J-0200000-05-01 Crane Checklist Form.pdf
PDF 20 KB Posted
- Attached to
- PAX FSS Amendment 005 and Current CBAs
- Solicitation number
- N4008020R0001
About this file
This document contains a crane checklist form and information about a federal contract opportunity for facility support services. The crane checklist form outlines 23 safety items that must be verified before conducting critical lifts, such as confirming the load weight and capacity of the crane.
The federal contract opportunity is a solicitation from the Department of the Navy Naval Facilities Engineering Command for facility support services at the Naval Air Station in Patuxent River, Maryland. The services include custodial services, pest control, grounds maintenance and landscaping, pavement clearance such as snow removal, and transportation services including vehicle and equipment maintenance. The contract type will be an IDIQ performance-based contract for recurring and non-recurring work items. The NAICS code was changed from 561720 to 561210 and the size standard increased from $19.5M to $41.5M, and it is now a total small business set-aside.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT "A"
CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO
1 Does the operator know the weight of the load to be lifted?
Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?
3 Is the crane level and on firm ground?
4 Are outriggers required?
5 If so, are outriggers fully extended and down, and the load off the wheels?
6 If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?
If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?
Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?
Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?
Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?
11 Is the lift swing path clear of obstructions?
12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?
13 Are personnel prevented from standing or passing under a suspended load?
14 Are personnel prevented from entering the load fall zone?
15 Is the crane operator's attention diverted?
16 Are proper signals being used at all times?
17 If radio communications are used is the frequency isolated to the crane team?
18 Do the operations ensure that side and tip loading is prohibited?
Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?
21 Is the lift a critical lift?
If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?
23 Is Attachment "A" current, filled out completely, and posted in the crane?
Contractor Name (Print Legibly):
Contractor Name (Signature):
Location: Date:
File details come from the government source that posted it. Updated .