Attachment_J-7_Safety_Data_Sheet_-_Safety_Narrative.docx

DOCX document 42 KB Posted

Attached to
Synopsis of Enterprise Computer and Information Technology Support Services (ECITS) Federal contract opportunity
Solicitation number
N3943019R2126
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains a safety data sheet template for a federal contract opportunity. The template requires offerors to provide safety information including experience modification rates, days away from work or job transfer rates, and total recordable case rates for the past three years, as well as explanations for any extenuating circumstances or trends. Offerors must also describe their plan for evaluating safety performance of potential subcontractors, the safety management system for overseeing subcontractor work, any innovative safety monitoring methods, and their methodology for executing an effective mishap prevention program. The related federal contract opportunity is for enterprise computer and information technology support services issued by the Department of the Navy Naval Facilities Engineering Command under solicitation number N3943019R2126.

Attachment_J-7_Safety_Data_Sheet_-_Safety_Narrative.docx

View the file

Other files for this federal contract opportunity

Other files attached to Synopsis of Enterprise Computer and Information Technology Support Services (ECITS), newest first.
File Type Posted
N3943019R2126-0009.pdf PDF
N3943019R2126-0008.pdf PDF
N3943019R2126_0001-0008_(Conformed_Copy).pdf PDF
N3943019R2126_0001-0007_(Conformed_Copy).pdf PDF
N3943019R2126-0007.pdf PDF
N3943019R2126_0001-0006_(Conformed_Copy).pdf PDF
N3943019R2126-0006.pdf PDF
N3943019R2126-0005.pdf PDF
Attachment_J-1_Schedule_of_IDIQ_Price.xlsx XLSX spreadsheet
Attachment_J-1_Schedule_of_IDIQ_Price.xlsx XLSX spreadsheet
CDRLS.zip ZIP file
N3943019R2126-0004.pdf PDF
N3943019R2126-0003.pdf PDF
N3943019R2126-0002.pdf PDF
N3943019R2126-0001.pdf PDF
ECITS_ATTACHMENTS.zip ZIP file
N3943019R2126.pdf PDF
N3943019R2126_ECITS_Pre-Solicitation_Notice.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-7

SAFETY DATA SHEET / SAFETY NARRATIVE

This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART, and TRC rates shall not be submitted for subcontractors.

Joint Venture (JV) or Partnership: Complete Blocks 1 through 6 for each contractor who is part of the JV or partnership. Only one safety narrative (Block 9) is required.

1. Offeror Name:

Name of JV partner providing the information below (if applicable):

Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:

Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.

2. Experience Modification Rate (EMR):
2016
2017
2018

3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:

3b. Explain any upward or downward EMR trends:

3c. If you do not have an EMR for a given year, state so here and explain why:

4. Insurance Carrier Information:

Insurance Carrier Name:

Agent’s name:
Phone No.:
Email:
5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
2016
2017
2018

Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.

6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:

6b. Explain any upward or downward DART Rate trends:

6c. If you do not have a DART Rate for a given year, state so here and explain why:

ATTACHMENT J-7 (continuation)

SAFETY NARRATIVE

7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate
2015
2016
2017

Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.

8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:

8b. Explain any upward or downward TRC Rate trends:

8c. If you do not have a TRC Rate for a given year, state so here and explain why:

9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:

Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:

ATTACHMENT J-7 (continuation)

SAFETY NARRATIVE

9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.

Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels:

Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps:

Note: Form may be expanded up to the page limit specified in the RFP.

Attachment J-7 – Safety Factor Form, Page 1 of 3

Attachment J-7 – Safety Factor Form, Page 2 of 3

File details come from the government source that posted it. Updated .