RFI CLAIFICATIONS

Donley Construction Concern: The plans for all three projects read “Preliminary Not For Construction”. Response clarifies to provide a complete design for only A49. Any changes issued after award to the plans for A59 & 43 will result in the Gov’t issuing a cost modification.

Response: The drawings included in the RFP package are a concept. The design builder is required to come up with a complete and usable design with the information provided in the RFP. This RFI was provided under the A49 Specific RFIs, however, it is applicable to all projects.

Section 015719-1.11 mentions contaminated soil or groundwater. Please clarify this. How much is expected to be encountered and at what locations? Provide a per unit price for contaminted soil/ cubic yard of material. Areas of concern loacation of existing generator and the pathway for new generator and ductbank. Contractor shall provide soil testing under this contract.

Donley Construction Concern: The revised pricing schedule issued under Amendment 1 does not provide a section for providing pricing for contaminated soil. This may lead to the Gov’t issuing a costlier than expected change order after award if not clarified.

Response: This RFI was under the Building 43 Specific RFIs, this is not an option but rather a specified portion of the RFP so it wouldn’t be listed on the price schedule. The areas identified are as stated: location of the existing generator and the pathway for the new generator and ductbank.