BESS-Additional-SiteData-N3943020T2238 Amd 1.pdf

PDF 8 MB Posted

Attached to
Design and Procure a Battery Energy Storage System (BESS)
Solicitation number
N3943020T2238
Issued by

View the file

Other files

File Type Posted
N3943020T2238 BESS RFQ Amd 0003.pdf PDF
Generator Specs-Attachment-2.xlsx XLSX spreadsheet
MDP Photos-Attachment-1.pdf PDF
J-2_Financial_Inst_Bank_Information-Revised.docx DOCX document
N3943020T2238 BESS RFQ Amd 0002.pdf PDF
N3943020T2238 BESS RFQ Amendment 0001.pdf PDF
IMG_1804.pdf PDF
N3943020T2236 BESS RFQ.pdf PDF
IMG_1811.pdf PDF
PH-372 BCO Ventura ESS Node Site.pdf PDF
IMG_1812.pdf PDF
372B7Oct19MeterData.xlsx XLSX spreadsheet
J-2_Financial_Inst_Bank_Information.docx DOCX document
B372-Map.pdf PDF
J-3_Pricing Sheet.xlsx XLSX spreadsheet
J-1_Non-Disclosure.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BESS Project

• Incoming power supply

Primary transformer

Main service disconnect to Bldg. and Meter

Step down transformer to Bldg. (75KVA 208-480Y/277

"Approved for public release: distribution unlimited."

Transformer Data Plate that Feeds PH 372

Main service disconnect and Meter

Close up of Meter voltage supplying power to MDP Panel (Note: ATS and emergency generator is not connected to this panel)

Generator and ATS

"Approved for public release: distribution unlimited."

Generator Data Plate

125 Amp ATS

• This panel is connected to the

ATS

• There is no disconnect or main breaker (Main breaker is located upstream, 200 Amp service disconnect)

• Panel supplies power to two sub panels-NMCI panel that has two 20 amp Single pole breakers and a DC panel that has a 100 amp main breaker

• Service connections are supplied on power bus bar and connected to both sub panels

• Pictures attached for reference

• Grid power is supplied to ATS and is connected to panel. Panel supplies power to sub panels from main lugs

• Two Air Conditioning systems are powered from this panel Circuit breaker 1,3,5- 3 pole 30amp Circuit breaker 7,9,11- 3 pole 40 amp

• MDP panel has a 200 Amp service breaker that supplies power to this panel (200 amp panel is upstream)

Incoming power (Grid) supplied from ATS and connected to two sub panels

• Direct Current 100Amp panel, (services UPS system)

DC Service panel

100Amp DC Panel

Sub Panel Qty 2-2 pole 20 amp sub panel (supplies power to computer systems)

Direct Current UPS System

UPS Battery’s

• Older wall mounted AC unit 3 pole 40 amp breaker.

Data Plate for Pad mounted Air Conditioning -208v 3 pole 30 amp breaker

"Approved for public release:

distribution unlimited."

NMCI 2

pole 20 A

Communication panel backed up from Generator

DC panel to UPS system125A ATSG

Main Dist. MDP 200Amp

208/120v 3PH 4W

XFMR to

BLDG

208/120v

3PH 4W

Meters

POLE

Connection Diagram

Disclaimer: Accuracy of Information is not guaranteed. Contractors shall verify the accuracy.

BESS Project
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Generator Data Plate
125 Amp ATS
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Direct Current UPS System
UPS Battery’s
Slide Number 15
Slide Number 16
Slide Number 17

File details come from the government source that posted it. Updated .