N4008018R0316_J-0200000-10_CraneandRiggingGearForms.pdf

PDF 296 KB Posted

Attached to
REVISED DRAFT SOLICITATION
Solicitation number
N4008018R0316
Issued by

About this file

This pre-solicitation notice announces a forthcoming solicitation for facilities support services at various Naval District of Washington locations, including Joint Base Anacostia-Bolling, Naval Support Activity Patauxent River, Naval Support Activity Bethesda, Naval Support Activity Indian Head, and Naval Support Activity Dahlgren. Services include general facility management, utilities, transportation, and fire emergency equipment maintenance.

The solicitation will utilize FAR Part 15 procedures and seek proposals for corporate experience, technical approach, management approach, safety, and past performance, along with pricing. Award will be made using a tradeoff source selection process to the offeror providing the best value. The NAICS code is 561210 with a small business size standard of $38.5 million. The contract consists of a base period of up to 12 months and four 12-month option periods, not to exceed 66 months total. Incumbent services are currently provided by EMCOR Government Services under a contract with an estimated annual value of $15 million. The anticipated final RFP date is August 30, 2018 and proposals will be due on or about October 14, 2018. This procurement will be an 8(a) small business set-aside.

N4008018R0316_J-0200000-10_CraneandRiggingGearForms.pdf

View the file

Other files

File Type Posted
N4008018R0316_NCR_5JB-1FTESHEET_0003.xlsx XLSX spreadsheet
N4008018R0316_DRAFT_N40080-18-R-0316_REV1.pdf PDF
N4008018R0316_SecNav_5512_1.pdf PDF
N4008018R0316_J-0200000-02_DC180002.pdf PDF
N4008018R0316_J-0200000-02_Local_602_Agreement.pdf PDF
N4008018R0316_J-0200000-02_MD180037CalvertandCharlesCounties.docx DOCX document
N4008018R0316_J-0200000-02_MD_180057MontgomeryCounty.docx DOCX document
N4008018R0316_J-0200000-02_Local_99_CBA.pdf PDF
N4008018R0316_J-0200000-02_WD_2015-4269Revision5.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4265Revision6.pdf PDF
N4008018R0316_J-0200000-02_VA80007KingGeorgeCounty.docx DOCX document
N4008018R0316_J-0200000-02_WD2015-4329Revision6.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4281Revision9.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4279Revision5.pdf PDF
N4008018R0316_J-0200000-04_BethesdaBaseMap.pdf PDF
N4008018R0316_J-0200000-04_DalecarliaBaseMap.pdf PDF
N4008018R0316_J-0200000-04_JBABMapFeb18.pdf PDF
N4008018R0316_J-0200000-04_WebsterFieldSiteMapPAXRiver.PDF PDF
N4008018R0316_J-0200000-06__ContractorInterfaceMapping.xlsx XLSX spreadsheet
N4008018R0316_J-0200000-04_NRLMap.pdf PDF
N4008018R0316_J-0200000-11_ELINS_BLANK.xlsx XLSX spreadsheet
N4008018R0316_J-0200000-09_CONTRACTORHAZAROUSMATERIALINVENTORYLOG.pdf PDF
N4008018R0316_J-1501000-01_ASSETTAGGINGTEMPLATErevised.pdf PDF
N4008018R0316_J-1502000-04_FACILITYINVENTORY.xlsx XLSX spreadsheet
N4008018R0316_J-1502000-06_FIREPROTECTIONSYSTEMSINVENTORY.xlsx XLSX spreadsheet
N4008018R0316_J-1601000-04_BoilerControlInventoryJBAB.xlsx XLSX spreadsheet
N4008018R0316_J-1601000-01_PointsofDemarcationJBAB.pdf PDF
N4008018R0316_J-1700000-03_EmergencyVehiclesandEquipmentFleetInventory.xlsx XLSX spreadsheet
N4008018R0316_JB-2_N4008018R0318_GIF.xlsx XLSX spreadsheet
N4008018R0316_5JB-1_FTE_SHEET_SAMPLE.xlsx XLSX spreadsheet
N4008018R0316_DRAFT_N40080-18-R-0316__13AUG18.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-0200000-10

CRANE CHECKLIST FORM

ATTACHMENT "A"

CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO

1 Does the operator know the weight of the load to be lifted?

2 Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?

3 Is the crane level and on firm ground?

4 Are outriggers required?

5 If so, are outriggers fully extended and down, and the load off the wheels?

If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?

If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?

Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?

Has the hook been centered over the load in such a manner to prevent swing

(deflection, side loading, load-moment)?

Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?

11 Is the lift swing path clear of obstructions?

If rotation of the load being lifted is hazardous, is tag line or restraint line being used?

13 Are personnel prevented from standing or passing under a suspended load?

14 Are personnel prevented from entering the load fall zone?

15 Is the crane operator's attention diverted?

16 Are proper signals being used at all times?

17 If radio communications are used is the frequency isolated to the crane team?

18 Do the operations ensure that side and tip loading is prohibited?

Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

20 If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?

21 Is the lift a critical lift?

If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?

23 Is Attachment "A" current, filled out completely, and posted in the crane?

Contractor Name (Print Legibly):

Contractor Name (Signature):

Location: Date:

CRANE AND RIGGING GEAR ACCIDENT REPORT FORM

CRANE AND RIGGING GEAR ACCIDENT REPORT

Accident Category: Crane Accident Rigging Gear Accident

From:

UIC:

To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity:

Report No:

Crane No:

Category:

Accident Date:

Time: hrs:

Category of Service: SPS GPS Crane Type:

Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical

Non-Crane Rigging Operation: Yes No

Location:

Weather:

Crane Capacity:

Hook Capacity:

Weight of Load on hook:

Fatality or Permanent Disability? Yes No

Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure Other: Specify

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date)

Certifying Official (Crane Accident Only):

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24-hour clock) the accident occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability? Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN? Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem? Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame.

Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.

ATTACHMENT J-0200000-XX

CRANE AND RIGGING GEAR NEAR MISS FORM

CRANE AND RIGGING GEAR NEAR MISS REPORT

Near Miss Category: Crane Near Miss Rigging Gear Near Miss

From:

UIC:

To: Navy Crane Center

Bldg. 491 NNSY

Portsmouth, VA 23709

Fax (757) 967-3808 nfsh_ncc_accident@navy.mil

Activity: Report No:

Crane/Equipment No: Category: Near Miss Date: Time: hrs

Category of Service: SPS GPS Crane /Equipment Type: Crane/Equipment Manufacturer:

Location: Weather:

Crane/Equipment Capacity: Hook Capacity: Weight of Load on Hook:

Is this near miss indicative of a recurring problem? Yes No

If yes, list report numbers:

In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:

Preparer:

Phone and email

Code Date

ATTACHMENT J-0200000-XX

CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Near Miss Category: Indicate either crane or rigging gear near miss.

2. From: The naval activity that is responsible for reporting the near miss and UIC number.

3. Activity: The naval activity where the near miss took place.

4. Report No.: The activity assigned near miss number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Near Miss Date: The date the near miss occurred.

8. Time: The time (24-hour clock) the near miss occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).

13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).

14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.

16. Weight of Load on Hook: If applicable, the weight of the load on the hook.

17. Is this a recurring problem? Check yes or no. Identify any other similar near misses or accidents.

18. Situation Description/Corrective Actions: Self-explanatory.

19. Preparer: Self-explanatory.

File details come from the government source that posted it. Updated .