This is a request for proposals (RFP) for an indefinite delivery indefinite quantity (IDIQ) small business multiple award construction contract (SB MACC) for new construction, repair, and renovation projects at various public works departments in Washington, DC, Joint Base Anacostia-Bolling, Bethesda, and Quantico under the Naval Facilities Engineering Command area of responsibility. The RFP includes specifications for a building 209 renovation project at the Naval Research Laboratory in Washington, DC, with a magnitude of construction between $5-10 million. Offerors must submit technical and price proposals by December 13, 2018. The contract will be awarded to the most highly qualified small businesses. The Department of the Navy is the contracting agency.

The document provides attachments with specifications, plans, and pricing requirements for the building 209 renovation project. General decision wage determinations are also included for DC, Maryland, Virginia, and various counties within those states.

N4008018R0001_GOLD_SB_MACC_PHASE_2_RFP.pdf

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR4887155

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY INDEFINITE QUANTITY SMALL BUSINESS MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEW CONSTRUCTION, REPAIR, AND RENOVATION OF VARIOUS FACILITIES AT PUBLIC WORKS DEPARTMENTS WASHINGTON, JOINT BASE ANACOSTIA-BOLLING, BETHESDA AND QUANTICO, NAVFAC WASHINGTON AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO

WASHINGTON, D.C., MARYLAND AND VIRGINIA

Issue Phase II RFP

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 49

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008018R0001

X 9B. DATED (SEE ITEM 11)

22-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Oct-2018

CODE

NAVAL FACILITIES ENG COMMAND

1314 HARWOOD STREET SE

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION

SUMMAR

SECTION

The follow

AMEN

INDEFIN

CONSTRU

VARIOUS

ANACOS

RESPONS

VIRGINIA

The purpos

1. Ph

2. Ph

3. Se

4. Pr

5. Ph

6. A

7. Pr

8. W

All other te

The short-procureme the most h only be acc

1. PRIM

Trang

2. SECO

3. REQU

C

SU

SF 30 BLOCK

RY OF CHAN

SF 30 - BLO

wing have been

NDMENT 000

ITE DELIV

UCTION CO

S FACILITI

TIA-BOLLIN

SIBILITY IN

A se of this amen hase II Determ hase II Instruct eed Project Inf re-Proposal an hase II Evaluat

Attachments rice Schedule

Wage Determin erms and cond

-list determina ent. In accordan highly qualified cepted from th

ARY POINT

.T.Tran@Navy

ONDARY POIN

UEST FOR INF

ONTRACTOR

UBMITTING

K 14 CONTIN

NGES

CK 14 CONTI

n added by full

04 PH2 RFP

VERY INDEF

ONTRACT F

IES AT PUB

NG, BETHE

NCLUDING B

ndment is to pr mination tions to Offero formation d Site Visit tion Factors ations itions remain u ation has been nce with Naval d offerors sele ose offerors de

2. PHA

OF CONTA

y.mil.

NT OF CONTA

FORMATION

RS ARE REQU

QUESTIONS.

NUATION PAG

INUATION PA

text:

FINITE QU

FOR NEW C

BLIC WOR

SDA AND

BUT NOT LI

rovide the follo ors unchanged.

1. PHASE II

n made, and t l Facilities Acq ected to submit etermined the m

ASE II - INSTR

ACT: The pr

ACT: Lindsay

N (RFI)

UIRED TO RE

GE

AGE

UANTITY SM

CONSTRUCT

RKS DEPART

QUANTICO

IMITED TO

owing:

I DETERMIN

the purpose o quisition Supp t Phase II prop most highly qu

RUCTIONS T

rimary point y Brown at Lin

EVIEW THE E

MALL BUS

TION, REPA

TMENTS W

O, NAVFAC

WASHINGT

NATION

of this amendm plement 36.303 posals is not r ualified and inv

TO OFFEROR

of contact fo ndsay.Naill@N

ENTIRE SOLI

INESS MUL

AIR, AND R

WASHINGTON

WASHING

TON, D.C., M

ment is to beg 3-1-100, the nu eleasable. Pha vited to submit

RS

or this project

Navy.mil.

ICITATION P

N4008018R

LTIPLE AW

RENOVATION

N, JOINT B

GTON AREA

MARYLAND

gin Phase II umber and iden ase II proposa Phase II propo t is Trang Tr

ACKAGE BE

R0001

WARD

N OF

BASE

A OF

AND

of the ntity of als will osals.

ran at

EFORE

N4008018R0001

ALL INQUIRIES MUST BE SUBMITTED NO LATER THAN NOVEMBER 26, 2018 BY 2:00 PM

EST. All inquiries must be submitted in writing and emailed to Trang Tran at Trang.T.Tran@Navy.mil and Lindsay Brown at Lindsay.Naill@Navy.mil with inquiries attached as a WORD document.

4. DELIVERY OF PROPOSAL

The proposals and all copies shall be sent via FedEx or hand-delivery to the address and POC as shown below:

NAVFAC Washington Attn: Trang Tran 1314 Harwood Street SE, Bldg. 212, First Floor Mail Room Washington Navy Yard Washington, DC 20374

Proposals must be received no later than DECEMBER 13, 2018 AT 2:0 PM EST.

If hand-delivering, please see Instructions for Hand Delivery of Proposals below.

Facsimile copies or email copies will NOT be accepted.

Please allow SUFFICIENT TIME for your proposal to be received prior to the proposed closing date/time. Technical and Price proposals shall be submitted in sealed envelopes/boxes marked in the bottom right corner “Solicitation N40080-18-R-0001, DO NOT OPEN”

All proposals must be received prior to the due date and time. Any proposals submitted after the time set for receipt will be stamped with the date and hour of receipt and held unopened until after award.

The file shall be documented in accordance with FAR 15.208 (h).

INSTRUCTIONS FOR HAND DELIVERY OF PROPOSALS:

The current security condition at the Washington Navy Yard requires escorts for entry to the base by individuals not possessing a U.S. Government DoD Common Access Card (CAC) identification card.

Individuals without a DoDCAC will not be permitted to enter the Navy Yard. NAVFAC Washington WILL NOT be able to provide escorts for Navy Yard entry of hand delivered proposals. NAVFAC Washington WILL NOT receive hand delivered proposals at the Base Pass Office or any location other than that identified for receipt in the solicitation.

The Government considers use of a courier service, such as FedEx or UPS, as hand delivery of proposals and the responsibility for timely delivery resides with the offeror.

Offerors are notified that the entry point for proposals submitted through the U.S. Postal Service is at Joint Base Anacosta-Bolling and NOT at the Washington Navy Yard. Contractors proposals must be received by NAVFAC Washington at the Navy Yard by the due date outlines in the solicitation and delivery time from the Joint Base Anacosta-Bolling to the Navy Yard cannot be predicted nor guaranteed. Offerors should take this into consideration when determining delivery method.

5. PROPOSAL ORGANIZATION AND FORMAT:

a. The proposal submitted in response to this solicitation shall be clear, concise, and shall contain sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposals should not simply rephrase or restate the Government’s requirements, but rather should demonstrate convincing rationale to address how the offeror intends to meet these requirements. The offer shall be compliant with the requirements as stated in the RFP. Nonconformance with the b.

3. Th ev a of de

Project Ti

Project De 162 of Bui not require 148T.

The renov conference provide du

The labora connection used the ex systems ar also provid solicitation of the prop subject to v knowledge information

. Phase II Pr

Offeror tabbed o o o o

The pr content Cross-r withou for pro omitted he proposal sha valuated with a proposal volum f cross-referen esignated volum

3.

itle: Building escription: Th ilding 209 at th ed for elevator vation work in e room, server uty staff adequa atories are to ns and chilled xisting fume h re to be upgrad ded.

requirements, osal. All claim verification by of the offero n contained in t roposal Organ r shall submit appropriately

Text pages 8 A cover pag Phone Numb Firm’s type small busine

SB, WOSB/

A complete (include with roposal shall b t may be evalu referencing wi ut impairing cl posal evaluatio d from the prop all be written t a minimum of me is permitted nces is permiss me or cross-ref

SEED PROJ

209 Renovate he project scop he Naval Rese and for the m ncludes new room with Op ate room and sp have new gas water lines. N hood routing th ded. A one ton specified orga med technical c the Governme or’s business the offeror’s pr nization and N one (1) origin by evaluation f

8 ½ x 11 forma ge with Contrac ber, DUNS, Ca of business a ess for which

/EDWOSB, VO

electronic cop h the Original be written to t uated with a m ithin a propos arity. Hyperlin on, but not pro posal.

to the greatest e cross-referenc d where its use sible. Informat ferenced, is ass

JECT – NRL B

Rooms 143A-pe is to renova earch Laborato mail room, Men enclosed offic pen Secret SIP pace to suppor s line connecti New fume hood hrough the exis bridge crane i anization and co capabilities to ent. Offerors s and that the roposals.

Number of Cop al and two (2) factor with the at, minimum 10 ct Number, Co age Code, Poin and business s the firm quali

OSB, and/or SD py of the techn non-price subm the greatest ex minimum of cro sal volume is nking of cross ovided in its de extent possible ing to other vo e would conser tion required f sumed omitted

BUILDING 2

162 at the Nav ate the existing ory, Washingto n’s and women ces, reconfigu PR room with rt their work an ions, compress ds with exhaus sting floor syst is to be provid ontent may res meet the requ should assume Government pies.

) copies, each i e following cha

0 point font.

ontract Title, P nt of Contact, p size, including ifies (i.e, Larg

DVOSB).

nical proposal a mission).

xtent possible oss-referencing permitted whe s-references is esignated volum e on a stand-alo olumes of the p rve space witho for proposal e d from the prop

209 LAB REN

val Research La g first floor offi on DC. New ro n’s rooms, jani uration of room connections, “ nd mission for sed air line co st provisions a tem. Mechanic ded for the Frac sult in eliminat uirements shall that the Gove will base its in a separate th aracteristics:

Prime Contract phone and ema g information o e Business, SB as a single .pd on a stand-alo g to other volu ere its use wo permissible. I me or cross-ref one basis so th proposal. Cros out impairing c evaluation, but posal.

NOVATION

aboratory, Was fices and labs, r oom finishes o itor’s room, an ms, open offi “IT” room and a 24 hour oper onnections, liq are to be provid cal, electrical, a cture Lab. Bui

N4008018R tion or miseval l be realistic a ernment has no s evaluation o hree-ring bind or’s Name, Ad ail address.

on the categor

B SDB, HUGZ

f file on a CD one basis so t umes of the pro ould conserve Information re ferenced, is as hat its content m ss-referencing clarity. Hyperl t not provided shington DC rooms 143A th r renovation w nd Office’s 148 fices, laborator d electrical clo ration.

quid nitrogen, ded. Where po and communic ilt-in lab casew

R0001 luation and are o prior on the der and ddress, ries or

ZONE

-ROM

that its oposal.

space equired sumed may be within linking d in its hrough work is 8E and ries, a sets to water ossible cations work is

Work will doors, fram corridors.

The renov design mee of acoustic gypsum bo will be inf replaced w

A few sele fixtures an frames and leaf. Lab t with Archi will be pro with dispo

Areas not room (146 furniture w lines.

Magnitud

Contract C

Wage Det

Liquidated

Invitation procureme November

Attached is

**No later and prov Trang.T.Tr

PLEASE N

**Only tw

**Access t

**This wi invited and include but lim mes, and door ated lab space eting. Office sp c paneling or o oard walls will filled, and all p with new suspen ect labs will h nd all existing d hardware. La tables and coun itectural Barrie ovided. Small sal. The kitche included in sc ), Janitor (146J will be by End e of Construc

Completion D ermination: D d Damages: $ is hereby exte ent. All person r 15, 2018, wh s NRL map to r than 2:00 PM vide the com ran@navy.mil

NOTE AND U

wo (2) people p to NRL is not g ll be the ONL d strongly enco mited to new p r hardware are e layouts will b paces mostly r other materials l span to the ex penetrations w nded ACT on a have an expose ceiling heights ab doors with nters will rece ers Act (ABA) kitchenette ca enette will inclu ope of work a J), Offices (14 d User. Floor p tion: Between

Date: All work

DC180002 10/

$2,867 per cale

4. PRE-PR

ended to all pro nnel attendin ere the Govern building 226.

M EST, Novem mpleted "NR and Mikhail B

UNDERSTAN

per offeror sha guaranteed. NR

LY Governmen ouraged to atten partitions, inter e to be provid be reconfigure remain intact w s to reveal a cl xisting structur will be sealed f a prefinished g ed ceiling stru s will be maint be 48” wide t eive new acid r and The Ame asework is to b ude space for a are the elevator 8E and 148T) plan layout is f n $5M-$10M.

k shall be comp

19/2018 DC2

endar day.

ROPOSAL CO

ospective offer g the site vis nment will kick mber 02, 2018 RL Visitor Bleykhman at m

ND THE FOLL

all be permitted

RL Security w nt scheduled p nd.

rior floor finis ded. New inter ed to meet the without remova lean smooth fi re or slab abov for smoke and grid with reveal cture. Existing tained. All offi o match the ex resistive pheno erican with Dis be provide in C a microwave, c r, stairwells, m and Seawater W for reference o pleted within 60

ONFERENCE

rors to attend sit will meet k-off and brief

, provide the n Pass Reque mikhail.bleykhm

LOWING:

d to attend.

will conduct bac pre-proposal c shes, wall finis rior room sign user’s definit al of walls. A inish and prepp

ve. Existing op d/or fire ratings led, tegular edg g lighting throu fice and labs do xisting openin olic resin coun sabilities Act A Conference Roo coffee maker, t mail room (145 Wet Lab (162A only for coord

00 calendar d

E AND SITE V

a pre-proposa at NRL Buil all personnel.

names of only est" form ( man@navy.mi ckground check onference / si shes and new c nage is to be tion and review All walls remain ped for paint.

penings in wall s where requir ge.

ughout will be oors will recei ng with a 3’ w ntertops. Room Accessibility G om (159A) and toaster oven, an

5), Women’s R A). All office a dination of elec days after contr

VISIT

al conference a lding 226 at two (2) peopl (attached), to il.

ks as a part of ite visit. All p

N4008018R ceiling finishes provided with w from the ch ning will be st New metal stu ls no longer re red. Ceilings w e replaced wit ive new metal ide leaf and 1 m signage com Guidelines (AD d will include nd refrigerator.

Room (145T), and conference ctrical and plu ract award.

and site visit fo

10:00 AM ES

le who are atte o Trang Tra the access requ potential offero

R0001

s. New hin the harrette tripped ud and equired will be th new doors, ’ wide mplying

DAAG)

a sink

Men’s e room umbing for this ST on ending an at uest.

ors are

**Please m

**Taking

**Remarks construed commitme

**Reminde amendmen

P

Fa

P

This is a tw Phase II. F will not be will consid

The relativ are equal i When the approxima

The impor terms of o superiority solicitation

A. P i.

Th sh w make advance pictures is no s and explanat to constitute a ent between the er: It is the nts to the subje hase II:

actor 5 – Techn

RICE

wo-phase procu Factor 1 will o e invited to part der Factors 2-5 ve order of imp in importance t proposal is e ately equal to p rtance of price verall quality, y to the Gover n and represent

RICE

Solicitation he Offeror sha he price propo hall submit (1) with the followi o Text pa o Compl o Price S o Copy o

Manag o Confirm report f o Bid Gu e arrangement t allowed.

tions addresse any representa e DOD and any contractor’s r ct solicitation.

PHASE II

nical Solution urement. Facto nly be rated A ticipate in Phas and price.

portance of the to each other a evaluated as a rice.

will increase or if price is rnment. Awar ts the best valu n Submittal R all submit the fo osals shall be s ) original, mark ng:

ages 8 ½ x 11 f eted SF 1442 s

Schedule.

of Online Repr ement (SAM) mation of filin for the cycle.

uarantee in acc ts and expect d d during the p ation or warran y other party, o responsibility

I - EVALUAT

ors 1-4 will be e Acceptable or U se II. In makin e non-cost/price and when comb a whole, the t if the Offeror so high as to s rd will be mad ue to the Gover equirements:

ollowing inform submitted in P ked “Original” format, minimu signed with all resentation and ng of Veterans' ordance with F delays of up to pre-proposal co nty by the DO or alter the term to check the

TION FACTO

evaluated in Ph Unacceptable.

ng the best valu e evaluation fa bined, are equa technical facto s’ non-cost/pri significantly d de to the resp rnment, price a mation:

hase II along ”, and (1) copy um 10 point fo amendments a d Certifications

Employment

FAR Clause 52 o two hours.

onference and OD, or a legal ms and conditio e NECO web

ORS FOR AW

hase I and Fac Offerors that a ue award decis actors is the tec al in importanc ors and past p ice proposals a diminish the va onsible Offero and non-price f with Phase II y, marked “cop ont.

acknowledged.

s and proof of and Training

2.228-1 Bid Gu d site visit sha lly binding agr ons of the solic site, www.nec

WARD

tor 5 and Price are rated Unacc sion after Phase chnical factors ce to Factor 4 performance f are considered alue of a non-c or(s) whose of factors consider

I technical pro py”, in a separ f registration i

(VETS) VETS

uarantee. Am

N4008018R ll not be deem reement, contr citation.

co.navy.mil, f e will be evalua ceptable for Fa e II, the Gover s (Factors 2, 3

– Past Perform factor combine d essentially eq cost/price prop ffer conforms red.

posals. The O rate three ring in System for A

S 4212 and/or mount shall be a

R0001 med or ract or for all ated in actor 1 rnment and 5) mance.

ed are qual in posal’s to the

Offeror binder

Award

VETS

at least

O su al ii.

an pe

FACTOR

i. Solicitat

Provide a n shall not ex may be pr included in

1.

2.

3.

ii. Basis of

The Gover the Offeror Governmen the RFP.

20 perc o Include

Addres email a o A comp

Offerors shall su ubmit the Price ll the line items

Basis of Ev he Governmen nd all option it 2.217-5, Evalu 2.217-5, evalua erformed by on

a. Co

b. Co

c. Co

d. Co

5 – TECHNI

tion Submittal narrative descr xceed four (4) rovided to sup n the narrative

. A plan for water lines, . Approach f alteration or

. Design and and constru applicable.

f Evaluation:

rnment will ev r demonstrates nt will evaluat cent of the bid e a cover pag ss, Phone Num address.

plete electronic ubmit their Pri e Schedule (se s (CLINS) com valuation:

nt will evaluate tems. The Gov uation of Optio ation of option ne or more of t omparison of p omparison of p omparison of p omparison of m

CAL SOLUT

l Requirement ribing the techn double-sided p pplement the n page limit. Inc the efficient a lighting, floor for schedule c r installation o d Construction uction activitie valuate the narr s a clear unders te the Offeror' price but shall ge with Solici mber, Fax Num c copy of the p ice proposal in ction 00100 – mpleted.

e price based on vernment inten ons (JUL 1990) ns will not oblig the following te roposed prices roposed prices roposed prices market survey r

ION:

ts:

nical solution t pages (or eight narrative (i.e. f clude the follow and safe demol ring, ceiling til coordination o f new utility sy schedule; in G es, governmen rative and con standing of the s technical sol not exceed $3 itation Numbe mber, DUNS, C price proposal a n accordance w Solicitation C n the total pric nds to evaluate ) in Section 00 gate the Gover echniques to en s received in re s with the IGCE s with available results.

o the project th t (8) single-sid floor plan, elev wing:

lition of interio es, plumbing a of potential ut ystems.

GANTT format nt design revi ceptual drawin architectural a lution to determ

3 million.

er, Solicitation

Cage Code, Poi as a single .pdf with the solicit Contract Form)

ce. Total price e all options an 0100 of the sol rnment to exerc nsure a fair and esponse to the R E.

e historical info hat meets the r ded pages). U vation, and sit or walls and u and HVAC sup tility outages f at, incorporatin ews, long lea ngs (if include and engineerin mine adherenc n Title, Prime int of Contact, f file on a CD-R tation requirem for submissio consists of the nd has included icitation. In ac cise the option d reasonable p

RFP.

formation.

equirements of Up to three (3) te plan). The utilities includi pply and return for the demol ng phasing sche ad items and p

d) considering ng requirement ce to the techn

N4008018R e Contractor N , phone numbe

ROM.

ments. Offeror on of their pric e basic requirem d the provision ccordance with (s). Analysis w rice:

f the RFP. Nar conceptual dra ese drawings a ing gas lines, c n ducting/lines.

lition and or eme, primary d permit approv g the extent to s of the project nical requireme

R0001

Name, er, and s shall ce with ments, n FAR h FAR will be rrative awings are not chilled repair, design vals as which

t. The ents of

PHASE II-ATTACHMENTS

NRL-Entrance NRL_Visitor_Pass_Request Attachment 1-NRL 209 RFP Part 1 Attachment 2-NRL 209 RFP Part 2 Attachment 3-NRL 209 RFP Part 3 Attachment 4-NRL 209 RFP Part 4 Attachment 5-NRL 209 RFP Part 5 Attachment 6-NRL 209 RFP Part 6 Attachment 7-NRL 209 RFP Part 7 Attachment 8-NRL 209 RFP Part 8 Attachment 9-NRL 209 RFP Part 9 Attachment 10-NRL 209 RFP Part 10 Attachment 11-NRL 209 RFP Part 11 Attachment 12-NRL 209 RFP Part 12

N40080-18-R-0001

PRICE SCHEDULE

BUILDING 209 RENOVATE ROOMS 143A-162 AT

THE NAVAL RESEARCH LABORATORY (NRL)

WASHINGTON, DC

ITEM DESCRIPTION PRICE

0001 Building 209 Renovation

Price for Item 0001 shall be the entire work complete In accordance with the RFP specifications, but not including work indicated or specified to be provided under the option bid items

0002 Option 1 FF&E: Fixture, Furniture & Equipment (FF&E) & Handling Administrative rate (HAR)

(1) Basis of Item 0002, Furniture, Fixtures and Equipment/Collateral Equipment (Budget only) (See FF&E Notes below)

$352,761

(2) HANGLING & ADMINISTRATIVE RATE

(HAR) (NTE 5%) % X $352,761 $

(3) TOTAL FF&E AMOUNT: (1) + (2) = (3) $

TOTAL PRICE FOR ITEMS 0001 AND 0002 $

Generate Notes:

1. Offerors shall provide a price for all items on the Price Schedule.

2. The magnitude of construction is between $5,000,000 and $10,000,000.

3. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options.

4. Evaluation of options will not obligate the Government to execute any or all of the options.

5. Offeror’s price is valid for at least 120 days from the receipt of proposals.

FF&E NOTES:

Item 0002: The total estimated budget amount for FF&E has been identified, to provide offeror(s) with the projected magnitude of effort for FF&E. The FF&E Budget amount is only an estimated amount. The contractor shall determine the final budget amount for the FF&E, during the post-award design phase of the FF&E.

1. Offeror(s) shall propose a Handling and Administration Rate (HAR) for the FF&E not to exceed (NTE)

5%. The HAR fee should account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract/task order award and will not be adjusted regardless of fluctuations from the estimated budget amount for FF&E. The proposed HAR is a fixed rate. The dollar amount of the HAR will change based on the actual, final amount for the FF&E determined during the post-award design phase of the FF&E.

2. If awarded, line item (1) under 0002 option item will be funded separately after completion of the FF&E design review by the Government, acceptance of FF&E package by the Government, and receipt of appropriate funding by the Government. The design effort and the development of the FF&E packages are performed by the Contractor under the Base Bid. See RFP, including (but not limited to) RFP Sections E20 (Parts 3 & 4) for details.

3. The Government is not obligated to award the FF&E Option. Should the Government choose to award the FF&E, the Option will be awarded as a negotiated Modification to the contract/task order. The contractor’s proposed HAR will be applied to all vendor/supplier costs for the FF&E.

4. It is the contractor responsibility to purchase, deliver, and install the FF&E without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E as a modification. No schedule extensions will be granted.

Name & Address of Firm Submitting Offer:

Signature:___________________________________

Phone:______________________________________

Email:______________________________________

ACKNOWLEDGEMENT OF AMENDMENT(S):___________________________

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATIONS

General Decision Number: DC180002 10/19/2018 DC2

Superseded General Decision Number: DC20170002

State: District of Columbia

Construction Type: Building

County: District of Columbia Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018 3 03/23/2018 4 04/20/2018 5 05/04/2018 6 05/11/2018 7 06/15/2018 8 06/29/2018 9 07/06/2018 10 07/27/2018

11 08/03/2018 12 08/17/2018 13 08/24/2018 14 09/07/2018 15 09/14/2018 16 09/21/2018 17 09/28/2018 18 10/19/2018

ASBE0024-007 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.13 16.22

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

ASBE0024-008 10/01/2017

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER.................$ 22.81 7.34

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems

ASBE0024-014 10/01/2017

Rates Fringes

FIRESTOPPER......................$ 28.01 7.78

Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.

BRDC0001-002 04/29/2018

Rates Fringes

BRICKLAYER.......................$ 31.36 10.78

CARP0197-011 05/01/2018

Rates Fringes

CARPENTER, Includes Drywall Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 28.71 12.08

CARP0219-001 05/01/2018

Rates Fringes

MILLWRIGHT.......................$ 34.24 11.23

CARP0441-001 05/01/2018

Rates Fringes

PILEDRIVERMAN....................$ 30.94 11.45

ELEC0026-016 06/04/2018

Rates Fringes

ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 45.45 18.01

ELEC0026-017 09/03/2018

Rates Fringes

ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 28.05 10.91

SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).

WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.

ELEV0010-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 44.12 32.645+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

IRON0005-011 06/01/2017

Rates Fringes

IRONWORKER.......................$ 31.15 20.63

* LABO0011-009 06/01/2018

Rates Fringes

LABORER: Skilled................$ 24.22 8.32

FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer, open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.

MARB0002-004 04/29/2018

Rates Fringes

MARBLE/STONE MASON...............$ 37.91 17.08

INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)

MARB0003-006 04/29/2018

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 28.20 11.67

MARB0003-007 04/29/2018

Rates Fringes

TERRAZZO FINISHER................$ 23.28 10.72

MARB0003-008 04/29/2018

Rates Fringes

TILE SETTER......................$ 28.20 11.67

MARB0003-009 04/29/2018

Rates Fringes

TILE FINISHER....................$ 23.28 10.72

PAIN0051-014 06/01/2018

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 26.07 12.15 Glazing Contracts over $2 million.....................$ 30.31 12.15

* PAIN0051-015 06/01/2018

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher............$ 25.06 9.76

PLAS0891-005 07/01/2018

Rates Fringes

PLASTERER........................$ 29.53 6.80

PLAS0891-006 02/01/2018

CEMENT MASON/CONCRETE FINISHER...$ 28.15 10.58

PLAS0891-007 08/01/2016

Rates Fringes

FIREPROOFER

Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.

PLUM0005-010 08/01/2018

Rates Fringes

PLUMBER..........................$ 42.92 18.15+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-008 08/01/2018

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 41.64 21.57+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2016

ROOFER...........................$ 28.75 11.74

SFDC0669-002 04/01/2018

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 35.60 20.24

SHEE0100-015 07/01/2018

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 20.34+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUDC2009-003 05/19/2009

Rates Fringes

LABORER: Common or General......$ 13.04 2.80

LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85

LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: MD180057 10/19/2018 MD57

Superseded General Decision Number: MD20170057

State: Maryland

Construction Type: Building

County: Montgomery County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional

1 01/12/2018 2 02/09/2018 3 02/23/2018 4 03/23/2018 5 04/20/2018 6 05/11/2018 7 05/25/2018 8 06/15/2018 9 06/29/2018 10 07/06/2018 11 07/13/2018 12 08/03/2018 13 08/17/2018 14 08/24/2018 15 09/07/2018 16 09/14/2018 17 09/21/2018 18 09/28/2018 19 10/19/2018

ASBE0024-007 10/01/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.13 16.22

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

ASBE0024-010 10/01/2017

Rates Fringes

ASBESTOS WORKER: HAZARDOUS

MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 22.81 7.34

BRMD0001-006 04/29/2018

Rates Fringes

TILE SETTER......................$ 28.20 11.67

BRMD0001-009 04/29/2018

Rates Fringes

TILE FINISHER....................$ 23.28 10.72

BRMD0001-011 04/29/2018

Rates Fringes

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 31.36 10.78

BRMD0001-012 04/29/2018

Rates Fringes

MASON - STONE....................$ 37.91 17.08

CARP0197-001 05/01/2018

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 28.71 12.08

CARP0219-001 05/01/2018

Rates Fringes

MILLWRIGHT.......................$ 34.24 11.23

ELEC0026-021 09/03/2018

ELECTRICIAN (Communication and Sound Equipment).............$ 28.05 10.91

ELEC0026-022 06/04/2018

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 45.45 18.01+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.

ELEV0010-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 44.12 32.645+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.

b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0077-018 05/01/2017

Rates Fringes

OPERATOR: Bulldozer.............$ 30.56 8.95+a OPERATOR: Loader Front End Loaders 3 1/2 cubic yards and above.......$ 30.56 8.95+a Front End Loaders Below 3 1/2 cubic yards.............$ 30.56 8.95+a a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

IRON0005-011 06/01/2017

IRONWORKER.......................$ 31.15 20.63

LABO0011-013 06/01/2018

Rates Fringes

LABORER: Mason Tender - Cement/Concrete..................$ 24.22 8.32 LABORER: Pipelayer..............$ 24.22 8.32

PAIN0051-014 06/01/2018

Rates Fringes

GLAZIER

Glazing Contracts $2 million and under...........$ 26.07 12.15 Glazing Contracts over $2 million.....................$ 30.31 12.15

* PAIN0051-019 06/01/2018

Rates Fringes

PAINTER

Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.06 9.76 Industrial..................$ 31.10 11.48

PLAS0891-005 07/01/2018

Rates Fringes

PLASTERER........................$ 29.53 6.80

PLAS0891-006 02/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.15 10.58

PLAS0891-008 08/01/2016

Rates Fringes

PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

PLUM0005-010 08/01/2018

PLUMBER..........................$ 42.92 18.15+a

a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.

PLUM0602-011 08/01/2018

Rates Fringes

PIPEFITTER (Including HVAC Pipe and System Installation)....$ 41.64 21.57+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.

ROOF0030-016 05/01/2016

Rates Fringes

ROOFER...........................$ 28.75 11.74

SFMD0669-001 04/01/2018

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 35.60 20.24

SHEE0100-015 07/01/2018

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.27 20.34+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day

SUMD2010-091 08/04/2010

Rates Fringes

LABORER

Common or General...........$ 14.15 2.30

Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 Mason Tender - Brick........$ 13.00 0.00 Mason Tender - Stone........$ 14.03 0.00 Mason Tender for Pointing, Caulking and Cleaning.......$ 13.21 Mortar Mixer................$ 16.61 9.08

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.19 0.00

POWER EQUIPMENT OPERATOR:

Asphalt Roller..............$ 21.35 5.38 Backhoe.....................$ 19.82 5.02 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 0.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88

TERRAZZO WORKER/SETTER...........$ 19.94 6.54

TRUCK DRIVER

Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after cited type(s) of construction in the area covered by the wage determination.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .