N4008019R0310_SOURCES_SOUGHT_NOTICE_N4008019R0310_CEG.pdf

PDF 81 KB Posted

Attached to
REGIONAL HAZARDOUS WASTE SERVICES FOR NAVAL DISTRICT WASHINGTON, WASHINGTON DC
Solicitation number
N4008019R0310
Issued by

About this file

N4008019R0310_SOURCES_SOUGHT_NOTICE_N4008019R0310_CEG.pdf

View the file

Other files

File Type Posted
N4008019R0310_1800000_F_Environmental_v2.2_CEG_DONE.doc DOC document
N4008019R0310_0200000_F_M_and_A.doc DOC document
N4008019R0310_1800000_C_Environmental.doc DOC document
N4008019R0310_0100000_C_General_Information.doc DOC document
N4008019R0310_0200000_C_M_and_A.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMALL BUSINESS SOURCES SOUGHT NOTICE

Notice Number: N4008019R0310 – Revised 4/05/2019 Title: REGIONAL HAZARDOUS SERVICES FOR NAVAL DISTRICT WASHINGTON (NDW)

This is a Small Business Sources Sought notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding: (1) the availability and capability of qualified small business sources; (2) whether they are small businesses; HUB-Zone small businesses; service-disabled, veteran owned small businesses; 8(a) small businesses; veteran-owned small businesses; woman-owned small businesses; or small disadvantaged businesses; and (3) their size classification relative to the North American Industry Classification System (NAICS) code for the proposed acquisition. Your responses to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set-a-side is possible. An organization that is not considered a small business under the applicable NAICS code should not submit a response to this notice.

This Naval Facilities Engineering Command (NAVFAC) Washington project is for the renewal of contract N4008015D0306 with HazTrain Inc. that was awarded on as a competitive small business for a five year period. Freedom of Information Act (FOIA) requests regarding the current contract with Advant-Edge Solutions of Middle Atlantic, Inc should be directed to James Dixon at james.h.dixon2@navy.mil . This Small Business Sources Sought Notice (SBSS) is for information and planning purposes only and shall not be construed as a solicitation or as an obligation on the part of the Naval Facilities Engineering Command (NAVFAC) Washington. A determination by the Government not to compete this requirement as a set-aside based upon responses to this Notice is solely within the discretion of the Government.

Interested parties are expected to review this Notice and the draft Statement of Work to familiarize themselves with the requirements of this project; failure to do so will be at your firm’s own risk.

Background:

The Contractor shall provide all labor, management, supervision, tools, material, supplies, vehicles, and equipment required to perform environmental services including but not limited to hazardous waste management and operations at the Washington Navy Yard, Naval Support Activity (NSA) Bethesda, Walter Reed National Military Medical Center (WRNMMC), Naval Support Facility (NSF) Anacostia, Marine Barracks at 8th & I, Potomac Annex, NSF Naval Observatory, NSF Suitland, NSF Arlington, Pentagon, NSF Carderock, NSF Indian Head, NSF Dahlgren, NSF Stump Neck, NAS PAX River, Webster Field, NRC Solomon’s Island, and NSA Annapolis.

Purpose and Objectives:

The purpose of this Small Business Sources Sought Notice is to identify qualified small business concerns including HUBZone small businesses; service-disabled, veteran-owned small businesses;

8(a) small businesses, veteran-owned small businesses; woman-owned small businesses; or small disadvantaged business2 es that are interested in and capable of performing the work described herein. The NCI does not intend to award a contract on the basis of responses received nor otherwise pay for the preparation of any information submitted.

As a result of this SBSS Notice, the NCI may issue a Request for Proposal (RFP). THERE IS NO SOLICITATION AVAILABLE AT THIS TIME. However, should such a requirement materialize, no basis for claims against NCI shall arise as a result of a response to this Small Business Sources Sought Notice or the NCI’s use of such information as either part of our evaluation process or in developing specifications for any subsequent requirement.

Project Requirements:

1. The Contractor shall provide hazardous waste management and operations services in accordance with federal, state, and local statutes and regulations, and with DoD and Navy policies, instructions and guidance.

2. The Contractor shall hazardous waste management and operations to be in accordance with federal, state, and local statutes and regulations, and with DoD and Navy policies, instructions and guidance.

3. The estimated value of the contract for the base and options is approximately $5,900,000.

4. The requirements are planned to be solicited using FAR subpart 13.5 Test Program for Certain Commercial Items using FAR subpart 15.102 Lowest Price Technically Acceptable selection process.

Anticipated Period of Performance:

The period of performance for this requirement is five (5) years, consisting of a one-year base period plus four (4) one-year options. The anticipated start date is February 1, 2020.

Other Important Considerations:

mailto:james.h.dixon2@navy.mil

Mandatory Criteria - All parties interested in this project must meet the following mandatory criteria for eligibility:

Permits & Licenses – The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.

Insurance - The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

Certificate of Insurance - The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

Minimum Insurance Amounts - The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

• Comprehensive General Liability: $500,000 per occurrence

• Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

• Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

• Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law Protection of Government Property - During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

Government Information Technology (IT) System - Information about NMCI may be obtained at http://www.eds.com/nmci.

Directives, Instructions, and References - Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J- 0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

Government-Furnished Property, Materials and Services - In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract.

Government-Furnished Facilities (GFF) - The Government will provide office space and operational facilities to the Contractor. They are listed in Section J of the solicitation. Any additional space required will be provided by the offeror at their own expense.

Contractor-Furnished Items – Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities not already provided in Section J of the solicitation to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

Management - The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The http://www.eds.com/nmci

Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

Work Control - The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

Work Schedule - The Contractor shall provide a plan of Vehicle Routes and Collection Schedules that minimize the impact and effects of the interference of Government business. This plan and schedule shall be submitted to the KO for approval as specified in Section F, Deliverables. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls Service Interruptions - If any scheduled Hazardous Waste Removal Services must be discontinued, even temporarily, the Contractor shall notify the KO, affected tenants, and customers verbally and in writing or email as soon as possible before, but not less than 1 hour before known interruption of scheduled services. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.

Deliverables - Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract. The Contractor shall input data in accordance with Section C Annex 18-00000 Spec Item 2.4 the Hazardous Waste information into the Waste Track Software Database and Hazardous Waste Management Tracking System. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the update within the database. Each deliverable posting on the database and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

Documentation Requirements - The Contractor shall immediately notify the KO and NAVFAC Environmental Hazardous Waste Managers In writing as to the contents of each shipment of Hazardous Waste removed from collection stations. Notification, or manifest (shipping papers) will minimally contain the following information:

• Name of Hauler

• Driver’s Signature

• Specific Location of Pickup

• Quantity of Containers - Hazardous

• Date of Removal

• Destination (Facility)

• Signature of Official at Destination Certifying Receipt

A copy of the written notification, described above, must accompany the shipment of waste to be removed.

Shipments, generated at a Maryland location must abide by the Local and State regulations issued by the Environmental Protection Agency in Maryland.

Regulatory Compliance - The Contractor shall comply with all applicable local, state, and Federal instructions, regulations, standards and laws pertaining to the Hazardous waste disposal, and transportation of Hazardous waste.

The Contractor shall be required to fully comply with all changes in regulations and laws as they occur during the contract term. This compliance shall be at no additional cost to the Government.

Quality Management System (QMS) - The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

Quality Management (QM) Plan - The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

Policy and objectives of Quality Management System (QMS)

• Quality organization

• List of personnel

• Responsibilities & lines of authority

• Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services

• Scheduling and performance of inspection and surveillance

• Measurement, data collection and analysis

• Corrective action, preventive action, and continuous improvement

• Oversight of subcontracted work

• Documentation and records management

• Communication with Government (customers)

Quality Inspection and Surveillance - The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

Employee Certification and Training - The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes.

Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.

Proof of Legal Residency – The Contractor shall ensure that all employees working on this contract have a pre-employment physical performed by a Contractor selected physician.

Medical Conditions - The following conditions shall bar employees from working on this contract that display the following medical condition(s) until such time as the Contractor or the individual can prove the condition(s) no longer exists or that no other individual is at risk.

• Positive PPD Test

• Positive exam or test for communicable, infectious or contagious diseases

Medical Records - Individual employee medical records shall be maintained and located at the Contractor’s office and include the pre-employment physical, inoculation/immunization and other pertinent documentation. The Contractor shall ensure that medical records are current and periodic inoculation/immunization requirements are identified and obtained. At contract termination all individual medical records shall become the property of the Government and shall be delivered to the KO with the final invoice.

Enterprise-wide Contractor Manpower Reporting Application (eCMRA) - The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil. Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk , linked at https://doncmra.nmci.navy.mil.

Security Requirements - The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government https://doncmra.nmci.navy.mil/ https://doncmra.nmci.navy.mil/ regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

Vehicles - The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable. Contractor collection vehicles shall be operated in accordance with activity rules and regulations while in the activity area, and shall be kept closed when moving or when not actually engaged in collecting wastes. All vehicular equipment shall be maintained in good repair and in a safe, clean, and well-painted condition. Vehicles that are identified as unserviceable or unsightly by KO or appointed Government authority shall be repaired or replaced within ten working days at no additional cost to the Government. The Contractor shall have sufficient equipment for backup of regularly assigned vehicles to insure completion of contract requirements in the event of breakdowns or other equipment problems.

Access to Installation - All Contractor personnel shall obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS), or by obtaining a temporary pass from the Base Pass and Identification Office. Temporary passes issued through the Base Pass and Identification Office will be furnished without charge. Immediately report instances of lost or stolen badges to the Base Pass and Identification Office.

The Contractor shall furnish a completed DEPARTMENT OF THE NAVY LOCAL POPULATION ID CARD/BASE ACCESS PASS REGISTRATION (SECNAV FORM 5512/1) form for all personnel requesting badges

DBIDS Program - Defense Biometric Identification System (DBIDS) is an enterprise identity management and perimeter installation access control solution. DBIDS increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.

If the vendor/contractor employee passes the background screening process, the DBIDS credential that is issued to the vendor/contractor employee is valid for the term of the card. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges.

Contractors or vendors who need assistance in transitioning from NCACS to a DBIDS temporary pass to a DBIDS card can contact the installation Pass & ID office or Visitor Control Center.

1. If you currently have a Navy Commercial Access Control System (NCACS) card (used with RAPIDGate), the following is required to get a DBIDS credential:

a) Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center representative.

b) The VCC will pull up your information in the computer, ensuring all information is current and correct.

c) Once your information is validated, a temporary DBIDS credential is provided.

d) Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).

e) For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.

f) The representative will enter base access authorization.

2. If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:

a) Present a letter or official document from my government sponsoring organization that provides the purpose for your access.

b) Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c) Present a completed copy of the SECNAV 5512/1 form to obtain your background check.

Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.

Access to Buildings - The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

Escort Arrangement for Secured Areas - The Contractor shall make arrangements for Government escort into secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact. The Contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 15 minutes. The Contractor shall notify the Government Performance Assessment Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied. Unscheduled requirements may require a longer wait for an escort.

Security Clearances - The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.

Access to Sensitive Unclassified Information - The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a National Agency Check Investigation (NACI) to verify their suitability. If the Contractor personnel currently have a favorably adjudicated NACI the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).

The Contractor shall request from the Government for access to the E-QIP Direct program for the Contractor employees to complete the SF-85 form on line for an NACI. The Security Manager will determine suitability.

Upon a favorable NACI, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment per Section F. The Contractor shall be responsible for providing the fingerprint card. The request shall be renewed annually or for the duration of the contract if less than one year.

Employee Status - The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.

Contractor Safety Program - The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-596, Occupational Safety and Health Act.

Accident Prevention Plan (APP) - The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site. The APP shall follow the abbreviated format and include, as a minimum, elements addressed in paragraph 11 of Appendix A of EM 385-1-1. The Contractor shall submit an APP for acceptance per Section F. The Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or activities occur.

Occupational Risk and Compliance Plans - The Contractor shall develop, provide and implement occupational risk and compliance plans, as specified below, as necessary for the situation or types of work to be performed under this contract. These plans shall be submitted with the APP and shall be updated as situations change. Additional plans as referenced in Appendix A of EM 385-1-1 shall be developed as applicable when new types of work are required under this contract.

Draft Statement of Work:

A copy of the draft Statement of Work (SOW), which is subject to revisions, may be accessed on the Navy Electronic Commerce Online (NECO) Website at URL:

https://www.neco.navy.mil . Once there, click on Current Requests for Proposals.

NAICS Code and Size Standard:

In the event an RFP is issued, North American Industry Classification System (NAICS) code 562211 with a size standard of 38.5 million dollars is being considered.

Capability Statement/Information Sought:

Tailored Capability Statements shall demonstrate a clear understanding of all tasks specified in the draft Statement of Work (SOW). Tailored Capability Statements for this requirement shall address the following areas:

1. Demonstrate the ability to meet the mandatory criteria as noted above.

2. The organization’s awareness of project needs and approach to performance of Tasks in meeting the objectives of the attached draft SOW. Specifically, address the following:

• Experience with range of materials and equipment needed to perform the services.

• Demonstration of a practical and realistic approach to the collection and treatment of medical waste.

• Description of how the team will be organized both technically and administratively.

• Description of plan for transitioning ongoing tasks identified in the draft

SOW.

• Demonstrate the ability to provide knowledgeable staff to meet the objectives of the attached draft SOW. Specifically, addressing that proposed staff have the experience in the technical environment and range of tools comprising this project.

3. Document composition and qualifications of the Key Personnel proposed staff. Specifically, the following four positions:

(a) The Project Manager (PM) - The PM shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM shall be available and on-site within one hour during the Government's regular working hours at Government request. The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

(b) The Quality Manager (QM) – The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager may be the same person as the SSHO.

(c). The Site Safety & Health Officer (SSHO) - The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour General Industry Procedures safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

(d.) The Environmental Manager –The Environmental Manager shall have a minimum two years’ experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs); and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements) that are applicable to operations similar to those of this contract. The Environmental Manager role can be fulfilled by any competent Key Personnel.

Information Submission Instructions:

1. Page Limitations:

Interested qualified small business organizations should submit a tailored capability statement for this requirement not to exceed twenty (20) single sided pages including all attachments, resumes, charts, etc. (single spaced, 10 point font minimum) that clearly details the firm’s ability to perform the aspects of the notice described above and in the draft SOW. Tailored https://www.neco.navy.mil/ capability statements should also include an indication of current certified small business status; this indication should be clearly marked on the first page of your capability statement (preferable placed under the eligible small business concern’s name and address) as well as the eligible small business concern’s name, point of contact, address and DUNS number.

2. Number of Copies:

All capability Statement sent in response to this SMALL BUSINESS SOURCES SOUGHT notice must be submitted electronically (via e-mail) to James H. Waite, Contracting Officer, at james.h.waite@navy.mil in MS Word, or Adobe PDF.

The e-mail subject line must specify N4008019R0301. Facsimile responses will not be accepted.

3. Common Cut-off Date:

Electronically submitted tailored capability statements are due no later than 10:00AM (Eastern Prevailing Time) on 22 April 2019. CAPABILITY STATEMENTS RECEIVED AFTER THIS

DATE AND TIME WILL NOT BE CONSIDERED.

DISCLAIMER AND IMPORTANT NOTES: This notice does not obligate the Government to award a contract or otherwise pay for the information provided in this response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization’s mailto:james.h.waite@navy.mil

File details come from the government source that posted it.