ACQR5281175
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008018R1175 - DB, 46/67 RENOVATION OF OPERATIONAL ARCHIVES & RESEARCH FACILITY, WASHINGTON NAVY YARD, DC
Description of this amendment begins on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R1175
X 9B. DATED (SEE ITEM 11)
25-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2018
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008018R1175
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0010
The purpose of this amendment is to incorporate the following
1. RFI Responses
2. Attachments
3. Revised Wage Determination: DC180002 08/03/2018 DC2 located in Section
00800 – Special Contract Requirements
All other terms and conditions remain unchanged.
1. RFI RESPONSES
16. For the window replacement of Building 57, there were no drawing floor plans or elevations provided that show window dimensions, counts, etc. Is there existing drawings or concept drawings available for this building?
GOVERNMENT RESPONSE: See the attached drawings for more information including window counts, elevations and photos. These should be added to Part 6 Attachments.
Add the following paragraph to RFP-3 Options 3-6 Part 3, Paragraph 1.0 Project Description:
“The project includes the design and construction to replace exterior windows in Building 57 at the Washington Navy Yard in order to improve energy efficiency of the building and enhance the protection of museum and library artifacts. Windows to be replaced shall be match the existing in size, type, and color.
Building 57, built in 1866, is a 3-story office building immediately adjacent and connected to Building 44.
The third story is a secure area used by NHHC archivists and historians. The window replacement is subject to review and approval by NAVFAC Cultural Resources and SHPO.”
Replace the last sentence in RFP-3 Options 3-6, Part 3, Paragraph 4.7 New Work and Scope with the following:
“Remove and replace operable aluminum window units in Building 57 to match existing frame color, muntin spacing, lite configurations, and quantities. Provide insulated, laminated glazing with low-e coating. Existing interior sill, jamb, and head finish and trim to remain. Patch and repair or replace as required. Existing (historic) exterior sill, jamb, and head components to remain. Re-seal as required to maintain weather barrier. Concept elevations including quantities and sizes of windows can be found on the attached drawings. All window quantities and sizes shall be field verified. Drawings for existing occupied spaces can be found in the attached drawings for appropriate phasing.”
17. RFP-1 / Part 3 indicates that the existing windows are to remain in place where the concept drawing in Appendix D (Drawing A301) notes that the windows are to be refurbished. Please clarify what work is to be done to the existing windows. Will the window sash, frames, sills need to be removed, restored and reinstalled or just minor repairs and repainted? Will the existing windows need to be stripped of lead paint prior to repainting?
GOVERNMENT RESPONSE: Existing windows are historic to remain. They are to be restored according to Department of the Interiors standards for historic preservation and other applicable historic preservation codes and standards. Existing conditions of windows must be verified to determine the extent of work required. All hazardous materials meeting the limits of disturbance must be abated according to OSHA and EPA regulations. Refer to the Hazardous Materials Inspection Report included in the RFP.
18. General Note 8 on the Price Schedule indicates that if Options 3 & 4 are exercised then 270 calendar days are added to the contract duration and 180 calendar days will be added if Option 5 is exercised. If Options 3, 4 & 5 are exercised will 450 calendar days be added to the contract duration or only 270?
GOVERNMENT RESPONSE: If Option item 3 is exercised an additional 180 days will be added to the contract duration. If Option 4 is exercised an additional 90 days will be added to the contract duration. If Option 5 is exercised an additional 180 days will be added to the contract duration. Therefore, if option items 3, 4, and 5 are all exercised the contract duration will be increased by 450 days.
19. General Note 8 on the Price Schedule indicates that if Options 3 & 4 are exercised then 270 calendar days are added to the contract duration. Will this extension hold true if only one of these options is exercised and not the other? Is the plan to exercise both options or neither?
GOVERNMENT RESPONSE: See answer to RFI 18. The intent is to exercise all options subject to the availability of funds.
20. Is there an order that options 3, 4 and 5 will be exercised? For example, will Option 3 be exercised prior to Option 4 and Option 4 prior to Option 5? If the intent is for each of these three options to be a stand-alone price then the total price evaluation will include a significant overlap in General Condition costs based on the contract duration extension requirements. The sum of Options 3, 4 and 5 will include a total of 720 days (Option 3 - 270 days + Option 4 - 270 days + Option 5 - 180 days) of additional General Conditions. Is this the government's intent or can you provide an order in which Options 3, 4 and 5 will be exercised?
GOVERNMENT RESPONSE: See answer to RFI 18. The options may be exercised in any order, see General Note 7. The intent is to exercise all options subject to availability of funds.
21. Please confirm that all design costs for RFP-1, RFP-2 & RFP-3 packages are to only be carried in the base bid price.
GOVERNMENT RESPONSE: Per RFP-1 (Base Bid) Scope of work under Part 3, paragraph 1.1 All design costs should be included in the base bid.
22. Base bid scope calls for removal of existing under slab piping in multiple locations. Are there existing condition drawings available showing locations of existing under slab piping locations?
GOVERNMENT RESPONSE: No existing under-slab as-builts are available for building 46/67.
23. For the window replacement of Building 57, will this work need to be done at night to avoid public disturbances or can this work be done during normal business hours?
GOVERNMENT RESPONSE: Refer to Part 2 specifications 01 14 00.05 20. Building 57 will remain occupied during construction. Work can be done at night, and will need to be coordinated and phased with the contracting officer to prohibit disruption to existing occupants.
24. Will the contractor be responsible for moving office furniture & equipment & Building 57 employees in order to provide clearance for the window work or will work access be provided by the owner?
GOVERNMENT RESPONSE: Refer to Part 2 specifications 01 14 00.05 20. Contractor will be responsible for relocating movable furniture out of the work area as prescribed. All government property must be protected during construction.
25. Will temp partitions / protection be required for window replacement work in Building 57 to protect employees in Building 57 from construction or will workers be temporarily relocated by the owner?
GOVERNMENT RESPONSE: Refer to Part 2 specifications 01 14 00.05 20. Building 57 will remain occupied during construction. Work will need to be coordinated and phased with the contracting officer to prohibit disruption to existing occupants.
26. For Building 57 window replacement, will the new windows be required to be blast resistant? If so what is the required blast load on the windows?
GOVERNMENT RESPONSE: Refer to Part 3, 1.4 Option 5 Scope of Work. No Blast Requirements -No structural upgrades -No hardening -No change to parking or roadways. ALL exterior glazing must meet Min ATFP glazing requirements, see the ITG.
They must still comply with the other remaining criteria from UFC 4-010-01.
27. For Building 57 window replacement, will the new windows need to match makes, colors and profiles that of the other renovated buildings? If so, please provide specification information on what product manufacturers were used on the other buildings.
GOVERNMENT RESPONSE: New windows will need to match existing. Manufacturers and specifications are not available.
28. For Building 57 window replacement, what are the glass requirements on the new windows?
GOVERNMENT RESPONSE: Refer to Part 3, 1.4 Option 5 Scope of Work. No Blast Requirements -No structural upgrades -No hardening -No change to parking or roadways. ALL exterior glazing must meet Min ATFP glazing requirements, see the ITG.
They must still comply with the other remaining criteria from UFC 4-010-01.
29. In RFP-1 package / Part 3 / Paragraph 1.4 shows one of the salvage items to be full, undamaged slate tile with quantities to be verified with Government. Please confirm if this work is to be carried in the base bid and if so, please provide a quantity allowance to assume for this work.
GOVERNMENT RESPONSE: This work is included in the base bid. Assume that 20% of the slate roof can be salvaged.
30. In RFP-3 package / Part 3 / Section C30 indicates a SSPC QP1 requirement for surface prep and coatings of surfaces with the UA Macro Wet Artifact and Loading Dock Areas. Considering that this certification is used typically for bridge & industrial steel applications and not in commercial construction projects (commercial painters do not have this certification), please confirm that this requirement can be waived for painting applications in this locations.
GOVERNMENT RESPONSE: Confirmed, this requirement will be removed and is not required in these locations.
31. In RFP-3 package, page 5 of 25 states NAVFAC SB Goals are as follows:
‐ SB: 46.25%
‐ HUBZONE: 8.5%
‐ SDB: 30.5%
‐ SDVOSB: 6%
‐ WOSB: 9.5%
Page 8 of 25 states the SB participation rate is 20% of the contract value. Please confirm we are to proceed with both stated goals in mind."
GOVERNMENT RESPONSE: Amendment 0003, page 5: delete the following:
“**If you are a Large Business, submit a Small Business Subcontracting Plan for this project in the format provided in Attachment F, to include all information required in the attachment. If you are a Small Business, submit a subcontracting participation breakdown in the format provided in Attachment G.
All proposers: To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan or subcontracting participation breakdown may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed. For proposals submitted on design-build solicitations, the proposer must identify its designer/design team in its Subcontracting Plan or Small Business Participation Breakdown.
NAVFAC SB Goals:
SB: 46.25%
HUBZONE: 8.5%
SDB: 30.5%
SDVOSB: 6%
WOSB: 9.5% “
Replace with the following:
“NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 65%
SDB 15%
HUBZone SB 6%
WOSB 15%
SDVOSB 5%
Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e). Material discrepancies between the small business participation and commitment strategy and small business subcontracting plan (if required) shall be corrected and responses provided to questions identified.
See Attachment F Small Business Subcontracting Plan (Template) for format.”
Government Clarification: All offerors shall submit a “small business participation and commitment strategy" per Factor 6. The anticipated prime and first tier overall small business participation rate for this acquisition is 20% of the contract value. This 20% and other percentages in the offeror's commitment strategy are not considered subcontracting goals, but are participation rates and are included in the offeror's commitment strategy. The participation rates are separate from subcontracting goals found in the small business subcontracting plan.
This solicitation provides NAVFAC's command-wide small business subcontracting targets, and these targets are included in this amendment. These small business subcontracting targets listed in this amendment may be higher or lower percentages that would represent realistic challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals.
32. Please confirm that the new metal pan stairs and railings are to be priced in the Base Bid (not in Option 1).
GOVERNMENT RESPONSE: Metal pan stairs and railings are included in Base bid.
33. Please confirm that sprayed-fireproofing of structural steel framing is to be priced in Option 1 (not in the Base Bid).
GOVERNMENT RESPONSE: Sprayed-fireproofing shall be priced within Base Bid.
34. Building 169 work as indicated in the base bid narrative does not indicate any work associated with the structural reinforcement to meet AFTP / blast requirements. Please confirm that not structural hardening or progressive collapse work is required for this project at Building 169.
GOVERNMENT RESPONSE: No blast requirements or structural hardening required. Building 169 is a single-story facility, therefore there are no requirement for Progressive Collapse.
35. RFP-1 / Part 3 / Paragraph 1.3.2 indicates the demolition of the roof on Building 67 are in the Base Bid. RFP-3 / Part 3 / paragraphs 1.3 & 1.7.2 indicates that the demo of this roof is to be done in Option 4.
Please clarify if the demolition of the roof on Building 67 is to be either in the Base Bid or Option 4.
GOVERNMENT RESPONSE: Demolition and replacement of the building 67 built up roof is included as Option 4.
36. Please confirm whether or not interior landscaping is required for this bid per RFP-3 / Part 3 / Spec E202090. If so, what is specifically required for this scope and / or provide a schedule with quantities.
GOVERNMENT RESPONSE: Interior landscaping is not required.
37. In the RFP packages, there is not a lot of information on the AV equipment (Option 6). In order to price this work, can an equipment schedule with quantities be provided so this work can be priced? Or can this scope of work be a cost allowance (value provided by owner) similar to PLAN MOD 1 / CLIN 008 on the bid schedule?
GOVERNMENT RESPONSE: Review room data sheets for concept AV locations. Final AV locations and equipment shall be confirmed by NHHC & NAVFAC.
38. Specification section 013000 part 1.3.1.3 states that all qualified testing organizations shall be contracted first tier. Is this requirement applicable to the electrical equipment testing, or can that be contracted by the electrical contractor?
GOVERNMENT RESPONSE: This is applicable to the electrical equipment testing per Part 2 Spec Section 01 30 00.05 20, para. 1.3.1.3.
39. Per section D301002 ‘Gas Supply System’, the service side of the natural gas supply is to be contracted and performed by Washington Gas. Please confirm that Washington Gas will be contracted through NAVFAC, and we are to coordinate the service connection with Washington Gas.
GOVERNMENT RESPONSE: GC shall contract with Washington Gas to provide natural gas service connection.
40. Per section D301002 ‘Gas Supply System’, the natural gas service meter is to be provided by the contractor. Please confirm that Washington Gas is to provide the gas service meter.
GOVERNMENT RESPONSE: Washington Gas will provide gas service meter.
41. RFP 1 room data sheets states each exterior door shall receive card readers, however all electronic security system items are provided within RFP 2 CLIN 2, except for the SCIF. Please clarify the extent of access control work to be provided in CLIN 1, or if all work is to be performed in CLIN 2.
GOVERNMENT RESPONSE: Bid Option 1 References card reader locations. Provide infrastructure for card reader as required.
42. Item 0008 on the Price Schedule references Item 0007 within the description and price line. Please confirm these should state Item 0008.
GOVERNMENT RESPONSE: The Price Schedule was revised 23 July 2018 to include this change.
Please see Amendment 0008.
43. The Price Schedule states that no schedule extensions will be granted for FF&E Item 0008. How long does the government have to exercise this contract modification?
GOVERNMENT RESPONSE: A minimum of 120 days will be required for the government to exercise the contract modification upon received of the Final FF&E package/ pricing from the Design team post award.
44. Page 5 of the Amendment 3 RFP requires us to provide proposed modification/change order percentage rates. Please add lines to the Price Schedule to input this information if it is a requirement.
GOVERNMENT RESPONSE: Amendment 0003, page 5: Remove the bullet “Proposed Modification/Change order Percentage rates”
45. Spec Section 015000.0520 part 1.5.1 indicates that the contractor is responsible for their own utilities. Does this mean the GC is responsible for connections to Owner's existing utilities and consumption / usage charges or just the connections and the owner will pay utility consumption / usage charges on the project.
GOVERNMENT RESPONSE: Confirmed. Contractor will be responsible for temporary utility connections and the Government will pay utility consumption/usage charges.
46. RFP 2, Part 3, C103013 calls for providing sprayed fire-resistive materials to the building's structural framing components as required by Building Code to prevent structural failure. Please provide specification / guidance on which components steel columns, beams, metal decking should receive fireproofing. Also say whether this should be in the base bid item or with Option 1 and Option 3.
GOVERNMENT RESPONSE: Based on the final design the GC/Fire Protection DOR shall confirm final location(s) of Sprayed-fireproofing. Price with Base Bid.
47. Will NAVFAC or GC be responsible for the loading and unloading of contents found in the file cabinets and modular storage file systems shelves prior to the relocation of Art Department and Underwater Archaeology (UA) equipment and materials (currently located in Buildings 46/67) described in Base Bid part 3- 2.8.1?
GOVERNMENT RESPONSE: GC will not be responsible for loading/unloading contents. GC will be be responsible for moving furniture, boxes, and crates that are packed. Packing of personal items, artwork, and other stored materials will be by NAVFAC and NHHC.
48. Will GC be responsible to provide new track floor to accommodate the relocation of modular storage units in building 169 (currently located in Buildings 46/67) described in Base Bid part 3- 2.8.1?
GOVERNMENT RESPONSE: New track flooring and modular storage is not included in building 169 relocation.
49. Will certified manufacturer installers be required in order to maintain integrity of warranties pertaining to the relocation of the file cabinets and/or modular storage file systems that are to be relocated to building 169 (currently located in Buildings 46/67) described in Base Bid part 3- 2.8.1? If so, please provide the manufacturers for specified equipment.
GOVERNMENT RESPONSE: As part of the base contract, the relocations of most existing FF&E items between buildings can be relocated by standard moving companies. A few existing FF&E items are required to be installed by the certified manufacturer installers or handled with special cares. Refer to enclosed FF&E Summary list for details.
50. The existing furniture moving of Building 46 & 67 are not very clear in the base bid narrative.
Please provide a general list of furniture that will need to be moved to Building 169.
GOVERNMENT RESPONSE: Please review Base Bid Part 3 section 2.8.1
51. Please provide a copy of the Facility Engineering Assessment and Design Study as referenced in Part 3, Page 4 of RFP1.
GOVERNMENT RESPONSE: Facility engineering assessment is not needed and will not be provided. All requirements are included within the three RFP documents.
52. Part 3, Section 2.6.1 of RFP1 notes that there are existing building code violations. Part 3, Section
1.0 of RFP1 notes that the buildings are to be renovated to meet the NAVFAC and local applicable code requirements. Please provide additional information on the existing code violations including the nature and number of the violations.
GOVERNMENT RESPONSE: There is no additional information available or required.
53. The base bid includes designing, renovating and relocating existing personnel, equipment and materials to Building 169. Do the existing fire protection systems in Building 169 need to be renovated to accommodate the renovation and relocation? If so, please provide additional information on the existing systems in Building 169.
GOVERNMENT RESPONSE: There are no anticipated changes to the fire protection system.
54. Part 3, Sections 1.0, 2.3 and 2.4 reference NARA Directive 1571, 36 CFR 1234 and FC 4-760-10N.
Are each of these documents required and are all requirements of these documents pertaining to records storage applicable, including but not limited to:
a. redundant source of primary electric service
b. 3- to 4-hr fire resistance rated interior walls separating records storage areas from adjacent spaces
c. 125,000 cubic foot storage limit per storage area
d. Separately zoned HVAC systems for each collection storage area
e. Independent roof support structures in records storage areas
f. 1-hr fire resistance rated columns in records storage areas
g. Fire protection system design that limits maximum loss of a fire event to 300 cubic feet of records.
h. Smoke detection throughout the building."
GOVERNMENT RESPONSE: All of these documents are project criteria and specifics will be verified during the design process.
55. Does the design team have discretion to locate the lot line that defines the fire separation distance between buildings. If not, where should these lines be located?
GOVERNMENT RESPONSE: Yes. Lot lines will need to be reviewed and coordinated with NAVFAC FPE to confirm building separations are fully addressed in design.
56. Please confirm whether or not slave and sub-slave fire alarm panels are required to serve the secured area(s).
GOVERNMENT RESPONSE: Follow the requirements of TECHNICAL SPECIFICATIONS FOR
CONSTRUCTION AND MANAGEMENT OF SENSITIVE COMPARTMENTED INFORMATION
FACILITIES - IC Tech Spec‐for ICD/ICS 705.
57. Please confirm what types of materials are going to be stored in the following rooms:
a. Special Collections/Rare Book
b. Art Storage Room
c. UA Storage Room
GOVERNMENT RESPONSE: All storage requirements and quantities must be verified between GC, NHHC, and NAVFAC. The building function is the Operational Archives and Research Repository.
58. Is NARA Directive 1571 compliance required for Archive Storage? Identify which Hi Density storage areas require NARA compliance.
GOVERNMENT RESPONSE: All the above may apply, all requirements need to be verified between GC, NHHC & NAVFAC.
59. Concept drawings do not show NARA compliance for walls and ceilings. Confirm whether or not NARA compliance is required on this project.
GOVERNMENT RESPONSE: Concept drawings are provided as a test fit for space planning and do not represent the required design. NARA compliance is required for all archive and collections storage, processing, research or testing spaces as applicable.
60. If NARA is a requirement, please provide Hi Density Shelving/Storage height requirements for NARA compliance coordination.
GOVERNMENT RESPONSE: NARA will be required in all achieve spaces. ESFR Sprinkler heads will be installed in all Hi Density areas, review Bid Option 1 for ESFR requirements.
61. The concept drawings and specifications are not clear on what the slab deflection requirements are for Hi Density Shelving / Storage System locations. Please provide slab deflection requirements for this.
GOVERNMENT RESPONSE: Deflection of the slab system shall be coordinated with the specific hi-density shelving supplier
62. Fire Pump Room 113 is noted as receiving a fire separation but no other areas are indicated in the design packages. Please provide other locations that require fire separation beyond IBC 2015 requirements and NARA compliance (if required).
GOVERNMENT RESPONSE: Fire pump room identified with separation as a minimum. Other areas requiring separation will be determined based upon the D-B contractors final design layout and compliance with IBC 2015 and NARA requirements as applicable.
63. Provide chemical conservation Storage 120 requirements for Hazmat or restricted storage, ventilation, and secured shelving.
GOVERNMENT RESPONSE: All storage requirements and quantities must be verified between GC, NHHC, and NAVFAC. Provide dedicated exhaust system for chemical storage room. Size exhaust fan per ASHRAE 62.1 chemical storage room requirements.
64. Please provide additional information regarding the X-Ray Vault located in UA Lab 121 (description, use requirements, restrictions, general specifics, etc.)
GOVERNMENT RESPONSE: Per the RFP, the X-Ray is existing to be relocated. Existing unit must be field verified.
65. The documents indicate the relocation of an existing X-Ray unit on this project. Please provide additional information (manufacturer, specifications, product info, dimensions, electrical requirements, etc.) for this unit.
GOVERNMENT RESPONSE: Product info, manufacturer and specifications information is unavailable.
Requirements are similar to the dive locker described in ESR C103090. Existing unit must be field verified.
66. During the walk through, we noticed that the existing basement windows had exterior metal grates on them. Considering there is exterior window work requirements on this project, please confirm if the existing metal grates are to be removed and put back on after the window work is complete, restored or replaced to match?
GOVERNMENT RESPONSE: Exterior metal grates shall be restored or replaced in kind to match existing.
67. Impact Isolation Class 50 (IIC 50) is required for floor/ceilings assemblies in several Second Floor rooms. Confirm IIC 50 is required for Second Floor ceilings.
GOVERNMENT RESPONSE: IIC 50 is required for floor/ceilings for second floor spaces with offices and occupied areas below. IIC 50 not required for second floor ceilings with attic space above.
68. Confirm access hatch to Attic in Stair 2 ( S1-2, S2-2), is required to be secured. Does your definition of "secure" mean lockable or if entire access hatch unit is a secured construction.
GOVERNMENT RESPONSE: Hatch to the attic should be lockable to prevent unauthorized intrusion to the attic space.
69. Confirm Art Studio internal stair shown on the concept drawings is a communicating stair and does not need to be enclosed.
GOVERNMENT RESPONSE: Concept is shown as communicating stair. D-B contractor to verify the final requirements.
70. This project calls for SCIF related construction but no SCIF level requirements are indicated.
Please provide SCIF Level requirement
GOVERNMENT RESPONSE: Refer to RFP 3, Options 3-6 for extent of secure construction. Coordinate security levels with Government.
71. Operable Shades are noted but room locations are not identified in the program requirements.
Identify which rooms are to have operable shades installed.
GOVERNMENT RESPONSE: Provide aluminum window blinds in lieu of shades. See room data sheets for locations.
72. Provide fork lift access requirements in Corridor 201 and 215, and for adjacent Storage Areas that require fork lift access.
GOVERNMENT RESPONSE: Fork lift access is not required. End user will only require access for a pallet jack.
73. Is there base chilled water available for this project? If so, where is it located and what is the available capacity, pressure, and required temperature differential?
GOVERNMENT RESPONSE: No base chilled water service is available.
74. Is there base heating water available for this project? If so, where is it located and what is the available capacity, pressure, and required temperature differential?
GOVERNMENT RESPONSE: No base heating hot water service is available.
75. What is the available pressure and spare capacity of natural gas utility?
GOVERNMENT RESPONSE: Pressure and capacity will need to be confirmed with Washington Gas.
76. Who owns the gas utility pipe? Will Washington Gas or the GC have to provide?
GOVERNMENT RESPONSE: Washington Gas will own and provide the natural gas service piping from street main to service meter.
77. PTS D30 seems to allow all kinds of chillers and heat rejection systems. Are there any limitations as far as what can be provided for this?
GOVERNMENT RESPONSE: Review ESR D30 for HVAC system(s) requirements.
78. PTS D30 seems to allow all kinds of heat generation systems. Are there any limitations as far as what can be provided for this? Fuel oil, propane, and natural gas are all described as potential fuel sources.
GOVERNMENT RESPONSE: As stated in the D30 General paragraph Part 3 ESR provides project specific requirements.
79. Is it acceptable to have one cooling plant service both building 46 and 67, or must they be separate?
GOVERNMENT RESPONSE: Review mechanical system requirements within ESR D30 Bid Option 1.
80. Is it acceptable to have one heating plant service both building 46 and 67, or must they be separate?
GOVERNMENT RESPONSE: Review mechanical system requirements within ESR D30 Bid Option 1.
81. Please provide requirements, if any, for fume hoods, fume extraction arms, compressed air, laboratory gasses, eye washes, emergency showers, and laboratory equipment support utilities.
GOVERNMENT RESPONSE: Refer to room data sheet within Bid Option 1.
82. Part 3 D304002 describes underground steam piping requirements. Is new underground steam piping anticipated for this project?
GOVERNMENT RESPONSE: No new steam piping of any kind will be installed during this project.
83. Part 3 D306001 1.2 implies that a digital BAS is not to be provided for this project. Please confirm if this is accurate.
GOVERNMENT RESPONSE: Review Bid Option 1 Part 3 D306001 1.1 DDC Controls for all controls requirements.
84. Part 4 D201001 describes flush tank water closets. Are they required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
85. Part 4 D201005 describes showers and tubs. Are they required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
86. Part 4 D201006 1.1 describes drinking fountains. Are they required for this project vs. water coolers?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
87. Part 4 D202001 1.2 describes CPVC for domestic water. Are they required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
88. Part 4 D202003 1.2 describes electric water heaters, oil-fired water heaters, and steam heat exchangers and storage tanks. Are any of these required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
89. Part 4 D202003 1.3.2 describes base mounted domestic water pumps. Are they required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
90. Part 4 D209003 describes oil interceptors and grease interceptors. Are they required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
91. Part 4 D209005 describes compressed air systems, but no requirements for compressed air outlets could be found. Is this required for this project?
GOVERNMENT RESPONSE: As stated in the D20 General paragraph Part 3 ESR provides project specific requirements.
92. Part 4 D301001 describes an oil supply system. Is this required for this project?
GOVERNMENT RESPONSE: No oil supply systems. As stated in the D30 General paragraph Part 3 ESR provides project specific requirements.
93. Part 4 D301002 1.4 describes a propane supply system. Is this required for this project?
GOVERNMENT RESPONSE: No propane systems. As stated in the D30 General paragraph Part 3 ESR provides project specific requirements.
94. Part 4 D301003 implies that base steam may be available. Please confirm that is accurate for this project.
GOVERNMENT RESPONSE: No base steam system. As stated in the D30 General paragraph Part 3 ESR provides project specific requirements.
95. Part 4 D301004 implies that base heating water may be available. Is it available for this project?
GOVERNMENT RESPONSE: No base heating hot water system. As stated in the D30 General paragraph Part 3 ESR provides project specific requirements.
96. The sustainability checklist indicates that a 30% energy reduction below the 2013 ASHRAE 90.1 Appendix G will be achieved. The 2013 version of ASHRAE 90.1 makes the envelope baseline a code compliant baseline, as opposed to a baseline of the existing construction. The “NAVFAC CAPITAL
IMPROVEMENTS PRELIMINARY ENERGY BASELINE & OFFERORS MODEL PERFORMANCE
RATING ASSUMPTIONS (PRA)” assumes a baseline with the existing envelope. Has adequate diligence been done to determine if the renovation can comply with a 30% reduction vs ASHRAE 90.1 2013?
GOVERNMENT RESPONSE: Yes, an energy model was modeled during the LCCA. The new building envelope shall be used during the modeling of the alternative system. Review Base Bad ESR B20 for envelope requirements.
97. Is it contemplated that a vapor barrier will be added to protect the exterior envelope from humidification in the winter, or is it contemplated that humidification will only be provided within the limits of what the existing envelope will allow?
GOVERNMENT RESPONSE: Scope includes a new interior envelope to address water, air, vapor, and thermal deficiencies in the existing envelope. D-B Contractor to determine appropriate design of the envelope system to meet UFC envelope requirements.
98. The standards indicate that base steam may not be used for humidification. Requirements for a source of steam are not found elsewhere. Are there any requirements, or is the source of steam for humidification up to the design-build team?
GOVERNMENT RESPONSE: No Steam shall be utilized. Review mechanical system requirements within ESR D30 Bid Option 1.
99. The standards indicate that 100% redundancy may be required to the CO for critical spaces. Is this required, and if so, what components are required to be redundant?
GOVERNMENT RESPONSE: Per NARA 1571 section 3.44.1.2, redundant equipment is not required.
Critical areas must have two or more WSHPs serving the area.
100. The standards indicate that chillers should be sized with two at 75% of the load, or that as an alternate, two chillers sized at 60% of the load may be used. Which will be required if chillers are used?
GOVERNMENT RESPONSE: Review Bid Option 1 Part 3 ESR for project specific requirements. No chillers required.
101. The standards require that chemical filtration be used if the ambient air provides a risk of air pollution. Should the design-build team assume that chemical filtration will be required?
GOVERNMENT RESPONSE: Review Bid Option 1 Part 3 ESR for air filtration requirements.
102. The standards require that ceiling fans be provided where required by the end user. Does the NAVY require ceiling fans?
GOVERNMENT RESPONSE: Ceiling fans are not required.
103. The standards require interior condition set points of 72°F/50% RH in the summer. These conditions differ from the RFP which requires 72°F/40% RH in the summer. Which is to be followed?
GOVERNMENT RESPONSE: Follow space temperature and humidity requirements as provided in the room requirement sheets.
104. Part 3 Page 31: Packaged units are described with both gas heat and electric heat, is this correct?
Is the intent to provide electric reheat for individual zone control?
GOVERNMENT RESPONSE: Packaged rooftop is to be equipped with indirect gas heat. Individual zone shall be equipped with electric reheat.
105. Part 3 Page 31: Packaged units are described with MERV 8 and MERV 13 filters. FC 4-760-10N says MERV 8 and MERV 15. Part 3 D304008 indicates MERV 8 filtration should be used. Which standard should be followed
GOVERNMENT RESPONSE: Temporary packaged unit for Building 169 shall be equipped with MARV 8 & 13. Final dedicated outdoor air handler unit(s) shall have all filtration requirements described in Bid Option 1 D30 ESR D304008; this includes but not limited to: MERV 8 pre-filters, MERV 15, HEPA and carbon filtration to meet the required particulate concentrations.
106. Part 3 Page 31: This seems to describe a single unit for 169. National Archives and Records Administration (NARA) Requirements, Directive 1571, 15 February 2002 says storage, processing, and preservation areas must be served by separate systems. Other areas may be served by a common system. Which standard should be followed?
GOVERNMENT RESPONSE: Building 169 is for temporary use only. Provide unit as described within Base Bid Part Three section 2.8.6.
107. RFP-1, Section 2.3.5 is clear that based on NAVSDDMIN 026/18 and the fact that the Building 46 is greater than 50ft from the controlled perimeter, that the building is exempt from Standards 1, 2, 6, 10 and 12 of UFC 4-01-01 unless indicated otherwise within the RFP. Section 2.3.5.2 further states that:
a. Existing Masonry Walls: Unreinforced brick at inhabited portions of the building already provides the required level of performance.
b. Windows and Skylights: not required to meet Standard 10 for blast, laminated glass is still required.
c. Exterior Doors: Not required to meet Standard 12 for blast.
GOVERNMENT RESPONSE: ATFP standards 1, 2, 6, 10 & 12 are exempt, with the exception of providing laminated glazing.
108. RFP drawings A-101, A-102, A-201, A-202; callout new “interior blast resistant wall construction”, “blast resistant interior windows”, and “blast resistant doors” which appears to contradict Section 2.3.5 of the RFP. Please clarify whether or not interior inhabited spaces which are within the building envelope, and which is more than 50ft from the controlled perimeter are exempt from Standards 1, 2, 6, 10 and 12 of UFC 4-01-01.
GOVERNMENT RESPONSE: ATFP standards 1, 2, 6, 10 & 12 are exempt, with the exception of providing laminated glazing.
109. What are the project requirements for the incoming telecommunication services & distribution within the building as it pertains to non-secure, secure and classified communication capabilities?
GOVERNMENT RESPONSE: Design must comply will applicable telecommunication UFCs.
110. Please confirm if there are any spaces that require secure communications other than the SCIF suite?
GOVERNMENT RESPONSE: Secure telecommunication requirements are identified in Bid Option 3-6 RFP room data sheets. All networking requirements shall be confirmed with GC, NHHC & NAVFAC.
111. Please confirm Cast Iron Lintels, N. Wall, are to be stripped and painted for Building 57.
GOVERNMENT RESPONSE: Confirmed. All cast iron lintels shall be stripped and painted. Final color to be approved with NHHC, NAVFAC & SHPO.
112. RFP-1 (Base Bid) room requirements call for ATFP blast resistant door assemblies at Fire Pump Rm 113. RFP-2 (Option 1) calls for 1 HR fire rated door assemblies at Fire Pump Rm 113. Please confirm which is correct.
GOVERNMENT RESPONSE: As stated in room requirements provide AT/FP compliant doors where applicable. Refer to AT/FP Exemptions per NAVFACADMIN 026/18 included in Part 6 attachments to determine applicability. Door fire ratings and blast compliance to be determined by the Contractor's design according to all applicable codes, NARA compliance, and UFCs.
113. The room requirements in Part 3 indicate STC-50 rated construction for walls and door assemblies throughout the majority of the project including bathrooms, janitor closets, offices, etc. This is not typical for most, if not all, projects for similar office / laboratory buildouts. Please confirm if STC-50 construction is required throughout as indicated per the room requirements or confirm which areas are exempt from STC rated construction.
GOVERNMENT RESPONSE: Provide interior construction with sound batt insulation designed to meet STC 50 as indicated.
114. RFP-1 (Base Bid) room requirements call for ATFP blast resistant door assemblies at Fire Mech / Elect Rm 116. RFP-2 (Option 1) calls for 1 HR fire rated door assemblies at Mech / Elect Rm 116.
Please confirm which is correct.
GOVERNMENT RESPONSE: As stated in room requirements provide AT/FP compliant doors where applicable. Refer to AT/FP Exemptions per NAVFACADMIN 026/18 included in Part 6 attachments to determine applicability. Door fire ratings and blast compliance to be determined by the Contractor's design according to all applicable codes, NARA compliance, and UFCs.
115. RFP-1 (Base Bid) room requirements call for ATFP blast resistant door assemblies at UA Branch - Macro 119. RFP-2 (Option 1) calls for 1 HR fire rated door assemblies at UA Branch - Macro 119.
Please confirm which is correct.
GOVERNMENT RESPONSE: As stated in room requirements provide AT/FP compliant doors where applicable. Refer to AT/FP Exemptions per NAVFACADMIN 026/18 included in Part 6 attachments to determine applicability. Door fire ratings and blast compliance to be determined by the Contractor's design according to all applicable codes, NARA compliance, and UFCs.
116. To further clarify our previous question regarding small business requirements, please confirm that the small business requirement is 20% of the total contract value per page 8 of the RFP. In addition, please confirm that the subcontracting target percentages on page 5 of the RFP are project goals and if the contractor does not meet these goals then we are to submit an explanation regarding our actions taken and how we arrived at the submitted subcontracting percentages.
GOVERNMENT RESPONSE: See RFI 31
117. Section 011400 says to relocate 4 art department personnel and page 3 of the Part 3 Project Description says to relocate 5. Please confirm the correct personnel quantity.
GOVERNMENT RESPONSE: 5 Art personnel will be relocated to Bldg 169 and then back to Bldg 67 at completion of the project.
118. New interior windows for 46/67 are referenced in the Base Bid Scope of Work. New interior windows are also referenced in the Option 1 and Option 3 Scopes of Work for the first and second floor respectively. Please clarify where the new interior window pricing is to be included.
GOVERNMENT RESPONSE: Provide laminated, insulated windows on the interior at existing historic window locations where required for the new building envelope as part of the base bid. Provide interior windows where required for the first floor interior fit out with option 1. Provide interior windows where required for the second floor interior fit out with Option 3.
119. The RFP states that the Price Schedule and Small Business Subcontracting Plan may be uploaded via the SAFE website, however, the balance of the Price Proposal (SF1442, VETS 4212, Bid Guarantee, etc.) and the complete Technical Proposal must be hand delivered. All of these documents, except the Small Business Utilization Plan, can be completed prior to bid day. Please consider either allowing all documents to be uploaded via SAFE or adding the Small Business Utilization Plan (Factor 6) to the list of documents that can be uploaded. In addition, do price proposal sections, that are submitted electronically, also need to be submitted as hard copies prior to the deadline?
GOVERNMENT RESPONSE: Offerors have the option to deliver FACTOR 6 – SMALL BUSINESS UTILIZATION, inclusive of all forms associated with Factor 6, via the Safe Access File Exchange (SAFE) website at https://safe.amrdec.army.mil/SAFE/Welcome.aspx.
120. The Base Bid Scope of work references electrical distribution systems for mechanical, lighting, receptacles, and equipment in building 46/67. The Option 1 Scope of Work also references new power distribution equipment for the first and second floors. Please confirm that distribution equipment is to be including in the base bid and branch circuits will be included in Options 1 and 3.
GOVERNMENT RESPONSE: The main electrical service and distribution panels are to be provided in the base bid for building 46/67. The sub-panels on the first and second floors as well as the branch circuits for the first floor are provided in option 1 and the remaining branch circuits for the second floor are provided in option 3.
121. Please confirm that risers for second floor plumbing should be included in the base bid.
GOVERNMENT RESPONSE: Plumbing risers for the 2nd floor shall be stubbed up from the first-floor slab within the Base Bid. Bid Option 1 all plumbing shall be completed for the 1st floor including the risers to the 2nd floor.
122. Please confirm that the elevator shaft should be constructed in the base bid with the elevator pit.
GOVERNMENT RESPONSE: Confirmed. Elevator shaft and pit should be constructed with the base bid.
123. The building 46/67 roof removal and replacement is currently included in Option 4. Considering that Option 4 may not be exercised for 630 days, this could significantly delay the schedule for any interior equipment and finishes. Not removing the roof in the base bid will also impede our ability to install the new structural steel. Please consider moving the building 46/67 roof and deck replacement to the base bid.
GOVERNMENT RESPONSE: The Building 46/67 roof replacement shall remain in RFP 3, Option 4.
124. The RFP 1, Part 3 room requirements currently require spray foam insulation on all perimeter and interior masonry walls. Please confirm that spray foam insulation is only required on perimeter masonry walls.
GOVERNMENT RESPONSE: Provide sprayed on foam insulation to the interior face of existing brick walls as required for a continuous thermal and air barrier for conditioned spaces.
125. The RFP 1, Part 3 room requirements currently require the existing brick…