maximum: 500,000.00 Dollars, U.S.

Contractor Minimum/Maximum to Deliver Minimum: 50,000.00 Dollars, U.S.

Maximum: 45,000,000.00 Dollars, U.S.

Government Minimum/Maximum to Order Minimum: 50,000.00 Dollars, U.S.

Maximum: 45,000,000.00 Dollars, U.S.

Item Supplies/Service Quantity Unit Unit Price Amount

Five Year Ordering Period Multi-Media Environmental Compliance Services with an Emphasis on Stormwater, Wastewater and Drinking Water, Washington DC, AOR and US Territories

Pricing Arrangement: Firm Fixed Price

1 Task

Option Line Item

FAR 52.217-8 Option - Multi-Media Environmental Compliance Services with an Emphasis on Stormwater, Wastewater and Drinking Water, Washington DC, AOR and US Territories

Pricing Arrangement: Firm Fixed Price

1 Task

Section C - Description/Specifications/Statement of Work

SECTION C

PERFORMANCE WORK STATEMENT/STATEMENT OF WORK FOR MULTI-MEDIA COMPLIANCE

- WATER FOCUSED

PART 1.0 GENERAL DESCRIPTION AND PERSONNEL REQUIREMENTS

C.1 GENERAL

The intention for this contract is to provide a full range of multi-media environmental compliance services with an emphasis on Stormwater, Wastewater and Drinking Water. This basic contract will be tailored to identify specific Contract Task Order (CTO) requirements. A firm-fixed price, Indefinite Delivery/Indefinite Quantity (ID/IQ) contract will be established to perform the required services and shall be performed as outlined below.

C.2 PERFORMANCE OBJECTIVES

The Contractor will provide the full range of methods and technologies supporting activities necessary to be in compliance with environmental laws and regulations and meeting budgets and schedules. Requirements shall be carried out under CTOs for various locations primarily within Naval Facilities Engineering Command Washington footprint. To a lesser extent, work may occur at any sites located in the lands and waters of the Continental United States (CONUS) that support the U.S. Navy, Marine Corps and other federal entities supported by NAVFAC Washington. The exact location of the required effort will be specified in the individual CTOs.

CTOs will be either presented as a statement of work or as a performance-based product delivery, where desired outcomes of the work are identified without specifying the methods or technologies to be used. Contracted work is performed with minimal focus on government process and maximum focus on results. A results-based product delivery CTO enables the Contractor to select actions best suited to the site requirements and ensures that the most up-to-date and best management practices are employed.

C.2.1 GENERAL INFORMATION

The Contractor shall conduct such work to enable the customer to be in compliance with all applicable laws and regulations. The Contractor shall engage early in the process to allow for the development of the most cost-effective and technically sound solution and use its expertise to recognize and address problematic issues in executing work under the CTOs. Typical activities may include, but are not limited to, the following:

Primary Scope Stormwater Compliance Survey, inspection and design of Low Impact Development (LID) facilities and stormwater Best Management Practices (BMP) and post construction award services

Preparation or review of LID and structural and nonstructural BMP documentation

Develop maintenance manuals for LID/BMP features

Inventory and documentation for LID/BMP features

Assess and evaluate the condition of stormwater system and components

Maintenance and repairs of LID/BMP features

Permit application and support

Identify non-point source pollution areas including land use changes

Investigation and evaluation of illicit discharges

Stormwater and ambient water quality sampling and analysis including associated Quality Assurance and/or Sampling Analysis plans and self-monitoring reports Development of Geographic Information Systems (GIS) data and computer aided design and drafting drawing production

Developing storm water pollution prevention plans and site compliance evaluations

Other stormwater related tasks

Wastewater Compliance:

Wastewater evaluation, investigation, and reuse studies

Inflow and infiltration studies

POTW pretreatment applications

Wastewater permit compliance sampling and analysis

Sludge and wastewater characterization sampling and analysis

Preparation of operation and maintenance manuals for wastewater treatment plants

Sludge management and disposal plans (including land application)

Industrial wastewater management and pollution minimization plans

Conveyance system mapping using Geographic Information System (GIS) data obtained through surveying

Preparing NPDES permit applications and monitoring reports for indirect and direct wastewater discharges for wastewater collection and treatment systems

Conducting wastewater treatment plant operational evaluations

Conducting industrial wastewater surveys

Providing operator training

Illicit discharge studies

Other wastewater related tasks

Drinking Water Compliance:

Source water (surface and groundwater) protection and water quality evaluations

Sanitary surveys

Water leakage surveys or investigations and Water audits

Condition Assessments

Developing vulnerability assessment/emergency response plans

Completion of various studies: Water Conservation, Corrosion Control

Wellhead Protection Assessments

Drinking water characterization sampling and analysis

Preparation of operation and maintenance manuals for drinking water treatment plants

Evaluations for the upgrading or improving of the operation of existing drinking water facilities

Distribution system mapping using Geographic Information System (GIS) data obtained through surveying

Development of sampling monitoring plans

Hydraulic modeling of distribution systems

Other drinking water related tasks

Secondary Scope Air Quality and Clean Air Act Compliance:

Air emissions inventory

Preparing major and minor source air permit application and renewal

Preparation of semi-annual and annual compliance and emissions reporting as required by installation permits

Preparation or revision of facility compliance tools or databases

Providing equipment operator training

Performance of regulatory compliance evaluations and determinations

Complete Stage I and Stage II vapor recovery system certification

Refrigerant compliance and recordkeeping evaluation and support

Complete air emission and dispersion modeling

National emissions standard for hazardous air pollutant (NESHAP) review and applicability determination

New Source Performance Standards (NSPS) review and applicability determinations

Complete emission testing

Develop or update Standard Operating Procedures in terms of air emissions for equipment and processes

Develop or update compliance plans

Other air related tasks

Waste and Materials Compliance:

EPCRA reports

Hazardous waste management plans

Waste streams sampling and analysis

Waste stream determination

Integrated Solid Waste Management plans

Asbestos surveys and testing

Lead-based paint surveys and testing

Radon surveys and testing

Asbestos abatement

Lead-based paint abatement

Radon mitigation

Other waste/materials related tasks

Fuel Storage Tank and Spill Compliance:

Prepare tank management plans

Prepare tank inventories

Prepare SPCC plans

Prepare sampling plans and closure reports for tank replacements/closures

Conduct integrity evaluations of tanks and piping

Complete formal internal and external tank inspections

Perform tank removals and replacements

Perform tank repairs and upgrades to meet environmental regulations

Perform tank maintenance activities

Deliver aboveground storage tank (AST)/underground storage tank (UST) training courses for the tank managers

Conduct spill drills/training

Other tank and spill related tasks

Environmental Management System (EMS):

Training and auditing

Other EMS related tasks

Other Environmental Liabilities (OEL):

The OEL Sustainment Process addresses environmental liabilities for a broad range of Navy and Marine Corps assets, including: facilities, structures, utilities, land, relocatables and non-military equipment. The objective of the Navy's OEL Program is to provide an unqualified audit opinion of the Department of the Navy's OEL.

Assisting in field data collection for new and existing OEL Units

Coordination of site visits

Transcribing data into electronic formats

Other OEL related tasks

Environmental Planning:

Environmental Assessments (EA)

Environmental Impact Statements (EIS)

Studies to support an EA or EIS.

Other National Environmental Policy Act (NEPA) or environmental planning related tasks

Cultural Resources:

National Historic Preservation Act compliance

Cultural resource investigations/research

National Register eligibility determination

Architectural surveys

Archaeology surveys (Phase I/II/III)

Visual surveys

Artifact conservation/prestorage curation

Section 106 documentation

Support for Memoranda of Agreement and Programmatic Agreements

Report preparation

Photography

Mitigation

Archaeological Site Protection Plans

Historic Structures Reports

Historic American Building Survey / Historic American Engineering Record / Historic American

Landscape Survey (HABS/HAER/HALS) Documentation

Construction monitoring, underwater investigations, preparation of exhibits/interpretive materials, and other related studies/efforts etc.)

Conduct Phase I, II, and III cultural resources investigations/surveys

Other cultural resources related tasks

Natural Resources:

Biological investigations and restoration actions

Earth science (topography, geology, soils)

Wetland delineations, studies, and restoration

Coastal Zone Management, consistency determinations and shoreline studies

Benthic and water quality studies

Rare, threatened and endangered (RT&E) species surveys, assessments and consultations

Landscape design and management

Natural resource damage assessments

Forest inventories and studies

Integrated Natural Resource Management Plans (INRMPs)

Bird avoidance modeling (BAM) and bird/deer aircraft strike hazard (BASH/DASH)

Marine resources tasks

Invasive plant/animal species management

Landscape studies/plans; and the preparation of associated environmental reports, documentation, studies, plans, maps, measured drawings

Installation Restoration:

Support of Environmental Baseline Surveys (EBS) and Phase I and II Hazardous, Toxic, and Radiological Waste (HTRW) Surveys for real estate actions associated with property acquisition and excessing

Support of the Defense Department's Installation Restoration Program and Munitions Response Program in compliance with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) of 1980 as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986 and Resource Conservation and Recovery Act (RCRA)

Support of environmental documentation for base closure efforts

Support of assessments, studies, investigations, remedial designs that require coordination with, and understanding of other environmental programs such as air, water, waste water, solid waste, asbestos, and hazardous substance/waste management and complex compliance requirements requiring the integration of knowledge from several media and statues

Support of site investigation and remediation of unexploded ordnance (UXO) and associated contamination in accordance with DoD regulations expected to be promulgated specific to UXO Management and Remediation of Closed, Transferring and Transferred Ranges

Support of the Navy's Range Sustainability Environmental Program Assessment (R.S.E.P.A) program

Other installation restoration related tasks

Proximity to Naval District Washington Facilities The Offeror shall have at least one office in the NDW area and should be in close proximity (no greater than 150 miles to the major NDW installations (NSF Bethesda, NSA Annapolis, Washington Navy Yard, NSF Carderock, NSF Suitland, United States Naval Observatory, NAS Patuxent River, NSF Indian Head and NSF

Dahlgren.

C.3 PERSONNEL QUALIFICATIONS

The proposed teams shall be multi-disciplinary and shall demonstrate appropriate disciplines to perform the types of work addressed above. The Contractor shall furnish sufficient technical, management and administrative personnel at all times to ensure timely execution of the work. The Contracting Officer reserves the right to request resumes and documentation at any time to verify qualifications, and to require such documentation prior to use of personnel on any contract task order. Personnel qualification must include but is not limited to the following:

Principal/Program Manager. Person that is a principal, officer or senior manager of the contractor with full and unlimited authority to represent the interest of the contractor in all matters relating to the contract or to a specific Contract Task Order (CTO). The Program Manager shall be responsible for liaison between contract personnel and the Contracting Officer (KO), Contracting Officer's Representative (COR) or Navy Technical Representative (NTR), and for maintaining a fully staffed and equipped work force. CTO negotiations shall be accomplished on a one-to-one basis between the Program Manager and the Contracting Officer. The Program Manager shall have a minimum of 10 years of full time professional experience in project management, and shall have a minimum of 2 years of experience in a program manager capacity.

QA/QC Manager. The Quality Assurance/Quality Control (QA/QC) Manager shall have a minimum of 5 years of QA/QC experience, with at least 1 of those years involved with multimedia environmental projects. Responsibilities include developing, maintaining and enforcing the contractor's QA/QC Program.

Project/Task Order Manager. Minimum of 5 years of full time professional experience in Stormwater, Wastewater, and Drinking Water. Each Project/Task Order Manager is not required to demonstrate experience in all categories. Collectively, the Project Manager's resumes must demonstrate experience in all categories with a minimum of a BS degree. Project Managers must have at least 2 years full-time professional experience as a Project Manager for similar scope projects in Maryland, Virginia, and the District of Columbia. Each Project Manager is not required to demonstrate experience in all regulatory jurisdictions. Collectively, the Project Manager's resumes must demonstrate experience in Maryland, Virginia, and the District of Columbia. The Project Manager coordinates the efforts of the other disciplines (including sub-contractors), ensuring timeliness, forecasting delays, financial performance, etc. Additionally, this person will be the main point of contact for all required results and/or progress on projects.

Technical Specialist. This position shall be filled by persons with a BS degree in the appropriate engineering/science discipline and 10 years in a technical specialty that does not typically fall into one of the standard environmental engineering or science categories. This person would typically have a PhD or some other specific training/certification/specialization that is required for the project.

Senior Engineer. This position shall be filled by persons with a BS degree in the appropriate engineering discipline and 10 years of specifically related experience. Responsible for managing technical groups and/or management of projects of significance, prepares estimates, schedules work to meeting completion dates, directs assistance, reviews progress, evaluates results, makes changes in methods or equipment, operates with some latitude, performs technical work in support of project efforts and may serve as the Site Manager on major field efforts.

Mid-Level Engineer. This position shall be filled by persons with a BS degree in the appropriate engineering discipline and 5 years of specifically related experience. Collects and analyzes data, develops sections of reports and assists in development and design of projects. Capable of leading projects with a mid to low degree of difficulty.

Junior Engineer. This position shall be filled by persons with a BS degree in the appropriate engineering discipline with 0 to 5 years of experience.

This position documents and evaluates projects and experiments and largely collects and compiles data.

Senior Scientist/Geologist. This position shall be filled by persons with a BS degree in the appropriate science discipline and 10 years of specifically related experience. Responsible for managing technical groups and/or management of projects of significance, prepares estimates, schedules work to meeting completion dates, directs assistance, reviews progress, evaluates results, makes changes in methods or equipment, operates with some latitude, performs technical work in support of project efforts and may serve as the Site Manager on major field efforts.

Utilizes theories and principles to formulate solutions to complex problems.

Mid-Level Scientist/Geologist. This position shall be filled by persons with a BS degree in the appropriate science discipline and 5 years of specifically related experience. Collects and analyzes data, develops sections of reports and assists in development and design of some aspects of a project.

Junior Scientist/Geologist. This position shall be filled by persons with a BS degree in the appropriate science discipline. Documents and evaluates projects and experiments by collecting and compiling data.

Senior Field Technician. Minimum of 10 years of experience. The qualified individual for this position is responsible for major field operations, performs more complex/sophisticated assignments, and supervises lower level technicians. Performs field-testing and prepares reports associated with data collection.

Mid-Level Field Technician. Minimum of 5 years of experience. The qualified individual for this position performs non-routine and complex assignments; performs technical services, experiments or tests which may require non- standard procedures and complex equipment, programs and /or instrumentation; records computes and analyzes test or study data; prepares appropriate documentation and may supervise lower level technicians.

Junior Field Technician/Laborer. The qualified individual for this position performs assignments that are normally standardized, may troubleshoot malfunctioning equipment or programs and make simple repairs, extracts and processes test or study data.

GIS Analyst. Minimum of 5 years of computer mapping experience with ESRI compatible products. The analyst must be able to collect and interpret mapping data from a variety of sources including field survey data and aerial photography. Knowledge of RDMS (Relational Database Management Systems) and SQL (Structural Query Languages) such as Oracle is required. Produces engineering drawing and other documents from data.

CAD Operator. This position requires someone with demonstrated knowledge and skill in computer graphics or mapping techniques.

Produces engineering drawing and other documents from data.

Health & Safety Manager. Minimum of 2 years of experience with environmental sites where EPA Level C and/or Level B personal protective equipment was in use. Has specialized training in personal and respiratory protective equipment, program implementation, proper use of air monitoring instruments, air sampling methods, and interpretation of results. Has working knowledge of applicable Federal, State, and local occupational safety and health regulations. Responsibilities include ensuring that the elements of the approved site health and safety plan are implemented and enforced on site. Closely monitors worker compliance/accident statistics and implements corrective action.

Administrative. This position requires someone with demonstrated ability to handle administrative duties. Compiles and maintains files and records for project invoices and correspondence. Supports contract from proposal development through project closeout.

Senior Contracts. Minimum of 10 years of experience with government contracting.

Junior Contracts. Minimum of 2 years of experience with government contracting.

Scientist (Chemist). Must have at least 1 year experience providing up to Level III data validation.

Stormwater Project Manager. This position is responsible for managing projects related to Stormwater. This position shall be filled by persons with at least 10 years of experience working with Stormwater collection and treatment systems. Must have experience evaluating effluent monitoring data for projects in DC, MD, or VA to assist with identifying potential sources of contamination and providing recommendations. Must have experience performing illicit discharge investigations, stormwater BMP inspections, and system mapping projects at industrial facilities greater than ten (10) acres in DC, MD, or VA. Must have experience completing Stormwater System permitting projects in DC, MD, or VA.

Drinking Water Project Manager. This position is responsible for managing projects related to Drinking Water. This position shall be filled by persons with at least 10 years of experience working with Drinking Water treatment and distribution systems. Must have experience performing potable water treatment and system-related projects in DC, MD, or VA, including: water quality assessments, sanitary surveys, sampling siting plans, hydraulic modeling, wellhead protection, corrosion controls, emergency response, vulnerability assessments, standard operating procedures and O&M manuals, and condition assessments. Must have experience completing drinking water treatment and distribution systems permitting projects in DC, MD, or VA.

Wastewater Project Manager. This position is responsible for managing projects related to wastewater. This position shall be filled by persons with at least 10 years of experience working with wastewater collection and treatment. Must have experience performing Wastewater projects in DC, MD, or VA, including: preparation of permit applications and monitoring reports for indirect and direct wastewater discharges and wastewater collection and treatment systems; permit compliance sampling and analysis, wastewater system operator training, wastewater characterization studies, pollution minimization plans, permitting and evaluation of land application of sludge and wastewater reuse, standard operating procedures and O&M manuals, process operability assessments. Must have experience completing Wastewater collection and treatment systems permitting projects in DC, MD, or VA.

Labor Categories Substitution Qualifications

a) During the first one hundred eighty (180) calendar days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (b) below. After the initial one hundred eighty (180) calendar day period, the Contractor shall submit the information required by paragraph (b) to the Contracting Officer at least 30 days prior to making any permanent substitutions.

b) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 30 calendar days after receipt of all required of the decision on substitutions.

Requirements

MULTI-MEDIA ENVIRONMENTAL COMPLIANCE SERVICES-WATER

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-4 Inspection of Services-Fixed-Price. Aug 1996

Section F - Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC

Delivery Estimated By Delivery Date 27 Feb

1 Task Ship To DoDAAC: N40080 CountryCode: USA

NAVFACSYSCOM WASHINGTON

1314 HARWOOD STREET SE, WASHINGTON NAVY YARD DC

20374-5018

WASHINGTON NAVY YARD, DC 20374-5018

UNITED STATES

Ariana Gray, Contract Specialist Email: ariana.m.gray2.civ@us.navy.mil

Option Line Item

Delivery Estimated By Delivery Date 26 Aug

1 Task Ship To DoDAAC: N40080 CountryCode: USA

NAVFACSYSCOM WASHINGTON

1314 HARWOOD STREET SE, WASHINGTON NAVY YARD DC

20374-5018

WASHINGTON NAVY YARD, DC 20374-5018

UNITED STATES

Ariana Gray, Contract Specialist Email: ariana.m.gray2.civ@us.navy.mil

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989 52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

G.1 CONTRACT ADMINISTRATION

Upon award, contract administration shall be assigned to:

NAVAL FACILITIES ENGINEERING SYS COMMAND

1314 Harwood Street SE Washington, DC 20374

G.2 RELEASE OF CLAIMS

The contractor shall, with the final invoice for each task order, provide a release of claims worded similar to the following:

The undersigned Contractor does, and by the receipt of said sum shall for itself, its successors and assigns, remise, release and forever discharge the Government, its officers, agents, and employees, of and from all liabilities, obligations and claims whatsoever in law and in equity under or arising today out of said contract.

G.3 PERFORMANCE ASSESSMENT

Contractor's performance will be evaluated using the respective contractor performance evaluation report entry system located on the website http://www.cpars.gov/. Prior to commencement of work the contractor is required to provide the government with the name, phone number and e-mail address of the "Contractor's Representative" that will be responsible for receipt and review of draft performance evaluations prepared by the government in the appropriate system. It is the contractor's responsibility to keep this contact information current.

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Navy Construction/Facilities Management Invoice

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC TBD

Admin DoDAAC TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) TBD

Service Acceptor (DoDAAC) TBD

Accept at Other DoDAAC TBD

LPO DoDAAC TBD

DCAA Auditor DoDAAC TBD

Other DoDAAC(s) TBD

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

TBD

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.

May 2014

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

Jan 2017

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.

Dec 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Nov 2021

52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

Jan 2025

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.210-1 Market Research. Nov 2021 52.215-2 Audit and Records-Negotiation. Jun 2020 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data -- Modifications

(DEVIATION 2022-O0001)

Jun 2020 Deviation 2022-O0001 Oct 2021

52.215-12 Subcontractor Certified Cost or Pricing Data (DEVIATION 2022-O0001) Jun 2020 Deviation 2022-O0001 Oct 2021

52.215-13 Subcontractor Certified Cost or Pricing Data -- Modifications (Deviation 2022- O0001)

Jun 2020 Deviation 2022-O0001 Oct 2021

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications.

Nov 2021

52.215-23 Limitations on Pass-Through Charges. Jun 2020 52.219-3 Notice of HUBZone Set-Aside or Sole-Source Award. Oct 2022 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.219-8 Utilization of Small Business Concerns. Jan 2025

52.219-27 Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program.

Feb 2024

52.219-29 Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns.

Oct 2022

52.219-30 Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program.

Oct 2022

52.219-33 Nonmanufacturer Rule. Sep 2021 52.222-3 Convict Labor. Jun 2003 52.222-9 Apprentices and Trainees. (DEVIATION 2025-O0003) Jul 2005 Deviation 2025-O0003 Mar 2025 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. Dec 2010 52.222-41 Service Contract Labor Standards. Aug 2018

52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts).

Aug 2018

52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. Jan 2025 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022

52.223-10 Waste Reduction Program. (DEVIATION 2025-O0004) May 2024 Deviation 2025-O0004 Mar 2025 52.223-23 Sustainable Products and Services. (DEVIATION 2025-O0004) May 2024 Deviation 2025-O0004 Mar 2025 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.226-7 Drug-Free Workplace. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-1 Payments. Apr 1984 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-11 Extras. Apr 1984 52.232-17 Interest. May 2014 52.232-23 Assignment of Claims. May 2014 52.232-25 Prompt Payment. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004

52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.

Nov 2024

52.242-13 Bankruptcy. Jul 1995 52.243-1 Changes-Fixed-Price. Aug 1987 52.243-1 Changes-Fixed-Price. (Alternate I) Aug 1987 Alternate I Apr 1984 52.244-5 Competition in Subcontracting. Aug 2024 52.244-6 Subcontracts for Commercial Products and Commercial Services. Jan 2025 52.246-25 Limitation of Liability-Services. Feb 1997 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-8 Default (Fixed-Price Supply and Service). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. Jan 2023 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.203-7003 Agency Office of the Inspector General. Aug 2019 252.203-7004 Display of Hotline Posters. Jan 2023 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

May 2019

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014

252.225-7004 Report of Intended Performance Outside the United States and Canada -Submission after Award.

Jul 2024

252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023

252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.

Jan 2023

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023

252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.

Jan 2023

252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.204-1 Approval of Contract. (Dec 1989)

Approval of Contract (Dec 1989)

This contract is subject to the written approval of and shall not be binding until so approved.Head of the Contracting Activity

(End of clause)

52.216-18 Ordering. (Aug 2020)

Ordering (Aug 2020)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from through .date of contract award 66 months

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered "issued" when-

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either-

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

(End of clause)

52.216-19 Order Limitations. (Oct 1995)

Order Limitations (Oct 1995)

(a) . When the Government requires supplies or services covered by this contract in an amount of less than , the Minimum order $50,000.00 Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) . The Contractor is not obligated to honor-Maximum order

(1) Any order for a single item in excess of ;$45,000,000.00

(2) Any order for a combination of items in excess of ; or$45,000,000.00

(3) A series of orders from the same ordering office within that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) 15 days of this section.

(c) If this is a requirements contract ( includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the i.e., Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within after issuance, with written notice stating the Contractor's 15 days intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

52.216-22 Indefinite Quantity. (Oct 1995)

Indefinite Quantity (Oct 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; , that the Contractor shall not be required to make any deliveries provided under this contract after .66 months

(End of clause)

52.217-8 Option to Extend Services. (Nov 1999)

Option to Extend Services (Nov 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within .30 days prior to contract expiration

(End of clause)

52.217-9 Option to Extend the Term of the Contract. (Mar 2000)

Option to Extend the Term of the Contract (Mar 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days prior to the completion of the current ; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least before period of performance 60 days the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed .66 months

(End of clause)

52.219-14 Limitations on Subcontracting (DEVIATION 2021-O0008) (Oct 2022) Deviation 2021-O0008 (Feb 2023)

LIMITATIONS ON SUBCONTRACTING (FEB…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .