ATTACHMENT I -102740_Construction_Waste_Management_Report.pdf

PDF 138 KB Posted

Attached to
Amendment 0004 Various Changes Federal contract opportunity
Solicitation number
N4008020R5252
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a construction waste management report template and details of a federal contract opportunity for electrical system repairs at Marine Corps Base Quantico in Virginia. The construction waste management report template requires contractors to track waste disposal and recycling metrics by waste stream on a monthly basis. Metrics include tons and costs for materials landfilled, incinerated, composted, and recycled. Recycling is further broken down by material categories. The federal contract opportunity involves replacing an indoor electrical transformer with an outdoor unit, replacing the main automatic transfer switch and pad mounted sectionalizing switches, adding new switches and cables along Russell Road, performing repairs at overhead poles, and commissioning power quality and metering. The work must be completed in accordance with all applicable federal, state and local regulations.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NREA Rcvd:___________

FY Reporting Period:______

Form created 11/2008, revised 8/18 by Marilisa Porter, Solid Waste Manager

Construction Waste Management Report Quantico Marine Corps Base

Report Date:

Project Number: Project Name:

Contract Number: Contract Task Order/Delivery Order:

Reporting Period: to

RETURN THIS FORM TO marilisa.porter@usmc.mil FAX (703) 784-6335

REPORTS MUST BE TURNED IN MONTHLY

ANNUAL TURNINS ARE CASE BY CASE ONLY

Comments:

Waste Stream Disposal

(Tons)

Disposal

Cost

Recycled

(Tons)

Recycled

Cost

Recycled

Revenues Landfill $ $ $

Incinerated $ $ $

Composted $ $ $

For each landfill and/or incinerator, provide name, city, county, state and tipping fee. If there are multiple landfills, please annotate below on the additional lines provided.

Name City, County, State Tipping Fee

Recycling Breakdown (Qty should add up to recycled tons)

Category Tons

Food

Glass

Metals (Brass .50 cal and below)

Metals (excluding brass)

Other (non-food, describe in comments)

Paper and Paperboard

Cardboard mailto:marilisa.porter@usmc.mil

NREA Rcvd:___________

FY Reporting Period:______

Form created 11/2008, revised 8/18 by Marilisa Porter, Solid Waste Manager

Plastic

Wood

Yard/Green Waste

Comments: __________________________________________________________________________________

CONSTRUCTION & DEMOLITION DEBRIS (C&D).

Record hazardous and non-hazardous C&D waste as one entry. Enter total tons of C&D disposed of in a landfill, by incineration, and/or by hazardous waste contract.

Enter total disposal cost for C&D.

Enter the recycled hazardous and non-hazardous C&D tons as one entry under the recycling column. You can also claim C&D diversion conducted by a construction contractor or MILCON project. If you have recycled C&D, it is likely that some was disposed of as well. Therefore, if there are recycled tons of C&D there should be some disposed tons of C&D.

Enter the cost associated with recycling. Recycling costs include handling, processing, transportation, and other costs associated with recycling C&D. Soils that are used at another location or that are reclaimed count toward recycling.

Enter Recycling Revenues. Enter only actual revenues received from recycling. Do not enter cost avoidance for recycling revenues.

Reported by:

Company: Contact:

Address: Title:

E-mail address:

Telephone:

Fax:

Definitions:

Construction and Demolition (C&D) Debris. Waste derived from the construction, renovation, demolition or deconstruction of residential and commercial buildings and their infrastructure.

C&D waste typically includes concrete, wood, metals, gypsum wallboard, asphalt, and roofing material.

Other Select Waste (OSW). Construction and demolition debris are the “Other Select Waste” categories for purposes of DoD metric reporting via SW module. If the Other Select Wastes are hazardous they must also be reported in the calendar year HW module.

File details come from the government source that posted it. Updated .