This pre-solicitation notice announces a forthcoming solicitation for facilities support services at various locations within the Naval District of Washington. The proposed single-award IDIQ contract will provide facility management, facility investment, utilities management including steam, and transportation services including fire truck maintenance and repair. The solicitation will utilize FAR Part 15 procedures and require proposals for corporate experience, technical approach, management approach, safety, and past performance along with price. The tradeoff process will select the offer presenting the best value. The NAICS code is 561210 with a small business size standard of $38.5M. The solicitation targets 8(a) sources and will be available on NECO and FEDBIZOPPS. The anticipated RFP date is August 30th and proposals will be due October 14th. The incumbent is EMCOR Government Services under contract N40080-17-D-0303 valued at $15M annually. Questions should be directed to the specified contracting specialist.

N4008018R0316_DRAFT_N40080-18-R-0316_REV1.pdf

View the file

Other files

File Type Posted
N4008018R0316_NCR_5JB-1FTESHEET_0003.xlsx XLSX spreadsheet
N4008018R0316_SecNav_5512_1.pdf PDF
N4008018R0316_J-0200000-02_DC180002.pdf PDF
N4008018R0316_J-0200000-02_Local_602_Agreement.pdf PDF
N4008018R0316_J-0200000-02_MD180037CalvertandCharlesCounties.docx DOCX document
N4008018R0316_J-0200000-02_MD_180057MontgomeryCounty.docx DOCX document
N4008018R0316_J-0200000-02_Local_99_CBA.pdf PDF
N4008018R0316_J-0200000-02_WD_2015-4269Revision5.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4265Revision6.pdf PDF
N4008018R0316_J-0200000-02_VA80007KingGeorgeCounty.docx DOCX document
N4008018R0316_J-0200000-02_WD2015-4329Revision6.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4281Revision9.pdf PDF
N4008018R0316_J-0200000-02_WD2015-4279Revision5.pdf PDF
N4008018R0316_J-0200000-04_BethesdaBaseMap.pdf PDF
N4008018R0316_J-0200000-04_DalecarliaBaseMap.pdf PDF
N4008018R0316_J-0200000-04_JBABMapFeb18.pdf PDF
N4008018R0316_J-0200000-04_WebsterFieldSiteMapPAXRiver.PDF PDF
N4008018R0316_J-0200000-06__ContractorInterfaceMapping.xlsx XLSX spreadsheet
N4008018R0316_J-0200000-04_NRLMap.pdf PDF
N4008018R0316_J-0200000-10_CraneandRiggingGearForms.pdf PDF
N4008018R0316_J-0200000-11_ELINS_BLANK.xlsx XLSX spreadsheet
N4008018R0316_J-0200000-09_CONTRACTORHAZAROUSMATERIALINVENTORYLOG.pdf PDF
N4008018R0316_J-1501000-01_ASSETTAGGINGTEMPLATErevised.pdf PDF
N4008018R0316_J-1502000-04_FACILITYINVENTORY.xlsx XLSX spreadsheet
N4008018R0316_J-1502000-06_FIREPROTECTIONSYSTEMSINVENTORY.xlsx XLSX spreadsheet
N4008018R0316_J-1601000-04_BoilerControlInventoryJBAB.xlsx XLSX spreadsheet
N4008018R0316_J-1601000-01_PointsofDemarcationJBAB.pdf PDF
N4008018R0316_J-1700000-03_EmergencyVehiclesandEquipmentFleetInventory.xlsx XLSX spreadsheet
N4008018R0316_JB-2_N4008018R0318_GIF.xlsx XLSX spreadsheet
N4008018R0316_5JB-1_FTE_SHEET_SAMPLE.xlsx XLSX spreadsheet
N4008018R0316_DRAFT_N40080-18-R-0316__13AUG18.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C

D

EX

X G F 236 - 244

245 - 254 X H 255 - 266 karen.monahan@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 266

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N40080 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

KAREN MONAHAN 202-685-8052

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 3 4 - 14

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

15 - 110 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

112 - 122

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 123 - 126 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 127 - 129 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

130 - 152

PART II - CONTRACT CLAUSES

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

153 - 235

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

13 Sep 2018

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N4008018R0316

Section A - Solicitation/Contract Form

NARRATIVE

A.1 TYPE OF CONTRACT

Award of this solicitation will result in a facilities support indefinite-quantity contract with firm fixed price (FFP) and indefinite delivery indefinite quantity (IDIQ) provisions.

A.2 SERVICE REQUIREMENTS

The outcomes to be achieved are Facility Support Services (FSS) at Naval Support Activity (NSA) Washington DC and outlying areas within NSA Washington Area of Responsibility (AOR). This acquisition will provide Facility Support Services for Facility Management, Facility Investment, Utility Management, Steam Computerized Control Boilers, and Transportation. The outcomes for this acquisition are consistent with the Federal Acquisition Regulation (FAR) 37.101 definitions for service contracts.

A.3 CONTRACTING POINTS OF CONTACT

Contracting Officer – Leticia Walton (202) 685-3299, leticia.d.walton@navy.mil Contract Specialist – Karen Monahan (202) 685-8052, karen.monahan@navy.mil Contract Specialist – Yolanda McCray (202) 685-0281, yolanda.mccray@navy.mil

A.4 COMPETITION ENVIRONMENT

This is a competitive 100% Small Business 8(a) set-aside.

A.5 NAICS CODE

The NAICS code is 561210, Facilities Support Services.

A.6 PRIOR CONTRACT INFORMATION

This contract will replace a contract for similar services awarded in 2016 with a current annual value of $15,042,323.00 of which $8,758,655.00 consists of Recurring Work and an estimated value of

$6,283,668.00 consists of Non-Recurring Work for the most recent option year. This information is provided for informational purposes only. Prospective offerors are cautioned that they should not rely on this information to determine workload as there is no assurance that workload and volume of future effort and costs will replicate past experience.

A.7 MINIMUM/MAXIMUM CONTRACT VALUE

The guaranteed minimum quantity of work which will be required under this contract, and which will be initiated by one or more task orders, will not be less than $3,000.00. The estimated maximum dollar value of the contract is $95,000,000.00. If the Government’s requirement for services set forth in the solicitation do not result in task orders in the amount described as “estimated maximum,” this shall not constitute the basis for an equitable price adjustment under this contract.

Values provided under the Contract Line Item Numbers (CLINs) or by Installation, represent the estimated capacity only, and the Government reserves the right to move capacity between CLINs/Installations and performance periods as necessary.

The estimated maximum value/estimated capacity per installation will be determined after selection of the apparent successful offeror, prior to award, however will not exceed the estimated maximum stated above.

INSTALLATION

PUBLIC WORKS DEPARTMENT

ESTIMATED MAXIMUM VALUE

A.8 TASK ORDERS – RECURRING WORK:

Task Orders under this contract will be issued for recurring work by location. Initital task orders will be issued by the Procuring Contracting Officer at the regional level and Administered by the local Contracting Officer. A separate task order will be issued for Fire Truck Maintenance and Repair.

PWD Bethesda TBD PWD South Potomac -- Dahlgren TBD PWD South Potomac -- Indian Head TBD

PWD JBAB TBD

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1001 1 Each Bethesda Recurring Work Base Year

FFP

FOB: Destination

NET AMT

1002 1 Each OPTION Bethesda Recurring Work Option 1

1003 1 Each OPTION Bethesda Recurring Work Option 2

1004 1 Each OPTION Bethesda Recurring Work Option 3

1005 1 Each OPTION Bethesda Recurring Work Option 4

2001 1 Each Dahlgren Recurring Work Base Year

2002 1 Each OPTION Dahlgren Recurring Work Option 1

2003 1 Each OPTION Dahlgren Recurring Work Option 2

2004 1 Each OPTION Dahlgren Recurring Work Option 3

2005 1 Each OPTION Dahlgren Recurring Work Option 4

3001 1 Each Indian Head Recurring Work Base Year

3002 1 Each OPTION Indian Head Recurring Work Option 1

3003 1 Each OPTION Indian Head Recurring Work Option 2

3004 1 Each OPTION Indian Head Recurring Work Option 3

3005 1 Each OPTION Indian Head Recurring Work Option 4

4001 1 Each JBAB Recurring Work Base Year

4002 1 Each OPTION JBAB Recurring Work Option 1

4003 1 Each OPTION JBAB Recurring Work Option 2

4004 1 Each OPTION JBAB Recurring Work Option 3

4005 1 Each OPTION JBAB Recurring Work Option 4

5001 1 Each Regional Fire Truck Base Year

FFP

Repair, Maintenance, Testing and Administration

5002 1 Each OPTION Regional Fire Truck Option 1

FFP

5003 1 Each OPTION Regional Fire Truck Option 2

FFP

5004 1 Each OPTION Regional Fire Truck Option 3

FFP

5005 1 Each OPTION Regional Fire Truck Option 4

FFP

6001 1 Each Non-Recurring Work Base Year

FFP

In accordance with J-0200000-11 ELINS

6002 1 Each OPTION Non-Recurring Work Option 1

FFP

6003 1 Each OPTION Non-Recurring Work Option 2

FFP

6004 1 Each OPTION Non-Recurring Work Option 3

FFP

6005 1 Each OPTION Non-Recurring Work Option 4

FFP

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at various locations in the District of Columbia, Maryland and Virginia by means an Indefinite Delivery Indefinite Quantity type, performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 contains general information common to the entire contract within Specification 0100000, Annex 2 contains the on-site project management and administration requirements common to the entire contract within Specification 0200000, and Annexes 3 through 18 contain the technical requirements within one or more applicable seven-digit-numbered specifications as follows:

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support Sub-Annex 1501000 Facility Management Sub-Annex 1502000 Facility Investment Annex 16 Utilities Sub-Annex 1601000 Utility Management Sub-Annex 1605000 Steam Annex 17 Transportation Annex 18 Environmental N/A

1.2 Project Location The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.

Annex 15 Facilities Support

Naval Support Activity South Potomac Naval Support Activity Bethesda Joint Base Anacostia Bolling (JBAB)

Annex 16 Utilities

0100000 – General Information Spec Item Title Description

Annex 17 Transportation

Naval Support Activity Washington Naval Support Activity South Potomac Naval Support Activity PAX River Naval Support Activity Annapolis Naval Support Activity Bethesda

The Government may modify or add to these locations at any time during the performance of the contract.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations in addition to the services and locations identified in the recurring work requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Background Information With the nation’s capital at its heart, the Naval District Washington Region encompasses over 4,000 square miles, including the District of Columbia, Maryland and Virginia. Naval District Washington is responsible for efficiently delivering common operating support services to over 120 mission commands located within the Region. Naval District Washington is the regional provider of common operating support to twenty Naval installations within a one hundred mile radius of the Washington Navy Yard.

1.5 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

1.6 Climate Patterns See NOAA website for climate information

1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government.

Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.8 Navy Approach to

Service Contracting

The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.

The Navy also supports the following principles:

1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.

Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.

1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.

Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).

1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements.

Specification item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.

1.11 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 – Management and Administration Table of Contents

Spec Item Title

2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Formal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Government Information Technology (IT) System

2.3.8 Directives, Instructions, and References

2.3.9 Base Maps

2.3.10 Invoicing Procedures

2.4 Government-Furnished Property, Materials and Services

2.4.1 Government-Furnished Facilities (GFF)

2.4.2 Government-Furnished Utilities

2.4.3 Government-Furnished Materials (GFM)

2.4.4 Government-Furnished Equipment (GFE)

2.4.5 Government-Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.2.1 Systems Approach

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 NAVFAC MAXIMO

2.6.6.1 MAXIMO Data

2.6.6.2 MAXIMO Method of Data Entry

2.6.6.3 MAXIMO Access

2.6.6.4 MAXIMO Training

2.6.7 Quality Management System (QMS)

2.6.7.1 Quality Management (QM) Plan

2.6.7.2 Quality Inspection and Surveillance

2.6.7.3 Quality Inspection and Surveillance Report

2.6.8 System and Equipment Replacement

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager

2.7.1.3 Site Safety and Health Officer (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Paper Pass

2.8.5 Access to Buildings

2.8.5.1 Key and Access Control

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Sensitive Unclassified Information

2.8.9 Employ Status

2.9 Contractor Safety Program

2.9.1 Accident Prevention Plan (APP)

2.9.2 Activity Hazard Analysis (AHA)

2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.3.1 Alcohol and Drug Abuse Prevention Plan

2.9.3.2 Chemical Hazard Communication Program

2.9.3.3 Confined Space Program

2.9.3.4 Critical Lift Plan

2.9.3.5 Fall Prevention and Protection Plan

2.9.4 Crane Operations

2.9.4.1 Crane Inspections

2.9.4.2 Rigging Gear

2.9.4.3 Crane Operators

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Energy Management Program

2.10.1.1 Water Conservation Plan

2.10.1.2 Energy Efficient Products

2.10.2 Environmental Protection

2.10.2.1 ODS Requirements for Refrigerant Recycling

2.10.2.2 Non-Hazardous Waste Disposal

2.10.2.3 Hazardous Waste Disposal

2.10.2.4 Spill Prevention, Containment, and Clean-up

2.10.2.5 Hazardous Material Management

2.10.2.6 Protection of Endangered and Threatened Species (Flora and Fauna)

2.10.2.7 Noise Control

2.10.2.8 Salvage

2.10.2.9 Asbestos Containing Material (ACM)

2.10.2.10 Mold Containing Material (MCM)

2.10.3 Sustainable Procurement and Practices

2.10.3.1 Environmentally Preferable Products

2.10.3.2 Use of Recovered Materials

2.10.3.3 Use of Bio based Products

2.11 Disaster Preparedness

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.14.1 Notification to the Government for Work Above the Recurring Work Limitations

2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)

2.15 Non-recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL)Work (Negotiated)

2.15.2.1 Non-recurring Preparation of Proposals

2.16.2.1.1 Labor Requirements

2.15.2.1.2 Material and Equipment Requirements

2.15.2.2 Issuance of Final Task Order

2.15.3 Non-recurring ELINS

2.16 Inventory Data Quantity Variation

0200000 - Management and Administration

2 Management and Administration

2.1 Definitions and

Acronyms Definitions and Acronyms are listed in J-0200000-01.

2.2 General Information

2.2.1 Government Regular

Working Hours The Government's regular working hours are from 0700-1630, five days per week, Monday through Friday, except observed Federal holidays.

Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage Determinations Wage Determinations are included in J-0200000-02.

2.2.3 Requirements

Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General Administrative Requirements

2.3.1 Required Conferences

and Meetings The Contractor may be required to attend administrative and coordination meetings.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractor’s teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

* President/Vice President

* Project Manager

* Quality Manager

* Site Safety and Health Officer

2.3.4 Permits and Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations.

The Contractor shall submit copies of Permits and Licenses per Section F.

The Contractor must maintain/provide the necessary licensed personnel to repair/maintain all systems within this contract to include but not limited to: HVAC, Exhaust Hoods, Fire Protection Systems, Boilers, DDC, etc.

Personnel repairing/maintaining DDC systems shall have the appropriate certifications to conduct work on Johnson and Siemens systems and other systems in this contract.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days’ written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum Insurance

Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law.

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.7 Government

Information Technology (IT) System

Additional information about NMCI may be obtained at http://www.dxc.technology.

2.3.8 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.9 Base Maps See J-0200000-04 for maps.

2.3.10 Invoicing Procedures Refer to Section G,

2.4 Government-Furnished

Property, Materials and Services

In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract as stated below.

2.4.1 Government-Furnished

Facilities (GFF)

A list of Government Furnished Facilities is provided in J-0200000-05.

2.4.2 Government-Furnished

Utilities

The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the

Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Contractor shall provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Contractor shall meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions.

Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.3 Government-Furnished

Materials (GFM)

No Government Furnished Materials provided.

2.4.4 Government-Furnished

Equipment (GFE)

No Government Furnished Equipment provided.

2.4.5 Government-Furnished

Services (GFS)

No Government Furnished Services provided.

2.5 Contractor-Furnished

Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.

Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

The Contractor shall submit a Work Management Plan per Section F.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to service orders and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

2.6.2.1 Systems Approach The contractor shall use a systems approach in the management of the inventory under this contract. The contractor's proposal shall include maintenance efforts for all portions of the systems whether specifically detailed or not. Specific equipment adds or deletes upon initial contractor inventory assessment and PM program development will not be grounds for Contract modification. These items are inherently part of their respective system and typical for the facility type being served. Any subsequent changes caused by other contracted or in-house effort will be addressed via modification to this contract.

J-0200000-06 contains the list of master systems and subsystems established for this contract.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website.

Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, COR, affected tenants and customers as soon as practicable.

The Facilities & Energy Operations Cell (FEOC), located at the Washington Navy Yard, must be kept informed of all service interruptions including location, system, impacted buildings, timeframes, and any reference ticket, maintenance, or task order associated.

2.6.6 NAVFAC MAXIMO MAXIMO is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:

2.6.6.1 MAXIMO Data Required data fields for all work performed and the process for submitting the specified information for NAVFAC MAXIMO is indicated in J- 0200000-06.

Specified data shall be provided for all work performed in 1501000 (Facility Management), 1502000 (Facility Investment), 1601000 (Utility Management), 1605000 (Steam), and 1700000 Transportation. Further instructional information detailing the process for submitting the specified information for MAXIMO Data Reporting is provided in J-0200000-07.

As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the Contractor 60 calendar days of notice of modifications to the Service Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.

2.6.6.2 MAXIMO Method of

Data Entry

The Contractor shall provide data for NAVFAC MAXIMO using the methods detailed below:

DIRECT ENTRY: The Contractor shall manually enter required work order, asset data and condition assessment data directly into NAVFAC MAXIMO. The Contractor shall ensure all information is updated by the end of each workday for all work performed.

If the Contractor does not have access to NAVFAC MAXIMO at contract start, work order, asset data and condition assessment data shall be submitted in an Excel spreadsheet following the NAVFAC MAXIMO Data Reporting process described in J-0200000-07 per Section F.

Flat File submission of work order, asset data and condition assessment data will be allowed up to three months after the contractor gains access to the system unless an extension is approved in writing by the KO.

GENERAL TYPES OF DATA:

WORK ORDER DATA: Includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program, and work issued as non-recurring. Specific NAVFAC MAXIMO fields required for work order data are provided in J-0200000- 06.

ASSET DATA: Includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected. Specific NAVFAC MAXIMO fields required for asset data are provided in J-0200000-06. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset. Contractors will assign asset naming per J-0200000-06.

CONDITION ASSESSMENT DATA: Includes all necessary information for the accurate condition rating of all assets in support of the

Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are provided in J- 0200000-06.

2.6.6.3 MAXIMO Access The process for obtaining access and establishing MAXIMO accounts are detailed in the NAVFAC MAXIMO System Access Procedures provided in J-0200000-08

Once accounts have been established, MAXIMO can be accessed at https://maximo.navfac.navy.mil.

The Contractor shall provide all necessary computer equipment and Internet Service Provider (ISP) accounts to access MAXIMO for Direct Entry of required data.

A maximum of ten MAXIMO accounts will be approved for the Contractor. A justification for additional accounts shall be provided to the KO if needed. Changes of personnel requiring MAXIMO accounts more than once per year may result in required compensation to the Government for the administrative costs in processing account requests.

The Contractor shall provide a list of personnel requiring MAXIMO accounts per Section F.

2.6.6.4 MAXIMO Training The Government will provide or make available initial training on NAVFAC MAXIMO to Contractor personnel responsible for direct entry of work order, asset, specification, and condition assessment data.

Additional training will be provided by the Government when there are significant changes to the NAVFAC MAXIMO software or data entry requirements. Training due to changeover of personnel will be the responsibility for the Contractor. The Contractor will be provided a general user guide, local instructions, and other materials by the Government as reference material for the use of NAVFAC MAXIMO.

2.6.7

Quality Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1 Quality Management

(QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.7.2 Quality Inspection and

Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.7.3 Quality Inspection and

Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.

The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.8 System and Equipment

Replacement

The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.

Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager (PM) The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available during the Government's regular working hours and shall be available within one hour after the Government's regular working hours.

The PM shall have at least five years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least five years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not be the same person as the

SSHO.

2.7.1.3 Site Safety and Health

Officer (SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project.

Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .