ROOFING Elins - NRDE --PAX_IH_DAHL_N40080-20-R-0030 R1.xlsx

XLSX spreadsheet 311 KB Posted

Attached to
ROOFING IDIQ FOR NRDE COMMANDS AT NAS PATUXENT RIVER, NSF INDIAN HEAD AND NSF DAHLG
Solicitation number
N4008021R0030
Issued by

About this file

This federal contract opportunity notice seeks proposals for an indefinite-delivery/indefinite-quantity roofing construction contract to support facilities at Naval Air Station Patuxent River in Maryland, Naval Support Facility Indian Head in Maryland, and Naval Support Facility Dahlgren in Virginia. The Naval Facilities Engineering Command is requesting roofing repair and replacement services over a one-year base period and four one-year option periods, for an estimated total value of $50 million. The contract will be set aside for eligible HUBZone small businesses. Proposals are due by March 4, 2021, with a site visit scheduled for February 11 and requests for information due by February 18 to allow for timely award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Offerer Name: Total Cost

(IDIQ)

BASE PERIOD (1-YEAR) $9,000,891.82

1ST OPTION( 1 YEAR) $9,772,425.74

2ND OPTION(1 YEAR) $9,415,236.59

3RD OPTION (1 YEAR) $9,673,472.97

4TH OPTION( 1 YEAR) $10,460,274.05

Total Indefinite Delivery Indefinite Quantity Cost $48,322,301.17

Base Year

PRICE SHEET FY21 IDIQInflation 20202.73%
PROJECT:Inflation 20212%
CLIN 0001Total4.96%
ELIN A001, A002, A003, A004, A005, A006, A007, A008, A009, A010, A011, A012, A013, A014, A015INFLATION105.00%
BASE YEAR
ALL CLINS Including overhead and pre-negotiated profitTotal for task order including profit$9,000,891.82
Profit negotiated for task orderProfit negotiated for task order0.00%
SUBTOTAL ALL CLINS Including overhead and less profit$9,000,891.82
Unit ofOption Year 1Option Year 2Option Year 3Option Year 4
ContractofSectionLineLaborMaterialRatio labor to materialCompositeUnitLaborMaterialRatio labor to materialCompositeUnitLaborMaterialRatio labor to materialCompositeUnitLaborMaterialRatio labor to materialCompositeUnit
Line ItemMeans Item #MeasureDescriptionItem DescriptionUnit CostQuantityExtendedMark upMark upCostMark upMark upCostMark upMark upCostMark upMark upCost
ELINSUB-ELIN
A001AA07 05 0510 3420SFDEMOLITIONDemolition of standard non-asbestos, multi-ply BUR, up to three plies.1.053,000.003,150.001.50%4%11.50%$1.071.50%4%11.50%$1.081.50%4%11.50%$ 1.101.50%4%11.5%$ 1.11
A001AB07 05 0510 3470SFDEMOLITIONDemolition of standard non-asbestos, multi-ply BUR, four or more plies.1.253,000.003,748.501.50%4%11.50%$1.271.50%4%11.50%$1.291.50%4%11.50%$ 1.311.50%4%11.5%$ 1.33
A001AC07 05 0510 0220SFDEMOLITIONDemolition of standard non-asbestos, multi-ply perimeter flashing system1.803,000.005,386.501.50%4%11.50%$1.821.50%4%11.50%$1.851.50%4%11.50%$ 1.881.50%4%11.5%$ 1.91
A001AD07 05 0510 4420SFDEMOLITIONDemolition of single ply membrane, adhered0.683,000.002,031.751.50%4%11.50%$0.691.50%4%11.50%$0.701.50%4%11.50%$ 0.711.50%4%11.5%$ 0.72
A001AE07 05 0510 4370SFDEMOLITIONDemolition of single ply membrane, ballasted0.353,000.001,055.251.50%4%11.50%$0.361.50%4%11.50%$0.361.50%4%11.50%$ 0.371.50%4%11.5%$ 0.37
A001AF07 05 0510 0870BFDEMOLITIONDemolition of rigid roof insulation0.183,000.00535.501.50%4%11.50%$0.181.50%4%11.50%$0.181.50%4%11.50%$ 0.191.50%4%11.5%$ 0.19
A001A001AGNot used0.004%4%4%$ - 04%$ - 0
A001AH31 05 1610 0400CFDEMOLITIONDemolition of regular and/or lightweight concrete fill1.793,000.005,366.661.50%4%11.50%$1.821.50%4%11.50%$1.841.50%4%11.50%$ 1.871.50%4%11.5%$ 1.90
A001AINot used0.004%4%4%$ - 04%$ - 0
A001AJCFDEMOLITIONDemolition of asphaltic fill6.703,000.0020,097.001.50%4%11.50%$6.801.50%4%11.50%$6.901.50%4%11.50%$ 7.001.50%4%11.5%$ 7.11
A001AK02 82 1347 0100SF/ EADEMOLITIONAbatement and disposal of non-friable asbestos-containing roofing material (ACRM)15.9610,000.00159,600.001.50%4%11.50%$16.201.50%4%11.50%$16.441.50%4%11.50%$ 16.691.50%4%11.5%$ 16.94
A001AL07 05 0510 3725SFDEMOLITIONRemove loose gravel or ballast0.532,000.001,050.001.50%4%11.50%$0.531.50%4%11.50%$0.541.50%4%11.50%$ 0.551.50%4%11.5%$ 0.56
A001AM07 05 0510 3730SFDEMOLITIONRemove embedded gravel1.162,000.002,310.001.50%4%11.50%$1.171.50%4%11.50%$1.191.50%4%11.50%$ 1.211.50%4%11.5%$ 1.23
A001AN07 05 0510 3725SFDEMOLITIONRemove gravel & debris from gutters, roof drains, mech. equipment, and roof surface.0.532,000.001,050.001.50%4%11.50%$0.531.50%4%11.50%$0.541.50%4%11.50%$ 0.551.50%4%11.5%$ 0.56
A001AO07 05 0510 3730SFDEMOLITIONSpud embedded gravel at tie-ins1.315,000.006,562.501.50%4%11.50%$1.331.50%4%11.50%$1.351.50%4%11.50%$ 1.371.50%4%11.5%$ 1.39
A001AP07 05 0510 3730SFDEMOLITIONDemolition of plywood or board sheathing1.30350.00455.701.50%4%11.50%$1.321.50%4%11.50%$1.341.50%4%11.50%$ 1.361.50%4%11.5%$ 1.38
A001AP.106 05 0510 6096SFDEMOLITIONDemolition of plywood or board sheathing0.753,000.002,236.501.50%4%11.50%$0.761.50%4%11.50%$0.771.50%4%11.50%$ 0.781.50%4%11.5%$ 0.79
A001AQ06 05 0510 6159SFDEMOLITIONDemolition of 2" or 3" T&G wood decking0.533,000.001,575.001.50%4%11.50%$0.531.50%4%11.50%$0.541.50%4%11.50%$ 0.551.50%4%11.5%$ 0.56
A001AR05 05 0510 5000SFDEMOLITIONDemolition of standard metal roof deck0.5310,000.005,250.001.50%4%11.50%$0.531.50%4%11.50%$0.541.50%4%11.50%$ 0.551.50%4%11.5%$ 0.56
A001AS07 05 0510 3170SFDEMOLITIONDemolition of asphalt shingles and felt0.765,000.003,780.001.50%4%11.50%$0.771.50%4%11.50%$0.781.50%4%11.50%$ 0.791.50%4%11.5%$ 0.80
A001AT07 05 0510 5720SFDEMOLITIONDemolition of wood, vinyl or metal siding1.024,000.004,074.001.50%4%11.50%$1.031.50%4%11.50%$1.051.50%4%11.50%$ 1.071.50%4%11.5%$ 1.08
A001AU13 05 0510 0510SFDEMOLITIONDemolition of cementitious wall finish on CMU2.2140,000.0088,200.001.50%4%11.50%$2.241.50%4%11.50%$2.271.50%4%11.50%$ 2.311.50%4%11.5%$ 2.34
A001AVSFDEMOLITIONNot used0.00$ - 0$ - 0
A001AW09 05 0530 3500SFDEMOLITIONDemolition of stucco wall finish on wood or metal framing0.4310,000.004,257.751.50%4%11.50%$0.431.50%4%11.50%$0.441.50%4%11.50%$ 0.451.50%4%11.5%$ 0.45
A001AX06 05 0510 0120SFDEMOLITIONDemolition of wood framing, various sizes8.198,000.0065,520.001.50%4%11.50%$8.311.50%4%11.50%$8.441.50%4%11.50%$ 8.561.50%4%11.5%$ 8.69
A001AY07 05 0510 2725LFDEMOLITIONDemolition of sofia vent/fascia vent0.901,500.001,354.501.50%4%11.50%$0.921.50%4%11.50%$0.931.50%4%11.50%$ 0.941.50%4%11.5%$ 0.96
A001AZ07 32 1310 0300SFDEMOLITIONDemolition of clay tile roofing4.332,500.0010,828.131.50%4%11.50%$4.401.50%4%11.50%$4.461.50%4%11.50%$ 4.531.50%4%11.5%$ 4.60
A001BA07 05 0510 4120SFDEMOLITIONDemolition of slate shingles1.222,500.003,045.001.50%4%11.50%$1.241.50%4%11.50%$1.251.50%4%11.50%$ 1.271.50%4%11.5%$ 1.29
A001BB07 05 0510 2725LFDEMOLITIONDemolition of soffit vent strip, aluminum 3" to 4" inch wide3.272,500.008,163.751.50%4%11.50%$3.311.50%4%11.50%$3.361.50%4%11.50%$ 3.411.50%4%11.5%$ 3.47
A001BC07 05 0510 5870LFDEMOLITIONDemolition of wood cornice, various sizes1.392,500.003,465.001.50%4%11.50%$1.411.50%4%11.50%$1.431.50%4%11.50%$ 1.451.50%4%11.5%$ 1.47
A001BD02 83 1926 5000SFDEMOLITIONRemoval of lead based paint12.862,500.0032,156.251.50%4%11.50%$13.061.50%4%11.50%$13.251.50%4%11.50%$ 13.451.50%4%11.5%$ 13.65
A001BE02 82 1347 0210SFDEMOLITIONAbatement and Disposal of non-friable ACRM asphalt shingles and felt10.8210,000.00108,150.001.50%4%11.50%$10.981.50%4%11.50%$11.141.50%4%11.50%$ 11.311.50%4%11.5%$ 11.48
A001BF07 05 0510 0220LFDEMOLITIONDemolition of sheet metal, including removal of gutters, downspouts, metal counterflashing, drip edge, gravel stop and other miscellaneous metal flashings1.923,000.005,764.501.50%4%11.50%$1.951.50%4%11.50%$1.981.50%4%11.50%$ 2.011.50%4%11.5%$ 2.04
A001BGSFDEMOLITIONDemolition of PUF Roofing3.535,000.0017,655.001.50%4%11.50%$3.581.50%4%11.50%$3.641.50%4%11.50%$ 3.691.50%4%11.5%$ 3.75
A001BH07 05 0510 1620EADEMOLITIONRemove existing skylight69.30600.0041,580.001.50%4%11.50%$70.341.50%4%11.50%$71.391.50%4%11.50%$ 72.471.50%4%11.5%$ 73.55
A001BI07 05 0510 2670EADEMOLITIONRemove existing roof hatch181.65600.00108,990.001.50%4%11.50%$184.371.50%4%11.50%$187.141.50%4%11.50%$ 189.951.50%4%11.5%$ 192.80
A001BJ02 83 1921 0200JOBDEMOLITIONWork plan and engineering controls for lead or asbestos work1,417.5040.0056,700.001.50%4%11.50%$1,438.761.50%4%11.50%$1,460.341.50%4%11.50%$ 1,482.251.50%4%11.5%$ 1,504.48
SUB-TOTAL FOR CLIN A001785,144.73$ - 0$ - 0
A002AA04 01 2041 0110LFMASONRYSaw cut reglet joint in masonry walls2.912,000.005,817.001.50%4%11.50%$2.951.50%4%11.50%$3.001.50%4%11.50%$ 3.041.50%4%11.5%$ 3.09
A002ABLFMASONRYRemove and reset clay tile coping132.22600.0079,332.001.50%4%0.82.00%$134.861.50%4%0.82.00%$137.561.50%4%0.82.00%$ 140.311.50%4%0.82.0%$ 143.12
A002A002ACLFMASONRYRemove and reset up to 6" thick stone or concrete coping176.30600.00105,778.201.50%4%0.82.00%$179.821.50%4%0.82.00%$183.421.50%4%0.82.00%$ 187.091.50%4%0.82.0%$ 190.83
A002ADLFMASONRYRemove and reset stone or concrete coping greater than 6" thick.264.44600.00158,664.001.50%4%0.82.00%$269.731.50%4%0.82.00%$275.121.50%4%0.82.00%$ 280.631.50%4%0.82.0%$ 286.24
A002AECSFMASONRYTake down and rebuild masonry parapet to allow for insertion or replacement of wall flashing.132.22600.0079,332.001.50%4%0.82.00%$134.861.50%4%0.82.00%$137.561.50%4%0.82.00%$ 140.311.50%4%0.82.0%$ 143.12
A002AFSFMASONRYRepair/Replace concrete roof decks246.82600.00148,090.801.50%4%0.82.00%$251.751.50%4%0.82.00%$256.791.50%4%0.82.00%$ 261.931.50%4%0.82.0%$ 267.16
A002AGSFMASONRYNot used$ - 0$ - 0
A002AH04 01 2030 0300LFMASONRYPointing; cut out and repoint stonework, hard mortar3.943,000.0011,812.501.50%4%0.82.00%$4.021.50%4%0.82.00%$4.101.50%4%0.82.00%$ 4.181.50%4%0.82.0%$ 4.26
A002AI04 01 2020 0300SFMASONRYPointing; cut out and repoint brick, hard mortar9.355,000.0046,725.001.50%4%0.82.00%$9.531.50%4%0.82.00%$9.721.50%4%0.82.00%$ 9.921.50%4%0.82.0%$ 10.12
A002AJ02 41 1916 2040EAMASONRYRepair damaged brick102.38600.0061,425.001.50%4%0.82.00%$104.421.50%4%0.82.00%$106.511.50%4%0.82.00%$ 108.641.50%4%0.82.0%$ 110.81
A002AKLFMASONRYRepair damaged stone33.83600.0020,295.001.50%4%0.82.00%$34.501.50%4%0.82.00%$35.191.50%4%0.82.00%$ 35.901.50%4%0.82.0%$ 36.61
A002AL02 41 1916 2040EAMASONRYRemove and replace damaged brick with brick to match102.38600.0061,425.001.50%4%0.82.00%$104.421.50%4%0.82.00%$106.511.50%4%0.82.00%$ 108.641.50%4%0.82.0%$ 110.81
$ - 0$ - 0
SUB-TOTAL FOR CLIN A002778,696.50$ - 0$ - 0
A003AA07 01 9081 0050LFSEALANTSRemove sealant, clean joint and prime2.233,000.006,678.001.50%4%0.82.00%$2.271.50%4%0.82.00%$2.321.50%4%0.82.00%$ 2.361.50%4%0.82.0%$ 2.41
A003AB07 92 1910 0025LFSEALANTSSealant, 1/4" x 1/4"2.363,000.007,087.501.50%4%0.82.00%$2.411.50%4%0.82.00%$2.461.50%4%0.82.00%$ 2.511.50%4%0.82.0%$ 2.56
A003A003AC07 92 1320 0080LFSEALANTSSealant, 1/2" x 3/8"2.463,000.007,371.001.50%4%0.82.00%$2.511.50%4%0.82.00%$2.561.50%4%0.82.00%$ 2.611.50%4%0.82.0%$ 2.66
A003AD07 92 1910 0040LFSEALANTSSealant, 3/4" x 1/2"4.813,000.0014,427.001.50%4%0.82.00%$4.911.50%4%0.82.00%$5.001.50%4%0.82.00%$ 5.101.50%4%0.82.0%$ 5.21
$ - 0$ - 0
SUB-TOTAL FOR CLIN A00335,563.50$ - 0$ - 0
A004AA06 16 3610 0102SFCARPENTRYPlywood decking, 1/2" CDX1.732,000.003,465.001.50%4%0.52.75%$1.781.50%4%0.52.75%$1.831.50%4%0.52.75%$ 1.881.50%4%0.52.8%$ 1.93
A004AB06 16 3610 4730SFCARPENTRYPlywood decking, 5/8" CDX, T&G2.652,000.005,292.001.50%4%0.52.75%$2.721.50%4%0.52.75%$2.791.50%4%0.52.75%$ 2.871.50%4%0.52.8%$ 2.95
A004AC06 16 3610 0302SFCARPENTRYPlywood decking, 3/4" CDX2.252,000.004,494.001.50%4%0.62.50%$2.301.50%4%0.62.50%$2.361.50%4%0.62.50%$ 2.421.50%4%0.62.5%$ 2.48
A004AD06 16 3610 0802SFCARPENTRYPlywood decking, 3/4" CDX, T&G2.522,000.005,040.001.50%4%0.62.50%$2.581.50%4%0.62.50%$2.651.50%4%0.62.50%$ 2.711.50%4%0.62.5%$ 2.78
A004AE06 16 3310 0190SFCARPENTRY2x6 T&G wood decking5.182,000.0010,353.001.50%4%0.23.50%$5.361.50%4%0.23.50%$5.551.50%4%0.23.50%$ 5.741.50%4%0.23.5%$ 5.94
A004AF06 16 3310 0010SFCARPENTRY1x6 or 1x8 wood sheathing3.912,000.007,812.001.50%4%0.62.50%$4.001.50%4%0.62.50%$4.101.50%4%0.62.50%$ 4.211.50%4%0.62.5%$ 4.31
A004AG06 22 1360 1000SFCARPENTRYSoffit, Exterior AC Plywood,1/4" Thick4.441,000.004,441.501.50%4%0.62.50%$4.551.50%4%0.62.50%$4.671.50%4%0.62.50%$ 4.781.50%4%0.62.5%$ 4.90
A004AH06 22 1360 1050SFCARPENTRYSoffit, Exterior AC Plywood,3/8" Thick4.501,000.004,504.501.50%4%0.62.50%$4.621.50%4%0.62.50%$4.731.50%4%0.62.50%$ 4.851.50%4%0.62.5%$ 4.97
A004AI06 22 1360 1100SFCARPENTRYSoffit, Exterior AC Plywood,1/2" Thick4.711,000.004,714.501.50%4%0.62.50%$4.831.50%4%0.62.50%$4.951.50%4%0.62.50%$ 5.081.50%4%0.62.5%$ 5.20
A004A004AJ06 22 1360 1150SFCARPENTRYSoffit, Polivinyl chloride,White5.411,000.005,407.501.50%4%0.62.50%$5.541.50%4%0.62.50%$5.681.50%4%0.62.50%$ 5.821.50%4%0.62.5%$ 5.97
A004AK06 22 1360 1160SFCARPENTRYSoffit, Polivinyl chloride,White Perforated5.411,000.005,407.501.50%4%0.62.50%$5.541.50%4%0.62.50%$5.681.50%4%0.62.50%$ 5.821.50%4%0.62.5%$ 5.97
A004AL06 22 1360 1170SFCARPENTRYSoffit, Accessories,J" Channel 5/8"2.471,000.002,467.501.50%4%0.62.50%$2.531.50%4%0.62.50%$2.591.50%4%0.62.50%$ 2.661.50%4%0.62.5%$ 2.72
A004AMLFCARPENTRYNot used$ - 0$ - 0
A004ANLFCARPENTRY1x6 treated wood nailer2.972,000.005,940.001.50%4%0.62.50%$3.041.50%4%0.62.50%$3.121.50%4%0.62.50%$ 3.201.50%4%0.62.5%$ 3.28
A004AOLFCARPENTRYNot used2,000.00$ - 0$ - 0
A004AP06 11 1028 0160LFCARPENTRY2x4 treated wood curbing, blocking, or nailer3.662,000.007,329.001.50%4%0.62.50%$3.761.50%4%0.62.50%$3.851.50%4%0.62.50%$ 3.951.50%4%0.62.5%$ 4.04
A004AQ06 11 1028 0170LFCARPENTRY2x6 treated wood curbing, blocking, or nailer4.152,000.008,295.001.50%4%0.62.50%$4.251.50%4%0.62.50%$4.361.50%4%0.62.50%$ 4.471.50%4%0.62.5%$ 4.58
A004AR06 11 1028 0180LFCARPENTRY2x8 treated wood curbing, blocking, or nailer5.112,000.0010,227.001.50%4%0.62.50%$5.241.50%4%0.62.50%$5.371.50%4%0.62.50%$ 5.511.50%4%0.62.5%$ 5.64
A004AS06 11 1028 0190LFCARPENTRY2x10 treated wood curbing, blocking, or nailer5.882,000.0011,760.001.50%4%0.62.50%$6.031.50%4%0.62.50%$6.181.50%4%0.62.50%$ 6.331.50%4%0.62.5%$ 6.49
A004AT06 11 1028 0200LFCARPENTRY2x12 treated wood curbing, blocking, or nailer7.612,000.0015,225.001.50%4%0.62.50%$7.801.50%4%0.62.50%$8.001.50%4%0.62.50%$ 8.201.50%4%0.62.5%$ 8.40
A004AU06 22 1340 5200LFCARPENTRY1x6 wood fascia5.182,000.0010,353.001.50%4%0.62.50%$5.311.50%4%0.62.50%$5.441.50%4%0.62.50%$ 5.571.50%4%0.62.5%$ 5.71
A004AV06 22 1340 5300LFCARPENTRY1x8 wood fascia6.202,000.0012,390.001.50%4%0.62.50%$6.351.50%4%0.62.50%$6.511.50%4%0.62.50%$ 6.671.50%4%0.62.5%$ 6.84
A004AW06 22 1340 5310LFCARPENTRY1x10 wood fascia6.982,000.0013,965.001.50%4%0.62.50%$7.161.50%4%0.62.50%$7.341.50%4%0.62.50%$ 7.521.50%4%0.62.5%$ 7.71
A004AX06 11 1028 0100LFCARPENTRYTreated wood cant (4x4 cut on diagonal)5.032,000.0010,059.001.50%4%0.62.50%$5.161.50%4%0.62.50%$5.281.50%4%0.62.50%$ 5.421.50%4%0.62.5%$ 5.55
A004AY05 05 1910 1430EACARPENTRYEpoxy anchors64.58200.0012,915.001.50%4%0.62.50%$66.191.50%4%0.62.50%$67.841.50%4%0.62.50%$ 69.541.50%4%0.62.5%$ 71.28
SUB-TOTAL FOR CLIN A004181,857.00$ - 0$ - 0
A005AA07 21 1310 1600SFINSULATION3/4" to 1-1/2" isocyanurate board, hot applied1.562,000.003,124.001.50%4%0.62.50%$1.601.50%4%0.62.50%$1.641.50%4%0.62.50%$ 1.681.50%4%0.62.5%$ 1.72
A005ABSFINSULATION1 9/16 to 2 1/2" isocyanurate board, hot applied2.162,000.004,312.001.50%4%0.62.50%$2.211.50%4%0.62.50%$2.271.50%4%0.62.50%$ 2.321.50%4%0.62.5%$ 2.38
A005ACSFINSULATION2 9/16 to 3" isocyanurate board, hot applied2.722,000.005,434.001.50%4%0.62.50%$2.781.50%4%0.62.50%$2.851.50%4%0.62.50%$ 2.931.50%4%0.62.5%$ 3.00
A005ADSFINSULATION3/4 to 1 1/2" isocyanurate board, mechanically fastened1.772,000.003,542.001.50%4%0.62.50%$1.821.50%4%0.62.50%$1.861.50%4%0.62.50%$ 1.911.50%4%0.62.5%$ 1.95
A005AESFINSULATION1 9/16 to 2 1/2" isocyanurate board, mechanically fastened2.382,000.004,752.001.50%4%0.62.50%$2.441.50%4%0.62.50%$2.501.50%4%0.62.50%$ 2.561.50%4%0.62.5%$ 2.62
A005AFSFINSULATION2 9/16 to 3" isocyanurate board, mechanically fastened2.812,000.005,610.001.50%4%0.62.50%$2.881.50%4%0.62.50%$2.951.50%4%0.62.50%$ 3.021.50%4%0.62.5%$ 3.10
A005AG07 22 1610 1765BFINSULATIONIsocyanurate board, tapered for drainage, fastening excluded0.972,000.001,932.001.50%4%0.62.50%$0.991.50%4%0.62.50%$1.011.50%4%0.62.50%$ 1.041.50%4%0.62.5%$ 1.07
A005AH07 21 1310 1700SFINSULATION1/2 perlite board1.432,000.002,856.001.50%4%0.62.50%$1.461.50%4%0.62.50%$1.501.50%4%0.62.50%$ 1.541.50%4%0.62.5%$ 1.58
A005A005AI07 22 1610 1952SFINSULATION2" extruded polystyrene, 40 psi compressive strength, fastening excluded2.302,000.004,599.001.50%4%0.62.50%$2.361.50%4%0.62.50%$2.421.50%4%0.62.50%$ 2.481.50%4%0.62.5%$ 2.54
A005AJ07 22 1610 1954SFINSULATION3" extruded polystyrene, 40 psi compressive strength, fastening excluded3.232,000.006,465.901.50%4%0.62.50%$3.311.50%4%0.62.50%$3.401.50%4%0.62.50%$ 3.481.50%4%0.62.5%$ 3.57
A005AK07 22 1610 1956SFINSULATION4" extruded polystyrene, 40 psi compressive strength, fastening excluded4.112,000.008,211.001.50%4%0.62.50%$4.211.50%4%0.62.50%$4.311.50%4%0.62.50%$ 4.421.50%4%0.62.5%$ 4.53
A005AL07 22 1610 1950BFINSULATIONExtruded polystyrene, 40 psi compressive strength, tapered for drainage, fastening excluded1.352,000.002,709.001.50%4%0.62.50%$1.391.50%4%0.62.50%$1.421.50%4%0.62.50%$ 1.461.50%4%0.62.5%$ 1.50
A005AM07 22 1610 2470SFINSULATION3" composite, 2-1/2" isocyanurate with 1/2" perlite, fastening excluded(1-1/2"polyisocyanurate with 1" perlite)1.652,000.003,297.001.50%4%0.62.50%$1.691.50%4%0.62.50%$1.731.50%4%0.62.50%$ 1.781.50%4%0.62.5%$ 1.82
A005ANSFINSULATIONNot used2,000.000.00$ - 0$ - 0
A005AO07 22 1610 3030EAINSULATIONRoof deck insulation, fastening alternative, coated screws, 8 inch0.602,000.001,197.001.50%4%0.62.50%$0.611.50%4%0.62.50%$0.631.50%4%0.62.50%$ 0.641.50%4%0.62.5%$ 0.66
A005AP07 22 1610 3090SFINSULATIONRoof deck insulation, fastening alternative, full mop asphalt0.382,000.00756.001.50%4%0.62.50%$0.391.50%4%0.62.50%$0.401.50%4%0.62.50%$ 0.411.50%4%0.62.5%$ 0.42
A005AQSFINSULATIONNot used0.002,000.000.00$ - 0$ - 0
A005AR07 51 1330 0400LFINSULATIONMineral fiber cant strip, 1-1/2" x 5" face2.512,000.005,019.001.50%4%0.62.50%$2.571.50%4%0.62.50%$2.641.50%4%0.62.50%$ 2.701.50%4%0.62.5%$ 2.77
A005ASSFINSULATIONTapered edge strip, 1" edge x 12"2.732,000.005,456.001.50%4%0.62.50%$2.801.50%4%0.62.50%$2.871.50%4%0.62.50%$ 2.941.50%4%0.62.5%$ 3.01
A005ATSFINSULATIONTapered edge strip, 1-1/2" edge x 12"3.052,000.006,094.001.50%4%0.62.50%$3.121.50%4%0.62.50%$3.201.50%4%0.62.50%$ 3.281.50%4%0.62.5%$ 3.36
SUB-TOTAL FOR CLIN A00575,365.90$ - 0$ - 0
A006AA07 31 1310 0150SFSTEEP ROOFINGShingles, Asphalt/fiberglass, 3-tab, Class A, 20 year2.06450.00926.101.50%4%0.62.50%$2.111.50%4%0.62.50%$2.161.50%4%0.62.50%$ 2.221.50%4%0.62.5%$ 2.27
A006AB07 31 1310 0450SFSTEEP ROOFINGShingles, Asphalt/fiberglass, multi-layer laminated, 30 year, 260 - 300 lbs/square3.47400.001,386.001.50%4%0.62.50%$3.551.50%4%0.62.50%$3.641.50%4%0.62.50%$ 3.731.50%4%0.62.5%$ 3.82
A006AC07 31 2610 1200SFSTEEP ROOFINGShingles, slate, black, ASTM S1, VERMONT9.50400.003,801.001.50%4%0.62.50%$9.741.50%4%0.62.50%$9.981.50%4%0.62.50%$ 10.231.50%4%0.62.5%$ 10.49
A006AC.107 31 2610 0100SFSTEEP ROOFINGShingles, slate, black, ASTM S1, BUCKINGHAM10.08500.005,040.001.50%4%0.62.50%$10.331.50%4%0.62.50%$10.591.50%4%0.62.50%$ 10.861.50%4%0.62.5%$ 11.13
A006AD07 31 1310 0800SFSTEEP ROOFINGUnderlayment, No.15 felt, per layer (or rosin paper)0.16500.0080.591.50%4%0.62.50%$0.171.50%4%0.62.50%$0.171.50%4%0.62.50%$ 0.171.50%4%0.62.5%$ 0.18
A006AE07 31 1310 0825SFSTEEP ROOFINGUnderlayment, No.30 felt, per layer0.23500.00115.501.50%4%0.62.50%$0.241.50%4%0.62.50%$0.241.50%4%0.62.50%$ 0.251.50%4%0.62.5%$ 0.25
A006A006AFSFSTEEP ROOFINGIce & water shield, self-adhered, and primer0.98500.00489.501.50%4%0.62.50%$1.001.50%4%0.62.50%$1.031.50%4%0.62.50%$ 1.051.50%4%0.62.5%$ 1.08
A006AGSFSTEEP ROOFINGNot used0.00500.00$ - 0$ - 0
A006AH07 32 1310 1800SFSTEEP ROOFINGTerra cotta (clay) roof tile15.23500.007,612.501.50%4%0.62.50%$15.611.50%4%0.62.50%$16.001.50%4%0.62.50%$ 16.401.50%4%0.62.5%$ 16.81
SUB-TOTAL FOR CLIN A00619,451.19$ - 0$ - 0
A007AAB3010 105 6000SFLOW SLOPE ROOFINGFiberglass base sheet, fully mopped3.422,000.006,846.001.50%4%0.62.50%$3.511.50%4%0.62.50%$3.601.50%4%0.62.50%$ 3.691.50%4%0.62.5%$ 3.78
A007AB07 51 1320 3800SFLOW SLOPE ROOFINGBUR, Type VI fiberglass, 4-ply, asphalt, not including cap or base sheet3.832,000.007,665.001.50%4%0.62.50%$3.931.50%4%0.62.50%$4.031.50%4%0.62.50%$ 4.131.50%4%0.62.5%$ 4.23
A007AC07 51 1320 2910SFLOW SLOPE ROOFINGBUR, Type VI fiberglass, 2-ply, asphalt, not including cap or base sheet3.132,000.006,258.001.50%4%0.62.50%$3.211.50%4%0.62.50%$3.291.50%4%0.62.50%$ 3.371.50%4%0.62.5%$ 3.45
A007A007AD07 52 1610 1900SFLOW SLOPE ROOFINGBUR, 1-ply SBS base, SBS granulated cap, cold applied4.592,000.009,177.001.50%4%0.62.50%$4.701.50%4%0.62.50%$4.821.50%4%0.62.50%$ 4.941.50%4%0.62.5%$ 5.06
A007AE07 52 1610 2000SFLOW SLOPE ROOFINGSBS modified, granulated cap, 160 mil, hot applied4.632,000.009,261.001.50%4%0.62.50%$4.751.50%4%0.62.50%$4.861.50%4%0.62.50%$ 4.991.50%4%0.62.5%$ 5.11
A007AF07 52 1310 2350SFLOW SLOPE ROOFINGAPP modified, granulated surface, torch applied3.562,000.007,119.001.50%4%0.62.50%$3.651.50%4%0.62.50%$3.741.50%4%0.62.50%$ 3.831.50%4%0.62.5%$ 3.93
A007AG07 52 1310 2250SFLOW SLOPE ROOFINGAPP modified, smooth, torch applied3.372,000.006,741.001.50%4%0.62.50%$3.451.50%4%0.62.50%$3.541.50%4%0.62.50%$ 3.631.50%4%0.62.5%$ 3.72
A007AH07 53 2320 4800SFLOW SLOPE ROOFINGEPDM rubber, 45 mil, fully adhered2.492,000.004,977.001.50%4%0.62.50%$2.551.50%4%0.62.50%$2.611.50%4%0.62.50%$ 2.681.50%4%0.62.5%$ 2.75
A007AI07 53 2320 4800SFLOW SLOPE ROOFINGEPDM rubber, 60 mil, fully adhered2.672,000.005,334.001.50%4%0.62.50%$2.731.50%4%0.62.50%$2.801.50%4%0.62.50%$ 2.871.50%4%0.62.5%$ 2.94
A007AJ07 51 1350 0020SFLOW SLOPE ROOFINGWalkway pads, 1/2" asphaltic3.842,000.007,686.001.50%4%0.62.50%$3.941.50%4%0.62.50%$4.041.50%4%0.62.50%$ 4.141.50%4%0.62.5%$ 4.24
A007AK07 51 1350 0300SFLOW SLOPE ROOFINGWalkway pads, 2" concrete8.662,000.0017,325.001.50%4%0.62.50%$8.881.50%4%0.62.50%$9.101.50%4%0.62.50%$ 9.331.50%4%0.62.5%$ 9.56
A007AL07 51 1350 0100SFLOW SLOPE ROOFINGWalkway pads, 3/16" asphaltic ( 3"x3",3/4" thick)8.092,000.0016,170.001.50%4%0.62.50%$8.291.50%4%0.62.50%$8.491.50%4%0.62.50%$ 8.711.50%4%0.62.5%$ 8.92
A007AM07 54 1910 8750SFLOW SLOPE ROOFINGPVC, 48 mils,Hest Welded, Reinforced ,loose laid with stone/gravel1.972,000.003,948.001.50%4%0.62.50%$2.021.50%4%0.62.50%$2.071.50%4%0.62.50%$ 2.131.50%4%0.62.5%$ 2.18
A007AN07 54 1910 8800SFLOW SLOPE ROOFINGPVC, 48 mils,Hest Welded, Reinforced , Mechanically Attached2.102,000.004,200.001.50%4%0.62.50%$2.151.50%4%0.62.50%$2.211.50%4%0.62.50%$ 2.261.50%4%0.62.5%$ 2.32
A007AO07 54 1910 8850SFLOW SLOPE ROOFINGPVC, 48 mils,Hest Welded, Reinforced , Fully adhered with adhesive2.932,000.005,859.001.50%4%0.62.50%$3.001.50%4%0.62.50%$3.081.50%4%0.62.50%$ 3.151.50%4%0.62.5%$ 3.23
A007AP07 54 1910 8870SFLOW SLOPE ROOFINGPVC, 60 mils,Hest Welded, Reinforced ,loose laid with stone/gravel2.002,000.003,990.001.50%4%0.62.50%$2.041.50%4%0.62.50%$2.101.50%4%0.62.50%$ 2.151.50%4%0.62.5%$ 2.20
A007AQ07 54 1910 8880SFLOW SLOPE ROOFINGPVC,60 mils,Hest Welded, Reinforced , Mechanically Attached2.122,000.004,242.001.50%4%0.62.50%$2.171.50%4%0.62.50%$2.231.50%4%0.62.50%$ 2.281.50%4%0.62.5%$ 2.34
A007AR07 54 1910 8890SFLOW SLOPE ROOFINGPVC,60 mils,Hest Welded, Reinforced ,Fully Adhered with adhesive2.952,000.005,901.001.50%4%0.62.50%$3.021.50%4%0.62.50%$3.101.50%4%0.62.50%$ 3.181.50%4%0.62.5%$ 3.26
A007AS07 57 1310 0100SFLOW SLOPE ROOFINGSPF, Primer for metal substrate (when Required)1.372,000.002,730.001.50%4%0.62.50%$1.401.50%4%0.62.50%$1.431.50%4%0.62.50%$ 1.471.50%4%0.62.5%$ 1.51
A007AT07 57 1310 0200SFLOW SLOPE ROOFINGSPF, Primer for non-metal substrate (when Required)1.012,000.002,016.001.50%4%0.62.50%$1.031.50%4%0.62.50%$1.061.50%4%0.62.50%$ 1.091.50%4%0.62.5%$ 1.11
A007AU07 57 1310 0300SFLOW SLOPE ROOFINGSPF ,Closed Spray polyurethane foam, 3lb/CF density 1"0.912,000.001,825.951.50%4%0.62.50%$0.941.50%4%0.62.50%$0.961.50%4%0.62.50%$ 0.981.50%4%0.62.5%$ 1.01
A007AV07 57 1310 0400SFLOW SLOPE ROOFING2"1.672,000.003,339.001.50%4%0.62.50%$1.711.50%4%0.62.50%$1.751.50%4%0.62.50%$ 1.801.50%4%0.62.5%$ 1.84
A007AW07 57 1310 0500SFLOW SLOPE ROOFING3"2.432,000.004,851.001.50%4%0.62.50%$2.491.50%4%0.62.50%$2.551.50%4%0.62.50%$ 2.611.50%4%0.62.5%$ 2.68
A007AX07 57 1310 0600SFLOW SLOPE ROOFING4"3.202,000.006,405.001.50%4%0.62.50%$3.281.50%4%0.62.50%$3.361.50%4%0.62.50%$ 3.451.50%4%0.62.5%$ 3.53
A007AY07 57 1310 0700SFLOW SLOPE ROOFINGSPF, Spray on Silicone Coating2.392,000.004,788.001.50%4%0.62.50%$2.451.50%4%0.62.50%$2.521.50%4%0.62.50%$ 2.581.50%4%0.62.5%$ 2.64
A007AZ07 57 1310 0800SFLOW SLOPE ROOFINGWarranty 5-20 Year Manufacturer0.162,000.00315.001.50%4%0.62.50%$0.161.50%4%0.62.50%$0.171.50%4%0.62.50%$ 0.171.50%4%0.62.5%$ 0.17
A007AZ.107 57 1310 0900SFLOW SLOPE ROOFINGWarranty, 20 Year No dollar limit0.212,000.00420.001.50%4%0.62.50%$0.221.50%4%0.62.50%$0.221.50%4%0.62.50%$ 0.231.50%4%0.62.5%$ 0.23
SUB-TOTAL FOR CLIN A007159,388.95$ - 0$ - 0
A008AA07 01 5010 0300GALSURFACING & REPAIRPrimer8.772,000.0017,535.001.50%4%0.62.50%$8.991.50%4%0.62.50%$9.211.50%4%0.62.50%$ 9.441.50%4%0.62.5%$ 9.68
A008AB07 65 1310 0750SFSURFACING & REPAIRFibered asphalt mastic, trowel grade with glass fabric5.3010,000.0053,025.001.50%4%0.62.50%$5.441.50%4%0.62.50%$5.571.50%4%0.62.50%$ 5.711.50%4%0.62.5%$ 5.85
A008AC07 53 2320 4800SFSURFACING & REPAIRSingle ply membrane repair (EPDM, PVC, CSPE)2.6710,000.0026,670.001.50%4%0.62.50%$2.731.50%4%0.62.50%$2.801.50%4%0.62.50%$ 2.871.50%4%0.62.5%$ 2.94
A008AD28 42 1550 0220EASURFACING & REPAIRWet repair and emergency leak stoppage729.75600.00437,850.001.50%4%0.62.50%$747.991.50%4%0.62.50%$766.691.50%4%0.62.50%$ 785.861.50%4%0.62.5%$ 805.51
A008AEEASURFACING & REPAIREmergency Repair Leak836.48600.00501,890.401.50%4%0.62.50%$857.401.50%4%0.62.50%$878.831.50%4%0.62.50%$ 900.801.50%4%0.62.5%$ 923.32
A008AF07 31 2610 0100SQSURFACING & REPAIRSlate Shingles, Roof Repair, Extensive Replacement1,008.00600.00604,800.001.50%4%0.62.50%$1,033.201.50%4%0.62.50%$1,059.031.50%4%0.62.50%$ 1,085.511.50%4%0.62.5%$ 1,112.64
A008A008AG07 31 2610 2700L.FSURFACING & REPAIRSlate Shingles, Roof Repair, Individual Slates, scattered.(material omly use day charge for labor)14.916,000.0089,460.001.50%4%0.62.50%$15.281.50%4%0.62.50%$15.661.50%4%0.62.50%$ 16.061.50%4%0.62.5%$ 16.46
A008AH07 31 1310 0300EASURFACING & REPAIRAsphalt Shingles, Roof Repair, Individual Shingles, scattered.(material omly use day charge for labor)2.677,000.0018,669.001.50%4%0.62.50%$2.731.50%4%0.62.50%$2.801.50%4%0.62.50%$ 2.871.50%4%0.62.5%$ 2.94
A008AI07 32 1310 0500EASURFACING & REPAIRMinor repairs clay tile roof, individual tiles, scattered.(material omly use day charge for labor)8.828,000.0070,560.001.50%4%0.62.50%$9.041.50%4%0.62.50%$9.271.50%4%0.62.50%$ 9.501.50%4%0.62.5%$ 9.74
A008AJ22 14 2613 3920SURFACING & REPAIR30" x 30", roof drain flashing at existing roof drain including removals.1,262.27600.00757,363.201.50%4%0.62.50%$1,293.831.50%4%0.62.50%$1,326.171.50%4%0.62.50%$ 1,359.331.50%4%0.62.5%$ 1,393.31
A008AK07 71 1620 0100EASURFACING & REPAIRRemove old mastic & refill pitch pan, average approx. size 8" x 8" x 4" thick275.00600.00165,000.001.50%4%0.62.50%$281.881.50%4%0.62.50%$288.921.50%4%0.62.50%$ 296.141.50%4%0.62.5%$ 303.55
A008AK.1EASURFACING & REPAIRRemove old mastic & refill pitch pan, average approx. size 8" x 8" x 4" thick. With AC refrigerant piping.420.24600.00252,146.401.50%4%0.62.50%$430.751.50%4%0.62.50%$441.521.50%4%0.62.50%$ 452.561.50%4%0.62.5%$ 463.87
A008AL07 71 2330 5480LFSURFACING & REPAIRRe-solder existing copper joints8.405,000.0042,000.001.50%4%0.62.50%$8.611.50%4%0.62.50%$8.831.50%4%0.62.50%$ 9.051.50%4%0.62.5%$ 9.27
A008AMEASURFACING & REPAIR2.5 to 4 lb. lead plumbing stack flashing at existing stack including removals186.16600.00111,698.401.50%4%0.62.50%$190.821.50%4%0.62.50%$195.591.50%4%0.62.50%$ 200.481.50%4%0.62.5%$ 205.49
A008ANEASURFACING & REPAIRMinimum charge, full day (2 Men 1 Truck) Roofer.1,115.49600.00669,292.801.50%4%0.62.50%$1,143.381.50%4%0.62.50%$1,171.961.50%4%0.62.50%$ 1,201.261.50%4%0.62.5%$ 1,231.29
A008AOEASURFACING & REPAIRMinimum charge, full day (2 Men 1 Truck) Sheet Metal Worker.1,472.15600.00883,291.201.50%4%0.62.50%$1,508.961.50%4%0.62.50%$1,546.681.50%4%0.62.50%$ 1,585.351.50%4%0.62.5%$ 1,624.98
SUB-TOTAL FOR CLIN A0084,701,251.40$ - 0$ - 0
A009AASFFLASHINGS2-Ply system of glass felt with polyester & glass composite sheet, 8"-16" high7.21600.004,323.001.50%4%0.62.50%$7.391.50%4%0.62.50%$7.571.50%4%0.62.50%$ 7.761.50%4%0.62.5%$ 7.95
A009AB07 52 1610 0750SFFLASHINGS1-ply SBS modified bitumen sheet, granular surface, 8"-16" high4.42600.002,652.301.50%4%0.62.50%$4.531.50%4%0.62.50%$4.641.50%4%0.62.50%$ 4.761.50%4%0.62.5%$ 4.88
A009AC07 65 2310 8100SFFLASHINGSEPDM rubber with term bar, 8"-16" high4.84600.002,904.301.50%4%0.62.50%$4.961.50%4%0.62.50%$5.091.50%4%0.62.50%$ 5.211.50%4%0.62.5%$ 5.34
A009AD22 14 2613 3920EAFLASHINGS30" x 30", roof drain flashing at existing roof drain1,076.2540.0043,050.001.50%4%0.62.50%$1,103.161.50%4%0.62.50%$1,130.741.50%4%0.62.50%$ 1,159.001.50%4%0.62.5%$ 1,187.98
A009A009AEEAFLASHINGS2.5 to 4 lb. lead plumbing stack flashing at existing stack177.3440.007,093.681.50%4%0.62.50%$181.781.50%4%0.62.50%$186.321.50%4%0.62.50%$ 190.981.50%4%0.62.5%$ 195.75
A009AF07 71 2910 0620LFFLASHINGSExpansion joint with flexible bellows and metal flanges, cover width to 16", aluminum( openings upto 8")23.6360.001,417.501.50%4%0.62.50%$24.221.50%4%0.62.50%$24.821.50%4%0.62.50%$ 25.441.50%4%0.62.5%$ 26.08
A009AG07 71 2910 0920LFFLASHINGSExpansion joint with flexible bellows and metal flanges, cover width to 16", copper ( openings upto 8")33.08200.006,615.001.50%4%0.62.50%$33.901.50%4%0.62.50%$34.751.50%4%0.62.50%$ 35.621.50%4%0.62.5%$ 36.51
A009AH07 71 4310 0510LFFLASHINGSAluminum termination bar, 1/4" x 1"2.032,000.004,053.001.50%4%0.62.50%$2.081.50%4%0.62.50%$2.131.50%4%0.62.50%$ 2.181.50%4%0.62.5%$ 2.24
$ - 0$ - 0
SUB-TOTAL FOR CLIN A00972,108.78$ - 0$ - 0
A010AA07 71 2330 0400LFSHEET METALPrefinished aluminum downspout, .032", 4" x 5"( .020" 3"x4")10.55200.002,110.501.50%4%0.62.50%$10.821.50%4%0.62.50%$11.091.50%4%0.62.50%$ 11.361.50%4%0.62.5%$ 11.65
A010AB07 71 2330 0300LFSHEET METALPrefinished aluminum gutter, .032", 6"(5")10.55200.002,110.501.50%4%0.62.50%$10.821.50%4%0.62.50%$11.091.50%4%0.62.50%$ 11.361.50%4%0.62.5%$ 11.65
A010AC07 71 2310 1800LFSHEET METALCopper downspout, 16 oz, 4" dia.16.80200.003,360.001.50%4%0.62.50%$17.221.50%4%0.62.50%$17.651.50%4%0.62.50%$ 18.091.50%4%0.62.5%$ 18.54
A010AD07 71 2310 2500LFSHEET METALCopper downspout, 16 oz, 4" x 5"(3"x4")22.05200.004,410.001.50%4%0.62.50%$22.601.50%4%0.62.50%$23.171.50%4%0.62.50%$ 23.751.50%4%0.62.5%$ 24.34
A010AE07 71 2330 0700LFSHEET METALCopper gutter, 20 oz, 6"( 16OZ)16.12200.003,223.501.50%4%0.62.50%$16.521.50%4%0.62.50%$16.931.50%4%0.62.50%$ 17.361.50%4%0.62.5%$ 17.79
A010AFN/ALFSHEET METALNot used$ - 0$ - 0
A010AGSFSHEET METALMiscellaneous prefinished aluminum, .032", including roof edge, gravel stop, counter flashing, coping, and coverings0.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A010AH07 71 1910 0020SFSHEET METALMiscellaneous prefinished aluminum, .032", including drip edge & gravel stop13.13200.002,625.001.50%4%0.62.50%$13.451.50%4%0.62.50%$13.791.50%4%0.62.50%$ 14.131.50%4%0.62.5%$ 14.49
A010AH.104 72 1010 0800SFSHEET METALMiscellaneous prefinished aluminum, .032", coping with cover plates & one cleat.26.25200.005,250.001.50%4%0.62.50%$26.911.50%4%0.62.50%$27.581.50%4%0.62.50%$ 28.271.50%4%0.62.5%$ 28.98
A010AH.222 14 2613 0200SFSHEET METALMiscellaneous prefinished aluminum, .032", conductor head.561.75200.00112,350.001.50%4%0.62.50%$575.791.50%4%0.62.50%$590.191.50%4%0.62.50%$ 604.941.50%4%0.62.5%$ 620.07
A010A010AH.307 71 1910 1800SFSHEET METALMiscellaneous stainless steel, .025", including roof edge, gravel stop, counter flashing, coping, and coverings24.15200.004,830.001.50%4%0.62.50%$24.751.50%4%0.62.50%$25.371.50%4%0.62.50%$ 26.011.50%4%0.62.5%$ 26.66
A010AI07 71 1910 1800SFSHEET METALMiscellaneous stainless steel, .025", including drip edge & gravel stop24.15200.004,830.001.50%4%0.62.50%$24.751.50%4%0.62.50%$25.371.50%4%0.62.50%$ 26.011.50%4%0.62.5%$ 26.66
A010AI.1SFSHEET METALMiscellaneous stainless steel, .025", coping with cover plates & one cleat.27.31200.005,462.601.50%4%0.62.50%$28.001.50%4%0.62.50%$28.701.50%4%0.62.50%$ 29.411.50%4%0.62.5%$ 30.15
A010AI.222 14 2613 0260SFSHEET METALMiscellaneous stainless steel, .025", conductor head.691.95200.00138,390.001.50%4%0.62.50%$709.251.50%4%0.62.50%$726.981.50%4%0.62.50%$ 745.151.50%4%0.62.5%$ 763.78
A010AI.3SFSHEET METALMiscellaneous copper, 20 oz, including gutter liner, fascia, roof edge, gravel stop, counter flashing, coping, and coverings0.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
07 71 1910 1200LFSHEET METALMiscellaneous copper, 20 oz, including drip edge & gravel stop34.65100.003,465.001.50%4%0.62.50%$35.521.50%4%0.62.50%$36.401.50%4%0.62.50%$ 37.311.50%4%0.62.5%$ 38.25
LFSHEET METALMiscellaneous copper, 20 oz, coping with cover plates & one cleat.40.96100.004,096.401.50%4%0.62.50%$41.991.50%4%0.62.50%$43.041.50%4%0.62.50%$ 44.111.50%4%0.62.5%$ 45.22
22 14 2613 0280EASHEET METALMiscellaneous copper, 20 oz, conductor head.651.00100.0065,100.001.50%4%0.62.50%$667.281.50%4%0.62.50%$683.961.50%4%0.62.50%$ 701.061.50%4%0.62.5%$ 718.58
LFSHEET METALBuilt in 20 oz. copper gutter liner. Maximum width limited to 36 inch sheet.70.48100.007,047.701.50%4%0.62.50%$72.241.50%4%0.62.50%$74.041.50%4%0.62.50%$ 75.901.50%4%0.62.5%$ 77.79
07 61 1910 1000SFSHEET METALFlat seam roofing, 20 oz. copper21.79100.002,178.751.50%4%0.62.50%$22.331.50%4%0.62.50%$22.891.50%4%0.62.50%$ 23.461.50%4%0.62.5%$ 24.05
07 61 1310 0700SFSHEET METALStanding seam 20 oz. copper roofing, not including dormers or radius roofs.22.84100.002,283.751.50%4%0.62.50%$23.411.50%4%0.62.50%$23.991.50%4%0.62.50%$ 24.591.50%4%0.62.5%$ 25.21
0.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A010AJ07 71 1620 0100EASHEET METALCopper pitch pan, 4" x 4" x 3" high with pourable sealer36.7540.001,470.001.50%4%0.62.50%$37.671.50%4%0.62.50%$38.611.50%4%0.62.50%$ 39.581.50%4%0.62.5%$ 40.57
A010AK07 71 1620 0200EASHEET METALCopper pitch pan, 8" x 8" x 3" high with pourable sealer42.8440.001,713.601.50%4%0.62.50%$43.911.50%4%0.62.50%$45.011.50%4%0.62.50%$ 46.131.50%4%0.62.5%$ 47.29
A010ALLFSHEET METALNot used.$ - 0$ - 0
A010AM07 71 2310 0700LFSHEET METALRemove, realign, reinstall, and resecure existing gutter and/or downspouts (replace hangers, fasteners and straps). Reseal all joints.9.451,000.009,450.001.50%4%0.62.50%$9.691.50%4%0.62.50%$9.931.50%4%0.62.50%$ 10.181.50%4%0.62.5%$ 10.43
A010AN07 65 1010 0100SFSHEET METALStep flashing, prefinished aluminum, .032"6.201,000.006,195.001.50%4%0.62.50%$6.351.50%4%0.62.50%$6.511.50%4%0.62.50%$ 6.671.50%4%0.62.5%$ 6.84
A010AO07 46 7310 0012SFSHEET METALAluminum ,residential, 0.20" Thick5.511,000.005,512.501.50%4%0.62.50%$5.651.50%4%0.62.50%$5.791.50%4%0.62.50%$ 5.941.50%4%0.62.5%$ 6.08
A010AP07 46 7310 0100SHEET METALBaked enamel on steel, 16 or 18ga13.391,000.0013,387.501.50%4%0.62.50%$13.721.50%4%0.62.50%$14.071.50%4%0.62.50%$ 14.421.50%4%0.62.5%$ 14.78
A010AQ07 46 7310 0300SHEET METALPolyviny Chloride,White, Solid5.411,000.005,407.501.50%4%0.62.50%$5.541.50%4%0.62.50%$5.681.50%4%0.62.50%$ 5.821.50%4%0.62.5%$ 5.97
A010AR07 46 7310 0400SHEET METALPolyvinyl,Perforated 12" wide with 6" fascia5.411,000.005,407.501.50%4%0.62.50%$5.541.50%4%0.62.50%$5.681.50%4%0.62.50%$ 5.821.50%4%0.62.5%$ 5.97
SUB-TOTAL FOR CLIN A010391,952.30$ - 0$ - 0
A011AAB3020 230 0200EAACCESSORIESRoof hatch, 2'6" x 3'0" with prefabricated curb1,272.6010.0012,726.001.50%4%0.62.50%$1,304.421.50%4%0.62.50%$1,337.031.50%4%0.62.50%$ 1,370.451.50%4%0.62.5%$ 1,404.71
A011AB22 14 2613 3920EAACCESSORIESRemove existing & install new 3" to 6" diameter cast iron roof drain including piping connection1,076.2510.0010,762.501.50%4%0.62.50%$1,103.161.50%4%0.62.50%$1,130.741.50%4%0.62.50%$ 1,159.001.50%4%0.62.5%$ 1,187.98
A011ACEAACCESSORIESNew 3" to 6" diameter roof drain liner670.3410.006,703.401.50%4%0.62.50%$687.101.50%4%0.62.50%$704.281.50%4%0.62.50%$ 721.881.50%4%0.62.5%$ 739.93
A011ADEAACCESSORIESNew ring clamp and bolts on existing cast iron roof drain731.8410.007,318.411.50%4%0.62.50%$750.141.50%4%0.62.50%$768.891.50%4%0.62.50%$ 788.111.50%4%0.62.5%$ 807.82
A011AENot used10.00$ - 0$ - 0
A011AFEAACCESSORIESPrefabricated pipe flashing boot, to 6" diameter77.6910.00776.931.50%4%0.62.50%$79.641.50%4%0.62.50%$81.631.50%4%0.62.50%$ 83.671.50%4%0.62.5%$ 85.76
A011A010AGLFACCESSORIESPrefab sheet metal curb for BUR/EPDM roof 24" X 48"281.09200.0056,218.801.50%4%0.62.50%$288.121.50%4%0.62.50%$295.321.50%4%0.62.50%$ 302.711.50%4%0.62.5%$ 310.28
A011AHLFACCESSORIESPrefab sheet metal curb for BUR/EPDM roof 72" X 48"1,828.59200.00365,717.001.50%4%0.62.50%$1,874.301.50%4%0.62.50%$1,921.161.50%4%0.62.50%$ 1,969.191.50%4%0.62.5%$ 2,018.42
A011AIReconnection & Disconnection fee2,644.4410.0026,444.441.50%4%0.62.50%$2,710.561.50%4%0.62.50%$2,778.321.50%4%0.62.50%$ 2,847.781.50%4%0.62.5%$ 2,918.97
A011AJEAACCESSORIESPrefab sheet metal curb, 2' to 4' long x 4" to 6" wide228.0320.004,560.601.50%4%0.62.50%$233.731.50%4%0.62.50%$239.571.50%4%0.62.50%$ 245.561.50%4%0.62.5%$ 251.70
A011AKEAACCESSORIESPrefab sheet metal curb, 4' to 6' long x 6" to 8" wide474.72100.0047,471.601.50%4%0.62.50%$486.581.50%4%0.62.50%$498.751.50%4%0.62.50%$ 511.221.50%4%0.62.5%$ 524.00
A011AL07 72 2610 0150LFACCESSORIESContinuous ridge ventilator8.77200.001,753.501.50%4%0.62.50%$8.991.50%4%0.62.50%$9.211.50%4%0.62.50%$ 9.441.50%4%0.62.5%$ 9.68
A011AM13 34 1950 8400EAACCESSORIESTurbine ventilator, 12" diameter220.5020.004,410.001.50%4%0.62.50%$226.011.50%4%0.62.50%$231.661.50%4%0.62.50%$ 237.451.50%4%0.62.5%$ 243.39
A011ANEAACCESSORIESSplash block, concrete24.6120.00492.141.50%4%0.62.50%$25.221.50%4%0.62.50%$25.851.50%4%0.62.50%$ 26.501.50%4%0.62.5%$ 27.16
A011AO07 72 5310 0200EAACCESSORIESSnow Guard33.6020.00672.001.50%4%0.62.50%$34.441.50%4%0.62.50%$35.301.50%4%0.62.50%$ 36.181.50%4%0.62.5%$ 37.09
A011APEAACCESSORIESAluminum roof ladders, up to 30 feet with cage8,869.392.0017,738.781.50%4%0.62.50%$9,091.121.50%4%0.62.50%$9,318.401.50%4%0.62.50%$ 9,551.361.50%4%0.62.5%$ 9,790.14
A011AQNot used$ - 0$ - 0
A011AREAACCESSORIESRoof warranty sign82.5020.001,650.001.50%4%0.62.50%$84.561.50%4%0.62.50%$86.681.50%4%0.62.50%$ 88.841.50%4%0.62.5%$ 91.06
SUB-TOTAL FOR CLIN A011565,416.10$ - 0$ - 0
A012AA05 31 2350 2100SFROOF DECK REPAIRInstall new galvanized metal deck, 1 1/2" deep, 22 guage, shall include all closures and accessories (all or Partial)
Less than 50 squares3.23200.00646.801.50%4%0.62.50%$3.311.50%4%0.62.50%$3.401.50%4%0.62.50%$ 3.481.50%4%0.62.5%$ 3.57
A012AA.105 31 2350 2200SFROOF DECK REPAIR22 gauge 50 to 500 squares2.612,000.005,229.001.50%4%0.62.50%$2.681.50%4%0.62.50%$2.751.50%4%0.62.50%$ 2.821.50%4%0.62.5%$ 2.89
A012AB05 31 2350 2600SFROOF DECK REPAIRInstall new galvanized metal deck, 1 1/2" deep, 20 guage, shall include all closures and accessories(all or partial)3.79600.002,274.301.50%4%0.62.50%$3.891.50%4%0.62.50%$3.981.50%4%0.62.50%$ 4.081.50%4%0.62.5%$ 4.18
A012AB.105 35 1350 2650SFROOF DECK REPAIR20 gauge 50 to 500 squares3.14600.001,883.701.50%4%0.62.50%$3.221.50%4%0.62.50%$3.301.50%4%0.62.50%$ 3.381.50%4%0.62.5%$ 3.47
A012A012ACN/ASFROOF DECK REPAIRNot used0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A012ADN/ASFROOF DECK REPAIRNot used0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A012AE02 41 1916 2400
07 51 1350 0300SFROOF DECK REPAIRRemove existing 2" to 4" non-structural concrete covering, and provide new concrete covering.91.6120.001,832.251.50%4%0.62.50%$93.901.50%4%0.62.50%$96.251.50%4%0.62.50%$ 98.661.50%4%0.62.5%$ 101.12
A012AFEAROOF DECK REPAIRClose opening in concrete roof deck, up to approximately 16 square feet.3,263.542.006,527.071.50%4%0.62.50%$3,345.121.50%4%0.62.50%$3,428.751.50%4%0.62.50%$ 3,514.471.50%4%0.62.5%$ 3,602.33
$ - 0$ - 0
SUB-TOTAL FOR CLIN A01218,393.12$ - 0$ - 0
A013AA01 45 2350 2250
01 45 2350 2300EAROOF SERVICESCore test and analysis including patching121.28100.0012,127.501.50%4%0.62.50%$124.311.50%4%0.62.50%$127.411.50%4%0.62.50%$ 130.601.50%4%0.62.5%$ 133.86
A013AB01 45 2350 5750EAROOF SERVICESRoof inspection and survey609.00100.0060,900.001.50%4%0.62.50%$624.231.50%4%0.62.50%$639.831.50%4%0.62.50%$ 655.831.50%4%0.62.5%$ 672.22
A013ACEAROOF SERVICESNot Used0.00100.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A013A013ADEAROOF SERVICESLeak investigation870.10100.0087,010.001.50%4%0.62.50%$891.851.50%4%0.62.50%$914.151.50%4%0.62.50%$ 937.001.50%4%0.62.5%$ 960.43
A013AEEAROOF SERVICESTapered roof insulation system roof investigations & shop drawings548.36100.0054,836.101.50%4%0.62.50%$562.071.50%4%0.62.50%$576.121.50%4%0.62.50%$ 590.521.50%4%0.62.5%$ 605.29
A013AFN/AEAROOF SERVICESNot used100.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A013AGN/AEAROOF SERVICESNot Used100.000.001.50%4%0.62.50%$0.001.50%4%0.62.50%$0.001.50%4%0.62.50%$ - 01.50%4%0.62.5%$ - 0
A013AHEAROOF SERVICESInfrared moisture survey2,599.42100.00259,942.101.50%4%0.62.50%$2,664.411.50%4%0.62.50%$2,731.021.50%4%0.62.50%$ 2,799.291.50%4%0.62.5%$ 2,869.27
A013AIEAROOF SERVICESWind uplift diagram prepared by qualified design professional1,091.52100.00109,151.901.50%4%0.62.50%$1,118.811.50%4%0.62.50%$1,146.781.50%4%0.62.50%$ 1,175.451.50%4%0.62.5%$ 1,204.83
A013AJ02 82 1345 0250EAROOF SERVICESSample and test for presence of ACRM220.50100.0022,050.001.50%4%0.62.50%$226.011.50%4%0.62.50%$231.661.50%4%0.62.50%$ 237.451.50%4%0.62.5%$ 243.39
A011AKEAACCESSORIESFlush out roof drains and storm piping1,948.32100.00194,832.001.50%4%0.62.50%$1,997.031.50%4%0.62.50%$2,046.951.50%4%0.62.50%$ 2,098.131.50%4%0.62.5%$ 2,150.58
A013AL33 01 3011 9060EAROOF SERVICESCamera inspection of roof drain piping, up to 100'861.00100.0086,100.001.50%4%0.62.50%$882.531.50%4%0.62.50%$904.591.50%4%0.62.50%$ 927.201.50%4%0.62.5%$ 950.38
A013AMEAROOF SERVICESWarranty for roof up to and including 100 Squares1,650.0040.0066,000.001.50%4%0.62.50%$1,691.251.50%4%0.62.50%$1,733.531.50%4%0.62.50%$ 1,776.871.50%4%0.62.5%$ 1,821.29
A013ANSQROOF SERVICESWarranty for roofs exceeding 100 squares16.5040.00660.001.50%4%0.62.50%$16.911.50%4%0.62.50%$17.341.50%4%0.62.50%$ 17.771.50%4%0.62.5%$ 18.21
A013AOEAROOF SERVICESRRO/ARCH/ENG QC Inspection and Report (1 day)1,320.0010.0013,200.001.50%4%0.62.50%$1,353.001.50%4%0.62.50%$1,386.831.50%4%0.62.50%$ 1,421.501.50%4%0.62.5%$ 1,457.03
A013APB 3013 105 0600SFROOF SERVICESTotal BUR Roof Replacement10.3910.00103.911.50%4%0.62.50%$10.651.50%4%0.62.50%$10.921.50%4%0.62.50%$ 11.191.50%4%0.62.5%$ 11.47
A013AQB 3013 120 0600SFROOF SERVICESTotal Thermoplastic Roof Replacement8.9310.0089.251.50%4%0.62.50%$9.151.50%4%0.62.50%$9.381.50%4%0.62.50%$ 9.611.50%4%0.62.5%$ 9.85
A013ARB 3013 125 0600SFROOF SERVICESTotal Thermoset Roof Replacement10.8410.00108.391.50%4%0.62.50%$11.111.50%4%0.62.50%$11.391.50%4%0.62.50%$ 11.671.50%4%0.62.5%$ 11.96