This document is a Price Proposal Form for Solicitation N40080-24-R-2228 to Renovate Building 164 at Naval Support Facility, Indian Head, Maryland. The solicitation is set aside for holders of Indefinite Delivery Quantity Contracts N4008021D0022/0023/0024/0025/0026/0027/0028/0029.

The Price Proposal Form includes a Base Bid for the complete renovation work, as well as Option 0001 with unit costs and quantities for additional work beyond the Base Bid, such as steel framing repair, masonry repair, spoils removal, imported fill, UXO removal, and dewatering. The total contract duration for the Base Bid is 502 calendar days from Notice to Proceed, and the options may be awarded at the time of award or within 365 days of award. The evaluation of options will not obligate the government to execute any or all of them.

View the file

Other files

File Type Posted
Attachment E - Price Proposal Form Revised 7.16.2024.docx DOCX document
Amendment 0006.pdf PDF
100_1005.JPG JPG image
100_1006.JPG JPG image
100_1007.JPG JPG image
Attachment_PPI120_AmendESS_FINAL-Clean_V6_05102023_Redacted.pdf PDF
100_1018.JPG JPG image
100_1014.JPG JPG image
100_1017.JPG JPG image
100_1023.JPG JPG image
100_1010.JPG JPG image
100_1019.JPG JPG image
AMENDMENT 0005.pdf PDF
100_1011.JPG JPG image
Attachment E - Price Proposal Form Revised 7.15.2024.docx DOCX document
100_1009.JPG JPG image
100_1016.JPG JPG image
Attachment_PPI120_ESS_Trans_Ltr_IH_BLDG_28_154_164_RENO_Amnd1_20231016_1158.pdf PDF
100_1022.JPG JPG image
100_1021.JPG JPG image
100_1012.JPG JPG image
100_1020.JPG JPG image
100_1013.JPG JPG image
100_1008.JPG JPG image
100_1015.JPG JPG image
Attachment_PPI-10_154-164-Pk Lot Aerial_Final.pdf PDF
Amendment 0004.pdf PDF
Attachment_PPI-112_154-164-Pk Lot r1_Final.pdf PDF
Attachment_PPI-5_20210226_164 Basis of Design - IFC Submission - HAZMAT Report.pdf PDF
Amendment 0003.pdf PDF
Wage Determination 6.14.2024.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Site Visit Sign In Sheet.pdf PDF
Attachment B - Bldg 164 Vol 1 Specifications - IFC Submission.pdf PDF
Attachment H - Wage Determination.pdf PDF
Attachment D - Pre-Proposal Inquiry (PPI Form) Final Bldg 164.xlsx XLSX spreadsheet
Attachment C - Bldg 164 Vol 2 Specifications - IFC Submission.pdf PDF
Attachment A - Bldg 164 Drawings Combined - IFC Submission.pdf PDF
Attachment F -SECNAV 5512 Form.pdf PDF
Solicitation Renovate Building 164- 10 May 2024.docx DOCX document
Attachment G - Expected Visitor Form.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Proposal Form Solicitation: N40080-24-R-2228 Renovate Building 164, Indian Head, Maryland

CLIN
Description
Price

BASE BID:

The contractor shall provide a complete price for all work to be performed but not limited to labor, supervision, tools, materials and equipment necessary to complete the entire work in accordance with the drawings and specifications, Request for Proposal for Renovate Building 164, Indian Head, Maryland Work Order No. 1610029.

OPTION 0001

Unit Costs and Quantities associated with Building 164 in excess of Base Bid Quantities.

Items
Qty
UoM
Unit Rate
Total
Description
Steel framing Repair
1400
SF

Quantity based on columns and trusses labeled existing to remain in the Final docs, 20% added to the quantity for additional unforeseen damage

Masonry Repair
1260
SF

Quantity based on 10% of interior masonry walls existing to remain. Labor cost based on assumption of 420 hours (3sf/hr. for one bricklayer). Material cost is an allowance.

Spoils Removals
1306
CY

Unit rate and quantity pulled from the MII estimate

Imported Fill
1306
CY

Unit rate and quantity pulled from the MII estimate

UXO removal
1306
CY

Quantity based on the spoils removal line item. Total cost was developed for the IFC submittal with guidance from Jacobs and IH UXO expert

Dewatering
45
Days

Quantity based on duration of spoils excavation line item from MII estimate

TOTAL PRICE (CLIN 0001) $__________________________

General Notes:

1. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.

2. Option items may be awarded at time of award or within 365 days of award.

3. Total Contract duration for Base Bid is 502 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options, the contract duration will remain the same.

Acknowledgement of Amendments______, ______, ______, ______, ______, ______

Contractor Name: ________________________________________

Contractor Signature: ________________________________________ Date: _________________