N40080-19-R-5738,_NRL-43_RFI_Responses.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- N40080-19-R-5738
About this file
Amendment 1 Attachments + RFI responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment4_SF30.rtf | RTF text file | |
| C.E.R._RFIs_Responses.doc | DOC document | |
| RFP_Amendment_4,_NRL_43,_Replace_Emerg_Generator_Construction_Bundle.pdf | ||
| RFP_Amendment_3,_NRL_43,_Replace_Emerg_Generator_Construction_Bundle.pdf | ||
| RFI_CLAIFICATIONS.docx | DOCX document | |
| Amendment3_SF30.rtf | RTF text file | |
| RFP_Amendment_1,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| RFP_Amendment_2,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| RFP_Amendment_2,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| Amendment2_SF30.rtf | RTF text file | |
| Site_Visit_Sign-In_Sheet.pdf | ||
| Solicitation_N40080-19-R-5738,_price_schedule.docx | DOCX document | |
| Amendment1_SF30.rtf | RTF text file | |
| eOMSI.docx | DOCX document | |
| RFP_Amendment_1,__N40080-19-R-5738,_NRL-43_Replace_Emerg_Generator.pdf | ||
| A49_RFP.pdf | ||
| RFP__A59.pdf | ||
| NRL43_RFP.pdf | ||
| Solicitations_N40080-19-R-5738.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI | Response | Response by | |
| Are these escorted projects? | NAVFAC | DBI | |
| B43, sheet E101, Note 1, What type of plug do they need? | Coordinate receptacle configuration with IT racks | Summer | DBI |
| B43, sheet E102 & E104, Are we reworking the circuits to the generator panel like on E103? | No, only second floor receptacles and lights are being added to generator. | Summer | DBI |
| B43, sheet E102, note 3, What conduit size do they want? | AE 2 to coordinate with UFC requirements | Summer | DBI |
| B43, sheet E103, Why is the power lighting bldg. layout and the lighting bldg. layout different? | The circuiting is based on the reference drawings in Appendix C. | Summer | DBI |
| A47, sheet ED101, Why aren’t we reusing the existing conduits where possible since the conduit size is large enough? | A49, the majority of conduit is being reused except where the pull boxes are being located. AE 2 is to design the system to serve the ATS below, if more conduit can be reused that is part of the final design. | Summer | DBI |
| Is the project limited to any specific generator / ATS manufacturers? | No, however the unit shall fit and have proper clearances in the designated spaces. | Summer | T-B |
| A permanent load bank sized for 50% of the generator capacity is indicated as a requirement for the 400kW generator at NRL 43. A permanent load bank is not required for the 2000kW generator at NRL A49. Please confirm. | A permanent load bank is not required at A49, only a NFSS sized at 100%, for connection to a portable load bank. | Summer | T-B |
| NRL 43 - Will sealed Civil and/or Structural drawings be required? | YES, all drawings shall be signed and sealed. | Summer | T-B |
| NRL 43 - Is a portable generator connection (per NEC 2017) required? If so, where shall the connection be located? | No requirement for portable generator | Summer | T-B |
| NRL A49 - Is a portable generator connection (per NEC 2017) required? If so, where shall the connection be located? | No requirement for portable generator | Summer | T-B |
| Reference RFP paragraph 252.204-7000 Disclosure of Information, “The Contractor shall not release to anyone outside the Contractor's organization any unclassified information, regardless of medium (e.g., film, tape, document), pertaining to any part of this contract or any program related to this contract” Is it acceptable to provide subcontractors and suppliers copies of the plans and specs for this contract? | YES | NAVFAC | |
| Reference RFP 5252.228-9305 Notice of Bonding Requirements, section (c) the time does not reflect the RFP construction Time, when do the Liquidated Damages start? | Please disreguard Price Schedule submitted with the solicitation. It was a template used from another project. The note section is wrong and from another project. The proper price schedule will be included in the RFI amendment | NAVFAC | |
| Reference Bid Form Note 4, states “price valid for 90 days”, RFP states “Proposal acceptance period shall be 120 days”, which is correct? | Please disreguard Price Schedule submitted with the solicitation. It was a template used from another project. The note section is wrong and from another project. The proper price schedule will be included in the RFI amendment | NAVFAC | |
| Regarding the projects Staffing; A43 & A59 state The CQC & The SSHO can perform the same role along with a Superintendent, while A49 states the CQC cannot be the SSHO, please clarify is this project to be 1, 2 or 3 hat staff? | Due to the size and complexity of the A49 project the CQC cannot be the SSHO. | Summer | |
| Reference Bid Form Note 7 states “Options 1 & 2 may be awarded at time of award or within 365 days of award”. Will the award dates for the Options be simultaneously or independent of each other? How will the Contract time be extended to accommodate the additional work period for these Options if they not awarded at the time of the Base Bid award date? | More than likey the options will be awarded with the base bid. Its rare that options are awarded seperatly….unless there is not money at the time of award for the option(s). If the latter is the case then you will be notified at the time of the base award | NAVFAC | |
| Reference Bid Note #7, does the Government fully understand requesting a maximum of 365-day delay for acceptance of the Options will cost an enormous amount of money that in some cases, i.e. cost of the large generator, cannot be accurately estimated for that period of time. This puts undue burden on the Contractors to guess the Governments’ future budget time frames. | More than likey the options will be awarded with the base bid. Its rare that options are awarded seperatly….unless there is not money at the time of award for the option(s). If the latter is the case then you will be notified at the time of the base award | NAVFAC | |
| Is this project considered a design-bid-build contract? Or does the Government want the contractor to complete the design using Summer Consultant’s drawings and specifications? If the contractor is to complete the design how many design submissions are required? | Contractor is required to provide a complete design for the Building A49 Generator project per RFP Specification Section 01 33 10.05 20 | NAVFAC/Summer | |
| Reference: On-Site Staff Requirements / SECTION 01 30 00.05 20, Part 1.1; and SECTION 01 45 00.05 20, Part 1.2 |
Question:
A. Please confirm the Contractor’s Project Superintendent will NOT be allowed to also perform the roles of the Quality Control Manager (QCM) and Site Safety and Health Officer (SSHO), and that three (3) separate persons are to be performing these roles at the project site.
B. Please advise if the Superintendent must be on-site full-time while work is being performed on this project and be a direct employee of the Prime Contractor.
C. Please advise if the Quality Control Manager (QCM) must be on-site full-time while work is being performed on this project and be a direct employee of the Prime Contractor.
| D. Please advise if the Site Safety and Health Officer (SSHO) must be on-site full-time while work is being performed on this project and be a direct employee of the Prime Contractor. | A49 RFP Specification Section 01 35 26.05 20 indicates CQC manager cannot be the SSHO for the project. | NAVFAC | EGI |
| Reference: Photos of Existing Site Conditions / Pre-Bid Site Conference on 7/31/2019 |
Question: Would you please provide photos of existing site conditions, at the interior and exterior work areas for each of the three (3) projects included in this RFP.
| If there are any drawings available, they will be provided to the contractor after award at the discretion of NRL. | NAVFAC | EGI |
| Reference: BCIV Permit / NRL A49 Backup Generator, Part 3, Chapter 2, Item 2.3.2 |
Question: This item states that a “BCIV permit will need to be applied for with DCRA, and any filing or permit fees shall be paid by the applicant.” Would you please provide the cost amount we should include in our proposal for both the BCIV Permit Fee and Filing Fee.
| Contractor is required to identify and obtain all permits to comply with federal, state, and local regulatory requirements for the work per NRL A49 RFP Part 3 Chapter 6 Paragraph F20. | Summer | EGI |
| 4. Reference: Metal Building Manufacturer & Existing Roof System for NRL A49 / Drawing A-301, Keynote # 18 |
Question: Please provide the manufacturer of the existing NRL-A49 metal building and the manufacturer and/or type of the existing roof system.
| Manufacturer of the existing metal building is not known. Original building construction documents could not be located during the RFP design. It appears the roof was replaced in accordance with a 2005 Correct Structural Deficiencies, Building A-49 design by Wiley & Wilson. Design documents are available in the NRL drawing library and indicate 5" of polyisocyanurate insulation (3-1/2" between metal standing seams and 1-1/2" on top) and a 0.06" reinforced EPDM membrane. Government to provide any available as-built information for the roof replacement. | Summer | EGI |
| 5. Reference: HazMat Abatement Work / Hazmat Reports for NRL-43, A49 and A59 |
Question: The Hazardous Material Reports (separate report provided for each project) appear to indicate that no hazmat abatement work is required on any of the three (3) projects, except for the recommendation to notify contractors of all known lead-containing paints prior to bidding on work at the site. Please confirm this is correct and that no abatement costs are to be included in the Contractor’s proposal.
| Limited hazardous material testing was conducted as part of the RFP design. A summary report of findings is included in Part six of the A49 RFP. Laboratory analysis determined that of the sampled materials only the 12x12 beige and 9x9 tan floor tiles in the trailers contained asbestos. The trailers are to be removed as part of the construction. The floor tiles may be impacted by the work. | Summer | EGI |
| 6. Reference: Time for Completion for Option 1 and Option 2 / Solicitation N40080-19-R-5738 – GENERAL REQUIREMENTS; PRICE SCHEDULE, Note # 7. |
Question: The schedule requirements for Option 1 and Option 2 are unclear, whether the Options are awarded at time of Base Bid award or within 365 days of award, as written in Note 7 on the PRICE SCHEDULE.
A. What is the designated Time for Completion for design and construction of Option 1?
B. What is the designated Time for Completion for design and construction of Option 2?
| NAVFAC | EGI | |
| 7. Reference: Design Schedule and Number of Design Submissions Required |
Question: A design schedule is not included within the Solicitation Documents. The number of design submissions required by the Owner – and the award date for Options 1 and 2, if accepted and contracted - will impact the overall Project Schedule. Accordingly, please respond to the following questions:
A. Please provide a schedule for the design work required on this project.
B. Please designate the number of design submissions required -separately - for the Base Bid, Option 1 and Option 2.
| A. The schedule is to be developed by the contractor around the government holiday dates listed in the division 01 specifications. B. The number of design submissions are in the Division 01 Specifications. | NAVFAC | EGI |
| 8. Reference: Refrigerator to be Relocated / NRL-43, Drawing E-301, Note # 6 |
Question:
A. Please provide the specific location to which the existing refrigerator is to be moved.
B. Please advise if the existing refrigerator requires a water line for an automatic ice maker.
C. Is a dedicated power outlet required for the refrigerator?
| Relocation of the refrigerator is to be coordinated by AE2 under this contract. | Summer | EGI |
| 9. Reference: Existing Drawings; CAD Files / Base Bid, Option 1 and Option 2 |
Question: Are existing civil, structural , architectural, MEP and fire protection drawings available? If yes, are they in CAD format. Please advise.
| If there are any drawings available, they will be provided to the contractor after award at the discretion of NRL. | NAVFAC | EGI |
| 10. Reference: RFP Documents in MS Word and Autocad Formats / Base Bid, Option 1 and Option 2 |
Question: Will NAVFAC provide all documents of the RFP in MS Word and Autocad formats?
| If there are any drawings available, they will be provided to the contractor after award at the discretion of NRL. | NAVFAC | EGI |
| 11. Reference: Short Circuit, Coordination and Arc Flash Studies / Base Bid, Option 1 and Option 2 |
Question: Are copies of the short circuit, coordination and arc flash studies available? If yes, please provide these documents.
| Short circuit, coordination and arc flash studies are to be performed by AE2 under this contract. | Summer | EGI |
| 12. Reference: Permits / Base Bid, Option 1 and Option 2 |
Question:
A. Will NRL/NAVFAC procure and provide all permits that are required but not issued by NAVFAC/NRL?
B. Please identify any permits that are required for these projects but not issued by NAVFAC/NRL.
| Contractor is required to identify and obtain all permits to comply with federal, state, and local regulatory requirements for the work per NRL A49 RFP Part 3 Chapter 6 Paragraph F20. | Summer | EGI |
| 13. Reference: NRL 43 RFP |
Question: Is a temporary generator required when existing 40 KW generator is removed?
| Relocate the existing generator and provide temporary cables to exisitng ATS during construction. | Summer | EGI |
| 14. Reference: Load Sequencing / NRL 43 RFP |
Question: Is sequencing of the various loads required?
| Generator shall start and transfer the load in less than 10 seconds from loss of power. | Summer | EGI |
| 15. Reference: Circuit Identification / NRL 43 RFP; Drawing E-103, Note 2 |
Question: Are all circuits identified based on the circuit tracing?
| The circuiting is based on the reference drawings in Appendix C. All circuit tracing is to be performed under this contact. | Summer | EGI |
| 16. Reference: Topographic Survey; Existing Utilities Drawings / NRL 43 RFP |
Question: Are topographic survey and utility plans available? If yes, please provide these documents.
| If there are any drawings available, they will be provided to the contractor after award at the discretion of NRL. | NAVFAC | EGI |
| 17. Reference: Fuel Requirement at Project Turnover, for Fuel Storage Tank / NRL 43 RFP |
Question: Is tank full of diesel fuel required? Please designate quantity of fuel to be provided in storage tank at project completion and turnover.
| Fuel for testing shall be provided under this contract and the tank shall be full when the project is turned over to the government. | Summer | EGI |
| 18. Reference: NRL 43 RFP / Drawing E-103 |
Question:
A. Are arrows on Drawing E-103 representing homeruns?
B. Note # 1 and # 2: Are these locations based on the circuit tracing?
C. Note # 3: What are the NEMA configurations of all special receptacles?
| A. Yes, Arrows indicate homeruns. B. The circuiting is based on the reference drawings in Appendix C. All circuit tracing is to be performed under this contact. C. Coordinate receptacle configuration with IT racks | Summer | EGI |
| 19. Reference: Maximum Demand on Existing Switchgear / NRL 43 RFP; Part 3 – Statement of Work, Page 10. |
Question: Would NAVFAC please provide information about the maximum demand on the existing switchgear?
| Maximum Demand on Existing Switchgear shall be determined by AE2 under this contract. | Summer | EGI |
| 20. Reference: NRL 43 RFP / Drawing ES-101; Existing Trees Circled with No Associated Note Arborist Required? |
Question:
A. Two (2) existing trees are circled on ES-101, but no associated note is provided. Please designate work required, if any, for existing trees.
B. Are services of an arborist required for the trees?
| A. The circles indicate the drip edge of the tree, all escavation shall be performed outside to the drip edge of the tree See note 10. B. No tree work is anticipated on this project, all work is to be away from the tree to prevent damage. | Summer | EGI |
| 21. Reference: NRL A49 RFP |
Question: Is a load calculation available to confirm that a 2500 KVA generator is adequate for this building?
| No, the generator is sized to match the incoming transformer. | Summer | EGI |
| 22. Reference: NRL A49 RFP |
Question: Is sequencing of the various loads required?
| No, the generator is to carry the building in one block load. | Summer | EGI |
| 23. Reference: Topographic Survey; Existing Utilities Drawings / NRL A49 RFP |
Question: Are topographic survey and utility plans available? If yes, please provide these documents.
| Topographic survey with exsting utilities have been inclueded in Part 6 Attachements, concept drawings C-101 and C-102 | Summer | EGI |
| 24. Reference: Fuel Requirement at Project Turnover, for Fuel Storage Tank / NRL A49 RFP |
Question: Is tank full of diesel fuel required? Please designate quantity of fuel to be provided in storage tank at project completion and turnover.
| Fuel for testing shall be provided under this contract and the tank shall be full when the project is turned over to the government. | Summer | EGI |
| 25. Reference: Existing Fire Sprinkler and Fire Alarm System Drawings / NRL A49 RFP |
Question: Are existing sprinkler and fire alarm drawings available? If yes, please provide these documents.
| If there are any drawings available, they will be provided to the contractor after award at the discretion of NRL. | NAVFAC | EGI |
| 26. Reference: Maximum Demand on Existing Switchgear / NRL A49 RFP |
Question: Please provide information about the maximum demand on the existing switchgear.
| Maximum Demand on Existing Switchgear shall be determined by AE2 under this contract. | Summer | EGI |
| 27. Reference: Electrical Circuits to be Removed / NRL A59 RFP |
Question: Has NAVFAC performed circuit tracing of all circuits to be removed? If yes, please provide report/results.
| All circuit tracing is to be performed under this contact. | Summer | EGI |
| 28. Reference: Maximum Demand on Existing Electrical Panelboards / NRL A59 RFP |
Question: Please provide information about the maximum demand on the existing panels?
| Maximum Demand on Existing panelboards shall be determined by AE2 under this contract. | Summer | EGI | |
| 1) Please clarify if work at all three locations can be performed simultaneously and or if phasing of work is required | Work can be peformed simultaneously. | NAVFAC | Donley |
| 2) Please clarify if entering of the work areas will require that the Government provide escorts. | Work areas on the interior of the building will require escorts | NAVFAC | Donley |
| 3) Please clarify how much fuel is expected to be placed in the new fuel tank for Government use. | Fuel for testing shall be provided under this contract and the tank shall be full when the project is turned over to the government. | Summer | Donley |
| 4) Please clarify if working inside the work areas is to be performed during regular work hours. | Project are to be executed during normal working hours, Any action |
that required to be done after hours and on weekends because any work disruption has to be consulted with the NAVFAC construction manager
| NAVFAC | Donley | ||
| 5) At Bldg. 59 we are to remove the single personnel door and install double door opening. Please provide as built drawing for location of work and or indicate the thickness of the wall and material of wall. | There is no work at building 59. Doors are required on the Building A49 project, see A-102 | Summer | Donley |
| 6) Please confirm that this project only requires one personnel and that this personnel can be both the SSHO/QC. | A49 RFP Specification Section 01 35 26.05 20 indicates CQC manager cannot be the SSHO for the project. | NAVFAC | Donley |
| 7) Can you please clarify what are the DDC requirements | Project shall provide stand alone digital controls that can be integrated into the existing building controls and the campus wide, Siemens DDC control system per A49 RFP Part 3 Chapter 6 Paragraph D306001 1.1. Controls shall not be connected to the campus network as part of the construction per direction provided in RFP Part 6 correspondence. | Summer | Donley |
| 8) Can you please clarify if there is a designated DDC controller that must be used under this contract. | A specific controller is not required for the A49 Generator construction, but the controls must be able to be connected to the existing Building and Campus Siements systems. | Summer | Donley |
| 9) Please advise if removal of rock is expected and or if provisions are to be made in the proposal bid. | Geotechnical Investigation Report is included in A49 Generator RFP Part 6. Rock was not encountered as part of the RFP design investigation. Subsurface soil information is for Contractor's information only and is not guaranteed to fully represent all subsurface conditions. Contractor must perform additional subsurface investigation/testing as required to adequately determine all applicable geotechnical factors per A49 RFP Part 3 Chapter 6 Paragraph A10. | Summer | Donley |
| 10) Please advise if the intent will be to award the base bid. | Yes, the intent is to award the base bid. | NAVFAC | Donley |
| The three project RFP’s Section 011400.0520 mention obtaining approval before entering buildings and that escorts will be provided by the Government. Please clarify which buildings or portions of buildings will required work under escort. | Escorts will need to be provided for work in the interior. | NAVFAC | G-W |
| In the solicitation’s general requirements under the Proposal Acceptance Period states the Proposal acceptance period shall be 120 days from receipt of offers. In Attachment A note 4 states the offeror’s price is valid for 90 days from the receipt of proposals. Please clarify these conflicting documents. | Please disreguard Price Schedule submitted with the solicitation. It was a template used from another project. The note section is wrong and from another project. The proper price schedule will be included in the RFI amendment | NAVFAC | G-W |
| In the Attachment A, note 7, states options 1 and 2 may be awarded at time of award or within 365 days of award. The project duration is only listed at 365 days. Please clarify. |
a. If the options are awarded up to 365 days after NTP, how long would the project be extended for each of the options?
b. Should the Base Bid include the design for the Base Bid and both options? That way only one design submission process is required instead of three separate design processes for each of the bids. Or should we assume the design for each option will be its own separate activity and the cost for it included in each option?
c. Option 1 contains many expensive pieces of equipment. If the proposal period is 90 or 120 days and the award for the options occur at the end of the 365-day period that would be 15-16 months after the proposal date. Will the contractor be able to adjust pricing due to economic conditions?
| Please disreguard Price Schedule submitted with the solicitation. It was a template used from another project. The note section is wrong and from another project. The proper price schedule will be included in the RFI amendment. The price that the contractor proposes will only be applicable for 90 days. If we don’t accept or choose to go with that option at day 91 the contractor can come back with a different | NAVFAC | G-W |
| Please clarify the staffing requirements. Each of the RFPs have conflicting information on the number of personnel required for Superintendent, SSHO and CQC. A49 requires 3 separate individuals but B-43 and A59 only require two. |
a. Is this is two person or three person project?
b. Confirm that the same staff can manage all three projects and that separate staffing is not required for each building/project.
| Due to the size and complexity of the A49 project the CQC cannot be the SSHO. | Summer | G-W | |
| The Price Schedule Notes 1, 2 and 3 mention the Total Price is items 0001-0004 but there are only spaces for prices 0001-0003 to be entered. Please confirm Item 0004 is not applicable. | Please disreguard Price Schedule submitted with the solicitation. It was a template used from another project. The note section is wrong and from another project. The proper price schedule will be included in the RFI amendment | NAVFAC | G-W |
| All three projects, Part 3, Section C30 requires SSPC QP-1 certification for painters. Since the painting on this project is minor, can this requirement be waived? | The ceritification cannot be waived. | NAVFAC | G-W |
| A49 – Section 013310.0520-2.2.2 requires design submissions of DD 35%, DD65%, Prefinal 100% and Final, but the other two projects only require one DD design submission. Can we consolidate for uniformity and only have one DD submission for all three projects? | No, please follow what is in the RFP. | NAVFAC | G-W |
| A49 Specific | G-W | ||
| In the RFP specification Part 3 - D509002 (p 262) requires a non-fused NEMA 3R switch connected to the generator on the exterior for a future portable load-bank. This requirement may be unsafe because there is no safeguard in place to prevent the connection of another energized source which would parallel the generator emergency circuit. Consider the requirement to install a double-throw switch (2 position manual transfer) in the emergency circuit and a NEMA 3R load-bank connection cabinet on the exterior or some other design. (note; drawing E-601 does not show this requirement) | An exterior switch for load bank is required. The drawings are conceptual and are for information only. The design of the generator and accessories is to be completed by AE 2 under this contract and must meet the UFC's and NEC. All accessories required to meet code shall be provided under this contract. | Summer | G-W |
| Regarding the preceding question; will a motor operator and shunt trip be required on the load-bank switch in case the building requires emergency service during a load-bank test? | Shunt trip on the load bank breaker is required | Summer | G-W |
| Should the load-bank circuit be sized for 50% or some other percentage of the generator capacity? | 100% for annual testing | Summer | G-W |
| Does the NRL-Navy already have the DOEE permit to construct and operate the generator? | No, Contractor is to identify and procure all permits under this contract. | Summer | G-W |
| Who is responsible for furnishing diesel fuel for the tanks? Should we provide them completely full or just enough for testing? | Fuel for testing shall be provided under this contract and the tank shall be full when the project is turned over to the government. | Summer | G-W |
| Will the NRL require a factory witness test on the generator? If so, will the NRL be responsible for travel/lodging expenses for their personnel? | No, a factory witness test will not be required. | NAVFAC | G-W |
| Specification 26 32 13.00 20 3.5.3 requires an onsite emissions testing of the generator. The DOEE does not require field emissions testing for emergency generators that run less than 500 hours/year. If factory emissions test data for the engine are submitted and approved by DOEE, can this requirement be waived? | No, the requirement cannot be waived | NAVFAC | G-W |
| The RFP documents require the design to comply with the latest National Electrical Code. The generator serves Article 700 “Emergency” loads for the building. Article 700.3 (F) requires a temporary source of power for maintenance or repair of the alternate source of power. This requires connection to the portable or temporary alternate source and shall not require modification of the permanent system wiring. This can be done using a manual transfer switch and a temporary generator connection cabinet. Drawing E-601 does not show these requirements. Should this be part of the design? | This is a whole building generator and an alternate source of power is not required since the emergency loads are battery backup lights, fire alarm and security per exceptions (3 & 4) | Summer | G-W |
| Drawing ED-101 the photo in the lower left corner shows 12 sets 4” conduits. Drawing E-601 the feeder schedule shows these same conduits as 3-½”. These are conflicting. | The drawings are conceptual and are for information only. The design of the generator and accessories is to be completed by AE 2 under this contract and must meet the UFC's and NEC. AE 2 to field verify and match existing conduit size. | Summer | G-W |
| Where should the generator remote annunciator be located? | Coordinate exact location with NAVFAC during design. | Summer | G-W |
| Part 3, Chapter 6, F2010 mentions wet pipe sprinklers as does Part 5, Section 211313.0010. Other portions of the RFP state the sprinkler system is a dry type. Please clarify. | Provide dry pipe sprinkler system for generator enclosure per RFP Part 3 Chapter 6 Paragraph D4040 and Part 6 guidance provided by the Government. | Summer | G-W |
| Drawing M-401, Note 3 is all dots and had a formatting error. Please reissue this note. | Note 3 is not applied to Drawing M-401. | Summer | G-W |
| Part 3, Chapter 6 – B201003 states to provide a continuous air barrier and continuous water barrier. If this is required on this project, please define the limits. | Continuous air and water barrier apply to building roof, wall, and floor elements provided or modified as part of construction. | Summer | G-W |
| A49, Part 3, Chapter 6, C10 and Note D8 on AD-101 state to relocate the modular palletized storage racks. Where are these being relocated to? Do we need to reassemble them? | The racks are to be relocated and reassembled within the warehouse of A49, coordinate exacat location with NAVFAC during design. | Summer | G-W |
| NRL 43 Specific | G-W | ||
| B43, sheet E101, Note 1, What type of plug is required? | Coordinate receptacle configuration with IT racks | Summer | G-W |
| B43, sheet E102, note 3, What conduit size is required? | AE 2 to coordinate with UFC requirements | Summer | G-W |
| In the NRL 43 “Record of Categorical Exclusion” item 2 states “a new natural gas generator set”. The RFP specification paragraph 1.0(p.29) the project description requires a 400KW diesel generator. These are conflicting. Confirm that diesel is required. | Diesel is required | Summer | G-W |
| Does the NRL-Navy already have the DOEE permit to construct and operate the generator? | No, all permits are to be provided under this contract | Summer | G-W |
| Who is responsible for furnishing diesel fuel for the tanks? Should we provide them completely full or just enough for testing? | Fuel for testing shall be provided under this contract and the tank shall be full when the project is turned over to the government. | Summer | G-W |
| Will the NRL require a factory witness test on the generator? If so, will the NRL be responsible for travel/lodging expenses for their personnel? | No, a factory witness test will not be required. | NAVFAC | G-W |
| The RFP specification paragraph Part3 - D50 Electrical (p 37) has a requirement to “Test existing electrical equipment remaining in service”. Identify what existing equipment is to be tested. | Contractor shall test the electrical system down stream of the new generator and ATS switches. AE 2 shall survey and identify equipment. | Summer | G-W |
| The RFP specification paragraph Part 3 - D5030 (p 41) requires existing security circuits will be intercepted and connected to the generator panel on each floor. How many circuits are required to be relocated on each floor?. | The circuiting is based on the reference drawings in Appendix C. All circuit tracing is to be performed under this contact. | Summer | G-W |
| Is there a requirement to provide short circuit, coordination and arc flash studies? | Short circuit, coordination and arc flash studies are to be performed by AE2 under this contract. | Summer | G-W |
| The RFP specification paragraph D501003 (p39) requires a “White Sound attenuated weather resistant enclosure”. For a generator of this size, 400KW, the generator manufacturers do not provide for a custom enclosure color. The manufacturers provide the enclosure in two colors; gray or tan. Would one of these colors be acceptable or do you want a custom paint color provided by a third party? | White is available from several manufactures. | Summer | G-W |
| The RFP specification paragraph D501003 (p39) requires a “white vinyl fence to completely conceal the generator and fuel oil storage tank”. Please provide specification for this fence. | Fence is to be design by AE 2 under this contract. | Summer | G-W |
| Drawing E-601 the existing power riser shows 4#3 + 1#8 GRD. In 1¼” conduit for the existing GEN2 panel. The new power riser shows 2 sets of 4/0 in 2” conduit. The feeder feeds existing panel GEN2 which is 100A. Verify that the 4#3 + 1#8 GRD. In 1¼” conduit is correct? | Conduit and conductor size are to be determined by AE 2 under this contract. | Summer | G-W |
| Is it acceptable to use EMT conduit with compression fittings for all interior conduit runs? | YES | Summer | G-W |
| Provide the manufacturer and catalog or shop number of the existing main switchboard. | Square-D | Summer | G-W |
| Drawing E-501 the detail 1” innerduct requires 4-1” innerduct core to be installed in a 4” PVC conduit. This is not possible because the outside diameter of the innerduct is larger than the 4” PVC inside diameter. Can the contractor install 4-1” PVC conduits in lieu of the innerduct? | Four 1" PVC conduits will be acceptable. | Summer | G-W |
| The RFP specification paragraph D501003 (p39) requires the fuel supply and return piping to be heat traced. Should the power circuit to feed the heat trace come from panel GEN4? | Yes | Summer | G-W |
| The RFP documents require the design to comply with the latest National Electrical Code. Part of the generator serves Article 700 “Emergency” loads through ATS-GEN1. Article 700.3 (F) requires a temporary source of power for maintenance or repair of the alternate source of power. This requires connection to the portable or temporary alternate source and shall not require modification of the permanent system wiring. This can be done using a manual transfer switch and a temporary generator connection cabinet. Drawing E-601 does not show these requirements. Should this be part of the design? | The drawings are conceptual and are for information only. The design of the generator and accessories is to be completed by AE 2 under this contract and must meet the UFC's and NEC. All accessories required to meet code shall be provided under this contract. | Summer | G-W |
| On drawing E-101 in office 014 there is a symbol for an exit sign. Is this to be installed under the design? | No | Summer | G-W |
| Should we assume the existing generator and fuel tank contain fuel that needs to be evacuated before removal? If so, how much should be assumed? | 200 gallons | Summer | G-W |
| Part 2, Section 013300.0520-1.4 has an eOMSI chart but it isn’t filled out. Please fill out and reissue. | The chart in the RFP (43) is a list of all the deliverables associated with eOMSI that the contractor needs to provide. It is blank because the contractor should provide 1 electronic copy to each of the teams listed in the Chart. A blank copy will also be provided in the RFI amendment | NAVFAC | G-W |
| Part 2, Section 013310.0520-1.3 has a chart for copies of the design submissions that is not filled out. A49, Section 013310.0520-2.2.4 lists the number of design submissions for that project. Should we assume the A49 number of design submissions is correct for all three projects? | NRL 43 - says to provide 3 hard copies and electronic copies of design submittal package to the follow reviewers. | NAVFAC | G-W |
| Section 015719-1.10 states an “Above Ground Storage Tank Report” can be found in Part 6. We cannot locate this report. Please issue. | The information is within the Geotechnical Report that was provided in part 6. | G-W | |
| Section 015719-1.11 mentions contaminated soil or groundwater. Please clarify this. How much is expected to be encountered and at what locations? | Provide a per unit price for contaminted soil/ cubic yard of material. Areas of concern loacation of existing generator and the pathway for new generator and ductbank. Contractor shall provide soil testing under this contract. | G-W | |
| Part 5, Section 013123.1320-1.4.3 requires a tablet with CAC reader to be provided to the owner. On other previous projects this has not been required. Please confirm it is not required. | Not Required | NAVFAC | G-W |
| Please clarify the work restrictions when working on the upper floors. |
a. Does this work need to be done off-hour?
b. Do the offices contain much furniture or system furniture that may be in the way of the work? If so, who will move/protect the furniture and equipment?
A: Projects are to be executed during normal working hours*, Any action that required to be done after hours and on weekends because any work disruption has to be consulted with the NAVFAC construction manager.
B: Any system furniture that needs to be moved has to be coordinated by the end user, during design development A/E has to identify which furniture has to be removed prior work start, as schedule has to be summited to work areas by small section and proper coordination with end user to minimize work disruption. Any system furniture that cannot be moved has to be protected by the contractor
| NAVFAC | G-W | ||
| Notes 5 and 6 on E-103 state to relocate a shredder and refrigerator. Where are there being relocated to? | This should be coordinated with the end user. | G-W | |
| Please provide a copy of the sign in sheet from the site visit. | Yes. Included in the amendment | NAVFAC | G-W |
| A49, Part 4, Section B301090 states to extend any existing lightning protection system to the new exhaust pipe. Part 3, D509004 state lightning protection is not used. Is this required? Does this building have a lightning protection system? | The bulding has no lightning protection ground to structural steel. | Summer | G-W |