Attachment B - Drwgs for Russell Electrical Repair_Rec 12_May_2020.pdf

PDF 5 MB Posted

Attached to
Amendment 0004 Various Changes Federal contract opportunity
Solicitation number
N4008020R5252
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is an amendment to a solicitation for electrical repair work at Marine Corps Base Quantico in Virginia. The amendment provides various changes to the scope of work, which includes replacing the indoor building main electrical transformer with an outdoor pad mounted unit, replacing the main building Automatic Transfer Switch with a bypass-isolation ATS, replacing existing pad mounted 35kV sectionalizing switches along Russell Road, adding a new 35kV pad mounted sectionalizing switch for the Marsh Center transformer, replacing 35kV cables along Russell Road and adding a second feeder for primary selective system operation, performing replacements and repairs at the main overhead electrical delivery poles on Russell Road and adding a second riser pole for the second feeder, and commissioning existing power quality and revenue metering at the Marsh Center main electrical service. The solicitation is issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCB QUANTICO

PROJECT LOCATION

P O

T O

M A

C R

IV

E

R

I-

R O

U T E

1ROUTE 234

R T

E

I-

I-

R O

U T E

MCB QUANTICO

RUSSELL RD

BUFFALO RD

P U

R V

IS

R

D

CHOPAWAMSIC CREEK

CATLIN

A

VE

McCARD RD

JO

H

N Q

U

IC

K R

D

RUSSELL RD

PROJECT LOCATION

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O N

G

R U

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

G-001

C O

V E

R S

H E

E T

NALMSA MSA

3192561

REPAIR ELECTRICAL SYSTEMS

ALONG RUSSELL ROAD

NAVAL FACILITY ENGINEERING COMMAND

QU1828M, PWB 2017201

MARINE CORPS BASE QUANTICO

QUANTICO, VA

31 JANUARY 2020

VICINITY MAP

NO SCALE

LOCATION MAP

NO SCALE

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

S A

A

D D

M A

N H

O L E

M H

-1

/0

/2

M S

A

A

D D

E D

E

S D

R A

W

IN

G S

/1

/2

M

S A

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

G-002

S H

E E

T I N

D E

X A

N D

S U

M M

A R

Y O

F W

O R

K

NALMSA MSA

3192562

INDEX OF DRAWINGS

Sheet # Sheet Name NAVFAC #

1 G-001 COVER SHEET 3192561

2 G-002 SHEET INDEX AND SUMMARY OF WORK 3192562

3 E-001 LEGEND, ABBREVIATION & GENERAL NOTES 3192563

4 ES001 OVERALL ELECTRICAL SITE PLAN (1 OF 2) 3192564

5 ES002 OVERALL ELECTRICAL SITE PLAN (2 OF 2) 3192565

6 ES003 ENLARGED ELECTRICAL SITE PLAN 3192566

7 ES004 ENLARGED ELECTRICAL SITE PLAN 3192567

8 ES005 ENLARGED ELECTRICAL SITE PLAN 3192568

9 ES006 ENLARGED ELECTRICAL SITE PLAN 3192569

10 ED601 34.5kV DEMOLITION SINGLE LINE DIAGRAM 3192570

11 E-401 ENLARGED ELECTRICAL BUILDING PLAN 3192571

12 E-501 POLE DETAILS 3192572

13 E-502 EQUIPMENT FOUNDATION DETAILS 3192573

14 E-503 RISER POLE AND GROUNDING DETAILS 3192574

15 E-504 DUCT BANK AND MANHOLE DETAILS 3192575

16 E-505 XFMR FENCE AND RETAINING WALL DETAIL 3192576

17 E-506 MANHOLE DETAILS 3192577

18 E-507 MANHOLE DETAILS 3192578

19 E-508 MANHOLE DETAILS 3192579

20 E-509 MANHOLE DETAILS 3192580

21 E-601 34.5kV NEW WORK SINGLE LINE DIAGRAM 3192581

22 E-602 PARTIAL SINGLE LINE DIAGRAM 3192582

23 C-101 EROSION AND SEDIMENT CONTROL PLAN -

OVERALL

3193310

24 C-102 EROSION AND SEDIMENT CONTROL PLAN 3193311

25 C-103 EROSION AND SEDIMENT CONTROL PLAN 3193312

26 C-301 EROSION AND SEDIMENT CONTROL DETAILS 3193313

27 C-401 EROSION AND SEDIMENT CONTROL NARRATIVE 3193314

• REPLACE THE INDOOR BUILDING MAIN ELECTRICAL TRANSFORMER WITH AN

OUTDOOR PAD MOUNTED UNIT.

• REPLACE THE MAIN BUILDING AUTOMATIC TRANSFER SWITCH (ATS) WITH A

BYPASS-ISOLATION ATS

• REPLACE ALL EXISTING PAD MOUNTED 35KV SECTIONALIZING SWITCHES

ALONG RUSSELL ROAD

• ADD A NEW 35KV PAD MOUNTED SECTIONALIZING SWITCH FOR THE MARSH

CENTER TRANSFORMER

• ADD A SECOND 35kV CIRCUIT ALONG RUSSELL ROAD AND CONFIGURE THE

SECTIONALIZING SWITCHES FOR PRIMARY-SELECTIVE (AUTOMATIC TRANSFER)

OPERATION.

• PERFORM REPLACEMENTS AND REPAIRS AT THE MAIN OVERHEAD ELECTRICAL

DELIVERY POLES ON RUSSELL RD.

• COMMISSION ADVANCED POWER QUALITY AND REVENUE METERING AT THE

MARSH CENTER MAIN ELECTRICAL SERVICE.

SUMMARY OF WORK

OUTAGE #1 – MAIN UTILITY DELIVERY

1. COORDINATE AN OUTAGE OF THE RUSSELL ROAD FEEDER WITH DOMINION VA POWER.

2. REPLACE THE MAIN GANG-OPERATED DISCONNECT SWITCH, POLE, AND RELATED HARDWARE.

3. PERFORM MODIFICATIONS TO THE EXISTING RISER POLE (EXISTING CIRCUIT A) PER PLANS.

4. SET A NEW TANGENT RISER POLE FOR THE SECOND FEEDER (CIRCUIT B) BETWEEN THE EXISTING RISER AND THE MAIN GANG-OPERATED DISCONNECT SWITCH – TIE-IN ALL CIRCUITRY TO THE TOPS OF THE FUSED DISCONNECTS TO MAKE

READY FOR INSTALLING THE NEW UG FEEDER.

5. ADJUST AND EXERCISE NEW GANG-OPERATED DISCONNECT SWITCH.

6. CLOSE NEW GANG-OPERATED DISCONNECT SWITCH AND HAVE DOMINION RESTORE POWER TO EXISTING CIRCUIT A.

FEEDER B INSTALLATION AND COMMISSIONING

1. THE REMAINDER OF THIS SEQUENCE ASSUMES THAT THE SECOND FEEDER (CIRCUIT B) IS INSTALLED AND COMMISSIONED ALONG RUSSELL ROAD, AND IS DEENERGIZED AND GROUNDED PRIOR TO DOWNSTREAM WORK ACTIVITIES.

2. CIRCUIT B SHALL BE INSTALLED COMPLETE MANHOLE TO MANHOLE WITH ALL RACKING AND ARC-PROOFING, AND TERMINATED ON TWO POSITIONS OF A 600A THREE-POINT JUNCTION IN MANHOLES MH-4, MH-12, AND MH-19 PER PLANS, WITH THE THIRD CONNECTION CAPPED WITH A 600A INSULATING CAP.

3. THE FEEDER SHALL BE TESTED AND COMMISSIONED IN ITS ENTIRETY FROM THE RISER TO THE MARSH CENTER MANHOLE MH-19.

4. THE FEEDER SHALL BE DEENERGIZED AND GROUNDED AT THE RISER PRIOR TO WORKING ON CIRCUIT B CONNECTIONS IN SUBSEQUENT STEPS.

OUTAGE #2 – MARINE FEDERAL CREDIT UNION SWITCHGEAR

1. OPEN THE MAIN GANG-OPERATED DISCONNECT SWITCH, OPEN AND GROUND THE RUSSELL ROAD 35KV UNDERGROUND CIRCUITS A AND B.

2. DEMOLISH THE CREDIT UNION SECTIONALIZING SWITCH SS-1 AND REMOVE THE CONCRETE PAD – PRESERVE IN PLACE THE LOAD SIDE FEEDER TO THE MARINE CREDIT UNION AND THE CONDUITS FROM MANHOLE MH-4, REMOVE ELBOWS

AND PULL THE EXISTING MAIN FEEDERS BACK INTO MANHOLE MH-4 FOR REUSE.

3. CONNECT PRESERVED MAIN FEEDER CABLES TO CIRCUIT A 3-POINT JUNCTIONS PER PLANS.

4. INSTALL ONE NEW 6” DIRECT BURIAL CONDUIT FROM MH-4 TO THE ADJUSTED SWITCH PAD LOCATION FOR CIRCUIT B.

5. PREPARE THE PAD SITE AND INSTALL A CUSTOM PRE-CAST CONCRETE SWITCH FOUNDATION OVER THE CONDUIT ELBOWS.

6. INSTALL SWITCH SS-1 ON PAD.

7. INSTALL AND TERMINATE NEW MAIN FEEDER CABLES (CIRCUITS A AND B) FROM 3-POINT JUNCTIONS IN MH-4 AND INSTALL SWITCH GROUNDING – TEST NEW CABLES PRIOR TO CONNECTING TO SWITCHGEAR AND 3-POINT JUNCTIONS.

8. RE-TERMINATE LOAD SIDE CABLES TO CREDIT UNION XFMR, COMPLETE GROUNDING, LEAVE TRANSFORMER FEEDER IN THE “GROUND” POSITION.

9. COMMISSION NEW SS-1 BY ENERGIZING CIRCUIT A AT THE RISER, PICKING UP THE LOADS ON RUSSELL ROAD WITH THE GANG-OPERATED SWITCH – LEAVE CIRCUIT B OPEN AND GROUNDED AT THE RISER.

10. PROGRAM SETTINGS INTO FAULT INTERRUPTER CONTROL AND PLACE SWITCH IN MANUAL OPERATING CONFIGURATION WITH CIRCUIT A IN THE “CLOSE” POSITION AND CIRCUIT B IN THE “GROUND” POSITION – CONSULT DESIGNER OF

RECORD FOR SETTINGS.

11. MOVE TRANSFORMER FEEDER SWITCH FROM THE “GROUND” POSITION TO THE “CLOSE” POSITION TO PICK UP THE CREDIT UNION TRANSFORMER.

MARSH CENTER CONNECTIONS – STEPS 1 & 2 - COMMISSION SS-3 AND XFMR

1. COMPLETE DUCT BANK WORK BETWEEN MANHOLE MH-19 AND THE MARSH CENTER ELECTRICAL BUILDING, CONSTRUCT SWITCH FOUNDATION, SET NEW SECTIONALIZING SWITCH SS-3, AND ROUTE NEW CABLES FROM SWITCH SS-3 INTO

MH-19 –TEST CABLES THEN CONNECT TO SWITCH, LEAVING MANHOLE END TERMINATED BUT NOT CONNECTED.

2. COMPLETE DUCT BANK WORK BETWEEN SWITCH SS-3 AND NEW MARSH CENTER PAD MOUNTED TRANSFORMER, CONSTRUCT TRANSFORMER FOUNDATION, INSTALL SECONDARY DUCTBANK TO RISER ON BUILDING WALL, SET NEW

TRANSFORMER, AND ROUTE/TERMINATE NEW 35KV CABLES BETWEEN THE XFMR AND SWITCH – TEST THE CABLES, THEN CONNECT TO THE XFMR AND SWITCH, LEAVING THE SWITCH TO THE TRANSFORMER IN THE “GROUND” POSITION.

3. CONNECT THE SS-3 CABLES TO THE CIRCUIT A AND CIRCUIT B 3-POINT JUNCTIONS IN MH-19 – THE LINE SIDE CIRCUIT A CABLES WILL NOT BE CONNECTED TO THE JUNCTION AT THIS TIME – CAP ALL UNUSED JUNCTION POSITIONS WITH 600A

INSULATING CAPS.

4. COMMISSION NEW SS-3 BY UNGROUNDING AND ENERGIZING CIRCUIT B AT THE RISER, MAKING SURE THAT THE CIRCUIT A SWITCH IN SS-3 IS IN THE “GROUND”POSITION - IT IS NOT NECESSARY TO USE THE MAIN GANG-OPERATED SWITCH

AS CIRCUIT B WILL NOT PICK UP ANY LOAD AT THIS POINT.

5. PROGRAM SETTINGS INTO FAULT INTERRUPTER CONTROL AND PLACE SWITCH IN MANUAL OPERATING CONFIGURATION WITH CIRCUIT B IN THE “CLOSE” POSITION AND CIRCUIT A SWITCH IN THE “GROUND” POSITION – CONSULT DESIGNER

OF RECORD FOR SETTINGS.

6. ENERGIZE NEW MARSH CENTER PAD MOUNTED TRANSFORMER FROM SS-3 AND COMMISSION – LEAVE SWITCH TO XFMR FROM SS-3 IN THE “GROUND” POSITION AFTER COMMISSIONING.

7. OPEN AND GROUND CIRCUIT B AT THE RISER AND PLACE SS-3 CIRCUIT B SWITCH IN THE “GROUND” POSITION AFTER COMMISSIONING.

DAVIS CENTER CONNECTIONS – COMMISSION SS-2 AND XFMR FEEDER

1. CONSTRUCT DUCT BANK FROM MH-12 TO NEW SWITCH SS-2 AND MH-14 PER PLANS, CONSTRUCT SWITCH FOUNDATION, SET NEW SECTIONALIZING SWITCH SS-2, AND ROUTE NEW CABLES FROM SWITCH INTO MH-12 – TEST CABLES THEN

CONNECT TO SWITCH, LEAVING MANHOLE END TERMINATED BUT NOT CONNECTED.

2. CONNECT CIRCUIT B FEEDER CABLES FROM NEW SS-2 ON CIRCUIT B THREE-POINT JUNCTION IN MH-12 WITH CIRCUIT B DEENERGIZED AND GROUNDED AT THE RISER – DO NOT CONNECT CIRCUIT A CABLES AT THIS TIME.

3. CONNECT LOAD SIDE CABLES FROM NEW SS-2 TO THE THREE-POINT JUNCTION IN MH-12 FOR THE DAVIS CENTER XFMR– CAP UNUSED POSITIONS WITH 600A INSULATING CAPS.

4. ENERGIZE AND COMMISSION NEW SS-2 BY UNGROUNDING CIRCUIT B AT THE RISER, SS-1, AND SS-3, THEN ENERGIZING CIRCUIT B AT THE RISER AND CLOSING THE CIRCUIT B SWITCH IN SS-2 – DEENERGIZE AND GROUND CIRCUIT B AFTER

TESTING – LEAVE CIRCUIT A SWITCH IN THE “GROUND” POSITION DURING THIS OPERATION.

5. PROGRAM SETTINGS INTO FAULT INTERRUPTER CONTROL AND PLACE SWITCH IN MANUAL OPERATING CONFIGURATION LEAVING SS-2 CIRCUIT B SWITCH IN THE “GROUND” POSITION – CONSULT DESIGNER OF RECORD FOR SETTINGS –

LEAVE SWITCH TO DAVIS CENTER TRANSFORMER FEEDER 3-POINT JUNCTIONS IN THE “GROUND” POSITION.

OUTAGE #3 – DAVIS CENTER XFMR AND SS-2 CUTOVER

1. INSTALL CIRCUIT A CONDUCTORS FROM MH-12 TO MH-14 – INSTALL 600A ELBOWS ON CABLES IN MH-12 TO PREPARE FOR CONNECTION TO CIRCUIT A 3-POINT JUNCTION, PREPARE CABLE ENDS IN MH-14 FOR STRAIGHT SPLICING TO

EXISTING CIRCUIT A CONDUCTORS THERE.

2. DEENERGIZE CIRCUITS A AND B AT THE MAIN GANG-OPERATED SWITCH, OPEN AND GROUND BOTH CIRCUITS AT THE RISER.

3. CUT CIRCUIT A IN MH-12 SEPARATING THE EXISTING DAVIS CENTER TRANSFORMER FEEDER FROM CIRCUIT A, NOTING AND MARKING PHASING – LEAVE ADEQUATE SLACK TO CONNECT THE EXISTING DAVIS CENTER FEEDER TO THE DAVIS

CENTER XFMR 3-POINT JUNCTION.

4. DEMOLISH CIRCUIT A CONDUCTORS IN MH-12 PER PLANS, INSTALL CIRCUIT A 3-POINT JUNCTIONS.

5. INSTALL 600A ELBOWS ON THE CUT ENDS OF THE DAVIS CENTER FEEDER AND CONNECT TO THE DAVIS CENTER XFMR 3-POINT JUNCTION, MAINTAINING PHASING.

6. SPLICE NEW CIRCUIT A CABLE TO EXISTING IN MH-11 AND EXTEND TO MH-12 PER DRAWINGS NOTING PHASING – INSTALL 600A ELBOWS IN MH-12 AND LAND CABLES ON CIRCUIT A 3-POINT JUNCTION.

7. SPLICE NEW CIRCUIT A CABLE TO EXISTING IN MH-14, NOTING PHASING – LAND THE OTHER END OF THIS CABLE ON THE CIRCUIT A 3-POINT JUNCTION IN MH-12.

8. LAND THE CIRCUIT A CABLES FROM SS-2 ON THE CIRCUIT A 3-POINT JUNCTION IN MH-12, NOTING PHASING.

9. MOVE THE CIRCUIT B SWITCHES IN SS-1, SS-2, AND SS-3 TO THE “OPEN” POSITION IF THEY ARE IN THE “GROUND” POSITION.

10. MOVE THE CIRCUIT A SWITCHES IN SS-1 AND SS-2 TO THE “OPEN” POSITION, LEAVING THE CIRCUIT A SWITCH IN SS-3 IN THE “GROUND” POSITION.

11. UNGROUND AND CLOSE FUSED DISCONNECTS ON CIRCUIT A AT RISER – CLOSE GANG-OPERATED SWITCHES TO ENERGIZE CIRCUIT A AND PICK UP MARSH CENTER LOAD, LEAVING CIRCUIT B OPEN AND GROUNDED.

12. UNGROUND CIRCUIT B AT THE RISER AND CLOSE THE FUSED DISCONNECTS TO ENERGIZE CIRCUIT B – THIS WILL NOT PICK UP ANY LOAD, AS ALL DOWNSTREAM CIRCUIT B SWITCHES ARE IN THE “OPEN” POSITION.

13. MOVE THE CIRCUIT B SELECTOR SWITCHES AT SS-1 AND SS-2 TO THE “CLOSE” POSITION AND CLOSE THE TRANSFORMER FEEDER SWITCHES IN SS-1 AND SS-2, TRANSFERRING THE CREDIT UNION AND THE DAVIS CENTER TO CIRCUIT B –

THE MARSH CENTER WILL REMAIN ON CIRCUIT A.

OUTAGE #4 – MARSH CENTER DEMOLITION AND FINAL CONNECTION OF SS-3 (STEP 3)

1. INSTALL TEMPORARY DLO CABLES SIZED FOR THE BUILDING LOAD FROM THE NEW TRANSFORMER TO THE LOAD SIDE OF THE EXISTING MARSH CENTER UNIT SUBSTATION.

2. DE-ENERGIZE EXISTING MARSH CENTER UNIT SUBSTATION AT THE UNIT SUBSTATION DISCONNECT IN THE ELECTRICAL BUILDING AND OPEN MAIN BREAKER IN MARSH CENTER SWITCHBOARD INSIDE BUILDING - OPEN AND GROUND CIRCUIT

A AT MAIN RISER USING FUSED DISCONNECTS – NO LOAD WILL BE DROPPED AS MARSH CENTER IS ALREADY DISCONNECTED.

3. DISCONNECT AND CUT THE EXISTING SERVICE CONDUCTORS TO THE BUILDING IN THE UNIT SUB SECONDARY COMPARTMENT, LEAVING EXTRA SLACK FOR INSTALLATION OF THE SECONDARY JUNCTION ENCLOSURE LATER – BE CAREFUL

TO MAINTAIN PHASING AND TO CUT ALL CONDUCTORS OF THE SAME PHASE AN EQUAL AMOUNT.

4. CONNECT THE DLO CABLES TO THE CUT PHASE, NEUTRAL, AND GROUND CONDUCTORS USING TWO-HOLE DRILLED BUS-BARS, MECHANICAL LUGS, AND INSULATING TAPE TO ALLOW FOR SEPARATION LATER – MAKE SURE THAT ALL

CONDUCTORS OF THE SAME PHASE ARE ELECTRICALLY PARALLELED AND THAT ROTATION IS MAINTAINED.

5. ENERGIZE THE NEW TRANSFORMER FROM CIRCUIT B AT SS-3, CHECK VOLTAGE AND ROTATION, CLOSE MARSH CENTER MAIN AT MAIN SWITCHBOARD TO PICK UP BUILDING LOADS.

6. CUT CIRCUIT A IN MH-19 SEPARATING THE EXISTING MARSH CENTER TRANSFORMER FEEDER FROM CIRCUIT A, NOTING AND MARKING PHASING – LEAVE ADEQUATE SLACK TO CONNECT CIRCUIT A TO THE CIRCUIT A 3-POINT JUNCTION.

7. INSTALL 600A ELBOWS ON THE CUT ENDS OF CIRCUIT A AND CONNECT THE CABLES TO THE 3-POINT JUNCTION.

8. CONNECT THE SS-3 CABLES TO THE CIRCUIT A 3-POINT JUNCTIONS IN MH-19 AND REMOVE THE OLD MARSH CENTER ELECTRICAL BUILDING CONDUCTORS – CAP UNUSED JUNCTION POSITIONS WITH 600A INSULATING CAPS.

9. PLACE SS-3 CIRCUIT A SWITCH IN THE “OPEN” POSITION.

10. UNGROUND CIRCUIT A AT THE RISER AND CLOSE THE FUSED DISCONNECTS ON THE CIRCUIT A RISER, PICKING UP THE CABLE ALONG RUSSELL ROAD BUT NO LOAD.

OUTAGE #5 – PERMANENT BUILDING CONNECTION

1. COMPLETE ALL WORK INVOLVED WITH DEMOLITION OF THE EXISTING UNIT SUB AND THE INSTALLATION OF THE 480V SERVICE LATERAL, NEW BUILDING ATS, MAIN BUS DUCT, AND SECONDARY JUNCTION ENCLOSURE - PROTECTING

TEMPORARY BUILDING CONNECTIONS DURING CONSTRUCTION.

2. DE-ENERGIZE THE NEW PAD MOUNTED TRANSFORMER AT SS-3, PLACING THE SWITCH IN THE “GROUND” POSITION.

3. OPEN THE MAIN MARSH CENTER BREAKER AT THE MAIN SWITCHBOARD.

4. DISCONNECT THE DLO CABLES AND REMOVE TEMPORARY BUS CONNECTIONS IN THE ELECTRICAL BUILDING.

5. CONNECT THE BUILDING SERVICE ENTRANCE CONDUCTORS TO THE NEW SECONDARY JUNCTION ENCLOSURE BUSES, TRIMMING CABLES EVENLY BY PHASE AS NECESSARY AND BOLTING TO BUSES WITH TWO-HOLE COMPRESSION LUGS.

6. LAND NEW SERVICE LATERAL FROM TRANSFORMER TO ATS AT TRANSFORMER, CONNECTING WITH TWO HOLE COMPRESSION LUGS, MAINTAINING EQUAL LENGTH CUTS FOR ALL LIKE PHASE CONDUCTORS.

7. RE-ENERGIZE THE MARSH CENTER TRANSFORMER FROM SS-3 AND CHECK VOLTAGE AND ROTATION.

8. CLOSE THE MAIN BREAKER AT THE SWITCHBOARD TO PICK UP BUILDING LOADS.

ELECTRICAL SEQUENCE OF CONSTRUCTION – RUSSELL RD. AND MARSH

CENTER MAIN DELIVERY

SEQUENCE OF CONSTRUCTION

1. CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR MEANS AND METHODS

EMPLOYED DURING ALL CONSTRUCTION AND CUT-OVER ACTIVITIES.

2. THE SEQUENCE OF CONSTRUCTION PROVIDED ON THIS SHEET INDICATES THE

ORDER OF CONSTRUCTION THAT WILL CREATE THE LEAST DISRUPTION TO

THE ELECTRIC USERS ALONG RUSSELL ROAD. ANY DEVATION FROM THIS

SEQUENCE SHALL REQUIRE GOVERNMENT APPROVAL.

3. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR CAREFULLY REVIEWING

THIS SEQUENCE OF CONSTRUCTION AND VERIFYING THAT ALL ACTIONS

REQUIRED TO COMPLY WITH FEDERAL, STATE, MCBQ, AND CONTRACTOR

SAFETY REGULATIONS ARE MET. THE DESIGNER OF RECORD HAS PROVIDED

THIS SEQUENCE ONLY AS A SCHEMATIC PLAN FOR THE INSTALLATION AND

CUT-OVER OF THE NEW FACILITIES.

4. PER SPECIFICATION SECTION 01 50 00, CONTRACTOR IS TO PROVIDE TWO

TEMPORARY GENERATORS AND ASSOCIATED FUEL AND SERVICE FOR OUTAGE

SUPPORT.

A. THE 150 KW UNIT IS TO SUPPORT THE MARINE FEDERAL CREDIT UNION

B. THE 1000 KW UNIT IS TO SUPPORT THE DAVIS CENTER

C. THE EXISTING WHOLE BUILDING GENERATOR AT THE MARSH CENTER IS TO

BE USED TO SUPPORT OUTAGE REQUIREMENTS THERE - CONTRACTOR IS TO

PROVIDE FUEL FOR OUTAGE PERIODS AS A PART OF THE CONTRACT

GENERAL SEQUENCE OF CONSTRUCTION NOTES

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

S A

A

D D

E D

E

S D

R A

W

IN

G S

/1

/2

M

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

E-001

L E

G E

N D

A

B B

R E

V

IA

T

IO

N

G E

N E

R A

L N

O T

E S

NALMSA MSA

3192563

ELECTRICAL ABBREVIATIONS

MTD MOUNTED

MTR METER

MV MEDIUM VOLTAGE

N NEUTRAL

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NETA NATIONAL ELECTRICAL

TESTING ASSOCIATION

NF NON-FUSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

O.C. ON CENTER

P POLE OR PRIMARY

PC PHOTOELECTRIC CELL

PH PHASE

PNL PANEL

PVC POLYVINYL CHLORIDE

PWR POWER

QTY QUANTITY

RCPT OR

RECPT

RECEPTACLE

S SECONDARY OR SURFACE

WALL MOUNTED

SA SURGE ARRESTER

SC SHORT CIRCUIT

SCC SHORT CIRCUIT CURRENT

SHT SHEET

SO SPACE ONLY

STCB SHUNT TRIP CIRCUIT

BREAKER

SW SWITCH

SYM SYMMETRICAL

TB TERMINAL BOX

TS TAMPER SWITCH

TSP TWISTED, SHIELDED PAIR

TVSS TRANSIENT VOLTAGE SURGE

SUPPRESSOR

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER

SUPPLY

UTC UNDERGROUND

TELECOMMUNICATIONS

CONDUIT

V VOLTS

VFD VARIABLE FREQUENCY DRIVE

VFI VACUUM FAULT INTERRUPTER

W WIRE OR WATT

WP WEATHERPROOF

XFMR OR T TRANSFORMER

XMTR TRANSMITTER

Y WYE CONNECTED

YDCT WYE DELTA CLOSED

TRANSITION

ELECTRICAL ABBREVIATIONS

A AMPERES

AF AMPERE FRAME OR AMPERE

FUSE

AFG ABOVE FINISHED GRADE

AS AMPERE SWITCH

AT AMPERE TRIP OR AIR

TERMINAL

ATS AUTOMATIC TRANSFER

SWITCH

AWG AMERICAN WIRE GAUGE

C CONDUIT

CKT CIRCUIT

CKT BKR CIRCUIT BREAKER

COMM COMMUNICATIONS

CT CABLE TRAY

DB DECIBEL

DISC SW DISCONNECT SWITCH

DS DISCONNECT SWITCH OR

DISTRIBUTION SECTION

DVP DOMINION VIRGINIA POWER

EGC EQUIPMENT GROUNDING

CONDUCTOR

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FO FIBER OPTIC CABLE

FOTB FIBER OPTIC TERMINAL

BLOCK

FTL FEED THRU LUGS

FUS FUSE

G GROUND

GFI GROUND FAULT

INTERRUPTING

GP GENERAL PURPOSE

HP HORSE POWER

JB JUNCTION BOX

KV KILOVOLTS

KVA KILOVOLT AMPERES

KW KILOWATTS

LA LIGHTNING ARRESTER

LED LIGHT EMITTING DIODE

LPS LIGHTNING PROTECTION

SYSTEM

M MAIN OR METER

MB MAIN CIRCUIT BREAKER

MCCB MOLDED CASE CIRCUIT

BREAKER

MECH MECHANICAL

MH METAL HALIDE, MANHOLE, OR

MOUNTING HEIGHT TO

CENTER OF DEVICE

MLO MAIN LUGS ONLY

MS MAGNETIC STARTER

MSB MAIN SWITCHBOARD

M

VI

G

T

S

EXISTING EQUIPMENT

GROUND

ARRESTER

UTILITY

METER

SWITCH

FUSED SWITCH

VACCUM INTERRUPTER

DELTA CONFIGURATION

WYE CONFIGURATION

TRANSFORMER; ONE-LINES

AUTOMATIC TRANSFER SWITCH

GENERATOR

FUSE

RECEPTACLE

GENERAL ELECTRICAL

EQUIPMENT

KEY NOTE

MEDIUM VOLTAGE PAD-MOUNTED

TRANSFORMER

MEDIUM VOLTAGE PAD-MOUNT

SWITCHGEAR

CIRCUIT NUMBER; SINGLE PHASE

CIRCUIT NUMBER; THREE PHASE

MEDIUM VOLTAGE CABLE

TERMINATION

MEDIUM VOLTAGE SEPARABLE

ELBOW

CONNECTION

DISCONNECT

XX = AMPS

YY = POLES

ZZ = FUSE SIZE OR NF

SEPARABLE ELBOWS

LEGEND:

(E)

19,20,21

XX/YY/ZZ

1. THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE CODES, ORDINANCES, THE

VIRGINIA STATEWIDE BUILDING CODE AND THE UNIFIED FACILITIES CRITERIA (UFC). THE

CONTRACTOR SHALL DOCUMENT THAT THE OWNER IS FREE OF OBLIGATIONS IN THIS AREA AT THE

CONCLUSION OF WORK.

2. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL REQUIRED MATERIAL, LABOR, TOOLS,

EQUIPMENT AND SUPERVISION FOR A COMPLETE INSTALLATION.

3. BEFORE AND DURING THE INSTALLATION, THE CONTRACTOR SHALL OBSERVE THE OWNER'S

SAFETY REQUIREMENTS.

4. BASIC ELECTRICAL REQUIREMENTS - ALL WORK SHALL BE PERFORMED IN A PROFESSIONAL

MANNER, WITH A HIGH LEVEL OF QUALITY, BY, OR UNDER THE SUPERVISION OF AN ELECTRICIAN

LICENSED TO WORK IN THE COMMONWEALTH OF VIRGINIA. ALL WORK SHALL MEET ANY

APPLICABLE LOCAL OR NATIONAL CODES. ANY OUTAGES REQUIRED BY THIS WORK MUST BE

APPROVED BY THE OWNER.

5. ELECTRICIANS HANDLING, TESTING, TERMINATING, OR SPLICING MEDIUM VOLTAGE CABLES SHALL HAVE A MINIMUM OF 5 YEARS' EXPERIENCE SPLICING AND TERMINATING 35KV POWER CABLES.

REFER TO REQUIREMENTS IN SPECIFICATION SECTION 33 71 02 - UNDERGROUND ELECTRICAL

DISTRIBUTION.

GENERAL NOTES:

POTENTIAL TRANSFORMER

DRAW OUT BREAKER, AMP TRIP

LV CIRCUIT BREAKER, AMP TRIP

UNDERGROUND CABLE

XXA

XXA

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

S A

A

D D

M A

N H

O L E

M H

-1

/0

/2

M

ES003

ES004

MARINE FEDERAL CREDIT UNION

RISER POLES

S

E E

M A

T C

H L

IN

E

E

S

S E

E

M A

T C

H L

IN

E

E

S

MH-1

S

MH-2

MH-3

SS-1

MH-4

MH-5

MH-6

MH-7

MH-8

T

2017120

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES001

O V

E R

A L L E

L E

C T

R

IC

A L S

IT

E

P L A

N

O

F

NALMSA MSA

3192564

PLAN

NORTH

SCALE: 1" = 100'-0"

ELECTRICAL SITE PLAN - RISER POLES & MARINE FEDERAL CU

GENERAL NOTES:

1. REFER TO SHEETS MENTIONED IN CALLOUTS FOR

ENLARGED SITE PLANS

2. ALL ELECTRICAL WORK THIS SHEET IS DONE ALONG

RUSSELL ROAD.

KEY NOTES:

1. PROVIDE AND INSTALL NEW 10' X 8' X 7"H PRECAST

CONCRETE MANHOLE IN THIS LOCATION.

A

D D

M A

N H

O L E

M H

-1

/0

/2

M

ES005

ES006

MARSH CENTER

TO DAVIS CENTER

S

E E

M A

T C

H L

IN

E

E

S

S E

E

M A

T C

H L

IN

E

E

S

MH-8

MH-9

MH-10

MH-11

MH-12

MH-13

S

MH-15

MH-16

MH-17

MH-18

MH-19

MH-14

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES002

O V

E R

A L L E

L E

C T

R

IC

A L S

IT

E

P L A

N

O

F

NALMSA MSA

3192565

PLAN

NORTH

SCALE: 1" = 100'-0"

OVERALL ELECTRICAL SITE PLAN - DAVIS & MARSH CENTER

TO DOMINION

ENERGY

OVERHEAD POWERLINE

MCB QUANTICODOMINION ENERGY

E-501

E-501

(E) 35kV UNDERGROUND

ELECTRICAL FEEDER (TO

REMAIN)

RUSSELL ROAD

E-503

NEW MH-1

NEW 6" - 4-WAY DUCT

BANK

MH-2

NEW 6" - 2-WAY

DUCT BANK

NEW 6" - 4-WAY DUCT

BANK

(E) 35kV UNDERGROUND

ELECTRICAL FEEDER (TO

REMAIN)

E-504

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES003

E N

L A

R G

E D

E L E

C T

R

IC

A L S

IT

E

P L A

N

NALMSA MSA

3192566

PLAN

NORTH

SCALE: 1/16" = 1'-0"

ENLARGED ELECTRICAL SITE PLAN - DOMINION DELIVERY POINT

KEY NOTES:

1. REPLACE WOOD POLE, 600A GANG-OPERATED SWITCH,

ARRESTERS, AND POLE GROUNDING.

2. REPLACE SINGLE POLE SOLID BLADE DISCONNECTS WITH

NEW 34.5kV SMU-20 POWER FUSE DISCONNECTS. ADD

WILDLIFE CAPS ON ARRESTERS.

3. INSTALL TWO 1/2” EHS STEEL GUY LEADS TO A COMMON

ANCHOR ATTACH THE PRIMARY GUY AT THE TOP

CROSSARM USING A 72” FIBERGLASS GUY STRAIN

INSULATOR ROD ATTACH THE SECONDARY GUY AT THE

NEUTRAL ATTACHMENT MAINTAIN A MINIMUM GUY LEAD

SLOPE OF 30º USE A POWER DRIVEN HELIX ANCHOR WITH A

20,000 LB PULL-OUT RATING.

4. INSTALL NEW RISER POLE INCLUDING 38kV TERMINATIONS, 34.5kV SMU-20 POWER FUSE DISCONNECTS. INSTALL 45'

CLASS 3 SOUTHERN YELLOW PINE POLE,

PENTACHLOROPHENOL PRESERVED. SET POLE AT 6.5'

DEPTH.

5. PROVIDE AND INSTALL NEW 10' X 8' X 7'H PRECAST

CONCRETE MANHOLE INCLUDING GROUNDING, RACKS,

RING, AND COVER ASSEMBLY. INSTALL NEW 6" - 4-WAY

DUCT BANK TOWARD RISER POLES, TURN UP TO STEEL

ELBOWS AT THE BASE OF EACH POLE. USE ONE OF THE

NEW TURN-UPS TO ROUTE CIRCUIT "B" FROM THE NEW

RISER POLE TO MH-1. CAP THE OTHER FOR FUTURE USE.

6. INSTALL A NEW 6' - 4-WAY DUCT BANK FROM MH-1 TO MH-2

AND TIE INTO THE EXISTING MANHOLE. IT IS ASSUMED

THAT THE FOUR CONDUITS NOW LEAVING MANHOLE MH-2

DO NOT EXTEND ALL THE WAY TO THE RISER POLES. IF IT

IS FOUND THAT THEY DO EXTEND TO THE EXISTING RISER,

INTERCEPT THEM AS CLOSE AS POSSIBLE TO MH-1 AND TIE

INTO THE EXISTING CONDUITS. IF THIS IS THE CASE, THE

GOVERNMENT WILL REQUIRE A DEDUCT CREDIT.

A

D D

M A

N H

O L E

M H

-1

/0

/2

M

35kV UNDERGROUND

ELECTRICAL FEEDER

35kV UNDERGROUND

ELECTRICAL FEEDER

RUSSELL ROAD

MARINE FEDERAL CREDIT UNION

E-505

SS-1

T

S

(E) MH-4

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES004

E N

L A

R G

E D

E L E

C T

R

IC

A L S

IT

E

P L A

N

NALMSA MSA

3192567

PLAN

NORTH

SCALE: 1/16" = 1'-0"

ENLARGED ELECTRICAL SITE PLAN - MARINE FEDERAL CU

KEY NOTES:

1. REPLACE EXISTING MARINE FEDERAL CREDIT UNION

SECTIONALIZING SWITCH. DEMOLISH EXISTING CONCRETE

PAD, EXCAVATE SUB-BASE UNTIL LEVEL, AND ESTABLISH A

12" BASE OF CRUSHED STONE TO GRADE LEVEL TO

SUPPORT THE PRE-CAST PAD. MOVE NEW PAD LOCATION

SLIGHTLY TO THE EAST TO ADJUST EXISTING AND NEW

CONDUIT LOCATIONS TO THE LOCATIONS OF THE SWITCH

BUSHINGS.

2. MODIFY FENCE TO ALLOW ACCESS TO PRIMARY AND

SECONDARY TRANSFORMER COMPARTMENTS AT EXISTING

M.C.U. TRANSFORMER.

3. RECONFIGURE CABLES IN MANHOLE MH-4 PER MANHOLE

DIAGRAM DETAILS. RUN NEW TAPS FROM CIRCUITS "A" AND

"B" IN MH-4 AND CONNECT TO NEW LINE SIDE WAYS IN

SWITCH SS-2. RECONNECT EXISTING TAP TO MARINE

FEDERAL CREDIT UNION TO LOAD WAY OF NEW SWITCH.

CUT TAP TO LENGTH AS NEEDED AND INSTALL NEW LOAD

BREAK ELBOW CONNECTORS. IF THE CABLE DOES NOT

NEED TO BE SHORTENED, REMOVE EXISTING OUTER

ELBOW HOUSING, VERIFY CABLE CUT-BACKS, CLEAN

CABLE, AND INSTALL A NEW OUTER ELBOW HOUSING UNIT.

IF DAMAGE IS FOUND IN THE ELBOWS OR CABLE LENGTHS

WILL NOT WORK BACK, CONSULT DESIGNER OF RECORD

FOR GUIDANCE.

4. INSTALL ONE NEW 6" PVC CONDUIT FROM MH-4 TO NEW

SS-2 TO THE EAST OF THE EXISTING CONDUIT BANK.

COORDINATE LOCATION WITH THE ACTUAL SWITCH

BUSHING LOCATIONS SUCH THAT THE NEW CONDUIT

ALIGNS WITH THE EASTERNMOST LINE SIDE BUSHING

POSITION.

GENERAL NOTES:

1. SEE "EQUIPMENT FOUNDATION DETAILS" SHEET E-502.

2. SEE "EQUIPMENT GROUNDING DETAILS" SHEET E-503.

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

RUSSELL ROAD

NEW

SS-2

35kV UNDERGROUND

ELECTRICAL FEEDER

EXISTING DUCT TO SS-2

(E) MH-14

S

MH-11

EXISTING COMMS

MANHOLE

MH-12

S

1 4 5

EXIST SS-2

(DEMOLISH) 6

34.5kV UNDERGROUND

FEEDER TO MARSH

CENTER

EXISTING

COMMINICATIONS LINE

EXISTING 34.5kV FEEDER

TO DAVIS CENTER

TRANSFORMER VIA MH-13

E-504

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES005

E N

L A

R G

E D

E L E

C T

R

IC

A L S

IT

E

P L A

N

NALMSA MSA

3192568

PLAN

NORTH

SCALE: 1/16" = 1'-0"

ENLARGED ELECTRICAL SITE PLAN - DAVIS CENTER

KEY NOTES:

1. INSTALL NEW 34.5kV LOOP SWITCH "SS-2" ON NEW PAD.

DEMOLISH EXISTING "SS-2" AFTER NEW SS-2 IS IN SERVICE.

2. CORE DRILL 6 - 7" HOLES IN MANHOLE M-12 AND 2 - 7"

HOLES IN MANHOLE MH-14 TO ACCOMMODATE NEW

CONDUITS. GROUT AROUND INSTALLED CONDUITS AFTER

INSTALLATION TO SEAL WATER-TIGHT.

3. INSTALL NEW 6-WAY, 6" CONCRETE ENCASED DUCT BANK

FROM MH-12 TO NEW SWITCH LOCATION AND EXISTING

MH-14. SPLIT OFF FOUR CONDUITS TO THE NEW SWITCH

LOCATION AND TWO TO EXISTING MH-14. TRENCH UNDER

EXISTING COMMUNICATIONS DUCTBANK IF POSSIBLE.

CONTACT GOVERNMENT IF THIS PATH IS NOT POSSIBLE.

4. INSTALL NEW FEEDER "B" TO NEW SS-2 AND COMMISSION

SWITCH. ARRANGE OUTAGE AT DAVIS CENTER AND CUT

OVER BUILDING SERVICE TO NEW SS-2.

5. EXTEND EXISTING FEEDER "A" TO SS-2 AND CONNECT.

ARRANGE NECESSARY OUTAGES ON MFCU, DAVIS CENTER,

AND MARSH CENTER.

6. DEMOLISH REMAINING EXISTING SS-2 FEEDERS AND

CONDUITS. EXISTING DUCTS NOT INTERFERING WITH

WORK MAY BE ABANDONED IN PLACE.

GENERAL NOTES:

1. SEE "EQUIPMENT FOUNDATION DETAILS" SHEET E-502.

2. SEE "EQUIPMENT GROUNDING DETAILS" SHEET E-503.

E-401

35kV UNDERGROUND

ELECTRICAL FEEDER

ELECTRICAL BUILDING

E-401

(E) 35kV UNDERGROUND

ELECTRICAL FEEDER

(E) UNDERGROUND

COMMUNICATIONS

UNDERGROUND

COMMUNICATIONS

(ELECTRICAL)

MANHOLE MH-19

(ELECTRICAL) MANHOLE 1 (ORIGINAL DESIGNATION)

MARSH CENTER

E-504

RUSSELL ROAD

E-504

SS-3

(COMMS) MANHOLE 1

(COMMS)

MANHOLE 2

C

P

S

T

C

P

TYP

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ES006

E N

L A

R G

E D

E L E

C T

R

IC

A L S

IT

E

P L A

N

NALMSA MSA

3192569

PLAN

NORTH

SCALE: 1/16" = 1'-0"

ENLARGED ELECTRICAL SITE PLAN - MARSH CENTER

KEY NOTES:

1. INSTALL NEW SECTIONALIZING SWITCH AND CONCRETE

PAD. EXTEND NEW 34.5kV CONDUCTORS FROM MANHOLE

MH-19.

2. INSTALL NEW PAD-MOUNTED TRANSFORMER AND

CONCRETE PAD. FEED NEW PAD MOUNT TRANSFORMER

FROM VACUUM INTERUPTER WAY. EXISTING

UNDERGROUND ELECTRICAL FEEDERS SERVE

SWBD IN ROOM 127.

3. EXISTING UNDERGROUND COMMUNICATIONS LINE FEEDS

COMM ROOM 126.

4. EXTEND NEW 6 STRAND SINGLE-MODE 50/125 MICRON TYPE

OS2 LOOSE TUBE GEL-FILLED FIBER OPTIC CABLE FROM

RM 126 THROUGH COMMUNICATIONS MANHOLE 1 AND

MANHOLE 2 TO NEW PAD MOUNTED SWITCH.

5. EXISTING COMMUNICATIONS SERVICE TO BUILDING.

6. IF DUCT ROUTING INTERFERES WITH EXISTING

ORNAMENTAL TREES, REMOVE AFFECTED TREE(S) OR

RELOCATE USING A TREE SPADE PER GOVERNMENT

DIRECTION.

GENERAL NOTES:

1. SEE "EQUIPMENT FOUNDATION DETAILS" SHEET E-502.

2. SEE "EQUIPMENT GROUNDING DETAILS" SHEET E-503.

3. SEE "DUCT BANK AND MANHOLE DETAILS" SHEET E-504.

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

34.5kV

UTILITY

34.5kV- 208V

MARINE CREDIT UNION

MCB QUANTICO

DOMINION ENERGY

M

34.5kV- 480V

DAVIS CENTER

34.5kV- 480V

MARSH CENTER

600A GANG OP DISCONNECT

RISER POLE DISCONNECTS

27KV ARRESTER (TYP)

UNIT SUBSTATION

PRIMARY METER

PADMOUNT OIL SWITCH SS-1 PADMOUNT SF6 SWITCH SS-2

(E) GENERATOR

TO BUILDING

SWBD

G

MH-19

EXISTING CONNECTION

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

ED601

.5 k V

D E

M O

L

IT

IO

N

S

IN

G L E

L

IN

E D

IA

G

R A

M

NALMSA MSA

3192570

SCALE: NONE

34.5kV DEMOLITION SINGLE LINE DIAGRAM

KEY NOTES:

1. REMOVE OIL FILLED LOOP SWITCH. PRESERVE CABLES

FOR REUSE.

2. REMOVED SF6 FILLED LOOP SWITCH. PRESERVE

CABLES FOR REUSE.

3. REMOVE 35kV UNIT SUBSTATION. PRESERVE SERVICE

ENTRANCE CONDUCTORS FOR REUSE.

4. REMOVE 480V ATS. PRESERVE GENERATOR FEEDERS

FOR REUSE.

5. DEMOLISH GANG-OPERATED SWITCH, ARRESTERS,

WOODEN POLE, AND GROUNDING, COORDINATE WITH

REPLACEMENT OF SAME.

6. REMOVE CUTOUT TYPE DISCONNECTS AND REPLACE

PER SHEET E-501.

7. THESE CABLES ARE ROUTED INSIDE TRANSFORMER

ENCLOSURE.

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

ATS

35kV SWITCHGEAR

1500kVA

TRANSFORMER

(DRY CAST COIL)

FEEDER SECTION

RECEPTACLE

(E) GENERATOR

UNDERGROUND

CONDUCTORS

TO GENERATOR

(E) SERVICE

ENTRANCE TO

BUILDING

TO MH

(E) NEXUS 1272

POWER METER

(E) 35kV CABLE

35kV FEEDER TO

MANHOLE #2

JUNCTION BOX

3000A BUSDUCT

TO MANHOLE

TO GENERATOR3

(E) GENERATOR

UNDERGROUND

CONDUCTORS

PROVIDE DUPLEX

RECEPTACLE

(E) NEXUS 1272

POWER METER

E-505

BYPASS ISOLATION

ATS

E-504

E-504

OVERHEAD

CONDUITS

480V SERVICE

LATERAL

CONCRETE PAD

CONTROL JUNCTION BOX

1500kVA PAD-MOUNTED

TRANSFORMER

35kV UNDERGROUND

FEEDER TO MV SWITCH

FIBER OPTIC CONNECTION

FROM COMMS MH #2

35kV UNDERGROUND

FEEDER TO MH-19

MV SECTIONALIZING

SWITCH - 3-WAY

SLO

PE

SLOPE 1

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

E-401

E N

L A

R G

E D

E L E

C T

R

IC

A L B

U

IL

D

IN

G P

L A

N

NALMSA MSA

3192571

PLAN

NORTH

SCALE: NONE

ENLARGED ELECTRICAL BUILDING - DEMOLITION

PLAN

NORTH

SCALE: NONE

ENLARGED ELECTRICAL BUILDING - NEW WORK

KEY NOTES:

1. PROVIDE BYPASS ISOLATION ATS.

2. PROVIDE MV PAD-MOUNTED TRANSFORMER AND

CONCRETE PAD.

3. EXCAVATE AREA AROUND DOOR UNTIL LEVEL.

INSTALL A CAST-IN-PLACE RETAINING WALL AND

STOOP. SLOPE STOOP TO DRAIN AWAY FROM DOOR.

SEE DETAIL 2 ON SHEET E-505 FOR MORE

INFORMATION.

4. INSTALL NEMA 3R JUNCTION BOX SIZED PER NEC 314

CORE DRILL 8 - 5" HOLES THROUGH MASONRY WALL.

SEAL SPACE AROUND CONDUITS WITH GROUT AFTER

INSTALLATION. INSTALL BOX AT ELEVATION THAT WILL

ALIGN WITH THE OVERHEAD CONDUIT RUN THROUGH THE

WALL TO THE ATS. FASTEN THE JUNCTION BOX TO THE

MASONRY WALL USING "TAPCON" TYPE MASONRY SCREWS

OR EQUAL.

5. TRANSITION FROM RIGID PVC CONDUIT TO RGS

CONDUIT BELOW GRADE AT STEEL ELBOWS PRIOR

TO RISING ON BUILDING WALL.

6. PROVIDE 3PH, 4W SECONDARY JUNCTION

ENCLOSURE WITH BUSBAR PROVISIONS TO

TRANSITION FROM 3000A BUS DUCT TO 8 - 500kcmil

PER PHASE. PROVIDE LOCKING HINGED DOOR

PANEL ON FRONT SIDE TO BE SECURED WITH A 3

POINT LATCH AND PADLOCK. CABINET TO BE NEMA 12

CONSTRUCTION. CABINET NEEDS TO ACCOMODATE 3

- 2000A CURRENT TRANSFORMERS.

7. REINSTALL SAVED EQUIPMENT AND REBUILD

MASONRY WALL TO ORIGINAL SPECIFICATIONS AND

FINISHES.

8. PROVIDE MV SECTIONALIZING SWITCH AND CONCRETE

PAD. LOCATE SUCH THAT SWITCH AND XFMR DOORS DO

NOT CLASH.

GENERAL NOTES:

1. NEW PAD MOUNTED TRANSFORMER TO BE USED TO

TEMPORARY RE-FEED THE SERVICE ENTRANCE TO THE

BUILDING DURING ELECTRICAL BUILDING DEMOLITION.

USE DLO CABLE ROUTED SEPARATELY FROM

PERMANENT SERVICE CONDUCTORS AND CUT OVER

DURING A LIMITED PERIOD OUTAGE.

2. WHEN PERMANENT FACILITIES ARE READY TO

COMMISSION, REMOVE DLO CABLE, CONNECT

PERMANENT SERVICE, AND TEST PER SPECIFICATIONS.

3. EXISTING UNIT SUBSTATION WILL BE KEPT ENERGIZED

VIA A TEMPORARY CONNECTION AT THE NEW MARSH

CENTER MV SWITCH AT MANHOLE #2.

4. SELECTIVE BUILDING DEMOLITION MAY BE OMITTED AT

THE OPTION OF THE CONTRACTOR IF SUITABLE DEMO

PROCEDURE ARE ESTABLISHED TO ELIMINATE THIS

REQUIREMENT. SUBMIT DEMO PROCEDURE FOR

APPROVAL IF BUILDING DEMO IS TO BE OMITTED.

DEMOLITION KEY NOTES:

1. REMOVE EXISTING ELECTRICAL EQUIPMENT.

2. REMOVE ROLL UP DOOR AND SAVE FOR

REINSTALLATION.

3. REMOVE MASONRY WALL SECTION AND 2 DOOR

LINTELS - SAVE LINTELS FOR REUSE.

4. REMOVE PERSONNEL DOOR AND METAL FRAME -SAVE

FOR REINSTALLATION.

5. FEEDER TO BE PULLED OUT, CONDUIT TO BE

ABANDONDED IN PLACE. DEMOLISH ELBOWS

EVEN WITH SLAB AND CAP.

6. PROVIDE TEMPORARY SHORING FOR BUILDING

OPENING WHILE EQUIPMENT IS BEING REMOVED.

SUBMIT PLAN SEALED BY A REGISTERED

STRUCTURAL ENGINEER PRIOR TO DEMOLITION.

7. PROTECT GENERATOR AND SERVICE ENTRANCE

CONDUCTORS FOR REUSE.

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

8'

6'-6" 6'-6"

EXTENSION LINK

35kV POLYMER DEAD-END STRAIN INSULATOR (TYP OF 6)

5' MIN

EXOTHERMIC WELD

TWO-HOLE COMPRESSION LUG

36-1/2"

113"

76-12"

29"25"54"

18-7/8"

37"

60"

30"

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

E-501

P O

L E

D E

T A

IL

S

NALMSA MSA

3192572

SCALE: NONE

POLE DETAILS

SCALE: NONE

RISER POLE DETAIL

KEY NOTES:

1. 600A GANG-OPERATED VERTICAL BREAK DISCONNECT SWITCH. EQUIPPED

WITH (6) 27kV LIGHTNING ARRESTERS AND (6) DEAD-END EXTENTION LINKS

FOR CONDUCTOR TERMINATION. BASIS OF DESIGN: S&C ALDUTI-RUPTER CAT#

I35634R2-E OR APPROVED EQUAL.

2. 27kV LIGHTNING ARRESTER WITH ISOLATOR AND WILDLIFE CAP (TYP).

3. #6 ARRESTER GROUNDING LEAD (DO NOT ATTACH TO ARM)

4. DEAD-END SHOE. MATCH CONDUCTOR.

5. ONE WIRE SPOOL-PORCELAIN WITH HAND TIE.

6. 45 FOOT CLASS 3 SOUTHERN YELLOW PINE POLE WITH

PENTACHLOROPHENOL PRESERVATIVE.

7. REPLACE DISCONNECT SWITCH WITH FUSED CUTOUT TO ACCEPT E-SPEED

SLOW POWER FUSE CARTRIDGES. S&C SMU-20 OR APPROVED EQUAL (TYP OF

3). COORDINATE FUSE SIZE WITH ENGINEER.

8. INSTALL WILDLIFE CAP (TYP OF 3).

9. #6 BARE COPPER POLE GROUND LEAD.

10. 1010'x3/4" COPPER CLAD STEEL GROUND ROD DRIVEN 12" BELOW GRADE.

11. FACTORY GROUND LUG CONNECTION.

GENERAL NOTES:

1. FOR CLARITY, NOT ALL DETAIL OF SWITCH ARE SHOWN.

6X6 - W2XW2 WELDED WIRE FABRIC

4R2

4R3

4R4

OPEN/PIT AREA

SHADED AREA

4R1

4R4

ISOMETRIC VIEW

6" GRAVEL

PIT AREA (SHADED)

4R4 QTY (2)

46" LENGTH

4R1 QTY (2)

4R4 SPACED

10" APART

4R4 QTY (1)

116" LENGTH

4R2 QTY (2)

4R3 QTY (3)

NOTE: PLACE ALL STEEL REINFORCEMENT IN CENTER

OF CONCRETE SLAB AND PIT SIDE WALLS. MAINTAIN 2"

CLEAR COVER FROM EDGE OF CONCRETE TO ALL STEEL

REINFORCEMENT.

COMPLETE CONSTRUCTION

LEGEND:

SHAPE

DETAIL SYMBOL

4R1

4R2

4R3

4R4

#4

REINFORCEMENT

BARS

WWF 6X6 - W2XW2

WELDED WIRE FABRIC

SHADING INDICATES

OPEN/PIT AREA

6"

6" OF GRAVEL

26"

5-3/4" MINIMUM

18"

94"

18"

10' GROUND

ROD

6" MIN

30"

36"

SIDE VIEW

TOP VIEW

19"

56"

19"

6" 6" 22.5"

FRONT

94"

18"

6"

6"

94"

BACK

PRIMARY

CONDUIT

ADD 6" OF GRAVEL

TO COVER THE

BOTTOM OF THE

PIT

GROUND ROD

(OPTIONAL LOCATION

ON THE PRIMARY

CONDUIT POSITIONS)

GROUND ROD

(PREFERRED

LOCATION)

PERIMETER OF BOTTOM

SECONDARY CONDUITS. THIS

AREA IS LIMITED TO 22.5 BY 18

DIMENSIONS.

NOTE: TEMPORARILY CAP THE

CONDUIT WHEN THE 6" OF

GRAVEL FILL IS INSTALLED.

TYPICAL SWGR PAD TOP VIEW

FINAL GRADE

1' 1'

6" OF GRAVEL

10' GROUND ROD

2" CLR.

2" CLR.

2" CLR.

#4 (TYP)

#4'S

'S

M A

X

2" CLR.

10' GROUND ROD

26"30"

WAY 1 WAY 2

LOAD

6"

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

E-502

E Q

U

IP

M E

N T

F O

U N

D A

T

IO

N D

E T

A

IL

S

NALMSA MSA

3192573

SCALE: NONE

PAD MOUNTED SWITCH OR XFMR "PIT BOX" FOUNDATION

SCALE: NONE

PAD MOUNT TRANSFORMER FOUNDATION DETAIL

SCALE: NONE

SWITCHGEAR PAD DETAIL

KEY NOTES:

1. DIMENSIONS ARE TO BE DETERMINED

BASED UPON SHOP DRAWINGS OF

ACTUAL EQUIPMENT PROVIDED.

2. DIMENSIONS SHOWN ARE TYPICAL

FOR A 1500kVA TRANSFORMER.

CONTRACTOR TO VERIFY ACTUAL

DIMENSIONS USING SHOP DRAWINGS OF

ACTUAL EQUIPMENT PROVIDED. SUBMIT SHOP

DRAWING OF PAD DESIGN FOR GOVERNMENT

APPROVAL FOLLOWING APPROVAL OF ACTUAL

TRANSFORMER SUBMITTAL.

GENERAL NOTES:

1. CONCRETE MIX PLACED IN PAD SHALL MEET

THE FOLLOWING DESIGN REQUIREMENTS:

A.MINIMUM 28-DAY COMPRESSIVE STRENGTH

OF 3000 PSI.

B.MAXIMUM WATER/CEMENT RATIO OF 0.50.

C.MAXIMUM SLUMP OF 4".

D.AIR - ENTRAINMENT CONTENT BETWEEN 4

AND 8 PERCENT.

2. CONCRETE SHALL BE AFFORDED ADEQUATE

CURE FOR A MINIMUM OF 5 DAYS IF THE

AMBIENT TEMPERATURE IS GREATER THAN 70

DEGREES FOR 7 DAYS IF THE AMBIENT

TEMPERATURE IS LESS THAN 70 DEGREES F.

ADEQUATE CURE CAN BE PERFORMED BY ANY

OF THE FOLLOWING METHODS: WATERPROOF

MEMBRANES, SPRINKLING OR SOAKING, OR

CURING COMPOUNDS.

3. PAD SHALL BE SUPPORTED ON A SUB-BASE

OF SAND, GRAVEL, OR CRUSHED STONE. THE

GRANULAR SUB-BASE IS TO BE A MINIMUM OF

4" THICK AND SHALL BE COMPACTED WITH

VIBRATORY COMPACTORS.

4. ALL STEEL REINFORCEMENT SHALL BE ASTM

A615, Gr. 60.

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

A B

Tx

H1A

H2A

H3A

H1B

H2B

H3B

XO

X1

XO

X2

X3

A B

C

D E

CLOSED

OPEN

OPEN

CLOSED

CLOSED

OPEN

#6 BARE COPPER

TO POLE GROUND

TERMINATION

SPLIT BOLT

WILDLIFE COVER

CONNECTOR

COPPER GROUND BRAID

WOOD BRACES

WOOD CROSSARMS

EXTRA STRENGTH

DOUBLE 8 FOOT

(TYPICAL)

SINGLE STANDARD

8' WOOD CROSSARM

12"

T O

4" 9" 9" 4"

ELBOW

6 AWG MIN CABLE

SHIELD GROUND

INSTALL TIE WRAP

AROUND CABLE AND

CABLE GROUND AT

THE TOP OF PAD

FRONT OF PAD

GROUNDING RING

2AWG FOR XFMR

CABLE

10 AWG MIN

STATIC GROUND

CABLE SHIELD GROUND

2 AWG MIN CABLE GROUND FOR 500 KCMIL CKTS

6 AWG MIN CABLE GROUND FOR 1/0 AWG CKTS.

TAP CHANGER

"A" TRIPLE

BLADE SWITCH

"TX" TRIPLE

BLADE SWITCH

"B" TRIPLE

BLADE SWITCH

XO GROUNDING TWO BOLT COMPRESSION

LUG ON SECONDARY NEUTRAL SPADE XO

HO GROUNDING FOR ALL VOLTAGES

SOLDERLESS LUGS ON PRIMARY NEUTRAL

SPADE HO.

#2 SPLIT BOLT

#2 BARE

STRANDED

COPPER

HO

NOTES:

1. BOND GROUNDED CIRCUIT CONDUCTORS

ROUTED WITH MV CABLES TO GROUND

LOOP.

2. IF PRESENT, BOND 4/0 DUCT BANK

GROUNDS TO GROUND LOOP.

2AWG GROUNDED

CIRCUIT CONDUCTOR

6" PVC

RISER CDT

TO MH-1

DEAD-END RISER (TYP)

#6 BARE CU TIE LEADS

TANGENT RISER (TYP)

27kV LIGHTNING

ARRESTER

SMU-20 FUSED CUTOUT

FUSE: CONTACT DESIGNER

OF RECORD

10 AWG MIN

STATIC GROUND

INSTALL TIE WRAP

AROUND CABLE

AND CABLE

GROUND AT THE

TOP OF PAD

CABLE

FRONT

OF PAD

CABLE SHIELD GROUND

2 AWG MIN CABLE GROUND FOR 500 KCMIL CKTS

6 AWG MIN CABLE GROUND FOR 1/0 AWG CKTS

NOTES:

1. BOND GROUNDED CIRCUIT

CONDUCTORS ROUTED WITH MV

CABLES TO GROUND LOOP.

2. IF PRESENT, BOND 4/0 DUCT BANK

GROUND TO GROUND LOOP.

GROUNDING RING

4/0 AWG FOR SWGR

GROUNDING RING

4/0 AWG FOR SWGR

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

DRAWFORM REVISION: 10 MAY 2014

27OF

SEAL

CHK

SATISFACTORY TO DATE

FOR COMMANDER NAVFAC / B.L.T.L.

ACTIVITY

APPROVED

AS NOTED

R E

P A

IR

E

L E

C T

R

IC

A L S

Y S

T E

M S

A L

O

S S

E L L

R O

A D

N40080-D-0452

WILLIAM ROBSON

GREG SMITH

2850 EISENHOWER AVENUE

SUITE 200

ALEXANDRIA, VA 22314

/6

/2

:4 :3

P

M C

U s e rs

\n tu c h s c h e re r\ D o c u m e n ts \2

R

E

C

E N n tu c h s c h e re r.

rv t

E-503

R

IS

E R

P O

L E

A N

D G

R O

U N

D

IN

G D

E T

A

IL

S

NALMSA MSA

3192574

SCALE: NONE

XFMR FRONT VIEW GROUNDING DETAIL

SCALE: NONE

TYPICAL RISER POLE DETAIL

SCALE: NONE

TRANSFORMER SIDE VIEW DETAIL

SCALE: NONE

SWGR GROUNDING DETAIL

C

O N

F O

R M

E D

F O

R M

C B

Q P

W B

C O

M M

E N

T S

/1

/2

M

S A

A

D D

M A

N H

O L E

M H

-1

/0

/2

M

B B B B

B B

B

B

B B

19"

3" 1.5" 3"

3"

3"

12"5"

4/0 BARE

COPPER GROUND

(2 WAY 6" DUCT BANK SIMILAR)

18"

3" 1.5" 3"

3"

3"

10-1/2"3-1/2"

29"

3" 3"1.5"

13"

3"

3"

6"

4/0 BARE

COPPER GROUND

33"

3" 3.5" 3"

3"

18"

3"

3.5"

3-1/2"

19"

3" 1.5" 3"

3"

3"

12" 6"

4/0 BARE

COPPER GROUND

CONCRETE DUCT BANK WITH

GROUND WIRE SIDE VIEW

CONDUIT

SPACER

4/0 BARE

COPPER WIRE

2"

CONDUIT SPACER END VIEW

4'

"B"

POSITION

"A"

POSITION

UNDERGROUND LINE

MARKED TAPE

BACKFILL (SEE NOTE 8)

REBAR (SEE NOTE 4)

TOP OF DUCT BANK

3" 1.5"

29"

3"

3"

1.5" 29"

3"

30" MINIMUM

1'

4/0 BARE

COPPER GROUND

NOTE: CONDUIT

ARRANGEMENT VARIES.

GENERAL NOTES:

1. ALL QUANTITIES ARE ESTIMATES. CONTRACTOR

IS RESPONSIBLE FOR DETERMINING FINAL

QUANTITIES.

2. USE MATERIALS BY SPECIFIED MANUFACTURER

OR EQUIVALENT.

3. THE TOP OF THE DUCT BANK ENCASEMENT

SHALL BE A MINIMUM OF 30" BELOW GRADE.

4. SECURE THE CONDUIT IN POSITION BY DRIVING

A 36" LONG PIECE OF REBAR INTO THE TRENCH

WALLS. THIS WILL PREVENT THE CONDUIT FROM

RISING WHEN THE CONCRETE IS POURED.

5. POUR READY MIX CONCRETE WITH A STRENGTH

OF 2000 PSI AFTER 28 DAYS AND A MAXIMUM

AGGREGATE SIZE OF 3/8" AROUND THE DUCT

BANK. THE CONCRETE SHALL BE VIBRATED IN

ORDER TO FILL ALL OF THE SPACES AROUND

THE DUCTS. THERE MUST BE NO LESS THAN A 3"

ENVELOPE OF CONCRETE SURROUNDING THE

PERIMETER OF THE DUCT BANK.

6. FOLLOW NATIONAL ELECTRICAL CODE AND

NATIONAL ELECTRIC SAFETY CODE

REQUIREMENTS FOR MINIMUM BURIAL DEPTH

OF PRIMARY CABLE IN CONDUIT OR DUCT BANK.

NO PRIMARY CABLES SHALL BE BURIED AT LESS

THAN 30" BELOW GRADE WITHOUT SPECIFIC

GOVERNMENT APPROVAL.

7. THE TRENCH BOTTOM SHALL BE SMOOTH AND

FREE OF ROCKS AND DEBRIS. A 4" BED OF SAND

SHOULD BE ADDED IF THE BOTTOM IS ROCKY.

8. BACKFILL TRENCH WITH EARTH THAT IS FREE

OF VEGETATION, LARGE ROCKS, PIECES OF

PAVEMENT, AND OTHER FOREIGN MATTER.

9. INSTALL DUCT SPACERS EVERY 4' ALONG DUCT

ROUTE.

10. CONTRACTOR IS RESPONSIBLE FOR PLUGGING

EXTRA CONDUITS IN VAULTS.

DUCT BANK GROUNDING NOTES:

1. THE 4/0 BARE COPPER WIRE SHOULD BE

INSTALLED IN THE CONCRETE OF THE DUCT

BANK INSTALLATION FOR THE PURPOSE OF

LOWERING THE GROUND RESISTANCE IN THE

TRANSFORMER VAULTS AND MANHOLES.

THIS EMBEDDED CONCRETE METHOD WILL

OBTAIN LOWER GROUND RESISTANCES THAN

WIRE DIRECTLY BURIED IN THE SOIL OR A

LARGE NUMBER OF GROUND RODS. THE 4/0

BARE COPPER WIRE IS USED FOR THE PURPOSE

OF GROUNDING - NOT A SUBSTITUTE FOR THE

SYSTEM NEUTRAL.

2. CONSTRUCTION GUIDELINES:

A. INSTALL THE CONDUIT SPACERS AND THE

BOTTOM ROW OF PVCCONDUITS IN THE

TRENCH.

B. INSTALL THE 4/0 BARE COPPER WIRE

ALTERNATING THE WIRE FROM POSITION "A"

TO POSITION "B" IN THE CONDUIT SPACERS.

THE 4/0 BARE COPPER WIRE SHOULD BE

SAGGED WITH A 2" CLEARANCE FROM THE

BOTTOM OF THE CONCRETE DUCT BANK.

C. INSTALL THE REMAINING CONDUITS, CONDUIT

SPACERS AND CONCRETE IN THE

RECOMMENDED MANNER.

D. CONNECT THE 4/0 BARE COPPER WIRE TO

THE SYSTEM NEUTRAL IN EQUIPMENT AND TO

THE GROUND BUS IN THE MANHOLES. ALSO, A

DRILLED 1/2" HOLE IS REQUIRED IN THE

MANHOLE WALL FOR THE 4/0 BARE COPPER

WIRE. THE 1/2" HOLE AND WIRE SHOULD BE

WATERPROOFED WITH SEALING TAPE. THE 4/0

COPPER WIRE CAN BE SPLICED IN THE

VAULTS AND MANHOLES.

19"

3"1.5"3"

6"

30"

3"

3"

FINISH GRADE MANHOLE COVER

AND FRAME

TYPICAL DUCT BANK

ENTRANCE INTO

MANHOLE

MASONRY RISER

PULLING-IN

IRON (TYP)

DUCT BANK

GROUND

CONDUCTOR

6 BARE CU

BONDED TO

REINFORCING

STEEL (TYP)

12" SQUARE X

12" DEEP SUMP

GROUND ROD

4/0 BCSD

GRAVEL

4/0 BCSD

4/0 BCSD

GROUND LOOP

AROUND INSIDE

PERIMETER OF

MANHOLE

BOND (TYP)

FIBER GLASS CABLE

RACK. SEE CABLE

RACK DETAIL FOR

SIZE (TYP)

2017201

CHIEF ENG/ARCH

IPT TECH. BRANCH HEAD

PROJECT MANAGER

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G C

O M

M A

N D

W

A S

H

IN

G T

O N

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

M A

R

IN

E C

O R

P S

B A

S E

Q U

A N

T

IC

O Q

U A

N T

IC

O

V

A

R E

V D

A T

E

F

IL

E N

A M

E

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

PWB NO.

SHEET

NAVFAC DRAWING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .