Attachment E - Price Proposal Form Revised 7.16.2024.docx
DOCX document 28 KB Posted
- Solicitation number
- N4008024R2228
About this file
This document is a Price Proposal Form for Solicitation N40080-24-R-2228, which is a request for proposals to renovate Building 164 at Naval Support Facility, Indian Head, Maryland. The contractor must provide a total price for the BASE BID, which includes all labor, supervision, tools, materials, and equipment to complete the renovation work. The solicitation also includes an OPTION 1 for additional unit-priced items that may be needed in excess of the base bid quantities, such as steel framing, masonry repair, spoils removal, imported fill, and UXO removal. The government will evaluate offers by adding the option prices to the base bid. The total contract duration is 502 calendar days from the notice to proceed. The solicitation is set aside for small business MACC contract holders under multiple award contracts N4008021D0022 through N4008021D0029. Failure to provide pricing for any contract line item will result in the proposal being rejected as unacceptable.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal Form Solicitation: N40080-24-R-2228 Renovate Building 164, Indian Head, Maryland
| CLIN |
| Description |
| Price |
BASE BID:
The contractor shall provide a complete price for all work to be performed but not limited to labor, supervision, tools, materials and equipment necessary to complete the entire work in accordance with the drawings and specifications, Request for Proposal for Renovate Building 164, Indian Head, Maryland Work Order No. 1610029.
OPTION 1 – UNIT COSTS AND QUANTITIES ASSOCIATED WITH BUILDING 164
IN EXCESS OF BASE BID QUANTITIES.
| SLINs |
| Items |
| Qty |
| UoM |
| Unit Rate |
| Total |
| 0003A |
| Steel Framing |
| 1400 |
| SF |
| 0003B |
| Masonry Repair |
| 1260 |
| SF |
| 0003C |
| Spoils Removal |
| 1306 |
| CY |
| 0003D |
| Imported Fill |
| 1306 |
| CY |
| 0003E |
| UXO Removal |
| 1306 |
| CY |
| 0003F |
| Dewatering |
| 45 |
| Days |
Ma
TOTAL PRICE (CLINs 0001-0002) $_____________________________
General Notes:
1. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).
2. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If a bidder provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price. If the sum total proposed for CLINS 0001-0002 differs from the individual CLIN prices, the total will be recomputed using the individual CLIN proposed amounts. Unit priced items are subject to FAR 52.211-18, Variation in estimated Quantity.
3. Failure to enter a price for any CLIN will result in a proposal being rejected as unacceptable.
4. The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
5. Total Contract duration is 502 calendar days from Notice to Proceed (NTP). The Government reserves the unilateral right to award CLINS 0002-0003 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for CLINS 0001 and 0002. The Contract Completion Date (CCD) does not change if any or all the bid options are awarded.
6. If CLIN 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
7. In case of a discrepancy between the CLIN(s) price and the total price, the CLIN(s) price will be presumed to be correct and the total price will be recalculated accordingly; in case of a discrepancy between the SLIN(s) prices and the price for the CLIN, the SLIN(s) price will be presumed to be correct and the CLIN price will be recalculated accordingly; in case of a discrepancy between a unit price and an extended price, the unit price will be presumed to be correct and the extended price will be recalculated accordingly; subject, however, to correction to the same extent and in the same manner as any other mistake.
8. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.