RFI_CLAIFICATIONS.docx
DOCX document 12 KB Posted
- Solicitation number
- N40080-19-R-5738
About this file
RFI Clarifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment4_SF30.rtf | RTF text file | |
| C.E.R._RFIs_Responses.doc | DOC document | |
| RFP_Amendment_4,_NRL_43,_Replace_Emerg_Generator_Construction_Bundle.pdf | ||
| RFP_Amendment_3,_NRL_43,_Replace_Emerg_Generator_Construction_Bundle.pdf | ||
| Amendment3_SF30.rtf | RTF text file | |
| RFP_Amendment_1,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| RFP_Amendment_2,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| RFP_Amendment_2,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| Amendment2_SF30.rtf | RTF text file | |
| Site_Visit_Sign-In_Sheet.pdf | ||
| N40080-19-R-5738,_NRL-43_RFI_Responses.xlsx | XLSX spreadsheet | |
| Solicitation_N40080-19-R-5738,_price_schedule.docx | DOCX document | |
| Amendment1_SF30.rtf | RTF text file | |
| eOMSI.docx | DOCX document | |
| RFP_Amendment_1,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| A49_RFP.pdf | ||
| RFP__A59.pdf | ||
| NRL43_RFP.pdf | ||
| Solicitations_N40080-19-R-5738.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI CLAIFICATIONS
Donley Construction Concern: The plans for all three projects read “Preliminary Not For Construction”. Response clarifies to provide a complete design for only A49. Any changes issued after award to the plans for A59 & 43 will result in the Gov’t issuing a cost modification.
Response: The drawings included in the RFP package are a concept. The design builder is required to come up with a complete and usable design with the information provided in the RFP. This RFI was provided under the A49 Specific RFIs, however, it is applicable to all projects.
Section 015719-1.11 mentions contaminated soil or groundwater. Please clarify this. How much is expected to be encountered and at what locations? Provide a per unit price for contaminted soil/ cubic yard of material. Areas of concern loacation of existing generator and the pathway for new generator and ductbank. Contractor shall provide soil testing under this contract.
Donley Construction Concern: The revised pricing schedule issued under Amendment 1 does not provide a section for providing pricing for contaminated soil. This may lead to the Gov’t issuing a costlier than expected change order after award if not clarified.
Response: This RFI was under the Building 43 Specific RFIs, this is not an option but rather a specified portion of the RFP so it wouldn’t be listed on the price schedule. The areas identified are as stated: location of the existing generator and the pathway for the new generator and ductbank.