J-1503050-13(g3) JBAB LID 2020_Amend 0006 (Att 23).pdf

PDF 90 KB Posted

Attached to
Notice of Award
Solicitation number
N4008020R0011
Issued by

View the file

Other files

File Type Posted
N4008020R0011 0025.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 05.05.20_Amend 0025.xlsx XLSX spreadsheet
Copy of J-0200000-10_ELINS_BLANK_ 05.01.20_Amend 0024.xlsx XLSX spreadsheet
N4008020R0011 0024.pdf PDF
N4008020R0011 0023.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 04.30.20_Amendment 0023.xlsx XLSX spreadsheet
N4008020R0011 0022.docx DOCX document
N4008020R0011 0021.pdf PDF
J-0200000-10_ELINS_BLANK_ 04.26.20_Amend 0021.xlsx XLSX spreadsheet
C-1503060 Pavement Clearance Snow_04.21.2020 Amend 0020.pdf PDF
N4008020R0011 0020.pdf PDF
J-0200000-10_ELINS_BLANK_04.21.20_Amend 0020.xlsx XLSX spreadsheet
N4008020R0011 0019.pdf PDF
Dod Safe Instruction - Attachment 3 Amend 0018.docx DOCX document
C-1503060 Pavement Clearance Snow_04.13.20 Amend 0018.doc DOC document
N4008020R0011 0018.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_04.13.20_Amend 0018.xlsx XLSX spreadsheet
Dod PKE Reference Guide - Attachement 4 Amend 0018.pdf PDF
N4008020R0011 0017.pdf PDF
N4008020R0011 0016.pdf PDF
N4008020R0011 0015.pdf PDF
N4008020R0011 0014.docx DOCX document
N4008020R0011 0013.docx DOCX document
N4008020R0011 0012.docx DOCX document
N4008020R0011 0011.docx DOCX document
N40080-20-R-0011 0010.pdf PDF
N4008020R0011 0009.pdf PDF
Section L Amend 0009 ATT 38.docx DOCX document
RFIS Amend 0009 ATT 37.docx DOCX document
N4008020R0011 0008.pdf PDF
J-1503050-09(a6) MBW_Amendment 0008 (Att 36).pdf PDF
N4008020R0011 0007.pdf PDF
J-1503050-08(f5) NSAB Grounds Inventory-Amend 07 (Att 34).pdf PDF
Written Responses RFI FINAL_Amend 06 (Att 21).docx DOCX document
N4008020R0011 0006.pdf PDF
J-1503050-13(a5) CARD LID 2020_Amend 06 (Att 24).pdf PDF
J-1503050-13(a2) WNY Lid MAP_Amend 06 (Att 25).pdf PDF
C-1503050 Grounts Maint_Landscaping_Amend 0007 (Att35).pdf PDF
J-1503050-09(a6) MBW Irr_Amend 06 (Att 29).pdf PDF
J-1503050-08(f) NSAB Grounds Inventory-COL3_Amend 06 (Att 30).pdf PDF
J-1503060-06(b3) IndianHead_Salt Dome_Map_Amend 0006 (Att 32).pdf PDF
J-1503050-13(a11) Carderock N Swale Map_Amend 06 (Att 26.pdf PDF
J-1503060-05(a4) CARD_SNOW_INV 2020_Amend 06 (Att 33).pdf PDF
J-1503050-13(a10) Carderock N Swale Maint Spec 2020_Amend 06 (Att 27).pdf PDF
J-1503050-09(a6.1) MBW_Irr Map_Amend 06 (Att 28).pdf PDF
J-1503050-08(a4) Carderock 2020 Grounds Inv - Amend 0006 (Att 31).pdf PDF
J-0200000-10_ELINS_BLANK_ 02.13.20_Amend 0006 (Att 22).xlsx XLSX spreadsheet
40008020R0011 Amendment 0005.docx DOCX document
Pre Proposal Presentation (Att 18).pdf PDF
J-1503050-08(f) BETH Grounds Inventory-Amendment (Att 17).pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503050 - GROUNDS

Product Name (120

Characters) Structure ID Associated

Building No.

Zone Longitude Latitude Description Extended Estimated

Quantity Unit of Issue

0.047 0.349 0.123 0.504 1.426 0.988 0.474 0.603 1.353

2,439

66 234 271 1,650 250 South 630 250 North 396

1,071

5,900

Maintain LID – green roof

The Contractor shall perform maintenance and inspection of green roofs. This includes periodic irrigation, weeding, replanting, and removal of debris from outlets. Contractor shall perform the work within 15 days of request.

23,426 SF

Maintain LID-permeable pavement

The Contractor shall sweep and vacuum permeable pavement system to reduce sediment accumulation. Inlets and drains must be cleared of debris. Replace chips and stones from openings as necessary. The Contractor shall perform this work within 20 days of request.

2,990

SF

Maintain LID – swale The Contractor shall perform maintenance and inspection of dry, wet, and bio-swales. This includes: Checking and removing sediment accumulation, debris removal and disposal, mowing of dry swales, inspection of structures for spalling and deterioration, and replacement of planting, soil and rip rap (as necessary). The Contractor shall perform the work within 15 days of request.

SF

Maintain LID – Bioretention/rain garden

The Contractor shall perform maintenance and inspections of bioretention cells and rain gardens; which includes:

removal of debris, unclogging of inlets/outlets, remove weeds, re-mulch cells, replace dead plants with like species and comparable size to achieve 80% plant coverage. Contractor shall perform work within 15 days of request.

SF

Control Undesired Vegetation

Remove weeds and other undesirable vegetation using manual methods.. Work shall be completed within 10 calendar days. SY

Mulching Remove the existing mulch, removing weeds, dead shrubbery and other debris from the area to be mulched. The Contractor shall install a breathable mesh fabric over the entire area to be mulched. Low areas that retain water throughout the flowerbed shall be leveled and graded, using screened topsoil. The Contractor shall provide shredded hardwood mulch to a minimum depth of three inches (3”), ensuring the underside of all plantings and shrubs have a protective barrier against frost and diseases and to stimulate plant growth. Work shall be completed within 10 calendar days.

SY

Field Mowing Vegetation shall be mowed in accordance with C-1503050. All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days.

AC

Clear storm drains Drainage systems include curb gutters, curb inlets, brow ditches, drainage channels, swales, catch basins, yard drains, and other devices used to direct the flow of runoff. The Contractor shall clean and remove debris from drainage systems that would inhibit drainage. Aboveground storm drainage systems shall be maintained clear of obstructions, debris, weeds, and anything else which may restrict runoff flow.

EA

Tree Planting This line item is for time and labor to plant a tree. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly.

Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days

2 EA

J-1503050-13(a3) - JBAB LID Inventory & SOW

Medium Tree and Stump Removal

Remove trees 6 to 18 inches in diameter measured at 4.5 feet above ground level. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Work shall be completed within 7 calendar days.

2 EA

Large Tree Pruning Prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth by removing dead/damaged/diseased and broken areas. Lower limbs may be pruned to provide clearance. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 1 calendar day.

2 EA

File details come from the government source that posted it. Updated .