J-1503050-13(a10) Carderock N Swale Maint Spec 2020_Amend 06 (Att 27).pdf

PDF 40 KB Posted

Attached to
Notice of Award
Solicitation number
N4008020R0011
Issued by

View the file

Other files

File Type Posted
N4008020R0011 0025.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 05.05.20_Amend 0025.xlsx XLSX spreadsheet
Copy of J-0200000-10_ELINS_BLANK_ 05.01.20_Amend 0024.xlsx XLSX spreadsheet
N4008020R0011 0024.pdf PDF
N4008020R0011 0023.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_ 04.30.20_Amendment 0023.xlsx XLSX spreadsheet
N4008020R0011 0022.docx DOCX document
N4008020R0011 0021.pdf PDF
J-0200000-10_ELINS_BLANK_ 04.26.20_Amend 0021.xlsx XLSX spreadsheet
C-1503060 Pavement Clearance Snow_04.21.2020 Amend 0020.pdf PDF
N4008020R0011 0020.pdf PDF
J-0200000-10_ELINS_BLANK_04.21.20_Amend 0020.xlsx XLSX spreadsheet
N4008020R0011 0019.pdf PDF
Dod Safe Instruction - Attachment 3 Amend 0018.docx DOCX document
C-1503060 Pavement Clearance Snow_04.13.20 Amend 0018.doc DOC document
N4008020R0011 0018.pdf PDF
Copy of J-0200000-10_ELINS_BLANK_04.13.20_Amend 0018.xlsx XLSX spreadsheet
Dod PKE Reference Guide - Attachement 4 Amend 0018.pdf PDF
N4008020R0011 0017.pdf PDF
N4008020R0011 0016.pdf PDF
N4008020R0011 0015.pdf PDF
N4008020R0011 0014.docx DOCX document
N4008020R0011 0013.docx DOCX document
N4008020R0011 0012.docx DOCX document
N4008020R0011 0011.docx DOCX document
N40080-20-R-0011 0010.pdf PDF
N4008020R0011 0009.pdf PDF
Section L Amend 0009 ATT 38.docx DOCX document
RFIS Amend 0009 ATT 37.docx DOCX document
N4008020R0011 0008.pdf PDF
J-1503050-09(a6) MBW_Amendment 0008 (Att 36).pdf PDF
N4008020R0011 0007.pdf PDF
J-1503050-08(f5) NSAB Grounds Inventory-Amend 07 (Att 34).pdf PDF
Written Responses RFI FINAL_Amend 06 (Att 21).docx DOCX document
N4008020R0011 0006.pdf PDF
J-1503050-13(a5) CARD LID 2020_Amend 06 (Att 24).pdf PDF
J-1503050-13(a2) WNY Lid MAP_Amend 06 (Att 25).pdf PDF
C-1503050 Grounts Maint_Landscaping_Amend 0007 (Att35).pdf PDF
J-1503050-09(a6) MBW Irr_Amend 06 (Att 29).pdf PDF
J-1503050-08(f) NSAB Grounds Inventory-COL3_Amend 06 (Att 30).pdf PDF
J-1503060-06(b3) IndianHead_Salt Dome_Map_Amend 0006 (Att 32).pdf PDF
J-1503050-13(a11) Carderock N Swale Map_Amend 06 (Att 26.pdf PDF
J-1503060-05(a4) CARD_SNOW_INV 2020_Amend 06 (Att 33).pdf PDF
J-1503050-09(a6.1) MBW_Irr Map_Amend 06 (Att 28).pdf PDF
J-1503050-08(a4) Carderock 2020 Grounds Inv - Amend 0006 (Att 31).pdf PDF
J-1503050-13(g3) JBAB LID 2020_Amend 0006 (Att 23).pdf PDF
J-0200000-10_ELINS_BLANK_ 02.13.20_Amend 0006 (Att 22).xlsx XLSX spreadsheet
40008020R0011 Amendment 0005.docx DOCX document
Pre Proposal Presentation (Att 18).pdf PDF
J-1503050-08(f) BETH Grounds Inventory-Amendment (Att 17).pdf PDF
Show 40 more

Latest 50 of 74 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-1503050-13(a10)

PLANTING ZONE 1

1. Planting zone 1 is located in the stream channel and along the banks and bed of this zone. Annual maintenance will be required to maintain herbaceous cover and prevent colonization by woody species, both of which are required to maintain drainage efficiency after construction.

a. At the end of the first growing season after construction, use a mower, string trimmer, or other mechanism to remove all woody species that grow along the bed and banks.

b. Throughout the growing season, conduct mowing and trimming within the entire zone to maintain vegetation to a height between 6 and 8 inches.

c. At the beginning of each growing season, woody species and invasive weeds are to be removed by hand or treated with an approved herbicide.

d. All mowing or trimming activities shall be conducted with care so as not to cause erosion or damage to infrastructure.

PLANTING ZONES 2 AND 4

1. Planting zone 2 is located along the top of banks with a purpose of replacing existing forest that was removed during the construction process and establishing riparian buffers in areas that will not interfere with existing utilities, infrastructure or operations. Planting zone 4 is similar to zone 2 but with an emphasis on lower growing trees and shrubs with more ornamental appeal.

a. Monthly during the first growing season mow the native grass / plant ground cover to remove invasive weed and woody species maintaining a height of 8 inches.

b. For the second year and beyond, mow the groundcover once annually at the beginning of the growing season.

c. At the beginning of the growing season each year, inspect for invasive weed or woody species and remove as needed in same manner as item C for zone one.

d. Care is to be taken not to damage any trees or shrubs planted intentionally.

2. During landscape installation, buck guards and other protective devices will be installed to protect trees and shrubs from deer damage.

a. These protective devices can be removed if they present a danger or begin to inhibit growth.

PLANTING ZONE 3

1. Planting zone 3 is a lawn area intended to provide easy maintenance access to infrastructure while protecting underground utilities from root damage and maintaining sight line near roads.

a. This planting zone is to be mowed to a maximum of 6 inches throughout the growing season.

File details come from the government source that posted it. Updated .