Amendment 0004 SF30.pdf

PDF 607 KB Posted

Attached to
Multi-Media Environmental Compliance Services-Water
Solicitation number
N4008025R1006
Issued by

About this file

This is an Amendment (Amendment 0004) to a solicitation for multi-media environmental compliance services with a water-focused approach for Naval Facilities Engineering Command (NAVFAC) Washington. The contract is an Indefinite Delivery/Indefinite Quantity (ID/IQ) firm-fixed-price agreement primarily supporting stormwater, wastewater, and drinking water compliance services within the Naval District Washington area.

Key modifications include updating Service Contract Act Wage Determinations, revising multiple attachments (Price Template, Stormwater/Wastewater/Drinking Water Tables), and modifying technical evaluation factors. The scope encompasses comprehensive environmental services such as permit applications, system inspections, sampling and analysis, mapping, studies, and compliance monitoring across stormwater, wastewater, drinking water, air quality, waste management, and cultural/natural resource domains. Offerors must demonstrate experience with projects in Maryland, Virginia, or Washington DC, with a minimum task order value of $50,000, and be located within 150 miles of major NDW installations. The solicitation requires detailed technical and past performance submissions, with specific personnel qualification requirements for roles like Program Manager, Project Managers, and various technical specialists.

View the file

Other files

File Type Posted
Amendment 0006 SF30.pdf PDF
N4008025R1006_Revised PPIs dated 15OCT2025_Amendment 0005.pdf PDF
Amendment 0005 SF30.pdf PDF
REVISED Attachment C_Price Template_N4008025R1006_9OCT2025_Amendment 0004.xlsx XLSX spreadsheet
REVISED Attachment F_Table 2 Wastewater dated 8 October 2025_Amendment 0004.docx DOCX document
REVISED Attachment E_Table 1 Stormwater dated 8 October 2025_Amendment 0004.docx DOCX document
REVISED Attachment G_Table 3 Drinking Water dated 8 October 2025_Amendment 0004.docx DOCX document
SCA WD 2015-4329_VA_8JULY2025_Amendment 0004.pdf PDF
N4008025R1006_PPIs dated 8 October 2025_Amendment 0004.pdf PDF
REVISED Attachment C_Price Template_N4008025R1006_8 October 2025_Amendment 0004.xlsx XLSX spreadsheet
SCA WD 2015-4281_DC_8JULY2025_Amendment 0004.pdf PDF
SCA WD 2015-4265_MD_8JULY2025_Amendment 0004.pdf PDF
Amendment 0003 SF 30.pdf PDF
Amendment 0002 SF30.pdf PDF
Attachment G_Table 3 Drinking Water.docx DOCX document
Amendment 0001 SF30.pdf PDF
Attachment E_Table 1 Stormwater.docx DOCX document
Solicitation N4008025R10060001 SF33.pdf PDF
Attachment F_Table 2 Wastewater.docx DOCX document
Attachment C_Price Template Water IDIQ_N4008025R1006.xlsx XLSX spreadsheet
Attachment H_PPQ Form.docx DOCX document
Attachment D_Project Information Form.docx DOCX document
Attachment B_PPI Log_N4008025R1006.xlsx XLSX spreadsheet
Attachment A_PIEE Vendor Registration Instructions.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of Amendment 0004 is to:

a. Provide Government responses to Pre-Proposal Inquiries (PPIs), as an attachment under file name: N4008025R1006_PPIs dated 8 October 2025_Amendment 0004

b. Provide the updated Service Contract Act (SCA) Wage Determinations as outlined below:

SCA WD#2015-4281 rev #34 dated 08 July 2025 SCA WD#2015-4265 rev#31 dated 08 July 2025 SCA WD#2015-4329 rev#31 dated 08 July 2025

c. Provide REVISED Attachment C_Price Template_N4008025R1006_8 October 2025

d. Provide REVISED Attachment E_Table 1 Stormwater dated 8 October 2025

e. Provide REVISED Attachment F_Table 2 Wastewater dated 8 October 2025

f. Provide REVISED Attachment G_Table 3 Drinking Water dated 8 October 2025 (All Revised Attachments will be posted to the PIEE Solicitation Module, along with this Amendment.)

g. Revise the Performance Work Statement/Statement of Work under Section C of the Solicitation.

h. Revise Price and Solicitation Submittal Requirements under Section M of the Solicitation.

i. Revise certain technical evaluation factors contained in Section M of the solicitation.

Specifically:

-Factor 2 - Corporate Experience is revised as provided herein.

-Factor 4 - Past Performance is revised as provided herein.

-All other technical factors (Factor 1-Technical/Management Approach and Factor 3-Safety) remain unchanged.

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

SECTION C

PERFORMANCE WORK STATEMENT/STATEMENT OF WORK FOR MULTI-MEDIA COMPLIANCE-WATER

FOCUSED

PART 1.0 GENERAL DESCRIPTION AND PERSONNEL REQUIREMENTS

C.1 GENERAL

The intention for this contract is to provide a full range of multi-media environmental compliance services with an emphasis on Stormwater, Wastewater and Drinking Water. This basic contract will be tailored to identify specific Contract Task Order (CTO) requirements. A firm-fixed price, Indefinite Delivery/Indefinite Quantity (ID/IQ) contract will be established to perform the required services and shall be performed as outlined below.

C.2 PERFORMANCE OBJECTIVES

The Contractor will provide the full range of methods and technologies supporting activities necessary to be in compliance with environmental laws and regulations and meeting budgets and schedules. Requirements shall be carried out under CTOs for various locations primarily within Naval Facilities Engineering Command Washington footprint. To a lesser extent, work may occur at any sites located in the lands and waters of the Continental United States (CONUS) that support the U.S. Navy, Marine Corps and other federal entities supported by NAVFAC Washington. The exact location of the required effort will be specified in the individual CTOs.

CTOs will be either presented as a statement of work or as a performance-based product delivery, where desired outcomes of the work are identified without specifying the methods or technologies to be used. Contracted work is performed with minimal focus on government process and maximum focus on results. A results-based product delivery CTO enables the Contractor to select actions best suited to the site requirements and ensures that the most up-to-date and best management practices are employed.

C.2.1 GENERAL INFORMATION

N4008025R10060004

The Contractor shall conduct such work to enable the customer to be in compliance with all applicable laws and regulations. The Contractor shall engage early in the process to allow for the development of the most cost-effective and technically sound solution and use its expertise to recognize and address problematic issues in executing work under the CTOs. Typical activities may include, but are not limited to, the following:

Primary Scope

Stormwater Compliance:

Survey, inspection and design of Low Impact Development (LID) facilities and stormwater Best Management Practices (BMP) and post construction award services

Preparation or review of LID and structural and nonstructural BMP documentation

Develop maintenance manuals for LID/BMP features

Inventory and documentation for LID/BMP features

Assess and evaluate the condition of stormwater system and components

Maintenance and repairs of LID/BMP features

Permit application and support

Identify non-point source pollution areas including land use changes

Investigation and evaluation of illicit discharges

Stormwater and ambient water quality sampling and analysis including associated Quality Assurance and/or Sampling Analysis plans and self-monitoring reports

Development of Geographic Information Systems (GIS) data and computer aided design and drafting drawing production

Developing storm water pollution prevention plans and site compliance evaluations

Other stormwater related tasks

Wastewater Compliance:

Wastewater evaluation, investigation, and reuse studies

Inflow and infiltration studies

POTW pretreatment applications

Wastewater permit compliance sampling and analysis

Sludge and wastewater characterization sampling and analysis

Preparation of operation and maintenance manuals for wastewater treatment plants

Sludge management and disposal plans (including land application)

Industrial wastewater management and pollution minimization plans

Conveyance system mapping using Geographic Information System (GIS) data obtained through surveying

Preparing NPDES permit applications and monitoring reports for indirect and direct wastewater discharges for wastewater collection and treatment systems

Conducting wastewater treatment plant operational evaluations

Conducting industrial wastewater surveys

Providing operator training

Illicit discharge studies

Other wastewater related tasks

Drinking Water Compliance:

Source water (surface and groundwater) protection and water quality evaluations

Sanitary surveys

Water leakage surveys or investigations and Water audits

Condition Assessments

Developing vulnerability assessment/emergency response plans

Completion of various studies: Water Conservation, Corrosion Control

Wellhead Protection Assessments

Drinking water characterization sampling and analysis

Preparation of operation and maintenance manuals for drinking water treatment plants

Evaluations for the upgrading or improving of the operation of existing drinking water facilities

Distribution system mapping using Geographic Information System (GIS) data obtained through surveying

Development of sampling monitoring plans

Hydraulic modeling of distribution systems

Other drinking water related tasks

Secondary Scope Air Quality and Clean Air Act Compliance:

Air emissions inventory

Preparing major and minor source air permit application and renewal

Preparation of semi-annual and annual compliance and emissions reporting as required by installation permits

Preparation or revision of facility compliance tools or databases

Providing equipment operator training

Performance of regulatory compliance evaluations and determinations

Complete Stage I and Stage II vapor recovery system certification

Refrigerant compliance and recordkeeping evaluation and support

Complete air emission and dispersion modeling

National emissions standard for hazardous air pollutant (NESHAP) review and applicability determination

New Source Performance Standards (NSPS) review and applicability determinations

Complete emission testing

Develop or update Standard Operating Procedures in terms of air emissions for equipment and processes

Develop or update compliance plans

Other air related tasks

Waste and Materials Compliance:

EPCRA reports

Hazardous waste management plans

Waste streams sampling and analysis

Waste stream determination

Integrated Solid Waste Management plans

Asbestos surveys and testing

Lead-based paint surveys and testing

Radon surveys and testing

Asbestos abatement

Lead-based paint abatement

Radon mitigation

Other waste/materials related tasks

Fuel Storage Tank and Spill Compliance:

Prepare tank management plans

Prepare tank inventories

Prepare SPCC plans

Prepare sampling plans and closure reports for tank replacements/closures

Conduct integrity evaluations of tanks and piping

Complete formal internal and external tank inspections

Perform tank removals and replacements

Perform tank repairs and upgrades to meet environmental regulations

Perform tank maintenance activities

Deliver aboveground storage tank (AST)/underground storage tank (UST) training courses for the tank managers

Conduct spill drills/training

Other tank and spill related tasks

Environmental Management System (EMS):

Training and auditing

Other EMS related tasks

Other Environmental Liabilities (OEL):

The OEL Sustainment Process addresses environmental liabilities for a broad range of Navy and Marine Corps assets, including:

facilities, structures, utilities, land, relocatables and non-military equipment. The objective of the Navy's OEL Program is to provide an unqualified audit opinion of the Department of the Navy's OEL.

Assisting in field data collection for new and existing OEL Units

Coordination of site visits

Transcribing data into electronic formats

Other OEL related tasks

Environmental Planning:

Environmental Assessments (EA)

Environmental Impact Statements (EIS)

Studies to support an EA or EIS.

Other National Environmental Policy Act (NEPA) or environmental planning related tasks

Cultural Resources:

National Historic Preservation Act compliance

Cultural resource investigations/research

National Register eligibility determination

Architectural surveys

Archaeology surveys (Phase I/II/III)

Visual surveys

Artifact conservation/prestorage curation

Section 106 documentation

Support for Memoranda of Agreement and Programmatic Agreements

Report preparation

Photography

Mitigation

Archaeological Site Protection Plans

Historic Structures Reports

Historic American Building Survey / Historic American Engineering Record / Historic American

Landscape Survey (HABS/HAER/HALS) Documentation

Construction monitoring, underwater investigations, preparation of exhibits/interpretive materials, and other related studies/efforts etc.)

Conduct Phase I, II, and III cultural resources investigations/surveys

Other cultural resources related tasks

Natural Resources:

Biological investigations and restoration actions

Earth science (topography, geology, soils)

Wetland delineations, studies, and restoration

Coastal Zone Management, consistency determinations and shoreline studies

Benthic and water quality studies

Rare, threatened and endangered (RT&E) species surveys, assessments and consultations

Landscape design and management

Natural resource damage assessments

Forest inventories and studies

Integrated Natural Resource Management Plans (INRMPs)

Bird avoidance modeling (BAM) and bird/deer aircraft strike hazard (BASH/DASH)

Marine resources tasks

Invasive plant/animal species management

Landscape studies/plans; and the preparation of associated environmental reports, documentation, studies, plans, maps, measured drawings

Installation Restoration:

Support of Environmental Baseline Surveys (EBS) and Phase I and II Hazardous, Toxic, and Radiological Waste (HTRW) Surveys for real estate actions associated with property acquisition and excessing

Support of the Defense Department's Installation Restoration Program and Munitions Response Program in compliance with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) of 1980 as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986 and Resource Conservation and Recovery Act (RCRA)

Support of environmental documentation for base closure efforts

Support of assessments, studies, investigations, remedial designs that require coordination with, and understanding of other environmental programs such as air, water, waste water, solid waste, asbestos, and hazardous substance/waste management and complex compliance requirements requiring the integration of knowledge from several media and statues

Support of site investigation and remediation of unexploded ordnance (UXO) and associated contamination in accordance with DoD regulations expected to be promulgated specific to UXO Management and Remediation of Closed, Transferring and Transferred Ranges

Support of the Navy's Range Sustainability Environmental Program Assessment (R.S.E.P.A) program

Other installation restoration related tasks

Proximity to Naval District Washington Facilities The Offeror shall have at least one office in the NDW area and should be in close proximity (no greater than 150 miles to the major NDW installations (NSF Bethesda, NSA Annapolis, Washington Navy Yard, NSF Carderock, NSF Suitland, United States Naval Observatory, NAS Patuxent River, NSF Indian Head and NSF Dahlgren.

C.3 PERSONNEL QUALIFICATIONS

The proposed teams shall be multi-disciplinary and shall demonstrate appropriate disciplines to perform the types of work addressed above. The Contractor shall furnish sufficient technical, management and administrative personnel at all times to ensure timely execution of the work. The Contracting Officer reserves the right to request resumes and documentation at any time to verify qualifications, and to request such documentation prior to use of personnel on any contract task order. Personnel qualification must include but is not limited to the following:

Principal/Program Manager. Person that is a principal, officer or senior manager of the contractor with full and unlimited authority to represent the interest of the contractor in all matters relating to the contract or to a specific Contract Task Order (CTO). The Program Manager shall be responsible for liaison between contract personnel and the Contracting Officer (KO), Contracting Officer's Representative (COR) or Navy Technical Representative (NTR), and for maintaining a fully staffed and equipped work force. CTO negotiations shall be accomplished on a one-to-one basis between the Program Manager and the Contracting Officer. The Program Manager shall have a minimum of 10 years of full time professional experience in project management and shall have a minimum of 2 years of experience in a program manager capacity.

QA/QC Manager. The Quality Assurance/Quality Control (QA/QC) Manager shall have a minimum of 5 years of QA/QC experience, with at least 1 of those years involved with multimedia environmental projects. Responsibilities include developing, maintaining and enforcing the contractor's QA /QC Program.

Project/Task Order Manager. This position shall be filled by persons with a BS in an engineering or science discipline and a minimum of 5 years of full time professional experience in Stormwater, Wastewater, and/or Drinking Water. Project Managers must have at least 2 years full-time professional experience as a Project Manager for similar projects in corresponding regulatory jurisdictions (Maryland, Virginia, and the District of Columbia.) The Project Manager coordinates the efforts of the other disciplines (including sub-contractors), ensuring timeliness, forecasting delays, financial performance, etc. Additionally, this person will be the main point of contact for all required results and/or progress on projects.

Technical Specialist. This position shall be filled by persons with a BS in an engineering or science discipline, at least 10 years of specialized experience outside standard environmental engineering fields, and either a PhD in a STEM (Science, Technology, Engineering and Mathematics) field or equivalent specialized training/certification.

Senior Engineer. This position shall be filled by persons with a BS degree in the appropriate engineering discipline and 10 years of specifically related experience. Position shall also hold a Professional Engineer (PE) license within District of Columbia, Maryland or Virginia. Responsible for managing technical groups and/or management of projects of significance, prepares estimates, schedules work to meeting completion dates, directs assistance, reviews progress, evaluates results, makes changes in methods or equipment, operates with some latitude, performs technical work in support of project efforts and may serve as the Site Manager on major field efforts.

Mid-Level Engineer. This position shall be filled by persons with a BS degree in an engineering discipline and 5 years of specifically related experience. Collects and analyzes data, develops sections of reports and assists in development and design of projects. Capable of leading projects with a mid to low degree of difficulty.

Junior Engineer. This position shall be filled by persons with a BS degree in an engineering discipline with 0 to 5 years of experience. This position documents and evaluates projects and experiments and largely collects and compiles data.

Senior Scientist/Geologist. This position shall be filled by persons with a BS degree in a science discipline and 10 years of specifically related experience. Position shall also hold a Professional Engineer (PE) or Professional Geologist (PG) license within District of Columbia, Maryland or Virginia. Responsible for managing technical groups and/or management of projects of significance, prepares estimates, schedules work to meeting completion dates, directs assistance, reviews progress, evaluates results, makes changes in methods or equipment, operates with some latitude, performs technical work in support of project efforts and may serve as the Site Manager on major field efforts. Utilizes theories and principles to formulate solutions to complex problems.

Mid-Level Scientist/Geologist. This position shall be filled by persons with a BS degree in a science discipline and 5 years of specifically related experience. Collects and analyzes data, develops sections of reports and assists in development and design of some aspects of a project.

Junior Scientist/Geologist. This position shall be filled by persons with a BS degree in a science discipline. Documents and evaluates projects and experiments by collecting and compiling data.

Senior Field Technician. Minimum of 10 years of experience. The qualified individual for this position is responsible for major field operations, performs more complex/sophisticated assignments, and supervises lower level technicians. Performs field-testing and prepares reports associated with data collection.

Mid-Level Field Technician. Minimum of 5 years of experience. The qualified individual for this position performs non-routine and complex assignments; performs technical services, experiments or tests which may require non- standard procedures and complex equipment, programs and/or instrumentation; records computes and analyzes test or study data; prepares appropriate documentation and may supervise lower level technicians.

Junior Field Technician/Laborer. The qualified individual for this position performs assignments that are normally standardized, may troubleshoot malfunctioning equipment or programs and make simple repairs, extracts and processes test or study data.

GIS Analyst. Minimum of 5 years of computer mapping experience with ESRI compatible products. The analyst must be able to collect and interpret mapping data from a variety of sources including field survey data and aerial photography. Knowledge of RDMS (Relational Database Management Systems) and SQL (Structural Query Languages) such as Oracle is required. Produces engineering drawing and other documents from data.

CAD Operator. This position requires someone with demonstrated knowledge and skill in computer graphics or mapping techniques. Produces engineering drawing and other documents from data.

Health & Safety Manager. Minimum of 2 years of experience with environmental sites where EPA Level C and/or Level B personal protective equipment was in use. Has specialized training in personal and respiratory protective equipment, program implementation, proper use of air monitoring instruments, air sampling methods, and interpretation of results. Has working knowledge of applicable Federal, State, and local occupational safety and health regulations. Responsibilities include ensuring that the elements of the approved site health and safety plan are implemented and enforced on site. Closely monitors worker compliance/accident statistics and implements corrective action.

Administrative. This position requires someone with demonstrated ability to handle administrative duties. Compiles and maintains files and records for project invoices and correspondence. Supports contract from proposal development through project closeout.

Junior Contract Manager. Minimum of two (2) years of experience supporting Government contracting activities. Assists with contract preparation, management, and compliance monitoring under the supervision of a senior specialist or contracting officer. Responsible for administrative and coordination tasks related to contract modifications, amendments, and coordination with subcontractors.

Stormwater Project Manager. This position is responsible for managing projects related to Stormwater. This position shall be filled by persons with at least 10 years of experience working with Stormwater collection and treatment systems. Must have experience evaluating effluent monitoring data for projects in DC, MD, or VA to assist with identifying potential sources of contamination and providing recommendations. Must have experience performing illicit discharge investigations, stormwater BMP inspections, and system mapping projects at industrial facilities greater than ten (10) acres in DC, MD, or VA. Must have experience completing Stormwater System permitting projects in DC, MD, or VA.

Drinking Water Project Manager. This position is responsible for managing projects related to Drinking Water. This position shall be filled by persons with at least 10 years of experience working with Drinking Water treatment and distribution systems. Must have experience performing potable water treatment and system-related projects in DC, MD, or VA, including: water quality assessments, sanitary surveys, sampling siting plans, hydraulic modeling, wellhead protection, corrosion controls, emergency response, vulnerability assessments, standard operating procedures and O&M manuals, and condition assessments. Must have experience completing drinking water treatment and distribution systems permitting projects in DC, MD, or VA.

Wastewater Project Manager. This position is responsible for managing projects related to wastewater. This position shall be filled by persons with at least 10 years of experience working with wastewater collection and treatment. Must have experience performing Wastewater projects in DC, MD, or VA, including: preparation of permit applications and monitoring reports for indirect and direct wastewater discharges and wastewater collection and treatment systems; permit compliance sampling and analysis, wastewater system operator training, wastewater characterization studies, pollution minimization plans, permitting and evaluation of land application of sludge and wastewater reuse, standard operating procedures and O&M manuals, process operability assessments. Must have experience completing Wastewater collection and treatment systems permitting projects in DC, MD, or

VA.

Labor Categories Substitution Qualifications

a) During the first one hundred eighty (180) calendar days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (b) below. After the initial one hundred eighty (180) calendar day period, the Contractor shall submit the information required by paragraph (b) to the Contracting Officer at least 30 days prior to making any permanent substitutions.

b) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 30 calendar days after receipt of all required of the decision on substitutions.

Section J - List of Attachments

The following attachments were added:

N4008025R1006_PPIs dated 8 October 2025_Amendment 0004 REVISED Attachment C_Price Template_N4008025R1006_8 October 2025 REVISED Attachment E_Table 1 Stormwater dated 8 October 2025 REVISED Attachment F_Table 2 Wastewater dated 8 October 2025 REVISED Attachment G_Table 3 Drinking Water dated 8 October 2025

SCA WD 2015-4265_MD_8JULY2025

SCA WD 2015-4281_DC_8JULY2025

SCA WD 2015-4329_VA_8JULY2025

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

CHANGES

M2. EVALUATION FACTORS FOR AWARD

REPLACE WITH

4. Basis of Evaluation and Submittal Requirements for Each Factor.

(a) Price:

(1) Solicitation Submittal Requirements:

The Offeror shall submit one (1) electronic copy of the price proposal via PIEE, containing only the solicitation submittal requirements identified below. Price information included in the non- price/technical proposal will not be evaluated, and non-price/technical information included in the price proposal will not be considered.

All submissions must include the documents listed in items (i) through (v). Failure to provide any of these items will render the proposal non-responsive and ineligible for award.

Formatting requirements: text will be black, utilizing minimum Arial font size 11, single- spaced, with pages numbered. There is no page limitation for the price proposal.

(i) Executed SF33. Offeror shall insert its company name and address in Block #15A one number in Block #15B, acknowledge all, teleph amendments in Block #14 (if applicable), name and title of person authorized to sign in Block #16, signature in Block #17, and offer date in Block #18 of the SF33. In addition, offeror shall provide its UEI Number, CAGE code, and Federal Tax ID number with its proposal.

(ii) Offerors shall submit one set of burdened rates. The burdened rates submitted must include costs for all firms proposed under Factor 1 as well as inclusive of direct labor, indirect costs, overhead, general & administrative, and escalation rate (applicable to Years 2-5 and the 6- month option period), for each labor classification necessary to support this project. Offerors shall submit rates utilizing the Storm Water, Wastewater and Drinking Water IDIQ Price Template, provided.

(iii) SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement at the time the offer is submitted. If a Representation of Certification required by Section K of the RFP is not provided in SAM, include the representation or certification in your price proposal.

(iv) FAPIIS Certification. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) Certification as required by FAR 52.209-7, Information Regarding Responsibility Matters.

(v) VETS-4212 registration. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, www.

dol.gov/vets/vets4212.htm, if the Offeror is required to submit. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS- 4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.

ALL OTHER REQUIREMENTS OF THE PRICE FACTOR REMAIN UNCHANGED

(b) Technical Factors,

(i) Solicitation Submittal Requirements:

The offeror shall submit one (1) electronic copy marked "Original" via PIEE. Price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered. All submissions shall include the following:

Include a cover page in black text, utilizing a minimum Arial font size of 11. The cover page should include the following information:

Solicitation Number Solicitation Title Prime Contractor Name

Address Phone Number Unique Entity ID (UEI) Number CAGE Code Point of Contact (POC) Name, Title, Phone Number, and Email Address

Note: If submitting as a Joint Venture (JV), provide the POC, UEI, and CAGE Code for each JV partner.

Refer to the Solicitation Submittal Requirements under each evaluation factor for the applicable page limitations. All submittals must be in black Any pages exceeding the stated limitations will not be evaluated. The non-price/technical proposal shall text, using a minimum of Arial font size 11.

not exceed 65 pages.

Past Performance Questionnaires and Contractor Performance Assessment Reports are excluded from the page count.

(2) Factor 2 - Corporate Experience

(ii) Basis of Evaluation:

For purposes of this evaluation, a recent and relevant project is further defined as:

1. "Recent" is defined as a project 100% completed within the past seven (7) years of the date of original proposal submission date of 29 September 2025.

2. "Relevant" is defined as the type of work completed by a firm that is similar in Scope, Size, and Complexity.

a. "Scope" refers to work that includes Storm Water, Wastewater and Drinking Water (Attachments D, E, and F list anticipated project types)

b. "Size" refers to task orders with a minimum value of $50,000.

c. "Complexity" refers to projects performed in Maryland, Virginia, or Washington, DC.

3. "Projects" are defined as either stand-alone contracts or single task orders under an indefinite-delivery indefinite quantity (IDIQ) contract.

The Government will evaluate this factor to assess the offeror's experience and capability to perform the requirements of the solicitation. In order to receive an Acceptable rating, Offerors must submit 10 projects that demonstrate experience in the specialized experience categories in Attachments E, F, and G. Offerors personnel must also demonstrate meeting the requirements set forth under proximity to location. Projects that are not submitted on the mandatory Attachment D-Project Information Form, Attachment E (Table 1/Stormwater), Attachment F (Table 2/Wastewater), and Attachment G (Table 3/Drinking Water) forms, will not be evaluated. If a Project Information Form (Attachment D) exceeds two pages, only the first two pages will be evaluated.

(4) Factor 4, Past Performance

(ii) Basis of Evaluation:

This evaluation will focus on how well the Offeror performed on the relevant projects submitted under Factor 1, Corporate Experience/Personnel Qualifications and on other projects the Government may review from other sources. Relevant past performance pertains to the type of work set forth in with a minimum value of completed by an offeror within the last seven years.Attachments E, F, and G $50,000

The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.);

- Recency of tasks performed that are identical to, similar to, or related to the task at hand.

To receive an "acceptable" rating for this factor, the Offeror must have received Satisfactory or better rating in the following categories: Quality, Schedule, Cost Control, Management, Regulatory Compliance, Safety, and other areas, unless the Offeror provides an acceptable explanation for the lower rating.

IDCode: J
Page: 1
Pages: 12
AmendNo: 0004
EffDate: 08 Oct 2025
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N40080
AdmCode:
IssuedBy: NAVFACSYSCOM WASHINGTON

1314 HARWOOD STREET SE, WASHINGTON NAVY YARD DC 20374-5018

WASHINGTON NAVY YARD, DC 20374-5018

UNITED STATES

ARIANA GRAY, Email: ariana.m.gray2.civ@us.navy.mil Telephone: 240-416-9455 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008025R1006
SolDate: 20 Aug 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Ariana M. Gray
ContDate:
CODate: 08 Oct 2025

File details come from the government source that posted it. Updated .