N3943025R0015 -WFI OCONUS RFIs and Answers.docx
DOCX document 15 KB Posted
- Solicitation number
- N39430-25-R-0015
About this file
This document is a series of Request for Information (RFI) responses for solicitation N39430-25-R-0015, a Department of the Navy Naval Facilities Engineering Command contract for Architect-Engineer services for waterfront facilities inspection and assessment outside the continental United States, Hawaii, and Alaska. The RFIs clarify submission requirements for the Indefinite Delivery/Indefinite Quantity (IDIQ) contract, specifically addressing technical and administrative details such as equipment list submissions, key personnel commitment letters, electronic submission methods, and project experience requirements.
Key clarifications include that the equipment list and letters of commitment are not counted in the 50-page submission limit and can be attached to the SF-330, CPARS can be included as attachments, and project-specific experience must be from completed work within the past three years. For project experience, the government stipulates that only wholly severable and complete projects will be evaluated, and interim CPARS for completed tasking is acceptable. Electronic submissions should be via email, with a DoD SAFE link available if file size requires it.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3943025R0015 -WFI OCONUS RFI 1.docx | DOCX document | |
| Attachment 3 - WFI SAES Region OCONUS.pdf | ||
| Attachment 1 - SF330.pdf | ||
| WFI OCONUS SynopsisSolicitation_Final.pdf | ||
| Attachment 2 - NAVFAC PPQ Form.doc | DOC document | |
| Attachment 4 - QASP WFI Region OCONUS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N39430-25-R-0015 – WATERFRONT FACILITIES INSEPCTION AND ASSESSMENT, OCONUS
RFI #1
28 August 2025
1. PAGE 4 of 14. CRITERION 1. Specialized Experience. The Solicitation states: "Firms shall provide a list of this associated equipment, as well as indicating if they own or will be renting this equipment."
Please confirm that the list of equipment for waterfront inspections is NOT included in the 50-page limit for Part I, and may be included as an Attachment to the SF330. Additionally, is it EXWC's expectation that we provide an equipment list for our team, or that we provide a specific list of equipment utilized for each project presented in Section F?
Government Response:
The Equipment List is NOT included in the 50-page limit for Part I and may be included as an Attachment to the SF330. Provide equipment you intend to use on a routine WFI for this contract.
1. PAGE 6 of 14. CRITERION 2. Submission Requirements. The Solicitation states: "Firms that provide letters of commitment for their key personnel may be considered more favorably. "
Please confirm that EXWC expects a single letter of commitment from each firm on an Offeror's Team who is providing key personnel for the contract.
Government Response:
Confirmed. One page that captures all key personnel who will be supporting this contract.
1. PAGE 6 of 14. CRITERION 2. Submission Requirements. The Solicitation states: "Firms that provide letters of commitment for their key personnel may be considered more favorably. "
Please confirm that letters of commitment will NOT be included in the 50-page limit for Part I, and may be included as an Attachment to the SF330.
Government Response:
Confirmed. They will NOT be included in the 50-page limit for Part I, and may be included as an Attachment to the SF330.
1. PAGE 14 of 14. SF-330 SUBMISSION REQUIREMENTS. The Solicitation states: "submit one (1) electronic copy of the SF-330"
Please clarify the preferred method of electronic submission. Should firms submit their SF-330 via a DoD SAFE link, PIEE, or other electronic method?
Government Response:
PIEE will not be utilized for SF330 submittals. Firms shall submit their SF330 by email as detailed within the SynopsisSolicitation. If a firm requires a DoD SAFE submittal due to file size, they shall request a DoD SAFE link be provided prior to the due date.
5. PAGE 14 of 14. SF-330 SUBMISSION REQUIREMENTS. The Solicitation states: "the page limit does not include ISRs, certificates, PPQs…"
Please confirm that CPARS are also excluded from the 50-page limit of Part I and can be included as an Attachment to the SF330.
Government Response:
Confirmed. CPARS are also excluded from the 50-page limit of Part I and can be included as an Attachment to the SF330.
RFI #2
09 September 2025
6. For Criterion 1 – Specialized Experience, will a project meet the submission requirements if the project initial task order award is completed and has been evaluated but modifications to the task order for additional work are incomplete? If so, please confirm that interim CPARS evaluations that cover the initial task order period meet the submission requirements.
Government Response:
Incomplete projects submitted for specialized experience shall be evaluated if it is wholly severable and complete from the project. Incomplete experience will not be evaluated.
Interim CPARS for completed tasking/work is acceptable as it is technically a completed CPARS. But CPARS for ongoing work will not be accepted.
RFI #3
11 September 2025
7. Page 6 of 14. Criterion 2. Submission Requirements. The Solicitation states that project-specific experience for key personnel must be “within the past three (3) years’ (from the date of issuance of the Synopsis/Solicitation)”. Please confirm that resume project-specific experience within the past 3 years for ongoing projects will be scored equally to projects that have been completed within the same timeframe.
Government Response:
As long the experience has concluded, the project can be ongoing. If it has not concluded, but ongoing, then no – it won’t be considered.