ROOFING Elins - NRDE --PAX_IH_DAHL_N40080-20-R-0030 R1.xlsx
XLSX spreadsheet 311 KB Posted
- Solicitation number
- N4008021R0030
About this file
This federal contract opportunity notice seeks proposals for an indefinite-delivery/indefinite-quantity roofing construction contract to support facilities at Naval Air Station Patuxent River in Maryland, Naval Support Facility Indian Head in Maryland, and Naval Support Facility Dahlgren in Virginia. The Naval Facilities Engineering Command is requesting roofing repair and replacement services over a one-year base period and four one-year option periods, for an estimated total value of $50 million. The contract will be set aside for eligible HUBZone small businesses. Proposals are due by March 4, 2021, with a site visit scheduled for February 11 and requests for information due by February 18 to allow for timely award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R0030 Amendment 0006 Correction.pdf | ||
| 21R0030 Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| N4008021R0030 Amendment 0001.pdf | ||
| N4008021R0030 Roofing IDIQ PX-IH-DL Solicitation.pdf | ||
| ROOFING Elins - NRDE --PAX_IH_DAHL - Contractor copy_5.xlsx | XLSX spreadsheet | |
| Exhibit K - Coefficient Example.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Offerer Name: Total Cost
(IDIQ)
BASE PERIOD (1-YEAR) $9,000,891.82
1ST OPTION( 1 YEAR) $9,772,425.74
2ND OPTION(1 YEAR) $9,415,236.59
3RD OPTION (1 YEAR) $9,673,472.97
4TH OPTION( 1 YEAR) $10,460,274.05
Total Indefinite Delivery Indefinite Quantity Cost $48,322,301.17
Base Year
| PRICE SHEET FY21 IDIQ | Inflation 2020 | 2.73% | ||||||||||||||||||||||||||
| PROJECT: | Inflation 2021 | 2% | ||||||||||||||||||||||||||
| CLIN 0001 | Total | 4.96% | ||||||||||||||||||||||||||
| ELIN A001, A002, A003, A004, A005, A006, A007, A008, A009, A010, A011, A012, A013, A014, A015 | INFLATION | 105.00% | ||||||||||||||||||||||||||
| BASE YEAR | ||||||||||||||||||||||||||||
| ALL CLINS Including overhead and pre-negotiated profit | Total for task order including profit | $9,000,891.82 | ||||||||||||||||||||||||||
| Profit negotiated for task order | Profit negotiated for task order | 0.00% | ||||||||||||||||||||||||||
| SUBTOTAL ALL CLINS Including overhead and less profit | $9,000,891.82 | |||||||||||||||||||||||||||
| Unit of | Option Year 1 | Option Year 2 | Option Year 3 | Option Year 4 | ||||||||||||||||||||||||
| Contract | of | Section | Line | Labor | Material | Ratio labor to material | Composite | Unit | Labor | Material | Ratio labor to material | Composite | Unit | Labor | Material | Ratio labor to material | Composite | Unit | Labor | Material | Ratio labor to material | Composite | Unit | |||||
| Line Item | Means Item # | Measure | Description | Item Description | Unit Cost | Quantity | Extended | Mark up | Mark up | Cost | Mark up | Mark up | Cost | Mark up | Mark up | Cost | Mark up | Mark up | Cost | |||||||||
| ELIN | SUB-ELIN | |||||||||||||||||||||||||||
| A001AA | 07 05 0510 3420 | SF | DEMOLITION | Demolition of standard non-asbestos, multi-ply BUR, up to three plies. | 1.05 | 3,000.00 | 3,150.00 | 1.50% | 4% | 1 | 1.50% | $1.07 | 1.50% | 4% | 1 | 1.50% | $1.08 | 1.50% | 4% | 1 | 1.50% | $ 1.10 | 1.50% | 4% | 1 | 1.5% | $ 1.11 | |
| A001AB | 07 05 0510 3470 | SF | DEMOLITION | Demolition of standard non-asbestos, multi-ply BUR, four or more plies. | 1.25 | 3,000.00 | 3,748.50 | 1.50% | 4% | 1 | 1.50% | $1.27 | 1.50% | 4% | 1 | 1.50% | $1.29 | 1.50% | 4% | 1 | 1.50% | $ 1.31 | 1.50% | 4% | 1 | 1.5% | $ 1.33 | |
| A001AC | 07 05 0510 0220 | SF | DEMOLITION | Demolition of standard non-asbestos, multi-ply perimeter flashing system | 1.80 | 3,000.00 | 5,386.50 | 1.50% | 4% | 1 | 1.50% | $1.82 | 1.50% | 4% | 1 | 1.50% | $1.85 | 1.50% | 4% | 1 | 1.50% | $ 1.88 | 1.50% | 4% | 1 | 1.5% | $ 1.91 | |
| A001AD | 07 05 0510 4420 | SF | DEMOLITION | Demolition of single ply membrane, adhered | 0.68 | 3,000.00 | 2,031.75 | 1.50% | 4% | 1 | 1.50% | $0.69 | 1.50% | 4% | 1 | 1.50% | $0.70 | 1.50% | 4% | 1 | 1.50% | $ 0.71 | 1.50% | 4% | 1 | 1.5% | $ 0.72 | |
| A001AE | 07 05 0510 4370 | SF | DEMOLITION | Demolition of single ply membrane, ballasted | 0.35 | 3,000.00 | 1,055.25 | 1.50% | 4% | 1 | 1.50% | $0.36 | 1.50% | 4% | 1 | 1.50% | $0.36 | 1.50% | 4% | 1 | 1.50% | $ 0.37 | 1.50% | 4% | 1 | 1.5% | $ 0.37 | |
| A001AF | 07 05 0510 0870 | BF | DEMOLITION | Demolition of rigid roof insulation | 0.18 | 3,000.00 | 535.50 | 1.50% | 4% | 1 | 1.50% | $0.18 | 1.50% | 4% | 1 | 1.50% | $0.18 | 1.50% | 4% | 1 | 1.50% | $ 0.19 | 1.50% | 4% | 1 | 1.5% | $ 0.19 | |
| A001 | A001AG | Not used | 0.00 | 4% | 4% | 4% | $ - 0 | 4% | $ - 0 | |||||||||||||||||||
| A001AH | 31 05 1610 0400 | CF | DEMOLITION | Demolition of regular and/or lightweight concrete fill | 1.79 | 3,000.00 | 5,366.66 | 1.50% | 4% | 1 | 1.50% | $1.82 | 1.50% | 4% | 1 | 1.50% | $1.84 | 1.50% | 4% | 1 | 1.50% | $ 1.87 | 1.50% | 4% | 1 | 1.5% | $ 1.90 | |
| A001AI | Not used | 0.00 | 4% | 4% | 4% | $ - 0 | 4% | $ - 0 | ||||||||||||||||||||
| A001AJ | CF | DEMOLITION | Demolition of asphaltic fill | 6.70 | 3,000.00 | 20,097.00 | 1.50% | 4% | 1 | 1.50% | $6.80 | 1.50% | 4% | 1 | 1.50% | $6.90 | 1.50% | 4% | 1 | 1.50% | $ 7.00 | 1.50% | 4% | 1 | 1.5% | $ 7.11 | ||
| A001AK | 02 82 1347 0100 | SF/ EA | DEMOLITION | Abatement and disposal of non-friable asbestos-containing roofing material (ACRM) | 15.96 | 10,000.00 | 159,600.00 | 1.50% | 4% | 1 | 1.50% | $16.20 | 1.50% | 4% | 1 | 1.50% | $16.44 | 1.50% | 4% | 1 | 1.50% | $ 16.69 | 1.50% | 4% | 1 | 1.5% | $ 16.94 | |
| A001AL | 07 05 0510 3725 | SF | DEMOLITION | Remove loose gravel or ballast | 0.53 | 2,000.00 | 1,050.00 | 1.50% | 4% | 1 | 1.50% | $0.53 | 1.50% | 4% | 1 | 1.50% | $0.54 | 1.50% | 4% | 1 | 1.50% | $ 0.55 | 1.50% | 4% | 1 | 1.5% | $ 0.56 | |
| A001AM | 07 05 0510 3730 | SF | DEMOLITION | Remove embedded gravel | 1.16 | 2,000.00 | 2,310.00 | 1.50% | 4% | 1 | 1.50% | $1.17 | 1.50% | 4% | 1 | 1.50% | $1.19 | 1.50% | 4% | 1 | 1.50% | $ 1.21 | 1.50% | 4% | 1 | 1.5% | $ 1.23 | |
| A001AN | 07 05 0510 3725 | SF | DEMOLITION | Remove gravel & debris from gutters, roof drains, mech. equipment, and roof surface. | 0.53 | 2,000.00 | 1,050.00 | 1.50% | 4% | 1 | 1.50% | $0.53 | 1.50% | 4% | 1 | 1.50% | $0.54 | 1.50% | 4% | 1 | 1.50% | $ 0.55 | 1.50% | 4% | 1 | 1.5% | $ 0.56 | |
| A001AO | 07 05 0510 3730 | SF | DEMOLITION | Spud embedded gravel at tie-ins | 1.31 | 5,000.00 | 6,562.50 | 1.50% | 4% | 1 | 1.50% | $1.33 | 1.50% | 4% | 1 | 1.50% | $1.35 | 1.50% | 4% | 1 | 1.50% | $ 1.37 | 1.50% | 4% | 1 | 1.5% | $ 1.39 | |
| A001AP | 07 05 0510 3730 | SF | DEMOLITION | Demolition of plywood or board sheathing | 1.30 | 350.00 | 455.70 | 1.50% | 4% | 1 | 1.50% | $1.32 | 1.50% | 4% | 1 | 1.50% | $1.34 | 1.50% | 4% | 1 | 1.50% | $ 1.36 | 1.50% | 4% | 1 | 1.5% | $ 1.38 | |
| A001AP.1 | 06 05 0510 6096 | SF | DEMOLITION | Demolition of plywood or board sheathing | 0.75 | 3,000.00 | 2,236.50 | 1.50% | 4% | 1 | 1.50% | $0.76 | 1.50% | 4% | 1 | 1.50% | $0.77 | 1.50% | 4% | 1 | 1.50% | $ 0.78 | 1.50% | 4% | 1 | 1.5% | $ 0.79 | |
| A001AQ | 06 05 0510 6159 | SF | DEMOLITION | Demolition of 2" or 3" T&G wood decking | 0.53 | 3,000.00 | 1,575.00 | 1.50% | 4% | 1 | 1.50% | $0.53 | 1.50% | 4% | 1 | 1.50% | $0.54 | 1.50% | 4% | 1 | 1.50% | $ 0.55 | 1.50% | 4% | 1 | 1.5% | $ 0.56 | |
| A001AR | 05 05 0510 5000 | SF | DEMOLITION | Demolition of standard metal roof deck | 0.53 | 10,000.00 | 5,250.00 | 1.50% | 4% | 1 | 1.50% | $0.53 | 1.50% | 4% | 1 | 1.50% | $0.54 | 1.50% | 4% | 1 | 1.50% | $ 0.55 | 1.50% | 4% | 1 | 1.5% | $ 0.56 | |
| A001AS | 07 05 0510 3170 | SF | DEMOLITION | Demolition of asphalt shingles and felt | 0.76 | 5,000.00 | 3,780.00 | 1.50% | 4% | 1 | 1.50% | $0.77 | 1.50% | 4% | 1 | 1.50% | $0.78 | 1.50% | 4% | 1 | 1.50% | $ 0.79 | 1.50% | 4% | 1 | 1.5% | $ 0.80 | |
| A001AT | 07 05 0510 5720 | SF | DEMOLITION | Demolition of wood, vinyl or metal siding | 1.02 | 4,000.00 | 4,074.00 | 1.50% | 4% | 1 | 1.50% | $1.03 | 1.50% | 4% | 1 | 1.50% | $1.05 | 1.50% | 4% | 1 | 1.50% | $ 1.07 | 1.50% | 4% | 1 | 1.5% | $ 1.08 | |
| A001AU | 13 05 0510 0510 | SF | DEMOLITION | Demolition of cementitious wall finish on CMU | 2.21 | 40,000.00 | 88,200.00 | 1.50% | 4% | 1 | 1.50% | $2.24 | 1.50% | 4% | 1 | 1.50% | $2.27 | 1.50% | 4% | 1 | 1.50% | $ 2.31 | 1.50% | 4% | 1 | 1.5% | $ 2.34 | |
| A001AV | SF | DEMOLITION | Not used | 0.00 | $ - 0 | $ - 0 | ||||||||||||||||||||||
| A001AW | 09 05 0530 3500 | SF | DEMOLITION | Demolition of stucco wall finish on wood or metal framing | 0.43 | 10,000.00 | 4,257.75 | 1.50% | 4% | 1 | 1.50% | $0.43 | 1.50% | 4% | 1 | 1.50% | $0.44 | 1.50% | 4% | 1 | 1.50% | $ 0.45 | 1.50% | 4% | 1 | 1.5% | $ 0.45 | |
| A001AX | 06 05 0510 0120 | SF | DEMOLITION | Demolition of wood framing, various sizes | 8.19 | 8,000.00 | 65,520.00 | 1.50% | 4% | 1 | 1.50% | $8.31 | 1.50% | 4% | 1 | 1.50% | $8.44 | 1.50% | 4% | 1 | 1.50% | $ 8.56 | 1.50% | 4% | 1 | 1.5% | $ 8.69 | |
| A001AY | 07 05 0510 2725 | LF | DEMOLITION | Demolition of sofia vent/fascia vent | 0.90 | 1,500.00 | 1,354.50 | 1.50% | 4% | 1 | 1.50% | $0.92 | 1.50% | 4% | 1 | 1.50% | $0.93 | 1.50% | 4% | 1 | 1.50% | $ 0.94 | 1.50% | 4% | 1 | 1.5% | $ 0.96 | |
| A001AZ | 07 32 1310 0300 | SF | DEMOLITION | Demolition of clay tile roofing | 4.33 | 2,500.00 | 10,828.13 | 1.50% | 4% | 1 | 1.50% | $4.40 | 1.50% | 4% | 1 | 1.50% | $4.46 | 1.50% | 4% | 1 | 1.50% | $ 4.53 | 1.50% | 4% | 1 | 1.5% | $ 4.60 | |
| A001BA | 07 05 0510 4120 | SF | DEMOLITION | Demolition of slate shingles | 1.22 | 2,500.00 | 3,045.00 | 1.50% | 4% | 1 | 1.50% | $1.24 | 1.50% | 4% | 1 | 1.50% | $1.25 | 1.50% | 4% | 1 | 1.50% | $ 1.27 | 1.50% | 4% | 1 | 1.5% | $ 1.29 | |
| A001BB | 07 05 0510 2725 | LF | DEMOLITION | Demolition of soffit vent strip, aluminum 3" to 4" inch wide | 3.27 | 2,500.00 | 8,163.75 | 1.50% | 4% | 1 | 1.50% | $3.31 | 1.50% | 4% | 1 | 1.50% | $3.36 | 1.50% | 4% | 1 | 1.50% | $ 3.41 | 1.50% | 4% | 1 | 1.5% | $ 3.47 | |
| A001BC | 07 05 0510 5870 | LF | DEMOLITION | Demolition of wood cornice, various sizes | 1.39 | 2,500.00 | 3,465.00 | 1.50% | 4% | 1 | 1.50% | $1.41 | 1.50% | 4% | 1 | 1.50% | $1.43 | 1.50% | 4% | 1 | 1.50% | $ 1.45 | 1.50% | 4% | 1 | 1.5% | $ 1.47 | |
| A001BD | 02 83 1926 5000 | SF | DEMOLITION | Removal of lead based paint | 12.86 | 2,500.00 | 32,156.25 | 1.50% | 4% | 1 | 1.50% | $13.06 | 1.50% | 4% | 1 | 1.50% | $13.25 | 1.50% | 4% | 1 | 1.50% | $ 13.45 | 1.50% | 4% | 1 | 1.5% | $ 13.65 | |
| A001BE | 02 82 1347 0210 | SF | DEMOLITION | Abatement and Disposal of non-friable ACRM asphalt shingles and felt | 10.82 | 10,000.00 | 108,150.00 | 1.50% | 4% | 1 | 1.50% | $10.98 | 1.50% | 4% | 1 | 1.50% | $11.14 | 1.50% | 4% | 1 | 1.50% | $ 11.31 | 1.50% | 4% | 1 | 1.5% | $ 11.48 | |
| A001BF | 07 05 0510 0220 | LF | DEMOLITION | Demolition of sheet metal, including removal of gutters, downspouts, metal counterflashing, drip edge, gravel stop and other miscellaneous metal flashings | 1.92 | 3,000.00 | 5,764.50 | 1.50% | 4% | 1 | 1.50% | $1.95 | 1.50% | 4% | 1 | 1.50% | $1.98 | 1.50% | 4% | 1 | 1.50% | $ 2.01 | 1.50% | 4% | 1 | 1.5% | $ 2.04 | |
| A001BG | SF | DEMOLITION | Demolition of PUF Roofing | 3.53 | 5,000.00 | 17,655.00 | 1.50% | 4% | 1 | 1.50% | $3.58 | 1.50% | 4% | 1 | 1.50% | $3.64 | 1.50% | 4% | 1 | 1.50% | $ 3.69 | 1.50% | 4% | 1 | 1.5% | $ 3.75 | ||
| A001BH | 07 05 0510 1620 | EA | DEMOLITION | Remove existing skylight | 69.30 | 600.00 | 41,580.00 | 1.50% | 4% | 1 | 1.50% | $70.34 | 1.50% | 4% | 1 | 1.50% | $71.39 | 1.50% | 4% | 1 | 1.50% | $ 72.47 | 1.50% | 4% | 1 | 1.5% | $ 73.55 | |
| A001BI | 07 05 0510 2670 | EA | DEMOLITION | Remove existing roof hatch | 181.65 | 600.00 | 108,990.00 | 1.50% | 4% | 1 | 1.50% | $184.37 | 1.50% | 4% | 1 | 1.50% | $187.14 | 1.50% | 4% | 1 | 1.50% | $ 189.95 | 1.50% | 4% | 1 | 1.5% | $ 192.80 | |
| A001BJ | 02 83 1921 0200 | JOB | DEMOLITION | Work plan and engineering controls for lead or asbestos work | 1,417.50 | 40.00 | 56,700.00 | 1.50% | 4% | 1 | 1.50% | $1,438.76 | 1.50% | 4% | 1 | 1.50% | $1,460.34 | 1.50% | 4% | 1 | 1.50% | $ 1,482.25 | 1.50% | 4% | 1 | 1.5% | $ 1,504.48 | |
| SUB-TOTAL FOR CLIN A001 | 785,144.73 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A002AA | 04 01 2041 0110 | LF | MASONRY | Saw cut reglet joint in masonry walls | 2.91 | 2,000.00 | 5,817.00 | 1.50% | 4% | 1 | 1.50% | $2.95 | 1.50% | 4% | 1 | 1.50% | $3.00 | 1.50% | 4% | 1 | 1.50% | $ 3.04 | 1.50% | 4% | 1 | 1.5% | $ 3.09 | |
| A002AB | LF | MASONRY | Remove and reset clay tile coping | 132.22 | 600.00 | 79,332.00 | 1.50% | 4% | 0.8 | 2.00% | $134.86 | 1.50% | 4% | 0.8 | 2.00% | $137.56 | 1.50% | 4% | 0.8 | 2.00% | $ 140.31 | 1.50% | 4% | 0.8 | 2.0% | $ 143.12 | ||
| A002 | A002AC | LF | MASONRY | Remove and reset up to 6" thick stone or concrete coping | 176.30 | 600.00 | 105,778.20 | 1.50% | 4% | 0.8 | 2.00% | $179.82 | 1.50% | 4% | 0.8 | 2.00% | $183.42 | 1.50% | 4% | 0.8 | 2.00% | $ 187.09 | 1.50% | 4% | 0.8 | 2.0% | $ 190.83 | |
| A002AD | LF | MASONRY | Remove and reset stone or concrete coping greater than 6" thick. | 264.44 | 600.00 | 158,664.00 | 1.50% | 4% | 0.8 | 2.00% | $269.73 | 1.50% | 4% | 0.8 | 2.00% | $275.12 | 1.50% | 4% | 0.8 | 2.00% | $ 280.63 | 1.50% | 4% | 0.8 | 2.0% | $ 286.24 | ||
| A002AE | CSF | MASONRY | Take down and rebuild masonry parapet to allow for insertion or replacement of wall flashing. | 132.22 | 600.00 | 79,332.00 | 1.50% | 4% | 0.8 | 2.00% | $134.86 | 1.50% | 4% | 0.8 | 2.00% | $137.56 | 1.50% | 4% | 0.8 | 2.00% | $ 140.31 | 1.50% | 4% | 0.8 | 2.0% | $ 143.12 | ||
| A002AF | SF | MASONRY | Repair/Replace concrete roof decks | 246.82 | 600.00 | 148,090.80 | 1.50% | 4% | 0.8 | 2.00% | $251.75 | 1.50% | 4% | 0.8 | 2.00% | $256.79 | 1.50% | 4% | 0.8 | 2.00% | $ 261.93 | 1.50% | 4% | 0.8 | 2.0% | $ 267.16 | ||
| A002AG | SF | MASONRY | Not used | $ - 0 | $ - 0 | |||||||||||||||||||||||
| A002AH | 04 01 2030 0300 | LF | MASONRY | Pointing; cut out and repoint stonework, hard mortar | 3.94 | 3,000.00 | 11,812.50 | 1.50% | 4% | 0.8 | 2.00% | $4.02 | 1.50% | 4% | 0.8 | 2.00% | $4.10 | 1.50% | 4% | 0.8 | 2.00% | $ 4.18 | 1.50% | 4% | 0.8 | 2.0% | $ 4.26 | |
| A002AI | 04 01 2020 0300 | SF | MASONRY | Pointing; cut out and repoint brick, hard mortar | 9.35 | 5,000.00 | 46,725.00 | 1.50% | 4% | 0.8 | 2.00% | $9.53 | 1.50% | 4% | 0.8 | 2.00% | $9.72 | 1.50% | 4% | 0.8 | 2.00% | $ 9.92 | 1.50% | 4% | 0.8 | 2.0% | $ 10.12 | |
| A002AJ | 02 41 1916 2040 | EA | MASONRY | Repair damaged brick | 102.38 | 600.00 | 61,425.00 | 1.50% | 4% | 0.8 | 2.00% | $104.42 | 1.50% | 4% | 0.8 | 2.00% | $106.51 | 1.50% | 4% | 0.8 | 2.00% | $ 108.64 | 1.50% | 4% | 0.8 | 2.0% | $ 110.81 | |
| A002AK | LF | MASONRY | Repair damaged stone | 33.83 | 600.00 | 20,295.00 | 1.50% | 4% | 0.8 | 2.00% | $34.50 | 1.50% | 4% | 0.8 | 2.00% | $35.19 | 1.50% | 4% | 0.8 | 2.00% | $ 35.90 | 1.50% | 4% | 0.8 | 2.0% | $ 36.61 | ||
| A002AL | 02 41 1916 2040 | EA | MASONRY | Remove and replace damaged brick with brick to match | 102.38 | 600.00 | 61,425.00 | 1.50% | 4% | 0.8 | 2.00% | $104.42 | 1.50% | 4% | 0.8 | 2.00% | $106.51 | 1.50% | 4% | 0.8 | 2.00% | $ 108.64 | 1.50% | 4% | 0.8 | 2.0% | $ 110.81 | |
| $ - 0 | $ - 0 | |||||||||||||||||||||||||||
| SUB-TOTAL FOR CLIN A002 | 778,696.50 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A003AA | 07 01 9081 0050 | LF | SEALANTS | Remove sealant, clean joint and prime | 2.23 | 3,000.00 | 6,678.00 | 1.50% | 4% | 0.8 | 2.00% | $2.27 | 1.50% | 4% | 0.8 | 2.00% | $2.32 | 1.50% | 4% | 0.8 | 2.00% | $ 2.36 | 1.50% | 4% | 0.8 | 2.0% | $ 2.41 | |
| A003AB | 07 92 1910 0025 | LF | SEALANTS | Sealant, 1/4" x 1/4" | 2.36 | 3,000.00 | 7,087.50 | 1.50% | 4% | 0.8 | 2.00% | $2.41 | 1.50% | 4% | 0.8 | 2.00% | $2.46 | 1.50% | 4% | 0.8 | 2.00% | $ 2.51 | 1.50% | 4% | 0.8 | 2.0% | $ 2.56 | |
| A003 | A003AC | 07 92 1320 0080 | LF | SEALANTS | Sealant, 1/2" x 3/8" | 2.46 | 3,000.00 | 7,371.00 | 1.50% | 4% | 0.8 | 2.00% | $2.51 | 1.50% | 4% | 0.8 | 2.00% | $2.56 | 1.50% | 4% | 0.8 | 2.00% | $ 2.61 | 1.50% | 4% | 0.8 | 2.0% | $ 2.66 |
| A003AD | 07 92 1910 0040 | LF | SEALANTS | Sealant, 3/4" x 1/2" | 4.81 | 3,000.00 | 14,427.00 | 1.50% | 4% | 0.8 | 2.00% | $4.91 | 1.50% | 4% | 0.8 | 2.00% | $5.00 | 1.50% | 4% | 0.8 | 2.00% | $ 5.10 | 1.50% | 4% | 0.8 | 2.0% | $ 5.21 | |
| $ - 0 | $ - 0 | |||||||||||||||||||||||||||
| SUB-TOTAL FOR CLIN A003 | 35,563.50 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A004AA | 06 16 3610 0102 | SF | CARPENTRY | Plywood decking, 1/2" CDX | 1.73 | 2,000.00 | 3,465.00 | 1.50% | 4% | 0.5 | 2.75% | $1.78 | 1.50% | 4% | 0.5 | 2.75% | $1.83 | 1.50% | 4% | 0.5 | 2.75% | $ 1.88 | 1.50% | 4% | 0.5 | 2.8% | $ 1.93 | |
| A004AB | 06 16 3610 4730 | SF | CARPENTRY | Plywood decking, 5/8" CDX, T&G | 2.65 | 2,000.00 | 5,292.00 | 1.50% | 4% | 0.5 | 2.75% | $2.72 | 1.50% | 4% | 0.5 | 2.75% | $2.79 | 1.50% | 4% | 0.5 | 2.75% | $ 2.87 | 1.50% | 4% | 0.5 | 2.8% | $ 2.95 | |
| A004AC | 06 16 3610 0302 | SF | CARPENTRY | Plywood decking, 3/4" CDX | 2.25 | 2,000.00 | 4,494.00 | 1.50% | 4% | 0.6 | 2.50% | $2.30 | 1.50% | 4% | 0.6 | 2.50% | $2.36 | 1.50% | 4% | 0.6 | 2.50% | $ 2.42 | 1.50% | 4% | 0.6 | 2.5% | $ 2.48 | |
| A004AD | 06 16 3610 0802 | SF | CARPENTRY | Plywood decking, 3/4" CDX, T&G | 2.52 | 2,000.00 | 5,040.00 | 1.50% | 4% | 0.6 | 2.50% | $2.58 | 1.50% | 4% | 0.6 | 2.50% | $2.65 | 1.50% | 4% | 0.6 | 2.50% | $ 2.71 | 1.50% | 4% | 0.6 | 2.5% | $ 2.78 | |
| A004AE | 06 16 3310 0190 | SF | CARPENTRY | 2x6 T&G wood decking | 5.18 | 2,000.00 | 10,353.00 | 1.50% | 4% | 0.2 | 3.50% | $5.36 | 1.50% | 4% | 0.2 | 3.50% | $5.55 | 1.50% | 4% | 0.2 | 3.50% | $ 5.74 | 1.50% | 4% | 0.2 | 3.5% | $ 5.94 | |
| A004AF | 06 16 3310 0010 | SF | CARPENTRY | 1x6 or 1x8 wood sheathing | 3.91 | 2,000.00 | 7,812.00 | 1.50% | 4% | 0.6 | 2.50% | $4.00 | 1.50% | 4% | 0.6 | 2.50% | $4.10 | 1.50% | 4% | 0.6 | 2.50% | $ 4.21 | 1.50% | 4% | 0.6 | 2.5% | $ 4.31 | |
| A004AG | 06 22 1360 1000 | SF | CARPENTRY | Soffit, Exterior AC Plywood,1/4" Thick | 4.44 | 1,000.00 | 4,441.50 | 1.50% | 4% | 0.6 | 2.50% | $4.55 | 1.50% | 4% | 0.6 | 2.50% | $4.67 | 1.50% | 4% | 0.6 | 2.50% | $ 4.78 | 1.50% | 4% | 0.6 | 2.5% | $ 4.90 | |
| A004AH | 06 22 1360 1050 | SF | CARPENTRY | Soffit, Exterior AC Plywood,3/8" Thick | 4.50 | 1,000.00 | 4,504.50 | 1.50% | 4% | 0.6 | 2.50% | $4.62 | 1.50% | 4% | 0.6 | 2.50% | $4.73 | 1.50% | 4% | 0.6 | 2.50% | $ 4.85 | 1.50% | 4% | 0.6 | 2.5% | $ 4.97 | |
| A004AI | 06 22 1360 1100 | SF | CARPENTRY | Soffit, Exterior AC Plywood,1/2" Thick | 4.71 | 1,000.00 | 4,714.50 | 1.50% | 4% | 0.6 | 2.50% | $4.83 | 1.50% | 4% | 0.6 | 2.50% | $4.95 | 1.50% | 4% | 0.6 | 2.50% | $ 5.08 | 1.50% | 4% | 0.6 | 2.5% | $ 5.20 | |
| A004 | A004AJ | 06 22 1360 1150 | SF | CARPENTRY | Soffit, Polivinyl chloride,White | 5.41 | 1,000.00 | 5,407.50 | 1.50% | 4% | 0.6 | 2.50% | $5.54 | 1.50% | 4% | 0.6 | 2.50% | $5.68 | 1.50% | 4% | 0.6 | 2.50% | $ 5.82 | 1.50% | 4% | 0.6 | 2.5% | $ 5.97 |
| A004AK | 06 22 1360 1160 | SF | CARPENTRY | Soffit, Polivinyl chloride,White Perforated | 5.41 | 1,000.00 | 5,407.50 | 1.50% | 4% | 0.6 | 2.50% | $5.54 | 1.50% | 4% | 0.6 | 2.50% | $5.68 | 1.50% | 4% | 0.6 | 2.50% | $ 5.82 | 1.50% | 4% | 0.6 | 2.5% | $ 5.97 | |
| A004AL | 06 22 1360 1170 | SF | CARPENTRY | Soffit, Accessories,J" Channel 5/8" | 2.47 | 1,000.00 | 2,467.50 | 1.50% | 4% | 0.6 | 2.50% | $2.53 | 1.50% | 4% | 0.6 | 2.50% | $2.59 | 1.50% | 4% | 0.6 | 2.50% | $ 2.66 | 1.50% | 4% | 0.6 | 2.5% | $ 2.72 | |
| A004AM | LF | CARPENTRY | Not used | $ - 0 | $ - 0 | |||||||||||||||||||||||
| A004AN | LF | CARPENTRY | 1x6 treated wood nailer | 2.97 | 2,000.00 | 5,940.00 | 1.50% | 4% | 0.6 | 2.50% | $3.04 | 1.50% | 4% | 0.6 | 2.50% | $3.12 | 1.50% | 4% | 0.6 | 2.50% | $ 3.20 | 1.50% | 4% | 0.6 | 2.5% | $ 3.28 | ||
| A004AO | LF | CARPENTRY | Not used | 2,000.00 | $ - 0 | $ - 0 | ||||||||||||||||||||||
| A004AP | 06 11 1028 0160 | LF | CARPENTRY | 2x4 treated wood curbing, blocking, or nailer | 3.66 | 2,000.00 | 7,329.00 | 1.50% | 4% | 0.6 | 2.50% | $3.76 | 1.50% | 4% | 0.6 | 2.50% | $3.85 | 1.50% | 4% | 0.6 | 2.50% | $ 3.95 | 1.50% | 4% | 0.6 | 2.5% | $ 4.04 | |
| A004AQ | 06 11 1028 0170 | LF | CARPENTRY | 2x6 treated wood curbing, blocking, or nailer | 4.15 | 2,000.00 | 8,295.00 | 1.50% | 4% | 0.6 | 2.50% | $4.25 | 1.50% | 4% | 0.6 | 2.50% | $4.36 | 1.50% | 4% | 0.6 | 2.50% | $ 4.47 | 1.50% | 4% | 0.6 | 2.5% | $ 4.58 | |
| A004AR | 06 11 1028 0180 | LF | CARPENTRY | 2x8 treated wood curbing, blocking, or nailer | 5.11 | 2,000.00 | 10,227.00 | 1.50% | 4% | 0.6 | 2.50% | $5.24 | 1.50% | 4% | 0.6 | 2.50% | $5.37 | 1.50% | 4% | 0.6 | 2.50% | $ 5.51 | 1.50% | 4% | 0.6 | 2.5% | $ 5.64 | |
| A004AS | 06 11 1028 0190 | LF | CARPENTRY | 2x10 treated wood curbing, blocking, or nailer | 5.88 | 2,000.00 | 11,760.00 | 1.50% | 4% | 0.6 | 2.50% | $6.03 | 1.50% | 4% | 0.6 | 2.50% | $6.18 | 1.50% | 4% | 0.6 | 2.50% | $ 6.33 | 1.50% | 4% | 0.6 | 2.5% | $ 6.49 | |
| A004AT | 06 11 1028 0200 | LF | CARPENTRY | 2x12 treated wood curbing, blocking, or nailer | 7.61 | 2,000.00 | 15,225.00 | 1.50% | 4% | 0.6 | 2.50% | $7.80 | 1.50% | 4% | 0.6 | 2.50% | $8.00 | 1.50% | 4% | 0.6 | 2.50% | $ 8.20 | 1.50% | 4% | 0.6 | 2.5% | $ 8.40 | |
| A004AU | 06 22 1340 5200 | LF | CARPENTRY | 1x6 wood fascia | 5.18 | 2,000.00 | 10,353.00 | 1.50% | 4% | 0.6 | 2.50% | $5.31 | 1.50% | 4% | 0.6 | 2.50% | $5.44 | 1.50% | 4% | 0.6 | 2.50% | $ 5.57 | 1.50% | 4% | 0.6 | 2.5% | $ 5.71 | |
| A004AV | 06 22 1340 5300 | LF | CARPENTRY | 1x8 wood fascia | 6.20 | 2,000.00 | 12,390.00 | 1.50% | 4% | 0.6 | 2.50% | $6.35 | 1.50% | 4% | 0.6 | 2.50% | $6.51 | 1.50% | 4% | 0.6 | 2.50% | $ 6.67 | 1.50% | 4% | 0.6 | 2.5% | $ 6.84 | |
| A004AW | 06 22 1340 5310 | LF | CARPENTRY | 1x10 wood fascia | 6.98 | 2,000.00 | 13,965.00 | 1.50% | 4% | 0.6 | 2.50% | $7.16 | 1.50% | 4% | 0.6 | 2.50% | $7.34 | 1.50% | 4% | 0.6 | 2.50% | $ 7.52 | 1.50% | 4% | 0.6 | 2.5% | $ 7.71 | |
| A004AX | 06 11 1028 0100 | LF | CARPENTRY | Treated wood cant (4x4 cut on diagonal) | 5.03 | 2,000.00 | 10,059.00 | 1.50% | 4% | 0.6 | 2.50% | $5.16 | 1.50% | 4% | 0.6 | 2.50% | $5.28 | 1.50% | 4% | 0.6 | 2.50% | $ 5.42 | 1.50% | 4% | 0.6 | 2.5% | $ 5.55 | |
| A004AY | 05 05 1910 1430 | EA | CARPENTRY | Epoxy anchors | 64.58 | 200.00 | 12,915.00 | 1.50% | 4% | 0.6 | 2.50% | $66.19 | 1.50% | 4% | 0.6 | 2.50% | $67.84 | 1.50% | 4% | 0.6 | 2.50% | $ 69.54 | 1.50% | 4% | 0.6 | 2.5% | $ 71.28 | |
| SUB-TOTAL FOR CLIN A004 | 181,857.00 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A005AA | 07 21 1310 1600 | SF | INSULATION | 3/4" to 1-1/2" isocyanurate board, hot applied | 1.56 | 2,000.00 | 3,124.00 | 1.50% | 4% | 0.6 | 2.50% | $1.60 | 1.50% | 4% | 0.6 | 2.50% | $1.64 | 1.50% | 4% | 0.6 | 2.50% | $ 1.68 | 1.50% | 4% | 0.6 | 2.5% | $ 1.72 | |
| A005AB | SF | INSULATION | 1 9/16 to 2 1/2" isocyanurate board, hot applied | 2.16 | 2,000.00 | 4,312.00 | 1.50% | 4% | 0.6 | 2.50% | $2.21 | 1.50% | 4% | 0.6 | 2.50% | $2.27 | 1.50% | 4% | 0.6 | 2.50% | $ 2.32 | 1.50% | 4% | 0.6 | 2.5% | $ 2.38 | ||
| A005AC | SF | INSULATION | 2 9/16 to 3" isocyanurate board, hot applied | 2.72 | 2,000.00 | 5,434.00 | 1.50% | 4% | 0.6 | 2.50% | $2.78 | 1.50% | 4% | 0.6 | 2.50% | $2.85 | 1.50% | 4% | 0.6 | 2.50% | $ 2.93 | 1.50% | 4% | 0.6 | 2.5% | $ 3.00 | ||
| A005AD | SF | INSULATION | 3/4 to 1 1/2" isocyanurate board, mechanically fastened | 1.77 | 2,000.00 | 3,542.00 | 1.50% | 4% | 0.6 | 2.50% | $1.82 | 1.50% | 4% | 0.6 | 2.50% | $1.86 | 1.50% | 4% | 0.6 | 2.50% | $ 1.91 | 1.50% | 4% | 0.6 | 2.5% | $ 1.95 | ||
| A005AE | SF | INSULATION | 1 9/16 to 2 1/2" isocyanurate board, mechanically fastened | 2.38 | 2,000.00 | 4,752.00 | 1.50% | 4% | 0.6 | 2.50% | $2.44 | 1.50% | 4% | 0.6 | 2.50% | $2.50 | 1.50% | 4% | 0.6 | 2.50% | $ 2.56 | 1.50% | 4% | 0.6 | 2.5% | $ 2.62 | ||
| A005AF | SF | INSULATION | 2 9/16 to 3" isocyanurate board, mechanically fastened | 2.81 | 2,000.00 | 5,610.00 | 1.50% | 4% | 0.6 | 2.50% | $2.88 | 1.50% | 4% | 0.6 | 2.50% | $2.95 | 1.50% | 4% | 0.6 | 2.50% | $ 3.02 | 1.50% | 4% | 0.6 | 2.5% | $ 3.10 | ||
| A005AG | 07 22 1610 1765 | BF | INSULATION | Isocyanurate board, tapered for drainage, fastening excluded | 0.97 | 2,000.00 | 1,932.00 | 1.50% | 4% | 0.6 | 2.50% | $0.99 | 1.50% | 4% | 0.6 | 2.50% | $1.01 | 1.50% | 4% | 0.6 | 2.50% | $ 1.04 | 1.50% | 4% | 0.6 | 2.5% | $ 1.07 | |
| A005AH | 07 21 1310 1700 | SF | INSULATION | 1/2 perlite board | 1.43 | 2,000.00 | 2,856.00 | 1.50% | 4% | 0.6 | 2.50% | $1.46 | 1.50% | 4% | 0.6 | 2.50% | $1.50 | 1.50% | 4% | 0.6 | 2.50% | $ 1.54 | 1.50% | 4% | 0.6 | 2.5% | $ 1.58 | |
| A005 | A005AI | 07 22 1610 1952 | SF | INSULATION | 2" extruded polystyrene, 40 psi compressive strength, fastening excluded | 2.30 | 2,000.00 | 4,599.00 | 1.50% | 4% | 0.6 | 2.50% | $2.36 | 1.50% | 4% | 0.6 | 2.50% | $2.42 | 1.50% | 4% | 0.6 | 2.50% | $ 2.48 | 1.50% | 4% | 0.6 | 2.5% | $ 2.54 |
| A005AJ | 07 22 1610 1954 | SF | INSULATION | 3" extruded polystyrene, 40 psi compressive strength, fastening excluded | 3.23 | 2,000.00 | 6,465.90 | 1.50% | 4% | 0.6 | 2.50% | $3.31 | 1.50% | 4% | 0.6 | 2.50% | $3.40 | 1.50% | 4% | 0.6 | 2.50% | $ 3.48 | 1.50% | 4% | 0.6 | 2.5% | $ 3.57 | |
| A005AK | 07 22 1610 1956 | SF | INSULATION | 4" extruded polystyrene, 40 psi compressive strength, fastening excluded | 4.11 | 2,000.00 | 8,211.00 | 1.50% | 4% | 0.6 | 2.50% | $4.21 | 1.50% | 4% | 0.6 | 2.50% | $4.31 | 1.50% | 4% | 0.6 | 2.50% | $ 4.42 | 1.50% | 4% | 0.6 | 2.5% | $ 4.53 | |
| A005AL | 07 22 1610 1950 | BF | INSULATION | Extruded polystyrene, 40 psi compressive strength, tapered for drainage, fastening excluded | 1.35 | 2,000.00 | 2,709.00 | 1.50% | 4% | 0.6 | 2.50% | $1.39 | 1.50% | 4% | 0.6 | 2.50% | $1.42 | 1.50% | 4% | 0.6 | 2.50% | $ 1.46 | 1.50% | 4% | 0.6 | 2.5% | $ 1.50 | |
| A005AM | 07 22 1610 2470 | SF | INSULATION | 3" composite, 2-1/2" isocyanurate with 1/2" perlite, fastening excluded(1-1/2"polyisocyanurate with 1" perlite) | 1.65 | 2,000.00 | 3,297.00 | 1.50% | 4% | 0.6 | 2.50% | $1.69 | 1.50% | 4% | 0.6 | 2.50% | $1.73 | 1.50% | 4% | 0.6 | 2.50% | $ 1.78 | 1.50% | 4% | 0.6 | 2.5% | $ 1.82 | |
| A005AN | SF | INSULATION | Not used | 2,000.00 | 0.00 | $ - 0 | $ - 0 | |||||||||||||||||||||
| A005AO | 07 22 1610 3030 | EA | INSULATION | Roof deck insulation, fastening alternative, coated screws, 8 inch | 0.60 | 2,000.00 | 1,197.00 | 1.50% | 4% | 0.6 | 2.50% | $0.61 | 1.50% | 4% | 0.6 | 2.50% | $0.63 | 1.50% | 4% | 0.6 | 2.50% | $ 0.64 | 1.50% | 4% | 0.6 | 2.5% | $ 0.66 | |
| A005AP | 07 22 1610 3090 | SF | INSULATION | Roof deck insulation, fastening alternative, full mop asphalt | 0.38 | 2,000.00 | 756.00 | 1.50% | 4% | 0.6 | 2.50% | $0.39 | 1.50% | 4% | 0.6 | 2.50% | $0.40 | 1.50% | 4% | 0.6 | 2.50% | $ 0.41 | 1.50% | 4% | 0.6 | 2.5% | $ 0.42 | |
| A005AQ | SF | INSULATION | Not used | 0.00 | 2,000.00 | 0.00 | $ - 0 | $ - 0 | ||||||||||||||||||||
| A005AR | 07 51 1330 0400 | LF | INSULATION | Mineral fiber cant strip, 1-1/2" x 5" face | 2.51 | 2,000.00 | 5,019.00 | 1.50% | 4% | 0.6 | 2.50% | $2.57 | 1.50% | 4% | 0.6 | 2.50% | $2.64 | 1.50% | 4% | 0.6 | 2.50% | $ 2.70 | 1.50% | 4% | 0.6 | 2.5% | $ 2.77 | |
| A005AS | SF | INSULATION | Tapered edge strip, 1" edge x 12" | 2.73 | 2,000.00 | 5,456.00 | 1.50% | 4% | 0.6 | 2.50% | $2.80 | 1.50% | 4% | 0.6 | 2.50% | $2.87 | 1.50% | 4% | 0.6 | 2.50% | $ 2.94 | 1.50% | 4% | 0.6 | 2.5% | $ 3.01 | ||
| A005AT | SF | INSULATION | Tapered edge strip, 1-1/2" edge x 12" | 3.05 | 2,000.00 | 6,094.00 | 1.50% | 4% | 0.6 | 2.50% | $3.12 | 1.50% | 4% | 0.6 | 2.50% | $3.20 | 1.50% | 4% | 0.6 | 2.50% | $ 3.28 | 1.50% | 4% | 0.6 | 2.5% | $ 3.36 | ||
| SUB-TOTAL FOR CLIN A005 | 75,365.90 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A006AA | 07 31 1310 0150 | SF | STEEP ROOFING | Shingles, Asphalt/fiberglass, 3-tab, Class A, 20 year | 2.06 | 450.00 | 926.10 | 1.50% | 4% | 0.6 | 2.50% | $2.11 | 1.50% | 4% | 0.6 | 2.50% | $2.16 | 1.50% | 4% | 0.6 | 2.50% | $ 2.22 | 1.50% | 4% | 0.6 | 2.5% | $ 2.27 | |
| A006AB | 07 31 1310 0450 | SF | STEEP ROOFING | Shingles, Asphalt/fiberglass, multi-layer laminated, 30 year, 260 - 300 lbs/square | 3.47 | 400.00 | 1,386.00 | 1.50% | 4% | 0.6 | 2.50% | $3.55 | 1.50% | 4% | 0.6 | 2.50% | $3.64 | 1.50% | 4% | 0.6 | 2.50% | $ 3.73 | 1.50% | 4% | 0.6 | 2.5% | $ 3.82 | |
| A006AC | 07 31 2610 1200 | SF | STEEP ROOFING | Shingles, slate, black, ASTM S1, VERMONT | 9.50 | 400.00 | 3,801.00 | 1.50% | 4% | 0.6 | 2.50% | $9.74 | 1.50% | 4% | 0.6 | 2.50% | $9.98 | 1.50% | 4% | 0.6 | 2.50% | $ 10.23 | 1.50% | 4% | 0.6 | 2.5% | $ 10.49 | |
| A006AC.1 | 07 31 2610 0100 | SF | STEEP ROOFING | Shingles, slate, black, ASTM S1, BUCKINGHAM | 10.08 | 500.00 | 5,040.00 | 1.50% | 4% | 0.6 | 2.50% | $10.33 | 1.50% | 4% | 0.6 | 2.50% | $10.59 | 1.50% | 4% | 0.6 | 2.50% | $ 10.86 | 1.50% | 4% | 0.6 | 2.5% | $ 11.13 | |
| A006AD | 07 31 1310 0800 | SF | STEEP ROOFING | Underlayment, No.15 felt, per layer (or rosin paper) | 0.16 | 500.00 | 80.59 | 1.50% | 4% | 0.6 | 2.50% | $0.17 | 1.50% | 4% | 0.6 | 2.50% | $0.17 | 1.50% | 4% | 0.6 | 2.50% | $ 0.17 | 1.50% | 4% | 0.6 | 2.5% | $ 0.18 | |
| A006AE | 07 31 1310 0825 | SF | STEEP ROOFING | Underlayment, No.30 felt, per layer | 0.23 | 500.00 | 115.50 | 1.50% | 4% | 0.6 | 2.50% | $0.24 | 1.50% | 4% | 0.6 | 2.50% | $0.24 | 1.50% | 4% | 0.6 | 2.50% | $ 0.25 | 1.50% | 4% | 0.6 | 2.5% | $ 0.25 | |
| A006 | A006AF | SF | STEEP ROOFING | Ice & water shield, self-adhered, and primer | 0.98 | 500.00 | 489.50 | 1.50% | 4% | 0.6 | 2.50% | $1.00 | 1.50% | 4% | 0.6 | 2.50% | $1.03 | 1.50% | 4% | 0.6 | 2.50% | $ 1.05 | 1.50% | 4% | 0.6 | 2.5% | $ 1.08 | |
| A006AG | SF | STEEP ROOFING | Not used | 0.00 | 500.00 | $ - 0 | $ - 0 | |||||||||||||||||||||
| A006AH | 07 32 1310 1800 | SF | STEEP ROOFING | Terra cotta (clay) roof tile | 15.23 | 500.00 | 7,612.50 | 1.50% | 4% | 0.6 | 2.50% | $15.61 | 1.50% | 4% | 0.6 | 2.50% | $16.00 | 1.50% | 4% | 0.6 | 2.50% | $ 16.40 | 1.50% | 4% | 0.6 | 2.5% | $ 16.81 | |
| SUB-TOTAL FOR CLIN A006 | 19,451.19 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A007AA | B3010 105 6000 | SF | LOW SLOPE ROOFING | Fiberglass base sheet, fully mopped | 3.42 | 2,000.00 | 6,846.00 | 1.50% | 4% | 0.6 | 2.50% | $3.51 | 1.50% | 4% | 0.6 | 2.50% | $3.60 | 1.50% | 4% | 0.6 | 2.50% | $ 3.69 | 1.50% | 4% | 0.6 | 2.5% | $ 3.78 | |
| A007AB | 07 51 1320 3800 | SF | LOW SLOPE ROOFING | BUR, Type VI fiberglass, 4-ply, asphalt, not including cap or base sheet | 3.83 | 2,000.00 | 7,665.00 | 1.50% | 4% | 0.6 | 2.50% | $3.93 | 1.50% | 4% | 0.6 | 2.50% | $4.03 | 1.50% | 4% | 0.6 | 2.50% | $ 4.13 | 1.50% | 4% | 0.6 | 2.5% | $ 4.23 | |
| A007AC | 07 51 1320 2910 | SF | LOW SLOPE ROOFING | BUR, Type VI fiberglass, 2-ply, asphalt, not including cap or base sheet | 3.13 | 2,000.00 | 6,258.00 | 1.50% | 4% | 0.6 | 2.50% | $3.21 | 1.50% | 4% | 0.6 | 2.50% | $3.29 | 1.50% | 4% | 0.6 | 2.50% | $ 3.37 | 1.50% | 4% | 0.6 | 2.5% | $ 3.45 | |
| A007 | A007AD | 07 52 1610 1900 | SF | LOW SLOPE ROOFING | BUR, 1-ply SBS base, SBS granulated cap, cold applied | 4.59 | 2,000.00 | 9,177.00 | 1.50% | 4% | 0.6 | 2.50% | $4.70 | 1.50% | 4% | 0.6 | 2.50% | $4.82 | 1.50% | 4% | 0.6 | 2.50% | $ 4.94 | 1.50% | 4% | 0.6 | 2.5% | $ 5.06 |
| A007AE | 07 52 1610 2000 | SF | LOW SLOPE ROOFING | SBS modified, granulated cap, 160 mil, hot applied | 4.63 | 2,000.00 | 9,261.00 | 1.50% | 4% | 0.6 | 2.50% | $4.75 | 1.50% | 4% | 0.6 | 2.50% | $4.86 | 1.50% | 4% | 0.6 | 2.50% | $ 4.99 | 1.50% | 4% | 0.6 | 2.5% | $ 5.11 | |
| A007AF | 07 52 1310 2350 | SF | LOW SLOPE ROOFING | APP modified, granulated surface, torch applied | 3.56 | 2,000.00 | 7,119.00 | 1.50% | 4% | 0.6 | 2.50% | $3.65 | 1.50% | 4% | 0.6 | 2.50% | $3.74 | 1.50% | 4% | 0.6 | 2.50% | $ 3.83 | 1.50% | 4% | 0.6 | 2.5% | $ 3.93 | |
| A007AG | 07 52 1310 2250 | SF | LOW SLOPE ROOFING | APP modified, smooth, torch applied | 3.37 | 2,000.00 | 6,741.00 | 1.50% | 4% | 0.6 | 2.50% | $3.45 | 1.50% | 4% | 0.6 | 2.50% | $3.54 | 1.50% | 4% | 0.6 | 2.50% | $ 3.63 | 1.50% | 4% | 0.6 | 2.5% | $ 3.72 | |
| A007AH | 07 53 2320 4800 | SF | LOW SLOPE ROOFING | EPDM rubber, 45 mil, fully adhered | 2.49 | 2,000.00 | 4,977.00 | 1.50% | 4% | 0.6 | 2.50% | $2.55 | 1.50% | 4% | 0.6 | 2.50% | $2.61 | 1.50% | 4% | 0.6 | 2.50% | $ 2.68 | 1.50% | 4% | 0.6 | 2.5% | $ 2.75 | |
| A007AI | 07 53 2320 4800 | SF | LOW SLOPE ROOFING | EPDM rubber, 60 mil, fully adhered | 2.67 | 2,000.00 | 5,334.00 | 1.50% | 4% | 0.6 | 2.50% | $2.73 | 1.50% | 4% | 0.6 | 2.50% | $2.80 | 1.50% | 4% | 0.6 | 2.50% | $ 2.87 | 1.50% | 4% | 0.6 | 2.5% | $ 2.94 | |
| A007AJ | 07 51 1350 0020 | SF | LOW SLOPE ROOFING | Walkway pads, 1/2" asphaltic | 3.84 | 2,000.00 | 7,686.00 | 1.50% | 4% | 0.6 | 2.50% | $3.94 | 1.50% | 4% | 0.6 | 2.50% | $4.04 | 1.50% | 4% | 0.6 | 2.50% | $ 4.14 | 1.50% | 4% | 0.6 | 2.5% | $ 4.24 | |
| A007AK | 07 51 1350 0300 | SF | LOW SLOPE ROOFING | Walkway pads, 2" concrete | 8.66 | 2,000.00 | 17,325.00 | 1.50% | 4% | 0.6 | 2.50% | $8.88 | 1.50% | 4% | 0.6 | 2.50% | $9.10 | 1.50% | 4% | 0.6 | 2.50% | $ 9.33 | 1.50% | 4% | 0.6 | 2.5% | $ 9.56 | |
| A007AL | 07 51 1350 0100 | SF | LOW SLOPE ROOFING | Walkway pads, 3/16" asphaltic ( 3"x3",3/4" thick) | 8.09 | 2,000.00 | 16,170.00 | 1.50% | 4% | 0.6 | 2.50% | $8.29 | 1.50% | 4% | 0.6 | 2.50% | $8.49 | 1.50% | 4% | 0.6 | 2.50% | $ 8.71 | 1.50% | 4% | 0.6 | 2.5% | $ 8.92 | |
| A007AM | 07 54 1910 8750 | SF | LOW SLOPE ROOFING | PVC, 48 mils,Hest Welded, Reinforced ,loose laid with stone/gravel | 1.97 | 2,000.00 | 3,948.00 | 1.50% | 4% | 0.6 | 2.50% | $2.02 | 1.50% | 4% | 0.6 | 2.50% | $2.07 | 1.50% | 4% | 0.6 | 2.50% | $ 2.13 | 1.50% | 4% | 0.6 | 2.5% | $ 2.18 | |
| A007AN | 07 54 1910 8800 | SF | LOW SLOPE ROOFING | PVC, 48 mils,Hest Welded, Reinforced , Mechanically Attached | 2.10 | 2,000.00 | 4,200.00 | 1.50% | 4% | 0.6 | 2.50% | $2.15 | 1.50% | 4% | 0.6 | 2.50% | $2.21 | 1.50% | 4% | 0.6 | 2.50% | $ 2.26 | 1.50% | 4% | 0.6 | 2.5% | $ 2.32 | |
| A007AO | 07 54 1910 8850 | SF | LOW SLOPE ROOFING | PVC, 48 mils,Hest Welded, Reinforced , Fully adhered with adhesive | 2.93 | 2,000.00 | 5,859.00 | 1.50% | 4% | 0.6 | 2.50% | $3.00 | 1.50% | 4% | 0.6 | 2.50% | $3.08 | 1.50% | 4% | 0.6 | 2.50% | $ 3.15 | 1.50% | 4% | 0.6 | 2.5% | $ 3.23 | |
| A007AP | 07 54 1910 8870 | SF | LOW SLOPE ROOFING | PVC, 60 mils,Hest Welded, Reinforced ,loose laid with stone/gravel | 2.00 | 2,000.00 | 3,990.00 | 1.50% | 4% | 0.6 | 2.50% | $2.04 | 1.50% | 4% | 0.6 | 2.50% | $2.10 | 1.50% | 4% | 0.6 | 2.50% | $ 2.15 | 1.50% | 4% | 0.6 | 2.5% | $ 2.20 | |
| A007AQ | 07 54 1910 8880 | SF | LOW SLOPE ROOFING | PVC,60 mils,Hest Welded, Reinforced , Mechanically Attached | 2.12 | 2,000.00 | 4,242.00 | 1.50% | 4% | 0.6 | 2.50% | $2.17 | 1.50% | 4% | 0.6 | 2.50% | $2.23 | 1.50% | 4% | 0.6 | 2.50% | $ 2.28 | 1.50% | 4% | 0.6 | 2.5% | $ 2.34 | |
| A007AR | 07 54 1910 8890 | SF | LOW SLOPE ROOFING | PVC,60 mils,Hest Welded, Reinforced ,Fully Adhered with adhesive | 2.95 | 2,000.00 | 5,901.00 | 1.50% | 4% | 0.6 | 2.50% | $3.02 | 1.50% | 4% | 0.6 | 2.50% | $3.10 | 1.50% | 4% | 0.6 | 2.50% | $ 3.18 | 1.50% | 4% | 0.6 | 2.5% | $ 3.26 | |
| A007AS | 07 57 1310 0100 | SF | LOW SLOPE ROOFING | SPF, Primer for metal substrate (when Required) | 1.37 | 2,000.00 | 2,730.00 | 1.50% | 4% | 0.6 | 2.50% | $1.40 | 1.50% | 4% | 0.6 | 2.50% | $1.43 | 1.50% | 4% | 0.6 | 2.50% | $ 1.47 | 1.50% | 4% | 0.6 | 2.5% | $ 1.51 | |
| A007AT | 07 57 1310 0200 | SF | LOW SLOPE ROOFING | SPF, Primer for non-metal substrate (when Required) | 1.01 | 2,000.00 | 2,016.00 | 1.50% | 4% | 0.6 | 2.50% | $1.03 | 1.50% | 4% | 0.6 | 2.50% | $1.06 | 1.50% | 4% | 0.6 | 2.50% | $ 1.09 | 1.50% | 4% | 0.6 | 2.5% | $ 1.11 | |
| A007AU | 07 57 1310 0300 | SF | LOW SLOPE ROOFING | SPF ,Closed Spray polyurethane foam, 3lb/CF density 1" | 0.91 | 2,000.00 | 1,825.95 | 1.50% | 4% | 0.6 | 2.50% | $0.94 | 1.50% | 4% | 0.6 | 2.50% | $0.96 | 1.50% | 4% | 0.6 | 2.50% | $ 0.98 | 1.50% | 4% | 0.6 | 2.5% | $ 1.01 | |
| A007AV | 07 57 1310 0400 | SF | LOW SLOPE ROOFING | 2" | 1.67 | 2,000.00 | 3,339.00 | 1.50% | 4% | 0.6 | 2.50% | $1.71 | 1.50% | 4% | 0.6 | 2.50% | $1.75 | 1.50% | 4% | 0.6 | 2.50% | $ 1.80 | 1.50% | 4% | 0.6 | 2.5% | $ 1.84 | |
| A007AW | 07 57 1310 0500 | SF | LOW SLOPE ROOFING | 3" | 2.43 | 2,000.00 | 4,851.00 | 1.50% | 4% | 0.6 | 2.50% | $2.49 | 1.50% | 4% | 0.6 | 2.50% | $2.55 | 1.50% | 4% | 0.6 | 2.50% | $ 2.61 | 1.50% | 4% | 0.6 | 2.5% | $ 2.68 | |
| A007AX | 07 57 1310 0600 | SF | LOW SLOPE ROOFING | 4" | 3.20 | 2,000.00 | 6,405.00 | 1.50% | 4% | 0.6 | 2.50% | $3.28 | 1.50% | 4% | 0.6 | 2.50% | $3.36 | 1.50% | 4% | 0.6 | 2.50% | $ 3.45 | 1.50% | 4% | 0.6 | 2.5% | $ 3.53 | |
| A007AY | 07 57 1310 0700 | SF | LOW SLOPE ROOFING | SPF, Spray on Silicone Coating | 2.39 | 2,000.00 | 4,788.00 | 1.50% | 4% | 0.6 | 2.50% | $2.45 | 1.50% | 4% | 0.6 | 2.50% | $2.52 | 1.50% | 4% | 0.6 | 2.50% | $ 2.58 | 1.50% | 4% | 0.6 | 2.5% | $ 2.64 | |
| A007AZ | 07 57 1310 0800 | SF | LOW SLOPE ROOFING | Warranty 5-20 Year Manufacturer | 0.16 | 2,000.00 | 315.00 | 1.50% | 4% | 0.6 | 2.50% | $0.16 | 1.50% | 4% | 0.6 | 2.50% | $0.17 | 1.50% | 4% | 0.6 | 2.50% | $ 0.17 | 1.50% | 4% | 0.6 | 2.5% | $ 0.17 | |
| A007AZ.1 | 07 57 1310 0900 | SF | LOW SLOPE ROOFING | Warranty, 20 Year No dollar limit | 0.21 | 2,000.00 | 420.00 | 1.50% | 4% | 0.6 | 2.50% | $0.22 | 1.50% | 4% | 0.6 | 2.50% | $0.22 | 1.50% | 4% | 0.6 | 2.50% | $ 0.23 | 1.50% | 4% | 0.6 | 2.5% | $ 0.23 | |
| SUB-TOTAL FOR CLIN A007 | 159,388.95 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A008AA | 07 01 5010 0300 | GAL | SURFACING & REPAIR | Primer | 8.77 | 2,000.00 | 17,535.00 | 1.50% | 4% | 0.6 | 2.50% | $8.99 | 1.50% | 4% | 0.6 | 2.50% | $9.21 | 1.50% | 4% | 0.6 | 2.50% | $ 9.44 | 1.50% | 4% | 0.6 | 2.5% | $ 9.68 | |
| A008AB | 07 65 1310 0750 | SF | SURFACING & REPAIR | Fibered asphalt mastic, trowel grade with glass fabric | 5.30 | 10,000.00 | 53,025.00 | 1.50% | 4% | 0.6 | 2.50% | $5.44 | 1.50% | 4% | 0.6 | 2.50% | $5.57 | 1.50% | 4% | 0.6 | 2.50% | $ 5.71 | 1.50% | 4% | 0.6 | 2.5% | $ 5.85 | |
| A008AC | 07 53 2320 4800 | SF | SURFACING & REPAIR | Single ply membrane repair (EPDM, PVC, CSPE) | 2.67 | 10,000.00 | 26,670.00 | 1.50% | 4% | 0.6 | 2.50% | $2.73 | 1.50% | 4% | 0.6 | 2.50% | $2.80 | 1.50% | 4% | 0.6 | 2.50% | $ 2.87 | 1.50% | 4% | 0.6 | 2.5% | $ 2.94 | |
| A008AD | 28 42 1550 0220 | EA | SURFACING & REPAIR | Wet repair and emergency leak stoppage | 729.75 | 600.00 | 437,850.00 | 1.50% | 4% | 0.6 | 2.50% | $747.99 | 1.50% | 4% | 0.6 | 2.50% | $766.69 | 1.50% | 4% | 0.6 | 2.50% | $ 785.86 | 1.50% | 4% | 0.6 | 2.5% | $ 805.51 | |
| A008AE | EA | SURFACING & REPAIR | Emergency Repair Leak | 836.48 | 600.00 | 501,890.40 | 1.50% | 4% | 0.6 | 2.50% | $857.40 | 1.50% | 4% | 0.6 | 2.50% | $878.83 | 1.50% | 4% | 0.6 | 2.50% | $ 900.80 | 1.50% | 4% | 0.6 | 2.5% | $ 923.32 | ||
| A008AF | 07 31 2610 0100 | SQ | SURFACING & REPAIR | Slate Shingles, Roof Repair, Extensive Replacement | 1,008.00 | 600.00 | 604,800.00 | 1.50% | 4% | 0.6 | 2.50% | $1,033.20 | 1.50% | 4% | 0.6 | 2.50% | $1,059.03 | 1.50% | 4% | 0.6 | 2.50% | $ 1,085.51 | 1.50% | 4% | 0.6 | 2.5% | $ 1,112.64 | |
| A008 | A008AG | 07 31 2610 2700 | L.F | SURFACING & REPAIR | Slate Shingles, Roof Repair, Individual Slates, scattered.(material omly use day charge for labor) | 14.91 | 6,000.00 | 89,460.00 | 1.50% | 4% | 0.6 | 2.50% | $15.28 | 1.50% | 4% | 0.6 | 2.50% | $15.66 | 1.50% | 4% | 0.6 | 2.50% | $ 16.06 | 1.50% | 4% | 0.6 | 2.5% | $ 16.46 |
| A008AH | 07 31 1310 0300 | EA | SURFACING & REPAIR | Asphalt Shingles, Roof Repair, Individual Shingles, scattered.(material omly use day charge for labor) | 2.67 | 7,000.00 | 18,669.00 | 1.50% | 4% | 0.6 | 2.50% | $2.73 | 1.50% | 4% | 0.6 | 2.50% | $2.80 | 1.50% | 4% | 0.6 | 2.50% | $ 2.87 | 1.50% | 4% | 0.6 | 2.5% | $ 2.94 | |
| A008AI | 07 32 1310 0500 | EA | SURFACING & REPAIR | Minor repairs clay tile roof, individual tiles, scattered.(material omly use day charge for labor) | 8.82 | 8,000.00 | 70,560.00 | 1.50% | 4% | 0.6 | 2.50% | $9.04 | 1.50% | 4% | 0.6 | 2.50% | $9.27 | 1.50% | 4% | 0.6 | 2.50% | $ 9.50 | 1.50% | 4% | 0.6 | 2.5% | $ 9.74 | |
| A008AJ | 22 14 2613 3920 | SURFACING & REPAIR | 30" x 30", roof drain flashing at existing roof drain including removals. | 1,262.27 | 600.00 | 757,363.20 | 1.50% | 4% | 0.6 | 2.50% | $1,293.83 | 1.50% | 4% | 0.6 | 2.50% | $1,326.17 | 1.50% | 4% | 0.6 | 2.50% | $ 1,359.33 | 1.50% | 4% | 0.6 | 2.5% | $ 1,393.31 | ||
| A008AK | 07 71 1620 0100 | EA | SURFACING & REPAIR | Remove old mastic & refill pitch pan, average approx. size 8" x 8" x 4" thick | 275.00 | 600.00 | 165,000.00 | 1.50% | 4% | 0.6 | 2.50% | $281.88 | 1.50% | 4% | 0.6 | 2.50% | $288.92 | 1.50% | 4% | 0.6 | 2.50% | $ 296.14 | 1.50% | 4% | 0.6 | 2.5% | $ 303.55 | |
| A008AK.1 | EA | SURFACING & REPAIR | Remove old mastic & refill pitch pan, average approx. size 8" x 8" x 4" thick. With AC refrigerant piping. | 420.24 | 600.00 | 252,146.40 | 1.50% | 4% | 0.6 | 2.50% | $430.75 | 1.50% | 4% | 0.6 | 2.50% | $441.52 | 1.50% | 4% | 0.6 | 2.50% | $ 452.56 | 1.50% | 4% | 0.6 | 2.5% | $ 463.87 | ||
| A008AL | 07 71 2330 5480 | LF | SURFACING & REPAIR | Re-solder existing copper joints | 8.40 | 5,000.00 | 42,000.00 | 1.50% | 4% | 0.6 | 2.50% | $8.61 | 1.50% | 4% | 0.6 | 2.50% | $8.83 | 1.50% | 4% | 0.6 | 2.50% | $ 9.05 | 1.50% | 4% | 0.6 | 2.5% | $ 9.27 | |
| A008AM | EA | SURFACING & REPAIR | 2.5 to 4 lb. lead plumbing stack flashing at existing stack including removals | 186.16 | 600.00 | 111,698.40 | 1.50% | 4% | 0.6 | 2.50% | $190.82 | 1.50% | 4% | 0.6 | 2.50% | $195.59 | 1.50% | 4% | 0.6 | 2.50% | $ 200.48 | 1.50% | 4% | 0.6 | 2.5% | $ 205.49 | ||
| A008AN | EA | SURFACING & REPAIR | Minimum charge, full day (2 Men 1 Truck) Roofer. | 1,115.49 | 600.00 | 669,292.80 | 1.50% | 4% | 0.6 | 2.50% | $1,143.38 | 1.50% | 4% | 0.6 | 2.50% | $1,171.96 | 1.50% | 4% | 0.6 | 2.50% | $ 1,201.26 | 1.50% | 4% | 0.6 | 2.5% | $ 1,231.29 | ||
| A008AO | EA | SURFACING & REPAIR | Minimum charge, full day (2 Men 1 Truck) Sheet Metal Worker. | 1,472.15 | 600.00 | 883,291.20 | 1.50% | 4% | 0.6 | 2.50% | $1,508.96 | 1.50% | 4% | 0.6 | 2.50% | $1,546.68 | 1.50% | 4% | 0.6 | 2.50% | $ 1,585.35 | 1.50% | 4% | 0.6 | 2.5% | $ 1,624.98 | ||
| SUB-TOTAL FOR CLIN A008 | 4,701,251.40 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A009AA | SF | FLASHINGS | 2-Ply system of glass felt with polyester & glass composite sheet, 8"-16" high | 7.21 | 600.00 | 4,323.00 | 1.50% | 4% | 0.6 | 2.50% | $7.39 | 1.50% | 4% | 0.6 | 2.50% | $7.57 | 1.50% | 4% | 0.6 | 2.50% | $ 7.76 | 1.50% | 4% | 0.6 | 2.5% | $ 7.95 | ||
| A009AB | 07 52 1610 0750 | SF | FLASHINGS | 1-ply SBS modified bitumen sheet, granular surface, 8"-16" high | 4.42 | 600.00 | 2,652.30 | 1.50% | 4% | 0.6 | 2.50% | $4.53 | 1.50% | 4% | 0.6 | 2.50% | $4.64 | 1.50% | 4% | 0.6 | 2.50% | $ 4.76 | 1.50% | 4% | 0.6 | 2.5% | $ 4.88 | |
| A009AC | 07 65 2310 8100 | SF | FLASHINGS | EPDM rubber with term bar, 8"-16" high | 4.84 | 600.00 | 2,904.30 | 1.50% | 4% | 0.6 | 2.50% | $4.96 | 1.50% | 4% | 0.6 | 2.50% | $5.09 | 1.50% | 4% | 0.6 | 2.50% | $ 5.21 | 1.50% | 4% | 0.6 | 2.5% | $ 5.34 | |
| A009AD | 22 14 2613 3920 | EA | FLASHINGS | 30" x 30", roof drain flashing at existing roof drain | 1,076.25 | 40.00 | 43,050.00 | 1.50% | 4% | 0.6 | 2.50% | $1,103.16 | 1.50% | 4% | 0.6 | 2.50% | $1,130.74 | 1.50% | 4% | 0.6 | 2.50% | $ 1,159.00 | 1.50% | 4% | 0.6 | 2.5% | $ 1,187.98 | |
| A009 | A009AE | EA | FLASHINGS | 2.5 to 4 lb. lead plumbing stack flashing at existing stack | 177.34 | 40.00 | 7,093.68 | 1.50% | 4% | 0.6 | 2.50% | $181.78 | 1.50% | 4% | 0.6 | 2.50% | $186.32 | 1.50% | 4% | 0.6 | 2.50% | $ 190.98 | 1.50% | 4% | 0.6 | 2.5% | $ 195.75 | |
| A009AF | 07 71 2910 0620 | LF | FLASHINGS | Expansion joint with flexible bellows and metal flanges, cover width to 16", aluminum( openings upto 8") | 23.63 | 60.00 | 1,417.50 | 1.50% | 4% | 0.6 | 2.50% | $24.22 | 1.50% | 4% | 0.6 | 2.50% | $24.82 | 1.50% | 4% | 0.6 | 2.50% | $ 25.44 | 1.50% | 4% | 0.6 | 2.5% | $ 26.08 | |
| A009AG | 07 71 2910 0920 | LF | FLASHINGS | Expansion joint with flexible bellows and metal flanges, cover width to 16", copper ( openings upto 8") | 33.08 | 200.00 | 6,615.00 | 1.50% | 4% | 0.6 | 2.50% | $33.90 | 1.50% | 4% | 0.6 | 2.50% | $34.75 | 1.50% | 4% | 0.6 | 2.50% | $ 35.62 | 1.50% | 4% | 0.6 | 2.5% | $ 36.51 | |
| A009AH | 07 71 4310 0510 | LF | FLASHINGS | Aluminum termination bar, 1/4" x 1" | 2.03 | 2,000.00 | 4,053.00 | 1.50% | 4% | 0.6 | 2.50% | $2.08 | 1.50% | 4% | 0.6 | 2.50% | $2.13 | 1.50% | 4% | 0.6 | 2.50% | $ 2.18 | 1.50% | 4% | 0.6 | 2.5% | $ 2.24 | |
| $ - 0 | $ - 0 | |||||||||||||||||||||||||||
| SUB-TOTAL FOR CLIN A009 | 72,108.78 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| A010AA | 07 71 2330 0400 | LF | SHEET METAL | Prefinished aluminum downspout, .032", 4" x 5"( .020" 3"x4") | 10.55 | 200.00 | 2,110.50 | 1.50% | 4% | 0.6 | 2.50% | $10.82 | 1.50% | 4% | 0.6 | 2.50% | $11.09 | 1.50% | 4% | 0.6 | 2.50% | $ 11.36 | 1.50% | 4% | 0.6 | 2.5% | $ 11.65 | |
| A010AB | 07 71 2330 0300 | LF | SHEET METAL | Prefinished aluminum gutter, .032", 6"(5") | 10.55 | 200.00 | 2,110.50 | 1.50% | 4% | 0.6 | 2.50% | $10.82 | 1.50% | 4% | 0.6 | 2.50% | $11.09 | 1.50% | 4% | 0.6 | 2.50% | $ 11.36 | 1.50% | 4% | 0.6 | 2.5% | $ 11.65 | |
| A010AC | 07 71 2310 1800 | LF | SHEET METAL | Copper downspout, 16 oz, 4" dia. | 16.80 | 200.00 | 3,360.00 | 1.50% | 4% | 0.6 | 2.50% | $17.22 | 1.50% | 4% | 0.6 | 2.50% | $17.65 | 1.50% | 4% | 0.6 | 2.50% | $ 18.09 | 1.50% | 4% | 0.6 | 2.5% | $ 18.54 | |
| A010AD | 07 71 2310 2500 | LF | SHEET METAL | Copper downspout, 16 oz, 4" x 5"(3"x4") | 22.05 | 200.00 | 4,410.00 | 1.50% | 4% | 0.6 | 2.50% | $22.60 | 1.50% | 4% | 0.6 | 2.50% | $23.17 | 1.50% | 4% | 0.6 | 2.50% | $ 23.75 | 1.50% | 4% | 0.6 | 2.5% | $ 24.34 | |
| A010AE | 07 71 2330 0700 | LF | SHEET METAL | Copper gutter, 20 oz, 6"( 16OZ) | 16.12 | 200.00 | 3,223.50 | 1.50% | 4% | 0.6 | 2.50% | $16.52 | 1.50% | 4% | 0.6 | 2.50% | $16.93 | 1.50% | 4% | 0.6 | 2.50% | $ 17.36 | 1.50% | 4% | 0.6 | 2.5% | $ 17.79 | |
| A010AF | N/A | LF | SHEET METAL | Not used | $ - 0 | $ - 0 | ||||||||||||||||||||||
| A010AG | SF | SHEET METAL | Miscellaneous prefinished aluminum, .032", including roof edge, gravel stop, counter flashing, coping, and coverings | 0.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||
| A010AH | 07 71 1910 0020 | SF | SHEET METAL | Miscellaneous prefinished aluminum, .032", including drip edge & gravel stop | 13.13 | 200.00 | 2,625.00 | 1.50% | 4% | 0.6 | 2.50% | $13.45 | 1.50% | 4% | 0.6 | 2.50% | $13.79 | 1.50% | 4% | 0.6 | 2.50% | $ 14.13 | 1.50% | 4% | 0.6 | 2.5% | $ 14.49 | |
| A010AH.1 | 04 72 1010 0800 | SF | SHEET METAL | Miscellaneous prefinished aluminum, .032", coping with cover plates & one cleat. | 26.25 | 200.00 | 5,250.00 | 1.50% | 4% | 0.6 | 2.50% | $26.91 | 1.50% | 4% | 0.6 | 2.50% | $27.58 | 1.50% | 4% | 0.6 | 2.50% | $ 28.27 | 1.50% | 4% | 0.6 | 2.5% | $ 28.98 | |
| A010AH.2 | 22 14 2613 0200 | SF | SHEET METAL | Miscellaneous prefinished aluminum, .032", conductor head. | 561.75 | 200.00 | 112,350.00 | 1.50% | 4% | 0.6 | 2.50% | $575.79 | 1.50% | 4% | 0.6 | 2.50% | $590.19 | 1.50% | 4% | 0.6 | 2.50% | $ 604.94 | 1.50% | 4% | 0.6 | 2.5% | $ 620.07 | |
| A010 | A010AH.3 | 07 71 1910 1800 | SF | SHEET METAL | Miscellaneous stainless steel, .025", including roof edge, gravel stop, counter flashing, coping, and coverings | 24.15 | 200.00 | 4,830.00 | 1.50% | 4% | 0.6 | 2.50% | $24.75 | 1.50% | 4% | 0.6 | 2.50% | $25.37 | 1.50% | 4% | 0.6 | 2.50% | $ 26.01 | 1.50% | 4% | 0.6 | 2.5% | $ 26.66 |
| A010AI | 07 71 1910 1800 | SF | SHEET METAL | Miscellaneous stainless steel, .025", including drip edge & gravel stop | 24.15 | 200.00 | 4,830.00 | 1.50% | 4% | 0.6 | 2.50% | $24.75 | 1.50% | 4% | 0.6 | 2.50% | $25.37 | 1.50% | 4% | 0.6 | 2.50% | $ 26.01 | 1.50% | 4% | 0.6 | 2.5% | $ 26.66 | |
| A010AI.1 | SF | SHEET METAL | Miscellaneous stainless steel, .025", coping with cover plates & one cleat. | 27.31 | 200.00 | 5,462.60 | 1.50% | 4% | 0.6 | 2.50% | $28.00 | 1.50% | 4% | 0.6 | 2.50% | $28.70 | 1.50% | 4% | 0.6 | 2.50% | $ 29.41 | 1.50% | 4% | 0.6 | 2.5% | $ 30.15 | ||
| A010AI.2 | 22 14 2613 0260 | SF | SHEET METAL | Miscellaneous stainless steel, .025", conductor head. | 691.95 | 200.00 | 138,390.00 | 1.50% | 4% | 0.6 | 2.50% | $709.25 | 1.50% | 4% | 0.6 | 2.50% | $726.98 | 1.50% | 4% | 0.6 | 2.50% | $ 745.15 | 1.50% | 4% | 0.6 | 2.5% | $ 763.78 | |
| A010AI.3 | SF | SHEET METAL | Miscellaneous copper, 20 oz, including gutter liner, fascia, roof edge, gravel stop, counter flashing, coping, and coverings | 0.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||
| 07 71 1910 1200 | LF | SHEET METAL | Miscellaneous copper, 20 oz, including drip edge & gravel stop | 34.65 | 100.00 | 3,465.00 | 1.50% | 4% | 0.6 | 2.50% | $35.52 | 1.50% | 4% | 0.6 | 2.50% | $36.40 | 1.50% | 4% | 0.6 | 2.50% | $ 37.31 | 1.50% | 4% | 0.6 | 2.5% | $ 38.25 | ||
| LF | SHEET METAL | Miscellaneous copper, 20 oz, coping with cover plates & one cleat. | 40.96 | 100.00 | 4,096.40 | 1.50% | 4% | 0.6 | 2.50% | $41.99 | 1.50% | 4% | 0.6 | 2.50% | $43.04 | 1.50% | 4% | 0.6 | 2.50% | $ 44.11 | 1.50% | 4% | 0.6 | 2.5% | $ 45.22 | |||
| 22 14 2613 0280 | EA | SHEET METAL | Miscellaneous copper, 20 oz, conductor head. | 651.00 | 100.00 | 65,100.00 | 1.50% | 4% | 0.6 | 2.50% | $667.28 | 1.50% | 4% | 0.6 | 2.50% | $683.96 | 1.50% | 4% | 0.6 | 2.50% | $ 701.06 | 1.50% | 4% | 0.6 | 2.5% | $ 718.58 | ||
| LF | SHEET METAL | Built in 20 oz. copper gutter liner. Maximum width limited to 36 inch sheet. | 70.48 | 100.00 | 7,047.70 | 1.50% | 4% | 0.6 | 2.50% | $72.24 | 1.50% | 4% | 0.6 | 2.50% | $74.04 | 1.50% | 4% | 0.6 | 2.50% | $ 75.90 | 1.50% | 4% | 0.6 | 2.5% | $ 77.79 | |||
| 07 61 1910 1000 | SF | SHEET METAL | Flat seam roofing, 20 oz. copper | 21.79 | 100.00 | 2,178.75 | 1.50% | 4% | 0.6 | 2.50% | $22.33 | 1.50% | 4% | 0.6 | 2.50% | $22.89 | 1.50% | 4% | 0.6 | 2.50% | $ 23.46 | 1.50% | 4% | 0.6 | 2.5% | $ 24.05 | ||
| 07 61 1310 0700 | SF | SHEET METAL | Standing seam 20 oz. copper roofing, not including dormers or radius roofs. | 22.84 | 100.00 | 2,283.75 | 1.50% | 4% | 0.6 | 2.50% | $23.41 | 1.50% | 4% | 0.6 | 2.50% | $23.99 | 1.50% | 4% | 0.6 | 2.50% | $ 24.59 | 1.50% | 4% | 0.6 | 2.5% | $ 25.21 | ||
| 0.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||||||
| A010AJ | 07 71 1620 0100 | EA | SHEET METAL | Copper pitch pan, 4" x 4" x 3" high with pourable sealer | 36.75 | 40.00 | 1,470.00 | 1.50% | 4% | 0.6 | 2.50% | $37.67 | 1.50% | 4% | 0.6 | 2.50% | $38.61 | 1.50% | 4% | 0.6 | 2.50% | $ 39.58 | 1.50% | 4% | 0.6 | 2.5% | $ 40.57 | |
| A010AK | 07 71 1620 0200 | EA | SHEET METAL | Copper pitch pan, 8" x 8" x 3" high with pourable sealer | 42.84 | 40.00 | 1,713.60 | 1.50% | 4% | 0.6 | 2.50% | $43.91 | 1.50% | 4% | 0.6 | 2.50% | $45.01 | 1.50% | 4% | 0.6 | 2.50% | $ 46.13 | 1.50% | 4% | 0.6 | 2.5% | $ 47.29 | |
| A010AL | LF | SHEET METAL | Not used. | $ - 0 | $ - 0 | |||||||||||||||||||||||
| A010AM | 07 71 2310 0700 | LF | SHEET METAL | Remove, realign, reinstall, and resecure existing gutter and/or downspouts (replace hangers, fasteners and straps). Reseal all joints. | 9.45 | 1,000.00 | 9,450.00 | 1.50% | 4% | 0.6 | 2.50% | $9.69 | 1.50% | 4% | 0.6 | 2.50% | $9.93 | 1.50% | 4% | 0.6 | 2.50% | $ 10.18 | 1.50% | 4% | 0.6 | 2.5% | $ 10.43 | |
| A010AN | 07 65 1010 0100 | SF | SHEET METAL | Step flashing, prefinished aluminum, .032" | 6.20 | 1,000.00 | 6,195.00 | 1.50% | 4% | 0.6 | 2.50% | $6.35 | 1.50% | 4% | 0.6 | 2.50% | $6.51 | 1.50% | 4% | 0.6 | 2.50% | $ 6.67 | 1.50% | 4% | 0.6 | 2.5% | $ 6.84 | |
| A010AO | 07 46 7310 0012 | SF | SHEET METAL | Aluminum ,residential, 0.20" Thick | 5.51 | 1,000.00 | 5,512.50 | 1.50% | 4% | 0.6 | 2.50% | $5.65 | 1.50% | 4% | 0.6 | 2.50% | $5.79 | 1.50% | 4% | 0.6 | 2.50% | $ 5.94 | 1.50% | 4% | 0.6 | 2.5% | $ 6.08 | |
| A010AP | 07 46 7310 0100 | SHEET METAL | Baked enamel on steel, 16 or 18ga | 13.39 | 1,000.00 | 13,387.50 | 1.50% | 4% | 0.6 | 2.50% | $13.72 | 1.50% | 4% | 0.6 | 2.50% | $14.07 | 1.50% | 4% | 0.6 | 2.50% | $ 14.42 | 1.50% | 4% | 0.6 | 2.5% | $ 14.78 | ||
| A010AQ | 07 46 7310 0300 | SHEET METAL | Polyviny Chloride,White, Solid | 5.41 | 1,000.00 | 5,407.50 | 1.50% | 4% | 0.6 | 2.50% | $5.54 | 1.50% | 4% | 0.6 | 2.50% | $5.68 | 1.50% | 4% | 0.6 | 2.50% | $ 5.82 | 1.50% | 4% | 0.6 | 2.5% | $ 5.97 | ||
| A010AR | 07 46 7310 0400 | SHEET METAL | Polyvinyl,Perforated 12" wide with 6" fascia | 5.41 | 1,000.00 | 5,407.50 | 1.50% | 4% | 0.6 | 2.50% | $5.54 | 1.50% | 4% | 0.6 | 2.50% | $5.68 | 1.50% | 4% | 0.6 | 2.50% | $ 5.82 | 1.50% | 4% | 0.6 | 2.5% | $ 5.97 |
| SUB-TOTAL FOR CLIN A010 | 391,952.30 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| A011AA | B3020 230 0200 | EA | ACCESSORIES | Roof hatch, 2'6" x 3'0" with prefabricated curb | 1,272.60 | 10.00 | 12,726.00 | 1.50% | 4% | 0.6 | 2.50% | $1,304.42 | 1.50% | 4% | 0.6 | 2.50% | $1,337.03 | 1.50% | 4% | 0.6 | 2.50% | $ 1,370.45 | 1.50% | 4% | 0.6 | 2.5% | $ 1,404.71 | ||||||
| A011AB | 22 14 2613 3920 | EA | ACCESSORIES | Remove existing & install new 3" to 6" diameter cast iron roof drain including piping connection | 1,076.25 | 10.00 | 10,762.50 | 1.50% | 4% | 0.6 | 2.50% | $1,103.16 | 1.50% | 4% | 0.6 | 2.50% | $1,130.74 | 1.50% | 4% | 0.6 | 2.50% | $ 1,159.00 | 1.50% | 4% | 0.6 | 2.5% | $ 1,187.98 | ||||||
| A011AC | EA | ACCESSORIES | New 3" to 6" diameter roof drain liner | 670.34 | 10.00 | 6,703.40 | 1.50% | 4% | 0.6 | 2.50% | $687.10 | 1.50% | 4% | 0.6 | 2.50% | $704.28 | 1.50% | 4% | 0.6 | 2.50% | $ 721.88 | 1.50% | 4% | 0.6 | 2.5% | $ 739.93 | |||||||
| A011AD | EA | ACCESSORIES | New ring clamp and bolts on existing cast iron roof drain | 731.84 | 10.00 | 7,318.41 | 1.50% | 4% | 0.6 | 2.50% | $750.14 | 1.50% | 4% | 0.6 | 2.50% | $768.89 | 1.50% | 4% | 0.6 | 2.50% | $ 788.11 | 1.50% | 4% | 0.6 | 2.5% | $ 807.82 | |||||||
| A011AE | Not used | 10.00 | $ - 0 | $ - 0 | |||||||||||||||||||||||||||||
| A011AF | EA | ACCESSORIES | Prefabricated pipe flashing boot, to 6" diameter | 77.69 | 10.00 | 776.93 | 1.50% | 4% | 0.6 | 2.50% | $79.64 | 1.50% | 4% | 0.6 | 2.50% | $81.63 | 1.50% | 4% | 0.6 | 2.50% | $ 83.67 | 1.50% | 4% | 0.6 | 2.5% | $ 85.76 | |||||||
| A011 | A010AG | LF | ACCESSORIES | Prefab sheet metal curb for BUR/EPDM roof 24" X 48" | 281.09 | 200.00 | 56,218.80 | 1.50% | 4% | 0.6 | 2.50% | $288.12 | 1.50% | 4% | 0.6 | 2.50% | $295.32 | 1.50% | 4% | 0.6 | 2.50% | $ 302.71 | 1.50% | 4% | 0.6 | 2.5% | $ 310.28 | ||||||
| A011AH | LF | ACCESSORIES | Prefab sheet metal curb for BUR/EPDM roof 72" X 48" | 1,828.59 | 200.00 | 365,717.00 | 1.50% | 4% | 0.6 | 2.50% | $1,874.30 | 1.50% | 4% | 0.6 | 2.50% | $1,921.16 | 1.50% | 4% | 0.6 | 2.50% | $ 1,969.19 | 1.50% | 4% | 0.6 | 2.5% | $ 2,018.42 | |||||||
| A011AI | Reconnection & Disconnection fee | 2,644.44 | 10.00 | 26,444.44 | 1.50% | 4% | 0.6 | 2.50% | $2,710.56 | 1.50% | 4% | 0.6 | 2.50% | $2,778.32 | 1.50% | 4% | 0.6 | 2.50% | $ 2,847.78 | 1.50% | 4% | 0.6 | 2.5% | $ 2,918.97 | |||||||||
| A011AJ | EA | ACCESSORIES | Prefab sheet metal curb, 2' to 4' long x 4" to 6" wide | 228.03 | 20.00 | 4,560.60 | 1.50% | 4% | 0.6 | 2.50% | $233.73 | 1.50% | 4% | 0.6 | 2.50% | $239.57 | 1.50% | 4% | 0.6 | 2.50% | $ 245.56 | 1.50% | 4% | 0.6 | 2.5% | $ 251.70 | |||||||
| A011AK | EA | ACCESSORIES | Prefab sheet metal curb, 4' to 6' long x 6" to 8" wide | 474.72 | 100.00 | 47,471.60 | 1.50% | 4% | 0.6 | 2.50% | $486.58 | 1.50% | 4% | 0.6 | 2.50% | $498.75 | 1.50% | 4% | 0.6 | 2.50% | $ 511.22 | 1.50% | 4% | 0.6 | 2.5% | $ 524.00 | |||||||
| A011AL | 07 72 2610 0150 | LF | ACCESSORIES | Continuous ridge ventilator | 8.77 | 200.00 | 1,753.50 | 1.50% | 4% | 0.6 | 2.50% | $8.99 | 1.50% | 4% | 0.6 | 2.50% | $9.21 | 1.50% | 4% | 0.6 | 2.50% | $ 9.44 | 1.50% | 4% | 0.6 | 2.5% | $ 9.68 | ||||||
| A011AM | 13 34 1950 8400 | EA | ACCESSORIES | Turbine ventilator, 12" diameter | 220.50 | 20.00 | 4,410.00 | 1.50% | 4% | 0.6 | 2.50% | $226.01 | 1.50% | 4% | 0.6 | 2.50% | $231.66 | 1.50% | 4% | 0.6 | 2.50% | $ 237.45 | 1.50% | 4% | 0.6 | 2.5% | $ 243.39 | ||||||
| A011AN | EA | ACCESSORIES | Splash block, concrete | 24.61 | 20.00 | 492.14 | 1.50% | 4% | 0.6 | 2.50% | $25.22 | 1.50% | 4% | 0.6 | 2.50% | $25.85 | 1.50% | 4% | 0.6 | 2.50% | $ 26.50 | 1.50% | 4% | 0.6 | 2.5% | $ 27.16 | |||||||
| A011AO | 07 72 5310 0200 | EA | ACCESSORIES | Snow Guard | 33.60 | 20.00 | 672.00 | 1.50% | 4% | 0.6 | 2.50% | $34.44 | 1.50% | 4% | 0.6 | 2.50% | $35.30 | 1.50% | 4% | 0.6 | 2.50% | $ 36.18 | 1.50% | 4% | 0.6 | 2.5% | $ 37.09 | ||||||
| A011AP | EA | ACCESSORIES | Aluminum roof ladders, up to 30 feet with cage | 8,869.39 | 2.00 | 17,738.78 | 1.50% | 4% | 0.6 | 2.50% | $9,091.12 | 1.50% | 4% | 0.6 | 2.50% | $9,318.40 | 1.50% | 4% | 0.6 | 2.50% | $ 9,551.36 | 1.50% | 4% | 0.6 | 2.5% | $ 9,790.14 | |||||||
| A011AQ | Not used | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| A011AR | EA | ACCESSORIES | Roof warranty sign | 82.50 | 20.00 | 1,650.00 | 1.50% | 4% | 0.6 | 2.50% | $84.56 | 1.50% | 4% | 0.6 | 2.50% | $86.68 | 1.50% | 4% | 0.6 | 2.50% | $ 88.84 | 1.50% | 4% | 0.6 | 2.5% | $ 91.06 | |||||||
| SUB-TOTAL FOR CLIN A011 | 565,416.10 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| A012AA | 05 31 2350 2100 | SF | ROOF DECK REPAIR | Install new galvanized metal deck, 1 1/2" deep, 22 guage, shall include all closures and accessories (all or Partial) | |||||||||||||||||||||||||||||
| Less than 50 squares | 3.23 | 200.00 | 646.80 | 1.50% | 4% | 0.6 | 2.50% | $3.31 | 1.50% | 4% | 0.6 | 2.50% | $3.40 | 1.50% | 4% | 0.6 | 2.50% | $ 3.48 | 1.50% | 4% | 0.6 | 2.5% | $ 3.57 | ||||||||||
| A012AA.1 | 05 31 2350 2200 | SF | ROOF DECK REPAIR | 22 gauge 50 to 500 squares | 2.61 | 2,000.00 | 5,229.00 | 1.50% | 4% | 0.6 | 2.50% | $2.68 | 1.50% | 4% | 0.6 | 2.50% | $2.75 | 1.50% | 4% | 0.6 | 2.50% | $ 2.82 | 1.50% | 4% | 0.6 | 2.5% | $ 2.89 | ||||||
| A012AB | 05 31 2350 2600 | SF | ROOF DECK REPAIR | Install new galvanized metal deck, 1 1/2" deep, 20 guage, shall include all closures and accessories(all or partial) | 3.79 | 600.00 | 2,274.30 | 1.50% | 4% | 0.6 | 2.50% | $3.89 | 1.50% | 4% | 0.6 | 2.50% | $3.98 | 1.50% | 4% | 0.6 | 2.50% | $ 4.08 | 1.50% | 4% | 0.6 | 2.5% | $ 4.18 | ||||||
| A012AB.1 | 05 35 1350 2650 | SF | ROOF DECK REPAIR | 20 gauge 50 to 500 squares | 3.14 | 600.00 | 1,883.70 | 1.50% | 4% | 0.6 | 2.50% | $3.22 | 1.50% | 4% | 0.6 | 2.50% | $3.30 | 1.50% | 4% | 0.6 | 2.50% | $ 3.38 | 1.50% | 4% | 0.6 | 2.5% | $ 3.47 | ||||||
| A012 | A012AC | N/A | SF | ROOF DECK REPAIR | Not used | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||||||
| A012AD | N/A | SF | ROOF DECK REPAIR | Not used | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | ||||||||
| A012AE | 02 41 1916 2400 | ||||||||||||||||||||||||||||||||
| 07 51 1350 0300 | SF | ROOF DECK REPAIR | Remove existing 2" to 4" non-structural concrete covering, and provide new concrete covering. | 91.61 | 20.00 | 1,832.25 | 1.50% | 4% | 0.6 | 2.50% | $93.90 | 1.50% | 4% | 0.6 | 2.50% | $96.25 | 1.50% | 4% | 0.6 | 2.50% | $ 98.66 | 1.50% | 4% | 0.6 | 2.5% | $ 101.12 | |||||||
| A012AF | EA | ROOF DECK REPAIR | Close opening in concrete roof deck, up to approximately 16 square feet. | 3,263.54 | 2.00 | 6,527.07 | 1.50% | 4% | 0.6 | 2.50% | $3,345.12 | 1.50% | 4% | 0.6 | 2.50% | $3,428.75 | 1.50% | 4% | 0.6 | 2.50% | $ 3,514.47 | 1.50% | 4% | 0.6 | 2.5% | $ 3,602.33 | |||||||
| $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||||
| SUB-TOTAL FOR CLIN A012 | 18,393.12 | $ - 0 | $ - 0 | ||||||||||||||||||||||||||||||
| A013AA | 01 45 2350 2250 | ||||||||||||||||||||||||||||||||
| 01 45 2350 2300 | EA | ROOF SERVICES | Core test and analysis including patching | 121.28 | 100.00 | 12,127.50 | 1.50% | 4% | 0.6 | 2.50% | $124.31 | 1.50% | 4% | 0.6 | 2.50% | $127.41 | 1.50% | 4% | 0.6 | 2.50% | $ 130.60 | 1.50% | 4% | 0.6 | 2.5% | $ 133.86 | |||||||
| A013AB | 01 45 2350 5750 | EA | ROOF SERVICES | Roof inspection and survey | 609.00 | 100.00 | 60,900.00 | 1.50% | 4% | 0.6 | 2.50% | $624.23 | 1.50% | 4% | 0.6 | 2.50% | $639.83 | 1.50% | 4% | 0.6 | 2.50% | $ 655.83 | 1.50% | 4% | 0.6 | 2.5% | $ 672.22 | ||||||
| A013AC | EA | ROOF SERVICES | Not Used | 0.00 | 100.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||||||
| A013 | A013AD | EA | ROOF SERVICES | Leak investigation | 870.10 | 100.00 | 87,010.00 | 1.50% | 4% | 0.6 | 2.50% | $891.85 | 1.50% | 4% | 0.6 | 2.50% | $914.15 | 1.50% | 4% | 0.6 | 2.50% | $ 937.00 | 1.50% | 4% | 0.6 | 2.5% | $ 960.43 | ||||||
| A013AE | EA | ROOF SERVICES | Tapered roof insulation system roof investigations & shop drawings | 548.36 | 100.00 | 54,836.10 | 1.50% | 4% | 0.6 | 2.50% | $562.07 | 1.50% | 4% | 0.6 | 2.50% | $576.12 | 1.50% | 4% | 0.6 | 2.50% | $ 590.52 | 1.50% | 4% | 0.6 | 2.5% | $ 605.29 | |||||||
| A013AF | N/A | EA | ROOF SERVICES | Not used | 100.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||||||
| A013AG | N/A | EA | ROOF SERVICES | Not Used | 100.00 | 0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $0.00 | 1.50% | 4% | 0.6 | 2.50% | $ - 0 | 1.50% | 4% | 0.6 | 2.5% | $ - 0 | |||||||
| A013AH | EA | ROOF SERVICES | Infrared moisture survey | 2,599.42 | 100.00 | 259,942.10 | 1.50% | 4% | 0.6 | 2.50% | $2,664.41 | 1.50% | 4% | 0.6 | 2.50% | $2,731.02 | 1.50% | 4% | 0.6 | 2.50% | $ 2,799.29 | 1.50% | 4% | 0.6 | 2.5% | $ 2,869.27 | |||||||
| A013AI | EA | ROOF SERVICES | Wind uplift diagram prepared by qualified design professional | 1,091.52 | 100.00 | 109,151.90 | 1.50% | 4% | 0.6 | 2.50% | $1,118.81 | 1.50% | 4% | 0.6 | 2.50% | $1,146.78 | 1.50% | 4% | 0.6 | 2.50% | $ 1,175.45 | 1.50% | 4% | 0.6 | 2.5% | $ 1,204.83 | |||||||
| A013AJ | 02 82 1345 0250 | EA | ROOF SERVICES | Sample and test for presence of ACRM | 220.50 | 100.00 | 22,050.00 | 1.50% | 4% | 0.6 | 2.50% | $226.01 | 1.50% | 4% | 0.6 | 2.50% | $231.66 | 1.50% | 4% | 0.6 | 2.50% | $ 237.45 | 1.50% | 4% | 0.6 | 2.5% | $ 243.39 | ||||||
| A011AK | EA | ACCESSORIES | Flush out roof drains and storm piping | 1,948.32 | 100.00 | 194,832.00 | 1.50% | 4% | 0.6 | 2.50% | $1,997.03 | 1.50% | 4% | 0.6 | 2.50% | $2,046.95 | 1.50% | 4% | 0.6 | 2.50% | $ 2,098.13 | 1.50% | 4% | 0.6 | 2.5% | $ 2,150.58 | |||||||
| A013AL | 33 01 3011 9060 | EA | ROOF SERVICES | Camera inspection of roof drain piping, up to 100' | 861.00 | 100.00 | 86,100.00 | 1.50% | 4% | 0.6 | 2.50% | $882.53 | 1.50% | 4% | 0.6 | 2.50% | $904.59 | 1.50% | 4% | 0.6 | 2.50% | $ 927.20 | 1.50% | 4% | 0.6 | 2.5% | $ 950.38 | ||||||
| A013AM | EA | ROOF SERVICES | Warranty for roof up to and including 100 Squares | 1,650.00 | 40.00 | 66,000.00 | 1.50% | 4% | 0.6 | 2.50% | $1,691.25 | 1.50% | 4% | 0.6 | 2.50% | $1,733.53 | 1.50% | 4% | 0.6 | 2.50% | $ 1,776.87 | 1.50% | 4% | 0.6 | 2.5% | $ 1,821.29 | |||||||
| A013AN | SQ | ROOF SERVICES | Warranty for roofs exceeding 100 squares | 16.50 | 40.00 | 660.00 | 1.50% | 4% | 0.6 | 2.50% | $16.91 | 1.50% | 4% | 0.6 | 2.50% | $17.34 | 1.50% | 4% | 0.6 | 2.50% | $ 17.77 | 1.50% | 4% | 0.6 | 2.5% | $ 18.21 | |||||||
| A013AO | EA | ROOF SERVICES | RRO/ARCH/ENG QC Inspection and Report (1 day) | 1,320.00 | 10.00 | 13,200.00 | 1.50% | 4% | 0.6 | 2.50% | $1,353.00 | 1.50% | 4% | 0.6 | 2.50% | $1,386.83 | 1.50% | 4% | 0.6 | 2.50% | $ 1,421.50 | 1.50% | 4% | 0.6 | 2.5% | $ 1,457.03 | |||||||
| A013AP | B 3013 105 0600 | SF | ROOF SERVICES | Total BUR Roof Replacement | 10.39 | 10.00 | 103.91 | 1.50% | 4% | 0.6 | 2.50% | $10.65 | 1.50% | 4% | 0.6 | 2.50% | $10.92 | 1.50% | 4% | 0.6 | 2.50% | $ 11.19 | 1.50% | 4% | 0.6 | 2.5% | $ 11.47 | ||||||
| A013AQ | B 3013 120 0600 | SF | ROOF SERVICES | Total Thermoplastic Roof Replacement | 8.93 | 10.00 | 89.25 | 1.50% | 4% | 0.6 | 2.50% | $9.15 | 1.50% | 4% | 0.6 | 2.50% | $9.38 | 1.50% | 4% | 0.6 | 2.50% | $ 9.61 | 1.50% | 4% | 0.6 | 2.5% | $ 9.85 | ||||||
| A013AR | B 3013 125 0600 | SF | ROOF SERVICES | Total Thermoset Roof Replacement | 10.84 | 10.00 | 108.39 | 1.50% | 4% | 0.6 | 2.50% | $11.11 | 1.50% | 4% | 0.6 | 2.50% | $11.39 | 1.50% | 4% | 0.6 | 2.50% | $ 11.67 | 1.50% | 4% | 0.6 | 2.5% | $ 11.96 |