ACQR5281175

46/67 RENOVATION OF OPERATIONAL ARCHIVES & RESEARCH FACILITY

WASHINGTON NAVY YARD, DC

Competition Requirements: Full and Open Competition

Source Selection Process: Best Value Source Selection (BVSS) Tradeoffs, Tw o-step Design Build Procedures

Procurement Method: Contracting by Negotiations

Type of Contract: Firm Fixed Price

NAICS Code is 236220, Commercial and Institutional Building Construction

The Design Build Budget Amount is $67,184,000.

The draw ings and specifications for this project w ill not be available for Phase I. The draw ings and specifications w ill be available for Phase II.

The primary point of contact for this project is Lindsay Brow n at lindsay.naill@navy.mil. The secondary point of contact is Janine Queen at Janine.queen@navy.mil.

JANINE QUEEN 202-685-8022

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Apr-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________570 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 May 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: (202) 685-3192 TEL: FAX:

N4008018R1175 75

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N4008018R1175

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Project Base Bid

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR5281175

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTION TO OFFERORS

INSTRUCTIONS TO OFFERORS

The primary point of contact for this project is Lindsay Brown at lindsay.naill@navy.mil. The secondary point of contact is Janine Queen at Janine.queen@navy.mil.

All drawings, specifications and amendments shall be posted to the Navy Electronic Commerce Online (NECO) website at www.neco.navy.mil. Potential offerors will not be contacted regarding any changes posted.

1. The following paragraphs are supplemental instructions to bidders to be used in conjunction with the remaining sections.

2. This procurement is solicited on an unrestricted basis with full and open competition. This acquisition results in a Firm-Fixed Price (FFP) Design/Build construction contract.

3 TITLE: DB, 46/67 RENOVATION OF OPERATIONAL ARCHIVES AND RESEARCH FACILITY,

WASHINGTON NAVY YARD, DC

4. PROJECT DESCRIPTION: This project is for the design and construction of 46/67 Renovation of Operational Archives and Research Facility at the Washington Navy Yard, DC. This project refurbishes Buildings #46 (approx. 24,550 SF) and #67 (approx. 10,000 SF) at the Washington Navy Yard (WNY) for the Naval History and Heritage Command (NHHC). The primary functions programmed for the renovated buildings include a research area, archives storage, photo research, special collections and rare books, processing and library stacks, underwater archeology offices, storage and lab, art storage, art shop, art mezzanine, histories branch and a Secure Compartmented Information Facility (SCIF). While not all of the tenants and components will be housed in Buildings #46 and #67, these buildings will contain a large portion of archives, artifacts, photographs and administration for the Command.

5. This requirement is a Design/Build construction project with an overall estimate contract duration of 570 calendar days from contract award (this includes 15 days for bond submittal).

6. The Design-Build Budget amount is $67,184,000.

7. CONTRACTORS ARE REQUIRED TO REVIEW THE ENTIRE SOLICITATION PACKAGE BEFORE

SUBMITTING QUESTIONS. All inquiries must be submitted in writing and emailed to Lindsay Brown at lindsay.naill@Navy.mil and Janine Queen at janine.queen@navy.mil with inquiries attached as a WORD document.

PHASE I RFI CUT-OFF DATE IS COB 15 MAY 2018

8. All Phase One proposals must be received prior to 30 May 2018 at 2:00 PM EST.

Proposals may be sent via express mail carriers or hand-carried to the following address:

NAVFAC Washington Attn: Lindsay Brown 1314 Harwood Street SE, Bldg. 212, First Floor Mail Room Washington Navy Yard Washington, DC 20374

INSTRUCTIONS FOR HAND DELIVERY OF PROPOSALS:

The current security condition at the Washington Navy Yard requires escorts for entry to the base by individuals not possessing a U.S. Government DoD Common Access Card (CAC) identification card.

Individuals without a DoD CAC will not be permitted to enter the Navy Yard.

NAVFAC Washington will NOT be able to provide escorts for Navy Yard entry of hand delivered proposals. NAVFAC Washington will NOT receive hand delivered proposals at the Base Pass Office or any location other than that identified for receipt in the solicitation.

The Government considers use of a courier service, such as FedEx or UPS, as hand delivery of proposals and the responsibility for timely delivery resides with the offeror. Offerors are notified that the entry point for proposals submitted through the U.S. Postal Service is at Joint Base Anacosta-Bolling and NOT at the Washington Navy Yard. Proposals must be received by NAVFAC Washington at the Navy Yard by the due date and delivery time from the Joint Base Anacosta-Bolling to the Navy Yard cannot be predicted nor guaranteed. Offerors should take this into consideration when determining delivery method.

Facsimile copies or email copies will NOT be accepted.

Please allow SUFFICIENT TIME for your proposal to be received prior to the proposed closing date/time.

Proposals shall be submitted in sealed envelopes/boxes marked in the bottom right corner “Solicitation

N40080-18-R-1175, DO NOT OPEN.”

Any proposals submitted after the time set for receipt will be stamped with the date and hour of receipt and held unopened until after award. The file shall be documented in accordance with

FAR 14.304-4.

The Government reserves the right to reject any or all proposals at any time prior to award, to negotiate with any or all Offerors, and to award to the Offeror submitting the proposal determined by the Government to be the most advantageous. OFFERORS ARE ADVISED THAT AN AWARD MAY BE MADE WITHOUT DISCUSSIONS. Therefore, proposals should be submitted initially on the most favorable terms. Offerors should not assume that they will be contacted or afforded an opportunity to qualify, discuss or revise their proposals prior to award.

The proposal submitted in response to this solicitation shall be clear, concise, and shall contain sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposals should not simply rephrase or restate the Government’s requirements, but rather should demonstrate convincing rationale to address how the offeror intends to meet these requirements. The offer shall be compliant with the requirements as stated in the RFP. Nonconformance with the solicitation requirements, specified organization and content may result in elimination or misevaluation of the proposal. All claimed technical capabilities to meet the requirements shall be realistic and are subject to verification by the Government. Offerors should assume that the Government has no prior knowledge of the offeror’s business and that the Government will base its evaluation on the information contained in the offeror’s proposals.

Phase I Proposal Organization and Number of Copies.

Offeror shall submit one (1) original and four (4) copies, each in a separate three-ring binder and tabbed appropriately by evaluation factor with the following characteristics:

Text pages 8 ½ x 11 format, minimum 10 point font.

A cover page with Contract Number, Contract Title, Prime Contractor’s Name, Address, Phone Number, DUNS, Cage Code, Point of Contact, phone and email address.

Firm’s type of business and business size, including information on the categories or small business for which the firm qualifies (i.e, Large Business, SB SDB, HUGZONE SB, WOSB/EDWOSB, VOSB, and/or SDVOSB).

A complete electronic copy of the technical proposal as a single .pdf file on a CD- ROM (include with the Original non-price submission).

The proposal shall be written to the greatest extent possible on a stand-alone basis so that its content may be evaluated with a minimum of cross-referencing to other volumes of the proposal.

Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity. Hyperlinking of cross-references is permissible. Information required for proposal evaluation, but not provided in its designated volume or cross-referenced, is assumed omitted from the proposal.

9. Amendments will be posted to the website Navy Electronic Commerce Online (NECO) https://www.neco.navy.mil/. Hard copies of the amendments will not be mailed. It is the Offerors responsibility to check the website periodically for any amendments to the solicitation.

The Offerors must acknowledge any and all amendments issued under this solicitation either by annotating it on the SF 1442, Price Proposal Form, or signing each SF 30 (Amendment) and submitting it with the Offeror’s bid.

10. EVALUATION CRITERIA

BASIS FOR AWARD

1. Phase-One of the procurement process is the narrowing phase selecting a maximum of five

(5) offerors (design-build teams) based on technical factors that include: Technical Approach, Experience, Past Performance, and Safety for projects priced in the anticipated workload range.

Phase-One technical factors relate to contract requirements for similar type projects. Only those offerors selected in Phase-One will be allowed to proceed into Phase-Two.

2. In Phase-Two the selected Phase-One offerors must submit technical and price proposals for the project. Offerors who fail to submit their Phase –Two technical and price proposals will not be considered for award. Phase-Two technical factors include: Energy Design Reduction and Small Business Utilization. Price proposals will be evaluated based on total price. The offeror with the proposal deemed most advantageous to the Government, considering price and non-price/cost evaluation factors, will be awarded the design-build contract.

3. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.

4. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

5. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

6. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.

7. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions.

Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

EVALUATION FACTORS FOR AWARD

The solicitation requires the evaluation of Price and the following non-cost/price factors:

Phase I:

Factor 1 – Technical Approach Factor 2 – Experience Factor 3 – Past Performance Factor 4 – Safety

Phase II:

Factor 5 – Energy Design Reduction Factor 6 – Small Business Utilization

The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

For Two-Phase DB procurements, Factors 1-4 will be evaluated in Phase I and Factors 5-6 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II. The relative order of importance of the non-cost/price evaluation factors is the technical factors 1, 2, 4, 5, and 6 are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor, Factor 3. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are approximately equal to price.

The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

Basis of Evaluation and Submittal Requirements for Each Factor.

PHASE I

EVALUATION FACTORS

Factor 1 – Technical Approach:

(a) Solicitation Submittal Requirements:

The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.

The Offeror shall submit the following information:

(1) Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6).

The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.

The technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages) including the organizational chart. The information requested in item #2 below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).

(b) Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.

Factor 2 – Experience:

(a) Solicitation Submittal Requirements:

(1) Construction Experience:

Submit a minimum of three (3) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined by the individual size, scope, and complexity characteristics set forth below. . The overall relevancy will be determined considering all three elements.

Size: Approximately 15,000 SF

Scope: Renovation project of a climate controlled facility comparable to a warehouse, library, storage, and/or laboratory facilities.

Complexity: Complexity: Renovation of one of the facilities indicated in Scope above.

The projects submitted must collectively demonstrate experience:

- retrofitting buildings that have been registered as historic by State Historical Preservation Offices or Federal organizations,

- contain temperature and humidity climate controlled environments, and

- demonstrate blast resistant window and door assemblies

Relevance may be strengthened if the submitted projects possess:

1. Experience with installing pile foundations within an existing building.

2. Experience with Secure Compartmented Information Facility (SCIF) spaces.

3. Experience with one project that contains multiple complexity characteristics identified in this Factor.

4. Design-build experience.

5. Experience with sustainable features.

6. Demonstrate that the Offeror and the proposed design firm(s) have previously worked together.

Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment H) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If the Offeror is a Joint Venture (JV), at least one of the relevant projects should be submitted for the JV entity. If the Joint Venture entity does not have shared relevant experience, projects shall be submitted for the Joint Venture members; however, JV entities with no shared relevant experience may be considered less favorably. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the Offeror shall clearly demonstrate what portion of the work was performed by the JV partner offering on this contract and shall not include work performed by that JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percent of employees provided for the overall contract by the JV member as well as the overall work percentage of work performed by the JV member. This same information shall also be provided for the task orders listed under IDIQ contracts. If the Offeror does not specifically address what portion of the work under the submitted project was performed by the JV member offering on this contract, the project will not be evaluated. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. More weight may be given to the Offeror’s projects than to those submitted for subcontractors.

(2) Design Experience

Submit a minimum of three (3) and a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. The proposed Designer shall have been the Designer of Record for the submitted projects. For purposes of this evaluation, a relevant project is further defined by individual size, scope, and complexity characteristics set forth below. The overall relevancy will be determined considering all three elements.

Size: Approximately 15,000 SF

Scope: Renovation project of a climate controlled facility comparable to a warehouse, library, storage, and/or laboratory facilities.

Complexity: Complexity: Renovation of one of the facilities indicated in Scope above.

The projects submitted must collectively demonstrate experience:

- retrofitting buildings that have been registered as historic by State Historical Preservation Offices or Federal organizations,

- contain temperature and humidity climate controlled environments, and

- demonstrate blast resistant window and door assemblies Relevance may be strengthened if the submitted projects possess the following:

1. Experience with installing pile foundations within an existing building.

2. Experience with Secure Compartmented Information Facility (SCIF) spaces.

3. Experience with one project that contains multiple complexity characteristics identified in this Factor.

4. Design-build experience.

5. Experience with sustainable features.

6. Demonstrate that the Offeror and the proposed design firm(s) have previously worked together.

Projects submitted shall be completed within the past five (5) years of the date of issuance of this RFP.

For design-build projects, the design portion of the contract shall have been completed within the past five

(5) years of the date of issuance of this RFP.

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment H) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process. Also, the description should address features detailing how the work was completed in accordance with the "Secretary of the Interior's Standards for the Treatment of Historic Properties".

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.

(b) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements.

The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered. If an offeror submits more than five (5) construction or design projects the Government will evaluate the first five (5) projects submitted under each category this Factor.

Factor 3 – Past Performance

(a) Solicitation Submittal Requirements:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (Attachment B) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information.

However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Janine Queen, Contract Specialist, Janine.queen@navy.mil.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

(b) Basis of Evaluation:

This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.”

The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.

Factor 4 – Safety

(a) Submittal Requirements:

The Offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of self-performed and sub-contractor performed work and the Offeror’s method for qualifying, evaluating, selecting all tiers of sub-contractors. The narrative shall include:

(1) Experience Modification Rate (EMR); include three previous calendar years’ worth of data (2015, 2016, 2017). This rate compares company’s annual losses in insurance claims against its policy premiums. The Offeror may submit an insurance company-provided equivalent rate if no EMR exists. If there is no EMR premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends should be addressed as part of the element.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) and Total Recordable

Case (TRC) Rates; submit three previous calendar years’ worth of data (2015, 2016, 2017). If the OSHA DART and TRC rates cannot be submitted, affirmatively state so and explain why.

Any extenuating circumstances that affected the OSHA DART and TRC rate data negatively should be addressed as part of this element.

(3) Technical Approach for Safety should describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. Fully describe the safety management system that will be used to oversee safety compliance and performance of self-performed and sub-contractor performed work. Also describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels. Additionally, describe the methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to two pages.

Note: The narrative shall be limited to two pages. For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to four pages in length.

(b) Basis of Evaluation: (Include in RFP)

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its sub-contractors. The Government will evaluate the Offeror’s overall safety management system, safety performance record, and the Offeror’s methodology of qualifying, evaluating, selecting and overseeing its subcontractors. The Government’s sources of information for evaluating safety will include, but are not limited to: OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror.

The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project and the specific management practices that will be in place for providing deliberate safety program management and mishap prevention support.

Offeror’s Experience Modification Rates (EMR) will be evaluated against the following Navy standards:

Risk EMR Rate Very Low Risk Less than 0.6 Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than 1.0 to 1.1 Extremely High Risk Greater than 1.1

Offeror’s DART and TRC rates will be evaluated against the following Navy standards:

Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0

Risk _ TRC Rate Very Low Risk Less Than 2.49 Low Risk From 2.5 to 3.49 Moderate Risk From 3.5 to 4.49 High Risk From 4.5 to 5.99 Extremely High Risk Greater Than 6.0

PHASE II

Factor 5 – Energy Design Reduction

(a) Solicitation Submittal Requirements:

(1) Energy Efficiency Narrative:

Provide a detailed narrative describing how the proposed solution will meet baseline ASHRAE 90.1-2013.

Also describe how the solution will provide at least a 30% energy reduction below the baseline ASHRAE 90.1, based on life cycle cost effectiveness.

To determine solution, use the ASHRAE 90.1, Appendix G – Building Performance Rating Method, except replace the formula in G1.2 with the following:

Percentage improvement = 100 × ((Baseline building consumption − Receptacle and process loads) − (Proposed building consumption − Receptacle and process loads)) / (Baseline building consumption − Receptacle and process loads)

List assumptions used to obtain the percent energy reduction.

Organize narrative in four parts: 1) Orientation, Configuration, and Shape; 2) Envelope properties (fenestration, solar heat gain coefficients (SHGC), wall and roof insulation values (U-values), window U-values); 3) Mechanical (HVAC, plumbing, and domestic hot water heating systems, including any solar hot water systems); and 4) Electrical Systems (lighting and control systems, including any interior and exterior lighting systems, renewable energy and control systems).

Where 30% reduction is not lifecycle cost effective, provide highest percent energy reduction that is lifecycle cost effective.

Note: Building performance rating and percent energy reduction are calculated in terms of energy rather than energy cost.

Do not exceed two (2) double-sided pages (or four (4) single-sided pages).

(2) Whole Building Energy Simulation:

The Whole Building Energy Solution requires the use of the following documents included in Part 6 of this

RFP:

- Government Baseline Building Performance Rating

- Government Baseline Building Energy Model (input-output) schedules (If the process and receptacle loads are not given in the schedules, assume they are 25% of the total load.)

- Default simulation factors

- Utility Costs (energy rates) for project, based on local unburdened PWD rates

- “Whole Building Energy Simulation” templates

- “Performance Rating Method Compliance Reports”

Use the “Whole Building Energy Simulation” templates to demonstrate the percentage improvement over the “Proposed Building Performance Rating”. Receptacle and process loads are included in the “Whole Building Energy Simulation” as part of the building loads. Submit the Whole Building Energy Simulation in PDF electronic file format.

(b) Basis of Government Evaluation:

1) Energy Efficiency Narrative and Solution: The Government will evaluate the Offeror’s proposed energy efficiency narrative and solution.

2) Whole Building Energy Simulation: The Government will evaluate the Whole Building Energy Simulation to determine the validity of the design assumptions, thoroughness and accuracy of the Whole Building Energy Simulation, and the percent improvement of energy consumption reduction below the Government’s “Baseline Building Performance Rating”.

Factor 6 – Small Business Utilization

This Factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.

(i) Solicitation Submittal Requirements:

1. Achievements: All offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:

a. All offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment C, Small Business Subcontracting Record.

b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts. When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.

Notes:

The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.

Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.

Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.

2. Small Business Participation and Commitment: All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment E, Small Business Participation and Commitment Strategy.

a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).

b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.

c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment E consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.

(b) Basis of Evaluation:

Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.

Forms to be used for offeror submission of Small Business Utilization Factor information are:

Attachment D – Small Business Subcontracting Record Attachment E – Small Business Participation and Commitment Strategy

PRICE

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

The price proposals shall be submitted in Phase II along with Phase II technical proposals. The Offeror shall submit (1) original, marked “Original”, and (1) copy, marked “copy”, in a separate three ring binder with the following:

Text pages 8 ½ x 11 format, minimum 10 point font.

Completed SF 1442 signed with all amendments acknowledged.

Price Schedule.

Proposed Modification/Change order Percentage rates.

Copy of Online Representation and Certifications and proof of registration in System for Award

Management (SAM) Confirmation of filing of Veterans' Employment and Training (VETS) VETS 4212 and/or VETS report for the cycle.

Bid Guarantee in accordance with FAR Clause 52.228-1 Bid Guarantee. Amount shall be at least 20 percent of the bid price but shall not exceed $3 million.

Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, DUNS, Cage Code, Point of Contact, phone number, and email address.

Subcontracting Plan in accordance with FAR Part 52.219-9 - Small Business Subcontracting Plan. **See Instructions for submitting Subcontracting Plan.

**If you are a Large Business, submit a Small Business Subcontracting Plan for this project in the format provided in Attachment F, to include all information required in the attachment. If you are a Small Business, submit a subcontracting participation breakdown in the format provided in Attachment G.

All proposers: To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan or subcontracting participation breakdown may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed. For proposals submitted on design-build solicitations, the proposer must identify its designer/design team in its Subcontracting Plan or Small Business Participation Breakdown.

NAVFAC SB Goals:

SB: 46.25%

HUBZONE: 8.5%

SDB: 30.5%

SDVOSB: 6%

WOSB: 9.5%

Offerors shall submit their Price proposal in accordance with the solicitation requirements. Offerors shall submit the Price Schedule (section 00100 – Solicitation Contract Form) for submission of their price with all the line items (CLINS) completed.

(b) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00100 of the solicitation.