This federal solicitation seeks bids to repair the electrical system along Russell Road at Marine Corps Base Quantico in Virginia. The scope of work includes replacing the indoor building main electrical transformer with an outdoor unit, replacing the main Automatic Transfer Switch and sectionalizing switches, adding new cables and switches along Russell Road, performing repairs at overhead poles, and commissioning existing power quality and metering equipment. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2017201
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
W
A S
H I N
G T
O N
M A
R I N
E
C
O R
P S
B
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I L E
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
O
F
T
H
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
GREG SMITH
WILLIAM ROBSON
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
R
EP
AI
R
E
LE
C
TR
IC
AL
S
YS
TE
M
S
AL
O
G
N40080-D-0452
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
P
M
X
J V
V
F A
C
M
C B
Q
B
A
C
E l e c t C
A D
C i v i l E h e e t s S
H E
E T
S
A
C d w g
4/1 5/2
A D
D E
D
E
R A
W I N
G S
D
T S
C-101
R U
SS
EL
L R
O
AD
E R
O S
I O
N
A
D
I M
E N
T
C O
N T
R O
L
P
L A
N
O
V E
R A
L L
CATDTS DTS
23 27
SOILS IN WORK AREA LEGEND:
Ae - ALLUVIAL LAND, WET
ALLUVIAL LAND, WET IS NEARLY LEVEL LAND TO GENTLY SLOPING AND OCCURS THROUGHOUT STAFFORD AND KING GEORGE COUNTIES. SOIL PERMEABILITY
IN THE SUBSTRATUM IS MODERATE IS MODERATE TO RAPID. THIS SOIL IS SUBJECT TO FREQUENT FLOODING FROM ADJACENT DRAINAGE WAYS , STREAMS, AND TO FREQUENT RUNOFF FROM SURROUNDING SOIL AREAS. THIS SOIL IS STRONGLY ACID, LOW IN NATURAL FERTILITY AND ORGANIC CONTENT.
IU - IUKA FINE SANDY LOAM, LOCAL ALLUVIUM, 0 TO 4 PERCENT SLOPES
THE IUKA COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 0 TO 4 PERCENT. THIS COMPONENT IS ON FLOOD PLAINS ON COASTAL PLAINS.
THE PARENT MATERIAL CONSISTS OF ALLUVIUM. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE NATURAL DRAINAGE CLASS IS
MODERATELY WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR
RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS LOW. THIS SOIL IS RARELY FLOODED. IT IS NOT PONDED. A SEASONAL ZONE OF WATER
SATURATION IS AT 24 INCHES DURING JANUARY, FEBRUARY, MARCH, APRIL, DECEMBER. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 1
PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION IS 2W. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
SUC - SUSQUEHANNA SOILS, 2 TO 10 PERCENT SLOPES
THE SUSQUEHANNA COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 2 TO 10 PERCENT. THIS COMPONENT IS ON MARINE TERRACES ON
COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF LOAMY MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE
NATURAL DRAINAGE CLASS IS SOMEWHAT POORLY DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS LOW. AVAILABLE WATER TO A DEPTH
OF 60 INCHES (OR RESTRICTED DEPTH) IS HIGH. SHRINK-SWELL POTENTIAL IS HIGH. THIS SOIL IS NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF
WATER SATURATION WITHIN A DEPTH OF 72 INCHES. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 1 PERCENT. NONIRRIGATED LAND
CAPABILITY CLASSIFICATION IS 6E. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
SFC2 - SASSAFRAS FINE SANDY LOAM, 6 TO 10 PERCENT SLOPES, ERODED
THE SASSAFRAS COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 6 TO 10 PERCENT. THIS COMPONENT IS ON MARINE TERRACES ON
COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF LOAMY MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE
NATURAL DRAINAGE CLASS IS WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH. AVAILABLE WATER TO A DEPTH OF
60 INCHES (OR RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS LOW. THIS SOIL IS NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF
WATER SATURATION WITHIN A DEPTH OF 72 INCHES. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 2 PERCENT. NONIRRIGATED LAND
CAPABILITY CLASSIFICATION IS 3E. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
WH - WEHADKEE VERY FINE SANDY LOAM, 0 TO 2 PERCENT SLOPES
THE WEHADKEE COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 0 TO 2 PERCENT. THIS COMPONENT IS ON FLOOD PLAINS ON PIEDMONTS.
THE PARENT MATERIAL CONSISTS OF ALLUVIUM. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE NATURAL DRAINAGE CLASS IS
POORLY DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR
RESTRICTED DEPTH) IS HIGH. SHRINK-SWELL POTENTIAL IS LOW. THIS SOIL IS FREQUENTLY FLOODED. IT IS NOT PONDED. A SEASONAL ZONE OF WATER
SATURATION IS AT 6 INCHES DURING JANUARY, FEBRUARY, MARCH, APRIL, MAY, NOVEMBER, DECEMBER. ORGANIC MATTER CONTENT IN THE SURFACE
HORIZON IS ABOUT 4 PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION IS 6W. THIS SOIL MEETS HYDRIC CRITERIA.
34B - LUNT LOAM, 2 TO 7 PERCENT SLOPES
THE LUNT COMPONENT MAKES UP 80 PERCENT OF THE MAP UNIT. SLOPES ARE 2 TO 7 PERCENT. THIS COMPONENT IS ON HILLSLOPES ON COASTAL PLAINS.
THE PARENT MATERIAL CONSISTS OF MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE NATURAL DRAINAGE CLASS
IS WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR
RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS MODERATE. THIS SOIL IS NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF WATER
SATURATION WITHIN A DEPTH OF 72 INCHES. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 1 PERCENT. NONIRRIGATED LAND CAPABILITY
CLASSIFICATION IS 2E. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
3193310
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
GREG SMITH
WILLIAM ROBSON
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
R
EP
AI
R
E
LE
C
TR
IC
AL
S
YS
TE
M
S
AL
O
SUITE 200
ALEXANDRIA, VA 22314
P
M X
V
F A
C
M
C B
Q
B
A
C
E l e c t C
A D
C i v i l E e e t s S
H E
E T
S
A
C d w g
4/1 5/2
A D
D E
D
E
A
W I N
G S
D
T S
C-102
R U
SS
EL
L R
O
AD
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
P
L A
N
CATDTS DTS
24 27
3193311
AutoCAD SHX Text
DANIEL T. SUTTON
AutoCAD SHX Text Lic. No. 45799
AutoCAD SHX Text
WORK AREA #1
AutoCAD SHX Text
SCALE: 1" =20'
AutoCAD SHX Text
WORK AREA #2
AutoCAD SHX Text
SCALE: 1" =20'
AutoCAD SHX Text 3.05
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
SF
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text 3.07
AutoCAD SHX Text
STORM DRAIN INLET PROTECTION
AutoCAD SHX Text
IP
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL LEGEND
AutoCAD SHX Text 3.30
AutoCAD SHX Text 3.32
AutoCAD SHX Text
TOPSOILING
AutoCAD SHX Text
PERMANENT SEEDING
AutoCAD SHX Text
TO
AutoCAD SHX Text
PS
AutoCAD SHX Text
TO
AutoCAD SHX Text
PS
AutoCAD SHX Text 3.35
AutoCAD SHX Text
MULCHING
AutoCAD SHX Text
MU
AutoCAD SHX Text
MU
AutoCAD SHX Text
LIMITS OF DISTURBANCE 8,200 S.F.
AutoCAD SHX Text
IP
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
AutoCAD SHX Text
APPROXIMATE LIMITS OF WETLANDS PER NATIONAL WETLANDS INVENTORY
AutoCAD SHX Text
APPROXIMATE LIMITS OF CREEK PER NATIONAL WETLANDS INVENTORY
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text
APPROXIMATE LOCATION OF TREE LINE
AutoCAD SHX Text NOTE: ALL WORK SHALL BE WITHIN THE MAINTAINED SHOULDER. THE INTENT OF THE DESIGN IS TO PLACE STRUCTURES AND DUCTBANK WITHOUT REMOVING TREES. IF DEEMED NECESSARY, THE CONTRACTOR WILL COORDINATE WITH THE OWNER PRIOR TO REMOVING ANY TREES.
AutoCAD SHX Text Ae
AutoCAD SHX Text Wh
AutoCAD SHX Text 34B
AutoCAD SHX Text 34B
AutoCAD SHX Text lu
AutoCAD SHX Text 34B
AutoCAD SHX Text SuC
AutoCAD SHX Text 34B
AutoCAD SHX Text
LIMITS OF DISTURBANCE 620 S.F.
AutoCAD SHX Text
SF
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text
PS
AutoCAD SHX Text NOTE: ALL WORK SHALL BE WITHIN THE MAINTAINED SHOULDER. THE INTENT OF THE DESIGN IS TO PLACE STRUCTURES AND DUCTBANK WITHOUT REMOVING TREES. IF DEEMED NECESSARY, THE CONTRACTOR WILL COORDINATE WITH THE OWNER PRIOR TO REMOVING ANY TREES.
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
EXISTING UG POWER
AutoCAD SHX Text
NEW UG POWER
AutoCAD SHX Text
EXISTING STRUCTURE
AutoCAD SHX Text BASE MAPPING WAS PREPARED USING VGIN AERIAL MAPPING. CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. ANY DIFFERENCES SHALL BE COORDINATED WITH THE GOVERNMENT AND ENGINEER.
AutoCAD SHX Text
PROPOSED STRUCTURE
AutoCAD SHX Text
EXISTING POLES
AutoCAD SHX Text
EXISTING UG POWER
AutoCAD SHX Text
EXISTING UG POWER
AutoCAD SHX Text
PROPOSED CONCRETE PAD
AutoCAD SHX Text
PROPOSED CONDUIT
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
GREG SMITH
WILLIAM ROBSON
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
R
EP
AI
R
E
LE
C
TR
IC
AL
S
YS
TE
M
S
AL
O
SUITE 200
ALEXANDRIA, VA 22314
P
M X
V
F A
C
M
C B
Q
B
A
C
E l e c t C
A D
C i v i l E e e t s S
H E
E T
S
A
C d w g
4/1 5/2
A D
D E
D
E
A
W I N
G S
D
T S
C-103
R U
SS
EL
L R
O
AD
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
P
L A
N
CATDTS DTS
25 27
3193312
AutoCAD SHX Text
DANIEL T. SUTTON
AutoCAD SHX Text Lic. No. 45799
AutoCAD SHX Text
WORK AREA #3
AutoCAD SHX Text
SCALE: 1" =20'
AutoCAD SHX Text
WORK AREA #4
AutoCAD SHX Text
SCALE: 1" =20'
AutoCAD SHX Text
LIMITS OF DISTURBANCE 2,300 S.F.
AutoCAD SHX Text
LIMITS OF DISTURBANCE 3,300 S.F.
AutoCAD SHX Text 3.05
AutoCAD SHX Text
SILT FENCE
AutoCAD SHX Text
SF
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text 3.07
AutoCAD SHX Text
STORM DRAIN INLET PROTECTION
AutoCAD SHX Text
IP
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL LEGEND
AutoCAD SHX Text 3.31
AutoCAD SHX Text 3.32
AutoCAD SHX Text
TEMPORARY SEEDING
AutoCAD SHX Text
PERMANENT SEEDING
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text 3.35
AutoCAD SHX Text
MULCHING
AutoCAD SHX Text
MU
AutoCAD SHX Text
MU
AutoCAD SHX Text
SF
AutoCAD SHX Text
SF
AutoCAD SHX Text NOTE: WORK AREA SOIL IS COMPLETELY WITHIN SfC2 AREA
AutoCAD SHX Text NOTE: WORK AREA SOIL IS COMPLETELY WITHIN Ae AREA
AutoCAD SHX Text
SF
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
TO
AutoCAD SHX Text IF DUCT ROUTING INTERFERES WITH EXISTING ORNAMENTAL TREES, REMOVE AFFECTED TREE(S) OR RELOCATE USING A TREE SPADE PER GOVERNMENT DIRECTION.
AutoCAD SHX Text
SF
AutoCAD SHX Text BASE MAPPING WAS PREPARED USING VGIN AERIAL MAPPING. CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. ANY DIFFERENCES SHALL BE COORDINATED WITH THE GOVERNMENT AND ENGINEER.
AutoCAD SHX Text
PROPOSED CONCRETE PAD
AutoCAD SHX Text
PROPOSED STRUCTURE
AutoCAD SHX Text
PROPOSED DUCTBANK
AutoCAD SHX Text
EXISTING UNDERGROUND ELECTRIC
AutoCAD SHX Text
DEMO EXISTING CONCRETE PAD
AutoCAD SHX Text
PROPOSED CONCRETE PAD
AutoCAD SHX Text
EXISTING UNDERGROUND ELECTRIC
AutoCAD SHX Text
PROPOSED DUCTBANK
AutoCAD SHX Text
EXISTING UNDERGROUND ELECTRIC
EXISTING STRUCTURE
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L
I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
GREG SMITH
WILLIAM ROBSON
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
R
EP
AI
R
E
LE
C
TR
IC
AL
S
YS
TE
M
S
AL
O
SUITE 200
ALEXANDRIA, VA 22314
P
M
X
V
F A
C
M
C B
Q
B
A
C
E l e c t C
A D
C i v i l E e e t s S
H E
E T
S
A
C d w g
4/1 5/2
A D
D E
D
E
A
W I N
G S
D
T S
C-301
R U
SS
EL
L R
O
AD
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
T
A I L
S
CATDTS DTS
26 27
3193313
IPT TECH. BRANCH HEAD
PROJECT MANAGER
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
S
H I N
G T
O N
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
M A
R I N
E
C
O R
S
E
Q
U A
N T
I C
O Q
U A
N T
I C
O
V
A
R E
V D
A T
E
F I
M
E
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
PWB NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
D E
P A
R T
M E
T
V
Y
S Y
M D
E S
C R
I P
T I O
N D
A T
E A
P P
R
DRAWFORM REVISION: 10 MAY 2014
GREG SMITH
WILLIAM ROBSON
OF
SEAL
CHK
SATISFACTORY TO DATE
FOR COMMANDER NAVFAC / B.L.T.L.
ACTIVITY
APPROVED
AS NOTED
R
EP
AI
R
E
LE
C
TR
IC
AL
S
YS
TE
M
S
AL
O
SUITE 200
ALEXANDRIA, VA 22314
P
M X
V
F A
C
M
C B
Q
B
A
C
E l e c t C
A D
C i v i l E e e t s S
H E
E T
S
A
C d w g
4/1 5/2
A D
D E
D
E
A
W I N
G S
D
T S
I. PROJECT DESCRIPTION
THIS PROJECT INVOLVES THE CONSTRUCTION OF ELECTRIC MANHOLES, CONCRETE PADS, AND DUCTBANKS. THE PROJECT INVOLVES
APPROXIMATELY 0.33 ACRES OF LAND DISTURBANCE.
II. EXISTING SITE CONDITIONS
THE WORK IS WITHIN THE MAINTAINED LAWN SHOULDER OF RUSSELL ROAD.
III. ADJACENT PROPERTIES
THE MAJORITY OF THE WORK IS WITHIN RUSSELL ROAD'S RIGHT OF WAY.
IV. OFF-SITE AREAS
UNSUITABLE MATERIAL WILL BE HAULED FROM THE SITE AND DISPOSED OF IN AN APPROVED MANNER. THE CONTRACTOR SHALL SUBMIT A
SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN TO THE EROSION AND SEDIMENT CONTROL REGULATOR PERTAINING TO OFF-SITE
DISTURBED AREAS (IF ANY SUCH AREAS ARE REQUIRED) SUCH AS STOCKPILES, STAGING AREAS, AND SPOIL AREAS THAT ARE USED FOR THIS
PROJECT.
V. SOILS
ACCORDING TO USDA SCS SOIL MAPPING, THE PROJECT SITE LIES ON SOIL TYPES ALLUVIAL LAND, LUKA FINE SANDY LOAN (LOCAL ALLUVIUM), SASSAFRAS FINE SANDY LOAM, SUSQUEHANNA SOILS, WEHADKEE VERY FINE SANDY LOAM AND LUNT.
Ae - ALLUVIAL LAND, WET
ALLUVIAL LAND, WET IS NEARLY LEVEL LAND TO GENTLY SLOPING AND OCCURS THROUGHOUT STAFFORD AND KING GEORGE COUNTIES. SOIL
PERMEABILITY IN THE SUBSTRATUM IS MODERATE IS MODERATE TO RAPID. THIS SOIL IS SUBJECT TO FREQUENT FLOODING FROM ADJACENT
DRAINAGE WAYS , STREAMS, AND TO FREQUENT RUNOFF FROM SURROUNDING SOIL AREAS. THIS SOIL IS STRONGLY ACID, LOW IN NATURAL
FERTILITY AND ORGANIC CONTENT.
IU - IUKA FINE SANDY LOAM, LOCAL ALLUVIUM, 0 TO 4 PERCENT SLOPES
THE IUKA COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 0 TO 4 PERCENT. THIS COMPONENT IS ON FLOOD PLAINS ON
COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF ALLUVIUM. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE
NATURAL DRAINAGE CLASS IS MODERATELY WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH.
AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS LOW. THIS SOIL IS RARELY
FLOODED. IT IS NOT PONDED. A SEASONAL ZONE OF WATER SATURATION IS AT 24 INCHES DURING JANUARY, FEBRUARY, MARCH, APRIL, DECEMBER. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 1 PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION
IS 2W. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
SUC - SUSQUEHANNA SOILS, 2 TO 10 PERCENT SLOPES
THE SUSQUEHANNA COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 2 TO 10 PERCENT. THIS COMPONENT IS ON MARINE
TERRACES ON COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF LOAMY MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS
GREATER THAN 60 INCHES. THE NATURAL DRAINAGE CLASS IS SOMEWHAT POORLY DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE
LAYER IS LOW. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH) IS HIGH. SHRINK-SWELL POTENTIAL IS HIGH. THIS SOIL
IS NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF WATER SATURATION WITHIN A DEPTH OF 72 INCHES. ORGANIC MATTER CONTENT
IN THE SURFACE HORIZON IS ABOUT 1 PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION IS 6E. THIS SOIL DOES NOT MEET HYDRIC
CRITERIA.
SFC2 - SASSAFRAS FINE SANDY LOAM, 6 TO 10 PERCENT SLOPES, ERODED
THE SASSAFRAS COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 6 TO 10 PERCENT. THIS COMPONENT IS ON MARINE
TERRACES ON COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF LOAMY MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS
GREATER THAN 60 INCHES. THE NATURAL DRAINAGE CLASS IS WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS
MODERATELY HIGH. AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS LOW.
THIS SOIL IS NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF WATER SATURATION WITHIN A DEPTH OF 72 INCHES. ORGANIC MATTER
CONTENT IN THE SURFACE HORIZON IS ABOUT 2 PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION IS 3E. THIS SOIL DOES NOT
MEET HYDRIC CRITERIA.
WH - WEHADKEE VERY FINE SANDY LOAM, 0 TO 2 PERCENT SLOPES
THE WEHADKEE COMPONENT MAKES UP 85 PERCENT OF THE MAP UNIT. SLOPES ARE 0 TO 2 PERCENT. THIS COMPONENT IS ON FLOOD PLAINS
ON PIEDMONTS. THE PARENT MATERIAL CONSISTS OF ALLUVIUM. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60 INCHES. THE
NATURAL DRAINAGE CLASS IS POORLY DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH. AVAILABLE
WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH) IS HIGH. SHRINK-SWELL POTENTIAL IS LOW. THIS SOIL IS FREQUENTLY FLOODED.
IT IS NOT PONDED. A SEASONAL ZONE OF WATER SATURATION IS AT 6 INCHES DURING JANUARY, FEBRUARY, MARCH, APRIL, MAY, NOVEMBER, DECEMBER. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 4 PERCENT. NONIRRIGATED LAND CAPABILITY CLASSIFICATION
IS 6W. THIS SOIL MEETS HYDRIC CRITERIA.
34B - LUNT LOAM, 2 TO 7 PERCENT SLOPES
THE LUNT COMPONENT MAKES UP 80 PERCENT OF THE MAP UNIT. SLOPES ARE 2 TO 7 PERCENT. THIS COMPONENT IS ON HILLSLOPES ON
COASTAL PLAINS. THE PARENT MATERIAL CONSISTS OF MARINE DEPOSITS. DEPTH TO A ROOT RESTRICTIVE LAYER IS GREATER THAN 60
INCHES. THE NATURAL DRAINAGE CLASS IS WELL DRAINED. WATER MOVEMENT IN THE MOST RESTRICTIVE LAYER IS MODERATELY HIGH.
AVAILABLE WATER TO A DEPTH OF 60 INCHES (OR RESTRICTED DEPTH) IS MODERATE. SHRINK-SWELL POTENTIAL IS MODERATE. THIS SOIL IS
NOT FLOODED. IT IS NOT PONDED. THERE IS NO ZONE OF WATER SATURATION WITHIN A DEPTH
OF 72 INCHES. ORGANIC MATTER CONTENT IN THE SURFACE HORIZON IS ABOUT 1 PERCENT. NONIRRIGATED LAND CAPABILITY
CLASSIFICATION IS 2E. THIS SOIL DOES NOT MEET HYDRIC CRITERIA.
VI. CRITICAL AREAS
THERE ARE NO CRITICAL AREAS WITHIN THE LIMITS OF DISTURBANCE ADDRESSED BY THIS EROSION AND SEDIMENT CONTROL PLAN.
VII. EROSION AND SEDIMENT CONTROL MEASURES
ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED BY THE
CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. SYMBOLS, DETAILS, AND DIMENSIONS USED ARE TAKEN FROM THE HANDBOOK, AS WELL AS THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF
TRANSPORTATION'S ROAD AND BRIDGE STANDARDS.
A. STRUCTURAL PRACTICES
1. SILT FENCE (SF), SPEC. 3.05: SILT FENCE BARRIERS SHALL BE PROVIDED WHERE SHOWN AND AS NEEDED TO PREVENT SEDIMENT FROM
LEAVING THE SITE.
2. STORM DRAIN INLET PROTECTION (IP), SPEC. 3.07: STORM DRAIN INLET PROTECTION SHALL BE PROVIDED FOR INLETS AS SHOWN ON
THE PLANS.
3. SOIL STABILIZATION BLANKETS AND MATTING (B/M), SPEC. 3.36: PROVIDE SOIL STABILIZATION BLANKETS AND MATTING ALONG THE
STORM WATER CONVEYANCE CHANNELS AS SHOWN ON THE PLANS. IN AREAS WHERE SEEDING OR HYDROSEEDING OF SLOPES ARE
UNSUCCESSFUL, PROVIDE EC-2 BLANKETS AND OVERSEED.
B. VEGETATIVE PRACTICES
1. TOPSOILING (TO), SPEC. 3.30: TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILES
ARE TO BE STABILIZED WITH TEMPORARY VEGETATION AND HAVE SILT FENCE INSTALLED ALONG THE LOWER PERIMETER TO PROTECT
DOWNSTREAM AREAS.
2. PERMANENT SEEDING (PS), SPEC. 3.32: PERMANENT SEEDING SHALL BE PROVIDED ON SITE TO PROVIDE STABILIZATION FOR ALL
DISTURBED AREAS. APPLY SEED BASED ON PERMANENT SEEDING SCHEDULE SHOWN ON THE PLANS.
3. MULCHING (MU), SPEC. 3.35: ALL PERMANENT AND TEMPORARY SEEDING SHALL BE STRAW MULCHED IMMEDIATELY UPON COMPLETION
OF SEED APPLICATION. STRAW ON STEEP SLOPES SHALL BE ANCHORED UNLESS SEEDING WAS PROVIDED BY MEANS OF A
HYDROSEEDING, IN WHICH CASE, MULCHING IS NOT REQUIRED.
4. TREES, SHRUBS, VINES AND GROUND COVERS (VEG), SPEC. 3.37:
5. TREE PRESERVATION AND PROTECTION (TP), SPEC. 3.38: TREES IDENTIFIED ON THE E&S PLAN SHEET SHALL BE PROTECTED DURING
CONSTRUCTION.
C. MINIMUM STANDARDS
MS-1 STABILIZATION OF DENUDED AREAS:
PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL
GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO
DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT
STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS-2 STABILIZATION OF SOIL STOCKPILES:
DURING CONSTRUCTION OF THE PROJECT, SOIL STOCK PILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH
SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT
STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM
THE PROJECT SITE.
MS-3 PERMANENT VEGETATIVE COVER:
A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.
PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4 TIMING AND STABILIZATION OF SILT TRAPPING MEASURES:
SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT
SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE
UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5 CONCENTRATED RUNOFF DOWN CUT OR FILLED SLOPES:
STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY
AFTER INSTALLATION.
MS-6 SEDIMENT BASINS AND TRAPS:
SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO
BE SERVED BY THE TRAP OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE
TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL
TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN
SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE
STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN
RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST
WHILE THE SEDIMENT BASIN IS UTILIZED.
MS-7 CUT AND FILL SLOPES:
CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE
FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL
SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8 CONCENTRATED RUNOFF DOWN CUT OR FILL SLOPES:
CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY
OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9 WATER SEEPAGE FROM A SLOPE FACE:
WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
MS-10 STORM SEWER INLET PROTECTION:
ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED
TO REMOVE SEDIMENT.
MS-11 STABILIZATION OF OUTLETS:
BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET
PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12 WORK IN LIVE WATERCOURSES:
WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL
SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE
USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
MS-13 CROSSING A LIVE WATERCOURSE:
WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A
TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED.
MS-14 APPLICABLE REGULATIONS:
ALL APPLICABLE FEDERAL, STATE AND LOCAL REQUIREMENTS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES
SHALL BE MET.
MS-15 STABILIZATION OF BED AND BANKS:
THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS
COMPLETED.
MS-16 UNDERGROUND UTILITIES:
UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER
APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING
DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE
PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND
PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THIS CHAPTER.
F. APPLICABLE SAFETY REQUIREMENTS SHALL BE COMPLIED WITH.
MS-17 CONSTRUCTION ACCESS ROUTES:
WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO
MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS
TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END
OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS
MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND-DISTURBING
ACTIVITIES.
MS-18 TEMPORARY E&S CONTROL MEASURE REMOVAL:
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE
VESCP AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
MS-19 ADEQUACY OF RECEIVING CHANNELS:
PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE
STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA. STREAM
RESTORATION AND RELOCATION PROJECTS THAT INCORPORATE NATURAL CHANNEL DESIGN CONCEPTS ARE NOT MAN-MADE
CHANNELS AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE
CHANNELS:
A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE
NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS
DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE
SYSTEM SHALL BE PERFORMED.
B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER:
(1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL
IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR
(2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT
OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS.
(B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO
VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE
THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND
(C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT
STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM.
C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT
ADEQUATE, THE APPLICANT SHALL:
(1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR
STORM WILL NOT CAUSE EROSION TO THE CHANNEL, THE BED, OR THE BANKS; OR
(2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE
APPURTENANCES;
(3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO
INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE-DEVELOPMENT PEAK
RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR
(4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS
SATISFACTORY TO THE VESCP AUTHORITY TO PREVENT DOWNSTREAM EROSION.
D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS.
E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE
DEVELOPMENT CONDITION OF THE SUBJECT PROJECT.
F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE
VESCP OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE
REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE.
G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATORS SHALL
BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE
FACILITY TO THE RECEIVING CHANNEL.
H. ALL ON-SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE.
I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE
DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY.
J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL
OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE
DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS
THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS.
K ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES
IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE.
L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW
RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE
CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (I)
DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (II) DETAIN AND RELEASE OVER A 24-HOUR PERIOD
THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (III) REDUCE THE ALLOWABLE PEAK FLOW
RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK
FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF
THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT
WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND
SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS
AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT.
M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF §
62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY
REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT
REGULATIONS, UNLESS SUCH LAND-DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA
STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS.
N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER
MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF
THIS SUBSECTION.
B. MAINTENANCE
ALL EROSION AND SEDIMENT CONTROL STRUCTURES AND SYSTEMS SHALL BE MAINTAINED, INSPECTED, AND REPAIRED AS NEEDED TO
INSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
CHECKED AT THE END OF EACH DAY AND AFTER EVERY RAINFALL EVENT.
1. DAMAGE TO EROSION CONTROL MEASURES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY SHALL BE REPAIRED BEFORE THE
END OF EACH WORKING DAY.
2. MAINTAIN ALL SEEDED AREAS UNTIL A UNIFORM STAND IS ACCEPTED.
3. (SPEC. 3.02) PROVIDE FOR EQUIPMENT WASHING AS NEEDED TO PREVENT THE TRANSPORT OF SOIL ONTO EXISTING ASPHALT
ROADWAYS. ANY SEDIMENT ON THE PAVEMENT SHALL BE REMOVED IMMEDIATELY.
4. (SPEC. 3.05) SILT FENCE BARRIERS WILL BE CHECKED DAILY FOR UNDERMINING OR DETERIORATION OF THE FABRIC. SEDIMENT SHALL
BE REMOVED WHEN THE LEVEL REACHES HALF WAY TO THE TOP OF THE BARRIER.
5. (SPEC. 3.07) SEDIMENT SHALL BE REMOVED FROM AROUND THE INLET PROTECTION TRAP STRUCTURE AND RESTORED TO ITS ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. THE TRAP STRUCTURES SHALL
BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
6. (SPEC. 3.37) MAINTAIN A MULCH OR TURF COVER FOR SHRUBS AND TREES.
7. (SPEC. 3.38) IF THE SOIL HAS BECOME COMPACTED OVER THE ROOT ZONE OF ANY TREE, THE GROUND SHALL BE AERATED BY PUNCHING
HOLES WITH AN IRON BAR. ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM OF ANY TREE RETAINED ON THE SITE SHALL BE
REPAIRED IMMEDIATELY. BROADLEAF TREES THAT HAVE BEEN STRESSED OR DAMAGED SHALL RECEIVE A HEAVY APPLICATION OF
FERTILIZER TO AID THEIR RECOVERY.
VIII. PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH SEEDING FOLLOWING GRADING IN ACCORDANCE WITH THE MINIMUM
STANDARDS. SEEDING SHALL BE IN ACCORDANCE WITH THE TEMPORARY OR PERMANENT SEEDING SCHEDULES SHOWN ON THIS PLAN. IN ALL
SEEDING OPERATIONS, TOPSOIL, SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO INSTALLATION OF MULCHING OR EROSION
CONTROL BLANKETS AND MATTING.
IX. STORMWATER MANAGEMENT
ALL DISTURBED AREA WILL BE RETURNED TO CURRENT LAND COVER. STORMWATER WILL CONTINUE TO SHEET FLOW THROUGH DISTURBED
AREAS.
X. SOIL STOCKPILES AND BORROW AREAS
LOCATIONS OF SOIL STOCKPILES SHALL BE DETERMINED BY THE CONTRACTOR WITH THE APPROVAL OF THE GOVERNMENT. ALL STOCKPILES
SHALL BE LOCATED ON SITE AND PROTECTED WITH SURROUNDING SILT FENCING AND STABILIZED WITH A VEGETATIVE COVER. THE
CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION AND SEDIMENT CONTROL PLAN FOR ALL SOILS INTENTIONALLY TRANSPORTED
OFFSITE IF THE TRANSPORTED MATERIAL DISTURBS MORE THAN 10,000 SQUARE FEET IN AREA.
XI. SEQUENCE OF CONSTRUCTION
1. INSTALL SILT FENCE AND INLET PROTECTION.INSTALL TREE PROTECTION DIRECTED BY GOVERNMENT IN APPLICABLE AREAS.
2. INSTALL UTILITIES
3. STABILIZE ALL DISTURBED AREAS WITH PERMANENT VEGETATION.
4. EROSION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL RELEASED BY THE GOVERNING AGENCY.
5. REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES.
6. STABILIZE AREAS AFFECTED BY THE REMOVAL OF TEMPORARY E&S MEASURES.
C-401
R U
SS
EL
L R
O
AD
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
N
A R
R A
T I V
E
CATDTS DTS
27 27
3193314
AutoCAD SHX Text
DANIEL T. SUTTON
AutoCAD SHX Text Lic. No. 45799
EROSION & SEDIMENT CONTROL NARRATIVE